Building engineering construction monitoring equipment

By setting up timer switches, booster water pumps and oblique nozzles in construction monitoring equipment, the timing cleaning of the monitoring probe is achieved, the unclear image quality and monitoring blind spots caused by dust accumulation are solved, and the equipment is improved Practicality.

CN222306633UActive Publication Date: 2025-01-07ZHONGKONG FUTURE INTELLIGENT TECH JIANGSU CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421051435.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-15
Publication Date
2025-01-07
Estimated Expiration
2034-05-15

AI Technical Summary

Technical Problem

When using construction monitoring equipment for construction projects, due to the heavy dust on the construction site, a lot of dust is easily accumulated on the lens, resulting in unclear shooting quality and monitoring blind spots, which brings inconvenience to users.

Method used

A monitoring device including equipment rack, monitoring probe, water tank, oblique nozzle, booster water pump and timing switch is designed. The electric push rod and booster water pump are controlled through the timing switch, and the monitoring probe is flushed by the timing switch. , keep the surface clean.

Benefits of technology

It effectively reduces the occurrence of monitoring blind spots, improves the practicality of the equipment, meets the user's usage needs, and maintains the clean state of the monitoring probe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222306633U_ABST
    Figure CN222306633U_ABST
Patent Text Reader

Abstract

The utility model discloses building engineering construction monitoring equipment which comprises an equipment rack, a monitoring probe is arranged in the equipment rack, a notch is formed in the bottom of the monitoring probe, a fixing block is fixedly arranged in the notch, a cavity is formed in the fixing block, and the monitoring probe is arranged in the cavity. A water tank is fixedly arranged at the position, close to the top, of the rear surface in the fixing block, a cover plate is movably arranged at the front end of the water tank, three inclined spraying pipes are fixedly arranged on the rear surface of the cover plate, and a booster water pump communicates with the position, close to the bottom, of the front surface of the water tank. According to the building engineering construction monitoring equipment, by arranging a timing switch, a booster water pump, an inclined spray pipe and a water tank, when the equipment is used, a monitoring probe can be cleaned regularly, the surface cleanliness of the monitoring probe is kept, the situation of monitoring dead corners is reduced, convenience is brought to a user, the practicability of the equipment is improved, and the equipment is worthy of popularization. And the use requirements of users are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building engineering, in particular to a building engineering construction monitoring device. Background Art

[0002] Construction projects are part of construction projects, and refer to engineering entities formed through the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment, including factories, theaters, hotels, shops, schools, hospitals, and residences, etc., to meet people's needs for production, residence, study, public activities, etc. In construction projects, monitoring equipment is usually installed around the construction environment to conduct security monitoring of the construction environment.

[0003] However, when the monitoring equipment is in use, it is necessary to regularly process the dust on the lens. However, due to the high dust content at the construction site, a large amount of dust will quickly accumulate on the lens, resulting in unclear image quality and blind spots in monitoring, which brings inconvenience to users and can no longer meet the users' needs. Utility Model Content

[0004] The purpose of the utility model is to provide a construction project monitoring device to solve the problem that the monitoring device proposed in the above background technology can regularly process the dust on the lens when in use. Since the dust on the construction site is relatively large, a large amount of dust will soon accumulate on the lens, resulting in unclear picture quality and blind spots in monitoring, which brings inconvenience to users and can no longer meet the users' needs.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering construction monitoring device, comprising an equipment frame, a monitoring probe is arranged inside the equipment frame, a notch is provided at the bottom of the monitoring probe, and a fixing block is fixedly arranged inside the notch, a cavity is provided inside the fixing block, a water tank is fixedly arranged at a top position on the rear surface of the fixing block, a cover plate is movably provided at the front end of the water tank, three oblique nozzles are fixedly arranged on the rear surface of the cover plate, and a booster water pump is connected to a bottom position on the front surface of the water tank.

[0006] Furthermore, a monitoring base is fixedly arranged on the top of the monitoring rack.

[0007] Furthermore, an external rainwater pipe is fixedly provided at the rear end of the water tank, and the rear end of the external rainwater pipe passes through the fixing block and extends to the outside thereof.

