Environment-friendly smelting furnace flue gas treatment device for aluminum plate production
By introducing the design of servo motors and scrapers into the flue gas treatment device of the environmentally friendly smelting furnace for aluminum plate production, the impurities on the filter net are automatically cleaned, and the problem of poor wastewater recycling caused by the filter net blockage in the prior art is solved, and water conservation is achieved Resources and effects to improve device practicality.
Patent Information
- Application Number
- CN202323451038.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2025-01-10
- Estimated Expiration
- 2033-12-18
AI Technical Summary
The existing environmentally friendly smelting furnace flue gas treatment device for aluminum plate production requires manual disassembly and cleaning after the filter net is blocked, which is time-consuming and labor-intensive, and increases the manufacturing cost and power consumption of the device, affecting the efficiency of wastewater recycling.
A device including a treatment box and a circulation box is designed, and the drive shaft and scraper are driven by a servo motor to automatically clean impurities on the filter net, avoiding the increase of additional power cleaning mechanisms and ensuring smooth wastewater recycling.
It realizes automatic prevention and cleaning of filter net without adding additional power cleaning mechanisms, ensuring smooth wastewater recycling, saving water resources, and improving the practicality of the device.
Smart Images

Figure CN222324657U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of flue gas treatment, in particular to an environmentally friendly smelting furnace flue gas treatment device for aluminum plate production. Background Art
[0002] Aluminum plate refers to a rectangular plate made by rolling aluminum ingots, which is divided into pure aluminum plate, alloy aluminum plate, thin aluminum plate, medium and thick aluminum plate, and patterned aluminum plate. Therefore, before producing aluminum plate, a smelting furnace is required to produce and process the aluminum ingots for further processing. In the process of using the smelting furnace, it is inevitable that a certain amount of high-temperature harmful flue gas will be generated. Direct emission will cause pollution to the atmospheric environment. Therefore, a flue gas treatment and purification device is needed to treat this part of the flue gas.
[0003] The prior art discloses a flue gas treatment device for an environmentally friendly smelting furnace for aluminum plate production with a publication number of CN218924188U, comprising a treatment box, a stirring assembly is provided at the bottom of the inner cavity of the treatment box, a partition is fixedly connected to both sides of the inner cavity of the treatment box, an outlet valve is provided in the inner cavity of the partition, and a moisture absorption plate is fixedly connected to both sides of the inner cavity of the treatment box. The utility model cools the exhaust gas entering the treatment box through an atomizing pipe, and at the same time, the setting of the stirring assembly can stir the inside, increase the contact area between the flue gas and the spray, and realize rapid cooling treatment of the flue gas. At the same time, the water mist can treat the impurities dissolved in water in the exhaust gas, and the wastewater is pumped into the circulation box through a circulation pipe and a circulation pump, and is processed by a filter net for later reuse. Then the outlet valve is started to discharge the cooled exhaust gas upward, first through the moisture absorption plate for dehumidification, then through the filter plate for purification, and finally discharged.
[0004] During use, the above-mentioned utility model utilizes a filter to filter out impurities in the wastewater, thereby realizing the recycling of the cooling wastewater. However, after the filter has filtered out impurities in the wastewater for a period of time, the impurities will adhere to and clog the filter, resulting in poor wastewater recycling. Manual regular disassembly and cleaning of the filter is time-consuming and labor-intensive, and the addition of an electric cleaning mechanism will increase the manufacturing cost and power consumption of the device. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the shortcomings of the prior art, the utility model provides an environmentally friendly smelting furnace flue gas treatment device for aluminum plate production, which can automatically complete the anti-blocking cleaning of the filter without adding an additional electric cleaning mechanism, thereby ensuring the smooth circulation and recycling of wastewater, saving water resources, and being more practical, thereby solving the problems in the above-mentioned background technology.
