Safety belt fixing device for high-altitude operation at top of bridge pier

By introducing fixing devices of wire rope and support seat components at the high altitude work site on the top of the bridge pier, the problem of missing fixing points of the seat belt is solved, effective fixing of the seat belt and expansion of the working range are achieved, and construction safety is improved.

CN222332484UActive Publication Date: 2025-01-10THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420533786.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-19
Publication Date
2025-01-10
Estimated Expiration
2034-03-19

AI Technical Summary

Technical Problem

At the high-altitude operation site on the top of the bridge pier, the existing seat belt fixing device has the problem of missing fixing points, which makes the seat belt unable to be effectively fixed, increasing safety hazards for construction personnel.

Method used

A safety belt fixing device containing a wire rope and a support seat assembly is designed. The safety belt is fixed by a wire rope, and the end of the wire rope is tightened through the support seat assembly, providing a movable fixing point to meet the fixing of the safety belt. need.

Benefits of technology

The safety belt fixation in the high-altitude workplace on the top of the bridge pier has been achieved, which has enhanced the safety of construction personnel, expanded the operating range, and improved the stability and strength of the fixing points.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222332484U_ABST
    Figure CN222332484U_ABST
Patent Text Reader

Abstract

A safety belt fixing device for high-altitude operation at the top of a bridge pier comprises a steel wire rope (2) arranged to stretch across the top of the bridge pier and a supporting seat assembly arranged between the steel wire rope (2) and a bridge pier cover beam check block, fixing of a safety belt is achieved through the steel wire rope (2), and end tensioning connection of the steel wire rope (2) is achieved through the supporting seat assembly. The emptied safety belt connecting rope body is arranged in the high-altitude operation place at the top of the bridge pier, the technical problem that safety belt fixing points are lacked due to the fact that pre-buried padstone reinforcing steel bars serve as the safety belt fixing points is solved, and therefore the fixing requirement of the safety belt on the high-altitude operation place at the top of the bridge pier is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a safety belt fixing device, in particular to a safety belt fixing device used for high-altitude operations on the top of a bridge pier. Background Art

[0002] When working at heights on construction sites, safety belts must be worn to ensure the safety of construction workers. Safety belts are generally hung and fixed on fixing devices or lifelines. In the actual construction process of high-altitude operations on the top of bridge piers, there is often a lack of fixing points or the fixing points are difficult to set up, resulting in many times that workers wear safety belts but do not wear them for high-altitude operations. They are not used correctly, which brings serious safety hazards to workers. Therefore, the safety belt fixing device used for high-altitude operations on the top of bridge piers is an important construction product. In the existing safety belt fixing devices used for high-altitude operations on the top of bridge piers, pre-embedded pad stone steel bars are used as safety belt fixing points to solve the problem of missing safety belt fixing points. Although this solves the problem of safety belt fixing, there is still no hanging position after the pad stone is poured, which cannot meet the safety belt fixing needs.

[0003] At the same time, the working surface on the top of the pier is small, and the workers often move around during work, which can easily lead to safety accidents caused by the lack of safety protection measures for the construction workers.

[0004] The utility model has the technical feature of having an empty safety belt connecting rope body in the high-altitude working place on the top of the bridge pier, and effectively explores and studies the technical problem of missing safety belt fixing points due to the pre-embedded cushion stone steel bars being used as safety belt fixing points at the technical level. Summary of the invention

[0005] The object of the utility model is a safety belt connecting rope body with a hollow space at a high-altitude working place on the top of a bridge pier.

[0006] In order to overcome the above technical shortcomings, the purpose of the utility model is to provide a safety belt fixing device for high-altitude operations on the top of a pier, thereby meeting the need for fixing the safety belt in the high-altitude operation site on the top of the pier.

[0007] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: it includes a steel wire rope arranged to span over the top of the bridge pier, and a support seat assembly arranged between the steel wire rope and the bridge pier cap beam stopper.

[0008] Due to the design of the wire rope and support seat assembly, the safety belt is fixed by the wire rope, and the end of the wire rope is tightened and connected by the support seat assembly, so that an empty safety belt connecting rope body is provided at the high-altitude working place on the top of the bridge pier, which solves the technical problem of missing safety belt fixing points due to the use of pre-embedded cushion stone steel bars as safety belt fixing points, thereby meeting the need for fixing the safety belt at the high-altitude working place on the top of the bridge pier.