[0008] Furthermore, the rear end of the oblique nozzle extends to the interior of the fixed block, and the top end of the oblique nozzle is connected to a pressurized nozzle.

[0009] Furthermore, a water suction port at the rear end of the booster water pump is connected to a water suction pipe, and the rear end of the water suction pipe is connected to a water tank.

[0010] Furthermore, the water outlet at the front end of the booster water pump is connected to a water outlet pipe, and the front end of the water outlet pipe is connected to the oblique nozzle.

[0011] Furthermore, an electric push rod is fixedly arranged at a bottom position of the rear surface of the fixing block, and an output end of the electric push rod arranged at the front end penetrates the fixing block and is fixedly connected to the cover plate.

[0012] Furthermore, two timing switches are fixedly provided at the front end position of the top of the fixed block, and the timing switches are connected to the electric push rod and the booster water pump through power lines.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] The construction project monitoring equipment is provided with a timing switch, a booster water pump, an inclined nozzle and a water tank, so that when the device is in use, the monitoring probe can be cleaned regularly to maintain the cleanliness of the surface of the monitoring probe, reduce the occurrence of monitoring blind spots, bring convenience to the user, improve the practicability of the device, and meet the user's usage needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the structure of the utility model;

[0016] Figure 2 It is a side cross-sectional view of the fixing block of the utility model;

[0017] Figure 3 It is a side view of the cover plate and the oblique nozzle of the utility model;

[0018] Figure 4 for Figure 2 A partial enlarged schematic diagram of B in the figure.

[0019] In the figure: 1. Frame; 2. Monitoring probe; 3. Fixing block; 4. Water tank; 5. Cover plate; 6. Oblique nozzle; 7. Booster water pump; 8. Monitoring base; 9. External rainwater pipe; 10. Electric push rod; 11. Timer switch. DETAILED DESCRIPTION

[0020] The utility model is further described in detail below with reference to the accompanying drawings and through specific embodiments. The following embodiments are merely illustrative and not limiting of the protection scope of the utility model.

[0021] See also Figure 1-4The utility model provides a technical solution: a construction engineering monitoring device, including an equipment frame 1, the equipment frame 1 is used to install corresponding monitoring equipment, a monitoring probe 2 is arranged inside the equipment frame 1, the monitoring probe 2 can play a monitoring role, a notch is opened at the bottom of the monitoring probe 2, and a fixing block 3 is fixedly arranged inside the notch, the fixing block 3 is used to set corresponding components, a cavity is opened inside the fixing block 3, a water tank 4 is fixedly arranged at the top position of the rear surface of the fixing block 3, the water tank 4 is used to store clean water, a cover plate 5 is movably arranged at the front end of the water tank 4, the cover plate 5 is used to set an oblique nozzle 6, three oblique nozzles 6 are fixedly arranged on the rear surface of the cover plate 5, the oblique nozzle 6 is used to spray water, and a booster water pump 7 is connected to the bottom position of the front surface of the water tank 4, and the booster water pump 7 plays the role of pumping water and boosting pressure.

[0022] Furthermore, a monitoring base 8 is fixedly provided on the top of the monitoring frame 1, wherein the monitoring base 8 is convenient for installing the device.

[0023] Furthermore, an external rainwater pipe 9 is fixedly provided at the rear end of the water tank 4 , and the rear end of the external rainwater pipe 9 passes through the fixed block 3 and extends to the outside thereof, wherein the external rainwater pipe 9 can receive rainwater to replenish the water source in the water tank 4 .

[0024] Furthermore, the rear end of the oblique nozzle 6 extends to the interior of the fixed block 3, and the top end of the oblique nozzle 6 is connected to a pressurizing nozzle, wherein the pressurizing nozzle can play a role of pressurization.

[0025] Furthermore, the water suction port opened at the rear end of the booster water pump 7 is connected to the water suction pipe, and the rear end of the water suction pipe is connected to the water tank 4, wherein the water suction pipe plays a role of absorbing water.