[0007] (II) Technical solution
[0008] In order to achieve the above-mentioned advantages of being able to automatically complete the anti-blocking cleaning of the filter without adding an additional electric cleaning mechanism, ensuring the smooth recycling of wastewater, saving water resources, and being more practical, the specific technical scheme adopted by the utility model is as follows: an environmentally friendly smelting furnace flue gas treatment device for aluminum plate production, comprising a treatment box and a circulation box, a servo motor is fixedly installed on one side of the treatment box, and a transmission shaft is connected to the output end of the servo motor, and a plurality of stirring rods are evenly installed on the transmission shaft located in the inner cavity of the treatment box, a filter is fixedly installed in the inner cavity of the circulation box, and the transmission The axis is located in the inner cavity of the circulation box and is fixedly installed with a mounting frame, and scrapers are symmetrically fixed and welded at both ends of the mounting frame, and the scrapers are in contact with the bottom surface of the filter screen, one end of the branch pipe is connected to the center of the top surface of the circulation box, and the other end of the branch pipe is connected to a connecting pipe, and one side of the connecting pipe is connected to a number of atomizing pipes, a pressure pump is installed on the branch pipe, the atomizing pipe is located in the inner cavity of the treatment box and is evenly installed with a number of atomizing nozzles, one end of the circulation pipe is connected to the center of the bottom inner cavity of the treatment box, and the other end of the circulation pipe is connected to the inner cavity of the circulation box, and a circulation pump is installed on the circulation pipe.
[0009] Furthermore, a first partition is fixedly installed in the inner cavity of the processing box, and a plurality of one-way valves are evenly fixedly installed on the first partition, a second partition fixedly installed on the inner wall of the processing box is provided above the first partition, a third partition is fixedly installed between the bottom ends of both sides of the second partition and the inner wall of the processing box, and a connecting pipe is fixedly installed in the center of the third partition, and an electromagnetic valve is installed on the connecting pipe, a sealing cover is symmetrically connected and installed on the top surface of the processing box through a hinge, and an exhaust pipe is fixedly installed in the center of the sealing cover, first placement seats are fixedly installed on both sides of the second partition and on the inner wall of the processing box, and a moisture absorption plate is placed and installed on the first placement seat, second placement seats are fixedly installed on both sides of the second partition and on the inner wall of the processing box, and a desulfurization catalyst layer, a carbon monoxide catalyst layer and an activated carbon adsorption layer are placed and installed on the second placement seat in sequence.
[0010] Furthermore, a sealing groove is provided on the top surface of the second partition plate, and sealing strips are fixedly installed on the bottom surfaces of the two sealing covers, and the sealing strips are embedded in the sealing groove.
[0011] Furthermore, a side wall of one side of the processing box is connected to an air inlet pipe located below the first partition.
[0012] Furthermore, a dirt collecting hopper is fixedly installed on the bottom surface of the circulation box, and the bottom end of the dirt collecting hopper is connected to a sewage pipe that passes through the bottom surface of the circulation box.
[0013] Furthermore, a control panel is installed on the side wall of the processing box, and the control panel is electrically connected to the servo motor, the pressure pump, the circulation pump and the solenoid valve.
[0014] Furthermore, support frames are fixedly welded to the bottom surfaces of the processing box and the circulation box.