[0009] The utility model is designed to connect the steel wire rope and the supporting seat assembly to each other in a manner that a safety belt connecting rope body is provided in a hollow at a high-altitude working place on the top of the bridge pier.

[0010] The utility model is designed to connect the support seat assembly with the steel wire rope in a way of tightening the end heads.

[0011] The utility model is designed that the support seat component includes a pre-buried steel bar or includes a moving vehicle and a pressing screw.

[0012] The technical effects of the above four technical solutions are: highlighting the technical feature of having a vacant safety belt connecting rope body in the high-altitude working place on the top of the bridge pier, and introducing the application of the technical field of having a vacant safety belt connecting rope body in the high-altitude working place on the top of the bridge pier.

[0013] The utility model is designed to further include a first accessory device, and the first accessory device is arranged on the steel wire rope, and the first accessory device is arranged as a steel wire rope buckle.

[0014] The utility model is designed to further include a second accessory device, and the second accessory device is arranged on the support seat assembly, and the second accessory device is arranged as a top stopper.

[0015] The technical effects of the above two technical solutions are: realizing the integrated installation of other components and expanding the technical problem of the utility model.

[0016] The utility model is designed that a steel wire rope is arranged on the pre-buried steel bar, and a steel wire rope buckle is arranged on the end of the steel wire rope.

[0017] The technical effect of the above technical solution is that: by pre-embedded steel bars, steel wire ropes and steel wire rope buckles, the basic technical solution of the utility model is formed, which solves the technical problem of the utility model.

[0018] The utility model is designed that the steel wire rope is arranged as a single-strand rope and the end of the steel wire rope is arranged to be connected with the embedded steel bar in a through-type manner, the end of the steel wire rope is arranged to be connected with the steel wire rope buckle and the steel wire rope is arranged to be connected with the safety belt in a through-type manner.

[0019] The technical effect of the above technical solution is that: the linear traction of the safety belt is realized, and the moving range of the safety belt is increased.

[0020] The utility model is designed that the embedded steel bar is arranged to include an outer rod portion and an inner rod portion, and the end of the outer rod portion is arranged to be connected to the inner end of the inner rod portion, the outer rod portion is arranged to be connected to the steel wire rope and the outer rod portion is arranged on the upper end surface portion of the pier cap beam stopper, the inner rod portion is arranged in the concrete of the pier cap beam stopper and the cross portion of the inner rod portion is arranged to be connected to the steel bar skeleton of the pier cap beam stopper, the outer rod portion is arranged to be a C-shaped rod-shaped body and the inner rod portion is arranged to be an L-shaped rod-shaped body.

[0021] The technical effect of the above technical solution is that: the steel wire rope is supported and fixed at a fixed point, thereby increasing the fixing strength of the steel wire rope.

[0022] The utility model is designed that the wire rope buckle is arranged as a U-shaped wire rope buckle and the wire rope buckle is arranged to be connected with the wire rope.

[0023] The technical effect of the above technical solution is that the ends of the steel wire ropes can be butt-jointed and fixed.

[0024] The utility model is designed that the embedded steel bars and steel wire ropes are arranged to be distributed in a manner of end connection, and the embedded steel bars, steel wire ropes and steel wire rope buckles are arranged to be distributed in a manner of end compression connection.

[0025] The utility model is designed that two pre-buried steel bars are arranged on the steel wire rope, and at least three steel wire rope buckles are arranged on the end of the steel wire rope.

[0026] The utility model is designed that a steel wire rope, a top stopper and a pressing screw are respectively arranged on the moving vehicle, and a steel wire rope buckle is arranged on the steel wire rope.

[0027] The technical effect of the above technical solution is that the basic technical solution of the utility model is formed by the mobile vehicle, the ejector and the pressing screw, which solves the technical problem of the utility model.