[0026] Furthermore, the water outlet at the front end of the booster water pump 7 is connected to a water outlet pipe, and the front end of the water outlet pipe is connected to the oblique nozzle 6, wherein the water outlet pipe plays a role of discharging water.

[0027] Furthermore, an electric push rod 10 is fixedly provided at the bottom position of the rear surface of the fixed block 3. The output end of the electric push rod 10 is located at the front end and passes through the fixed block 3 and is fixedly connected to the cover plate 5. The electric push rod 10 can drive the cover plate 5 to move.

[0028] Furthermore, two timing switches 11 are fixedly provided at the front end position of the top of the fixed block 3, and the timing switches 11 are connected to the electric push rod 10 and the booster water pump 7 through power lines, respectively, wherein the timing switches 11 can start the device to work at a fixed time.

[0029] Working principle: When using this device, the user first adjusts the cycle start time of the two timing switches 11, and the time difference between the front and back of the timing switches 11 is ten seconds. Among them, the timing switch 11 that controls the electric push rod 10 is started first. When the timing switch 11 runs to start the electric push rod 10, the output end of the electric push rod 10 will extend to push the cover plate 5 to move. The movement of the cover plate 5 will drive the oblique nozzle 6 set thereon to move out. Then, the timing switch 11 that controls the booster water pump 7 is started, so that the booster water pump 7 pumps water to supply water to the oblique nozzle 6, so that the water flow is sprayed out to flush the monitoring probe 2.

[0030] According to the above working process, we can know:

[0031] The construction project monitoring equipment is provided with a timing switch 11, a booster pump 7, an inclined nozzle 6 and a water tank 4, so that when the device is in use, the monitoring probe 2 can be cleaned regularly to maintain the cleanliness of the surface of the monitoring probe 2, reduce the occurrence of monitoring blind spots, bring convenience to the user, improve the practicability of the device, and meet the user's usage needs.

[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction project monitoring device, comprising a device frame (1), characterized in that: A monitoring probe (2) is arranged inside the equipment frame (1), a notch is provided at the bottom of the monitoring probe (2), a fixing block (3) is fixedly arranged inside the notch, a cavity is provided inside the fixing block (3), a water tank (4) is fixedly arranged at a top position on the inner rear surface of the fixing block (3), a cover plate (5) is movably arranged at the front end of the water tank (4), three oblique nozzles (6) are fixedly arranged on the rear surface of the cover plate (5), and a booster water pump (7) is connected to a bottom position on the front surface of the water tank (4).

2. A construction engineering construction monitoring device according to claim 1, characterized in that: A monitoring base (8) is fixedly arranged on the top of the equipment frame (1).

3. A construction engineering construction monitoring device according to claim 1, characterized in that: An external rainwater pipe (9) is fixedly provided at the rear end of the water tank (4), and the rear end of the external rainwater pipe (9) penetrates the fixing block (3) and extends to the outside thereof.

4. A construction engineering construction monitoring device according to claim 1, characterized in that: The rear end of the oblique nozzle (6) extends to the interior of the fixed block (3), and the top end of the oblique nozzle (6) is connected to a pressurized nozzle.

5. A construction engineering construction monitoring device according to claim 1, characterized in that: The water suction port of the booster water pump (7) is located at the rear end and is connected to a water suction pipe, and the rear end of the water suction pipe is connected to the water tank (4).

6. A construction engineering construction monitoring device according to claim 1, characterized in that: The water outlet of the booster water pump (7) at the front end is connected to a water outlet pipe, and the front end of the water outlet pipe is connected to the oblique spray pipe (6).

7. A construction engineering construction monitoring device according to claim 1, characterized in that: An electric push rod (10) is fixedly arranged at a bottom position on the rear surface of the fixing block (3); the output end of the electric push rod (10) arranged at the front end penetrates the fixing block (3) and is fixedly connected to the cover plate (5).

8. The construction monitoring device according to claim 1, characterized in that: Two timing switches (11) are fixedly arranged at the front end of the top of the fixed block (3), and the timing switches (11) are connected to the electric push rod (10) and the booster water pump (7) through power lines.