[0015] (III) Beneficial effects
[0016] Compared with the prior art, the utility model provides an environmentally friendly smelting furnace fume treatment device for aluminum plate production, which has the following beneficial effects:
[0017] (1) The utility model is provided with a treatment box, a circulation box and a scraper. When in use, the flue gas generated by the environmentally friendly smelting furnace for aluminum plate production is introduced into the inner cavity of the treatment box through the air inlet pipe. At this time, the worker starts the pressure pump installed on the branch pipe to pump the cooling water in the circulation box into the connecting pipe through the branch pipe, and then the cooling water is evenly distributed to the inner cavities of several atomizing tubes installed in the inner cavity of the treatment box through the connecting pipe. Several atomizing nozzles are installed on the bottom surface of the atomizing tube, so that the cooling water can be atomized and sprayed out, so that it can fully contact with the flue gas, cool down and reduce dust on the flue gas, and preliminarily absorb soluble harmful substances in the flue gas. At the same time, the user starts the servo motor installed on one side of the treatment box to drive the transmission shaft to rotate, and uses several stirring rods evenly installed on the transmission shaft to accelerate the contact efficiency and contact area between the flue gas and the atomized water, thereby further improving the flue gas treatment effect. The wastewater generated by dust reduction and cooling of the flue gas falls to the bottom of the treatment box. At this time, the circulation pump installed on the circulation pipe is started to pump this part of the wastewater back into the circulation pipe. In the inner cavity of the ring box, a filter is fixedly installed in the inner cavity of the circulation box. Waste water needs to be filtered through the filter before it can enter the branch pipe for recycling again. The filter can filter out impurity particles in the waste water, and the filtered impurity particles will adhere to and clog the bottom of the filter. Because the transmission shaft is located in the inner cavity of the circulation box, a mounting frame is fixedly installed, and scrapers are symmetrically fixedly installed at both ends of the mounting frame, and the scrapers are in contact with the bottom of the filter. Therefore, when the transmission shaft drives the mounting frame to rotate together with the scraper, the rotating scraper can be used to scrape off impurities attached to and clogged on the bottom of the filter. The cleaned impurities fall into the sewage collecting hopper fixedly installed on the bottom of the circulation box for sedimentation. When they accumulate to a certain extent, the user opens the sewage pipe to discharge the collected impurity sludge, thereby enabling an environmentally friendly smelting furnace flue gas treatment device for aluminum plate production to automatically complete the anti-blocking cleaning of the filter without adding additional power cleaning mechanisms, thereby ensuring the smooth recycling of wastewater, saving water resources, and being more practical.
[0018] (2) The utility model is provided with a first partition, a second partition, a third partition and a sealing cover. The first partition is fixedly installed in the inner cavity of the processing box, and a plurality of one-way valves are evenly fixedly installed on the first partition. The flue gas that is fully in contact with the cooling water can enter the enclosed space formed by the first partition, the second partition and the third partition through the one-way valve. The two third partitions are fixedly installed with connecting pipes in the center of the bottom surface, and the connecting pipes are installed with electromagnetic valves. At this time, the worker opens the electromagnetic valve on one side to allow the cooled flue gas to enter the enclosed space formed by the second partition and the third partition on one side. The first placement seat fixedly installed in the space is installed with a moisture absorption plate, which can dehumidify and dry the water vapor in the flue gas. The second placement seat is fixedly installed in the space, and the desulfurization catalyst layer, an oxygen gas layer and the like are placed on the second placement seat in sequence. The carbon monoxide catalyst layer and the activated carbon adsorption layer can absorb and treat the toxic and harmful components in the flue gas, and finally the purified flue gas is discharged through the exhaust pipe installed on the sealing cover. When the desiccant plate, desulfurization catalyst layer, carbon monoxide catalyst layer and activated carbon adsorption layer need to be replaced, the user can close the solenoid valve on the connecting pipe on this side and open the solenoid valve on the connecting pipe on the other side, and then open the sealing cover installed on the top surface of the treatment box through the hinge to take out and replace the desiccant plate, desulfurization catalyst layer, carbon monoxide catalyst layer and activated carbon adsorption layer, so that the fume treatment device of an environmentally friendly smelting furnace for aluminum plate production can quickly replace the desiccant plate, desulfurization catalyst layer, carbon monoxide catalyst layer and activated carbon adsorption layer without stopping the machine, which is simple and convenient to operate and improves its flue gas treatment efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 It is a structural schematic diagram of an environmentally friendly smelting furnace fume treatment device for aluminum plate production according to an embodiment of the utility model;
[0021] Figure 2 According to the embodiment of the utility model Figure 1 A magnified image of point A;
[0022] Figure 3 According to the embodiment of the utility model Figure 1 A magnified view of point B;
[0023] Figure 4 According to the embodiment of the utility model Figure 1 Enlarged view of point C;
[0024] Figure 5 It is a stereoscopic diagram of a filter screen and a scraper of an environmentally friendly smelting furnace fume treatment device for aluminum plate production according to an embodiment of the utility model.