[0028] The utility model is designed that a movable vehicle is configured to include a frame portion, an axle portion, a roller portion and an upper rod portion, and a receiving hole body and a leakage window body are respectively arranged at an inner vertical portion of the frame portion, the upper end face portion of the horizontal portion of the frame portion is configured to be connected to the end head of the upper rod portion and the inner end face portion of the outer vertical portion of the frame portion is configured to be connected to the end head of the axle portion, the axle portion is configured to be through-connected to the roller portion and the receiving hole body is configured to be threadedly connected to a clamping screw, the lower end face portion of the inner vertical portion of the frame portion is configured to be connected to a top stopper and the upper rod portion is configured to be connected to a wire rope, the frame portion is configured to be a U-shaped frame body having an ear seat on the inner end face portion of the outer vertical portion and the axle portion is configured to be a rod-shaped body, the roller portion is configured to be a cylindrical body having rake teeth on the peripheral outer side face portion and the roller portion is configured to be connected to a pier cap beam stopper, the upper rod portion is configured to be a C-shaped rod-shaped body, the receiving hole body is configured to be a threaded hole and the leakage window body is configured to be a circular hole-shaped body.

[0029] The technical effect of the above technical solution is: it realizes the mobile point support and fixation of the wire rope, which facilitates the working range of construction workers.

[0030] The utility model is designed that the top control device is arranged to include a plate portion, a screw portion, a clamping nut portion, a swing arm portion, a top control disc portion and a customized strip portion, and a receiving groove body is arranged on the plate portion, the inner end face portion of the screw portion and the inner end face portion of the customized strip portion are respectively arranged to be connected with the peripheral side face portion of the top control disc portion, and the outer end head of the screw portion is arranged to be connected with the receiving groove body in a through-type manner, the outer end head of the screw portion is arranged to be threadedly connected with the clamping nut portion, and the inner end face portion of the clamping nut portion is arranged to be contact-connected with the plate portion, the lower end head of the plate portion is arranged to be connected with the inclined portion of the swing arm portion through a pin shaft, and the swing arm portion The end head of the longitudinal portion is arranged to be connected to the central portion of the top control disk portion, the upper end face portion of the plate portion is arranged to be connected to the moving vehicle and the plate portion is arranged to be a rectangular block body, the screw portion is arranged to be a plain bolt and the clamping nut portion is arranged to be a hexagonal nut, the inner end face portions of the inner and outer clamping nut portions are respectively arranged to be contact-connected to the plate portion and the swing arm portion is arranged to be an L-shaped rod-shaped body, the top control disk portion is arranged to be a D-shaped seat-shaped body and the customized strip portion is arranged to be a sheet-shaped body with an inclined surface at the outer end portion, the plane body of the top control disk portion and the outer end heads of the customized strip portion are respectively arranged to be connected to the pier cap beam stopper and the accommodating groove body is arranged to be a long strip hole-shaped body.

[0031] The technical effect of the above technical solution is that friction braking of the mobile vehicle on the pier cap beam block is achieved, thereby improving the stability of the mobile vehicle.

[0032] The utility model is designed that the clamping screw is arranged as a hexagonal bolt with a disc body at the inner end, the clamping screw is arranged to be threadedly connected with the moving vehicle, and the disc body of the clamping screw is arranged to be contact-connected with the bridge pier cap beam stopper.

[0033] The technical effect of the above technical solution is that: the mobile vehicle is pressed and connected to the pier cap beam block, thereby improving the stability of the mobile vehicle.

[0034] The utility model is designed that the moving vehicle, the ejector, the pressing screw rod and the steel wire rope are arranged to be distributed in the manner of being movably connected with the end heads.

[0035] The utility model is designed that a moving vehicle, a push-up device and a plurality of pressing screws are arranged to form a group of end head components, two groups of end head components are arranged on the wire rope, and the plate part is arranged to be connected with the vehicle frame part.

[0036] In this technical scheme, the wire rope is the basic component and also the necessary technical feature of the utility model. The embedded steel bar, wire rope buckle, mobile vehicle, top control device and clamping screw are functional components and are the features for realizing other technical effects of the utility model. The designs of the technical features such as the outer rod part, inner rod part, frame part, shaft part, roller part, upper rod part, accommodating hole body, leakage window body, plate part, screw part, clamping nut part, swing arm part, top control disc part, customized strip part and accommodating trough body are technical features that comply with the Patent Law and its implementing rules.

[0037] In the technical solution, the safety belt connecting rope body with a vacant space at the high-altitude working place on the top of the bridge pier is realized by a steel wire rope.