[0025] In the figure:
[0026] 1. Treatment box; 2. Inlet pipe; 3. Servo motor; 4. Drive shaft; 5. Agitator rod; 6. Circulation pipe; 7. Circulation pump; 8. Support frame; 9. Drain pipe; 10. Sewage collecting hopper; 11. Circulation box; 12. Filter screen; 13. Atomizing nozzle; 14. Atomizing pipe; 15. Hinge; 16. Exhaust pipe; 17. Sealing cover; 18. Mounting frame; 19. Scraper; 20. Branch pipe; 21. Pressure pump; 22. Connecting pipe; 23. First partition; 24. One-way valve; 25. Connecting pipe; 26. Solenoid valve; 27. Third partition; 28. Second partition; 29. First placement seat; 30. Moisture absorption plate; 31. Second placement seat; 32. Desulfurization catalyst layer; 33. Carbon monoxide catalyst layer; 34. Activated carbon adsorption layer; 35. Sealing groove; 36. Sealing strip. DETAILED DESCRIPTION
[0027] To further illustrate each embodiment, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments. They can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in the field should be able to understand other possible implementation methods and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.
[0028] According to an embodiment of the utility model, a fume treatment device for an environmentally friendly smelting furnace used in the production of aluminum plates is provided.
[0029] The present invention is now further described in conjunction with the accompanying drawings and specific implementation methods. Figure 1-5As shown, according to an embodiment of the utility model, an environmentally friendly smelting furnace fume treatment device for aluminum plate production includes a treatment box 1 and a circulation box 11, a servo motor 3 is fixedly installed on one side of the treatment box 1, and a transmission shaft 4 is connected to the output end of the servo motor 3, and the transmission shaft 4 is located in the inner cavity of the treatment box 1 and a plurality of stirring rods 5 are evenly installed, a filter screen 12 is fixedly installed in the inner cavity of the circulation box 11, a mounting frame 18 is fixedly installed on the transmission shaft 4 located in the inner cavity of the circulation box 11, and scrapers 19 are symmetrically fixedly welded at both ends of the mounting frame 18, and the scraper 19 is in contact with the bottom surface of the filter screen 12, and one end of the branch pipe 20 is connected to the center of the top surface of the circulation box 11, and the branch pipe 20 The other end is connected to a connecting pipe 22, and one side of the connecting pipe 22 is connected to a plurality of atomizing pipes 14. A pressure pump 21 is installed on the branch pipe 20. The atomizing pipe 14 is located in the inner cavity of the treatment box 1 and a plurality of atomizing nozzles 13 are evenly installed thereon. One end of the circulation pipe 6 is connected to the center of the bottom of the inner cavity of the treatment box 1, and the other end of the circulation pipe 6 is connected to the inner cavity of the circulation box 11, and a circulation pump 7 is installed on the circulation pipe 6, which enables an environmentally friendly smelting furnace fume treatment device for aluminum plate production to automatically complete the anti-blocking cleaning of the filter screen 12 without adding an additional electric cleaning mechanism, thereby ensuring the smooth recycling of wastewater, saving water resources, and being more practical.
[0030] In one embodiment, a first partition 23 is fixedly installed in the inner cavity of the processing box 1, and a plurality of one-way valves 24 are evenly fixedly installed on the first partition 23. A second partition 28 is fixedly installed on the inner wall of the processing box 1 above the first partition 23. A third partition 27 is fixedly installed between the bottom ends of both sides of the second partition 28 and the inner wall of the processing box 1, and a connecting pipe 25 is fixedly installed in the center of the third partition 27, and a solenoid valve 26 is installed on the connecting pipe 25. A sealing cover 17 is symmetrically connected to the top surface of the processing box 1 through a hinge 15, and an exhaust pipe 16 is fixedly installed in the center of the sealing cover 17. Both sides of the second partition 28 are connected to the processing box 1. A first placement seat 29 is fixedly installed on the inner wall, and a desiccant plate 30 is placed on the first placement seat 29. Second placement seats 31 are fixedly installed on both sides of the second partition plate 28 and on the inner wall of the processing box 1, and a desulfurization catalyst layer 32, a carbon monoxide catalyst layer 33 and an activated carbon adsorption layer 34 are placed on the second placement seat 31 in sequence. This enables an environmentally friendly smelting furnace flue gas treatment device for aluminum plate production to quickly replace the desiccant plate 30, the desulfurization catalyst layer 32, the carbon monoxide catalyst layer 33 and the activated carbon adsorption layer 34 without stopping the machine. The operation is simple and convenient, and its flue gas treatment efficiency is improved.
[0031] In one embodiment, a sealing groove 35 is formed on the top surface of the second partition plate 28 , and sealing strips 36 are fixedly installed on the bottom surfaces of the two sealing covers 17 , and the sealing strips 36 are embedded in the sealing groove 35 , thereby ensuring the sealing performance of the sealing covers 17 when they are closed.
[0032] In one embodiment, a side wall of the processing box 1 is connected to an air intake pipe 2 located below the first partition 23, which serves to guide the flue gas generated by the environmentally friendly smelting furnace for aluminum plate production into the inner cavity of the processing box 1 through the air intake pipe 2.
[0033] In one embodiment, a dirt collecting hopper 10 is fixedly installed on the bottom surface of the circulation box 11, and the bottom end of the dirt collecting hopper 10 is connected to a sewage pipe 9 that passes through the bottom surface of the circulation box 11, so that the cleaned impurities fall into the dirt collecting hopper 10 fixedly installed on the bottom surface of the circulation box 11 for sedimentation. When a certain level of accumulation occurs, the user opens the sewage pipe 9 to discharge the collected impurity sludge.
[0034] In one embodiment, a control panel is installed on the side wall of the processing box 1, and the control panel is electrically connected to the servo motor 3, the booster pump 21, the circulation pump 7 and the solenoid valve 26, so as to control the normal operation of the device.
[0035] In one embodiment, a support frame 8 is fixedly welded to the bottom surface of the processing box 1 and the circulation box 11 to provide a fixed support.
[0036] Working principle: The utility model is provided with a processing box 1, a circulation box 11 and a scraper 19. When in use, the flue gas generated by the environmentally friendly smelting furnace for aluminum plate production is introduced into the inner cavity of the processing box 1 through the air inlet pipe 2. At this time, the worker starts the pressure pump 21 installed on the branch pipe 20 to pump the cooling water in the circulation box 11 into the connecting pipe 22 through the branch pipe 20, and then the cooling water is evenly distributed to the inner cavities of several atomizing pipes 14 installed in the inner cavity of the processing box 1 through the connecting pipe 22. Several atomizing nozzles 13 are installed on the bottom surface of the atomizing pipe 14, so that the cooling water can be atomized and sprayed out, so that it can fully contact with the flue gas, cool down and reduce dust on the flue gas, and preliminarily absorb soluble harmful substances in the flue gas. At the same time, the user starts the servo motor 3 installed on one side of the processing box 1 to drive the transmission The shaft 4 rotates, and