[0038] In the present technical solution, the steel wire rope and support seat assembly with an empty safety belt connecting rope body at the high-altitude working place on the top of the bridge pier is an important technical feature. In the technical field of safety belt fixing devices used for high-altitude working on the top of the bridge pier, it has novelty, creativity and practicality. The terms in the present technical solution can be explained and understood using the patent literature in this technical field. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0040] Figure 1 This is a schematic diagram of one of the first embodiments of the utility model.

[0041] Figure 2 This is a schematic diagram of the second embodiment of the first embodiment of the present utility model.

[0042] Embedded steel bar 1, steel wire rope 2, steel wire rope buckle 3, mobile vehicle 4, top control device 5, clamping screw 6, outer rod portion 11, inner rod portion 12, frame portion 41, shaft portion 42, roller portion 43, upper rod portion 44, accommodating hole body 45, leakage window body 46, plate portion 51, screw portion 52, clamping nut portion 53, swing arm portion 54, top control disc portion 55, customized strip portion 56, accommodating trough body 57. DETAILED DESCRIPTION

[0043] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not precluding the existence or addition of one or more other elements or combinations thereof.

[0044] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0045] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0046] In addition, the technical features involved in the different embodiments of the utility model described below can be combined with each other as long as they do not conflict with each other. In addition, unless otherwise specified, the equipment and materials used in the following embodiments are commercially available. If the processing conditions are not clearly stated, please refer to the purchased product manual or proceed according to conventional methods in the field.

[0047] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0048] Figure 1 This is one of the first embodiments of the utility model. This embodiment is specifically described in conjunction with the accompanying drawings. It includes a pre-embedded steel bar 1, a steel wire rope 2 and a steel wire rope buckle 3. The steel wire rope 2 is arranged on the pre-embedded steel bar 1, and the steel wire rope buckle 3 is arranged on the end of the steel wire rope 2.

[0049] In this embodiment, the embedded steel bar 1 is configured to include an outer rod portion 11 and an inner rod portion 12, and the end of the outer rod portion 11 is configured to be connected to the inner end of the inner rod portion 12, the outer rod portion 11 is configured to be connected to the steel wire rope 2 and the outer rod portion 11 is arranged on the upper end surface portion of the pier cap beam stopper, the inner rod portion 12 is arranged in the concrete of the pier cap beam stopper and the cross portion of the inner rod portion 12 is arranged to be connected to the steel bar skeleton of the pier cap beam stopper, the outer rod portion 11 is configured to be a C-shaped rod body and the inner rod portion 12 is configured to be an L-shaped rod body.

[0050] By pre-embedded reinforcing rod 1, a support connection point for steel wire rope 2 is formed, the outer rod part 11 realizes connection with steel wire rope 2, and the inner rod part 12 realizes connection processing of outer rod part 11 in bridge pier cap beam block, and its technical purpose is to serve as a support carrier for steel wire rope 2.

[0051] In this embodiment, the steel wire rope 2 is configured as a single-strand rope and the end of the steel wire rope 2 is configured to be through-connected with the embedded steel bar 1, the end of the steel wire rope 2 is configured to be connected with the steel wire rope buckle 3 and the steel wire rope 2 is configured to be through-connected with the safety belt.

[0052] The steel wire rope 2 forms a supporting connection point for the embedded steel bar 1 and the steel wire rope buckle 3. The steel wire rope 2 realizes the connection with the embedded steel bar 1 and the steel wire rope buckle 3. The technical purpose is to be used as a component for connecting with a safety belt.

[0053] In this embodiment, the wire rope buckle 3 is configured as a wire rope U-shaped buckle and the wire rope buckle 3 is configured to be connected to the wire rope 2 .

[0054] A supporting connection point for the steel wire rope 2 is formed by the steel wire rope buckle 3, and the connection with the steel wire rope 2 is realized by the steel wire rope buckle 3. Its technical purpose is to be used as a component for connecting the end of the steel wire rope 2 in a ring shape.

[0055] In this embodiment, the embedded steel bars 1 and the steel wire rope 2 are arranged to be distributed in a manner of end connection, and the embedded steel bars 1, the steel wire rope 2 and the steel wire rope buckles 3 are arranged to be distributed in a manner of end compression connection, two embedded steel bars 1 are arranged on the steel wire rope 2, and at least three steel wire rope buckles 3 are arranged on the end of the steel wire rope 2.