a number of stirring rods 5 evenly installed on the transmission shaft 4 are used to accelerate the contact efficiency and contact area between the flue gas and the atomized water, thereby further improving the flue gas treatment effect. The wastewater generated by the dust reduction and cooling of the flue gas falls on the bottom of the treatment box 1. At this time, the circulation pump 7 installed on the circulation pipe 6 is started to pump this part of the wastewater back into the inner cavity of the circulation box 11. The inner cavity of the circulation box 11 is fixedly installed with a filter screen 12. The wastewater needs to be filtered through the filter screen 12 before it can enter the branch pipe 20 for recycling again. The filter screen 12 can filter and remove impurity particles in the wastewater. The filtered impurity particles will adhere to and clog the bottom surface of the filter screen 12. Because the transmission shaft 4 is located in the inner cavity of the circulation box 11, a mounting frame 18 is fixedly installed, and scrapers are symmetrically fixedly installed at both ends of the mounting frame 18. 19, and the scraper 19 is in contact with the bottom surface of the filter 12, so when the transmission shaft 4 drives the mounting frame 18 to rotate together with the scraper 19, the rotating scraper 19 can scrape off the impurities attached and blocked on the bottom surface of the filter 12, and the cleaned impurities fall into the dirt collecting hopper 10 fixedly installed on the bottom surface of the circulation box 11 for precipitation. When accumulated to a certain extent, the user opens the sewage pipe 9 to discharge the collected impurity sludge, so that an environmentally friendly smelting furnace flue gas treatment device for aluminum plate production can automatically complete the anti-blocking cleaning of the filter 12 without adding additional electric cleaning mechanism, ensure the smooth recycling of wastewater, save water resources, and be more practical. In addition, the utility model is provided with a first partition 23, a second partition 28, a third partition 27 and a seal The cover 17 is provided, and a first partition 23 is fixedly installed in the inner cavity of the processing box 1, and a plurality of one-way valves 24 are evenly fixedly installed on the first partition 23. The flue gas that is fully in contact with the cooling water can enter the closed space formed by the first partition 23, the second partition 28 and the third partition 27 through the one-way valve 24. A connecting pipe 25 is fixedly installed in the center of the bottom surface of the two third partitions 27, and a solenoid valve 26 is installed on the connecting pipe 25. At this time, the worker opens the solenoid valve 26 on one side, so that the cooled flue gas enters the closed space formed by the second partition 28 and the third partition 27 on one side. A desiccant plate 30 is installed on the first placement seat 29 fixedly installed in the space, which can dehumidify and dry the water vapor in the flue gas. A second placement seat 31 is fixedly installed in the space.The second placement seat 31 is sequentially provided with a desulfurization catalyst layer 32, a carbon monoxide catalyst layer 33 and an activated carbon adsorption layer 34, which can absorb and treat the toxic and harmful components in the flue gas, and finally the purified flue gas is discharged through the exhaust pipe 16 installed on the sealing cover 17. When the dehumidification plate 30, the desulfurization catalyst layer 32, the carbon monoxide catalyst layer 33 and the activated carbon adsorption layer 34 need to be replaced, the user can close the solenoid valve 26 on the connecting pipe 25 on this side and open the solenoid valve 26 on the connecting pipe 25 on the other side, and then open the sealing cover 17 installed on the top surface of the treatment box 1 through the hinge 15, and take out and replace the dehumidification plate 30, the desulfurization catalyst layer 32, the carbon monoxide catalyst layer 33 and the activated carbon adsorption layer 34, so that the environmentally friendly smelting furnace flue gas treatment device for aluminum plate production can quickly replace the dehumidification plate 30, the desulfurization catalyst layer 32, the carbon monoxide catalyst layer 33 and the activated carbon adsorption layer 34 without stopping the machine, which is simple and convenient to operate and improves its flue gas treatment efficiency.
[0037] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.
[0038] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An environmentally friendly smelting furnace fume treatment device for aluminum plate production, comprising a treatment box (1) and a circulation box (11), characterized in that: A servo motor (3) is fixedly mounted on one side of the processing box (1), and a transmission shaft (4) is connected to the output end of the servo motor (3), and a plurality of stirring rods (5) are evenly mounted on the transmission shaft (4) located in the inner cavity of the processing box (1). A filter screen (12) is fixedly mounted on the inner cavity of the circulation box (11), and a mounting frame (18) is fixedly mounted on the transmission shaft (4) located in the inner cavity of the circulation box (11), and scrapers (19) are symmetrically fixedly welded at both ends of the mounting frame (18), and the scrapers (19) are in contact with the bottom surface of the filter screen (12). The top of the circulation box (11) One end of a branch pipe (20) is connected in the center of the surface, and the other end of the branch pipe (20) is connected to a connecting pipe (22), and one side of the connecting pipe (22) is connected to a plurality of atomizing pipes (14), a pressure pump (21) is installed on the branch pipe (20), and a plurality of atomizing nozzles (13) are evenly installed in the inner cavity of the treatment box (1) on the atomizing pipe (14), one end of a circulation pipe (6) is connected in the center of the bottom surface of the inner cavity of the treatment box (1), and the other end of the circulation pipe (6) is connected to the inner cavity of the circulation box (11), and a circulation pump (7) is installed on the circulation pipe (6).
2. The environmentally friendly smelting furnace fume treatment device for aluminum plate production according to claim 1 is characterized in that: The inner cavity of the processing box (1) is fixedly installed with a first partition (23), and a plurality of one-way valves (24) are evenly fixedly installed on the first partition (23). A second partition (28) is fixedly installed on the inner wall of the processing box (1) above the first partition (23). A third partition (27) is fixedly installed between the bottom ends of both sides of the second partition (28) and the inner wall of the processing box (1). A connecting pipe (25) is fixedly installed in the center of the third partition (27), and a solenoid valve (26) is installed on the connecting pipe (25). The top surface of the processing box (1) is connected by a hinge (15). A sealing cover (17) is symmetrically connected and installed, and an exhaust pipe (16) is fixedly installed in the center of the sealing cover (17); first placement seats (29) are fixedly installed on both sides of the second partition plate (28) and on the inner wall of the treatment box (1), and a moisture absorption plate (30) is placed and installed on the first placement seat (29); second placement seats (31) are fixedly installed on both sides of the second partition plate (28) and on the inner wall of the treatment box (1), and a desulfurization catalyst layer (32), a carbon monoxide catalyst layer (33) and an activated carbon adsorption layer (34) are placed and installed in sequence on the second placement seat (31).
3. The environmentally friendly smelting furnace fume treatment device for aluminum plate production according to claim 2 is characterized in that: A sealing groove (35) is provided on the top surface of the second partition plate (28), and sealing strips (36) are fixedly installed on the bottom surfaces of the two sealing covers (17), and the sealing strips (36) are embedded in the sealing groove (35).
4. The environmentally friendly smelting furnace fume treatment device for aluminum plate production according to claim 2 is characterized in that: The side wall of one side of the processing box (1) is connected to an air inlet pipe (2) located below the first partition plate (23).
5. The environmentally friendly smelting furnace flue gas treatment device for aluminum plate production according to claim 1 is characterized in that: A dirt collecting hopper (10) is fixedly mounted on the bottom surface of the circulation box (11), and the bottom end of the dirt collecting hopper (10) is connected to a sewage discharge pipe (9) that passes through the bottom surface of the circulation box (11).
6. The environmentally friendly smelting furnace fume treatment device for aluminum plate production according to claim 1 is characterized in that: A control panel is installed on the side wall of the processing box (1), and the control panel is electrically connected to the servo motor (3), the pressure pump (21), the circulation pump (7) and the electromagnetic valve (26).
7. The environmentally friendly smelting furnace fume treatment device for aluminum plate production according to claim 1 is characterized in that: A support frame (8) is fixedly welded to the bottom surfaces of the processing box (1) and the circulation box (11).
Citation Information
Patent Citations
Environment-friendly smelting furnace flue gas treatment device for aluminum plate production
CN218924188U