[0056] The method of using this embodiment is as follows: before the concrete is poured on the pier, the transverse portion of the inner rod 12 is welded to the steel frame of the pier cap beam block, and then the concrete is poured on the pier, so that the inner end of the inner rod 12 is exposed on the upper end surface of the pier cap beam block. When it is necessary to perform aerial work on the top of the pier, the end of the outer rod 11 is welded to the inner end of the inner rod 12, and the end of the wire rope 2 is strung on the outer rod 11. Through the wire rope buckle 3, the end of the wire rope 2 is connected to the inside of the end of the wire rope 2, so that the wire rope 2 spans over the top of the pier. The construction workers install the safety belt hook they wear on the wire rope 2, and the construction workers can perform aerial work on the top of the pier.

[0057] Figure 2 This is the second embodiment of the first embodiment of the utility model. This embodiment is specifically described in conjunction with the accompanying drawings. It includes a wire rope 2, a wire rope buckle 3, a mobile vehicle 4, a top brake 5 and a clamping screw 6. The wire rope 2, the top brake 5 and the clamping screw 6 are respectively arranged on the mobile vehicle 4, and the wire rope buckle 3 is arranged on the wire rope 2.

[0058] In this embodiment, the mobile vehicle 4 is configured to include a frame portion 41, a shaft portion 42, a roller portion 43 and an upper rod portion 44, and a receiving hole body 45 and a leakage window body 46 are respectively provided in the inner vertical portion of the frame portion 41, the upper end face portion of the horizontal portion of the frame portion 41 is configured to be connected to the end of the upper rod portion 44, and the inner end face portion of the outer vertical portion of the frame portion 41 is configured to be connected to the end of the shaft portion 42, the shaft portion 42 is configured to be connected to the roller portion 43 in a through-type manner, and the receiving hole body 45 is configured to be threadedly connected to the pressing screw 6, The lower end surface portion of the inner vertical portion of the frame portion 41 is configured to be connected to the top brake 5 and the upper rod portion 44 is configured to be connected to the wire rope 2, the frame portion 41 is configured to be a U-shaped frame body with an ear seat on the inner end surface portion of the outer vertical portion and the shaft portion 42 is configured to be a rod-shaped body, the roller portion 43 is configured to be a cylindrical body with rake teeth on the peripheral outer side surface and the roller portion 43 is configured to be connected to the pier cap beam stopper, the upper rod portion 44 is configured to be a C-shaped rod-shaped body, the accommodating hole body 45 is configured to be a threaded hole and the leakage window body 46 is configured to be a circular hole-shaped body.

[0059] Through the mobile vehicle 4, a support connection point for the wire rope 2, the top brake 5 and the clamping screw 6 is formed. The upper rod part 44 realizes the connection with the wire rope 2, the frame part 41 realizes the connection with the top brake 5, the accommodating hole body 45 realizes the connection with the clamping screw 6, the shaft part 42 and the roller part 43 realize the connection with the pier cap beam block, and the leakage window body 46 realizes the connection with the hands of the construction workers. The technical purpose is to be used as a component for connecting with the wire rope 2.

[0060] In the present embodiment, the ejector 5 is configured to include a plate portion 51, a screw portion 52, a clamping nut portion 53, a swing arm portion 54, an ejection disc portion 55 and a custom strip portion 56, and a receiving groove body 57 is provided on the plate portion 51, the inner end face portion of the screw portion 52 and the inner end face portion of the custom strip portion 56 are respectively configured to be connected to the peripheral side surface portion of the ejection disc portion 55, and the outer end head of the screw portion 52 is configured to be through-connected to the receiving groove body 57, the outer end head of the screw portion 52 is configured to be threadedly connected to the clamping nut portion 53, and the inner end face portion of the clamping nut portion 53 is configured to be contact-connected to the plate portion 51, and the lower end head of the plate portion 51 is configured to be connected to the inclined portion of the swing arm portion 54 through a pin shaft and the swing arm portion 54 is configured to be connected to the swing arm portion 54 through a pin shaft. The longitudinal end of the movable arm portion 54 is arranged to be connected to the central portion of the top control disk portion 55, the upper end surface portion of the plate portion 51 is arranged to be connected to the moving vehicle 4 and the plate portion 51 is arranged to be a rectangular block body, the screw portion 52 is arranged to be a plain bolt and the clamping nut portion 53 is arranged to be a hexagonal nut, the inner end surfaces of the inner and outer clamping nut portions 53 are respectively arranged to be contact-connected to the plate portion 51 and the swing arm portion 54 is arranged to be an L-shaped rod-shaped body, the top control disk portion 55 is arranged to be a D-shaped seat-shaped body and the customized strip portion 56 is arranged to be a sheet-shaped body with an inclined surface at the outer end, the plane body of the top control disk portion 55 and the outer end heads of the customized strip portion 56 are respectively arranged to be connected to the pier cap beam stopper and the accommodating groove body 57 is arranged to be a long strip hole-shaped body.

[0061] A supporting connection point for the moving vehicle 4 is formed by the top control device 5, and the connection with the moving vehicle 4 is realized by the plate portion 51. The connection with the top control disc portion 55 and the customized strip portion 56 is realized by the screw portion 52, the clamping nut portion 53, the swing arm portion 54 and the accommodating groove body 57. The connection with the pier cap beam block is realized by the top control disc portion 55 and the customized strip portion 56. The technical purpose is to be used as one of the components for fixing the moving vehicle 4 on the pier cap beam block.

[0062] In this embodiment, the clamping screw 6 is configured as a hexagonal bolt with a disc body at the inner end and the clamping screw 6 is configured to be threadedly connected to the moving vehicle 4, and the disc body of the clamping screw 6 is configured to be contact-connected to the pier cap beam block.

[0063] A supporting connection point for the mobile vehicle 4 is formed by the compression screw 6, and the connection with the mobile vehicle 4 is realized by the compression screw 6. Its technical purpose is to serve as the second component for fixing the mobile vehicle 4 on the pier cap beam block.

[0064] In this embodiment, the moving vehicle 4, the top brake 5 and the clamping screw 6 are arranged to be distributed with the wire rope 2 in a manner of end movable connection. A moving vehicle 4, a top brake 5 and a plurality of clamping screws 6 are arranged to form a group of end components. Two groups of end components are arranged on the wire rope 2, and the plate portion 51 is arranged to be connected to the frame portion 41.

[0065] The method of using this embodiment is as follows: when it is necessary to perform aerial work on the top of the pier, place the frame portion 41 on the pier cap beam stopper, make the roller portion 43 contact the outer side surface of the pier cap beam stopper, make the inner and outer clamping nut portions 53 rotate on the screw portion 52, separate the inner end surface of the inner and outer clamping nut portions 53 from the plate portion 51, place the plane body of the top plate portion 55 and the outer end of the customized strip portion 56 on the inner side surface of the pier cap beam stopper, rotate the inner and outer clamping nut portions 53 in the opposite direction on the screw portion 52, make the inner end surface of the inner and outer clamping nut portions 53 act on the plate portion 51, make the clamping screw 6 rotate on the accommodating hole body 45, make the disk body of the clamping screw 6 act on the inner side surface of the pier cap beam stopper, string the end of the wire rope 2 on the outer rod portion 11, and clamp the wire rope through the wire rope. Buckle 3 connects the end of wire rope 2 with the inside of the end of wire rope 2, so that wire rope 2 spans over the top of the pier. Construction workers install the hook of the safety belt they wear on the wire rope 2, and they can perform high-altitude operations on the top of the pier. When it is necessary to move the wire rope 2 above the top of the pier, the screw part 52 and the clamping nut part 53 are used to separate the plane body of the top plate part 55 and the outer end of the customized strip part 56 from the inner side surface of the pier cap beam block, and the plate body of the clamping screw 6 is separated from the inner side surface of the pier cap beam block. The construction workers act on the leakage window body 46 with their hands to apply a moving pushing force to the frame part 41, so that the roller part 43 moves on the outer side surface of the pier cap beam block, and the mobile vehicle 4 is placed on the next wire rope 2 installation position.

[0066] When verifying the utility model, the inventor abandoned the existing technical features of the lack of safety belt fixing points due to the use of pre-embedded cushion stone steel bars as safety belt fixing points, and first proposed a technical feature of having an empty safety belt connecting rope body in the high-altitude working place on the top of the pier, and obtained the first unexpected technical effect: it is realized that the connection part of the safety belt is set in the high-altitude working place on the top of the pier, and the second unexpected technical effect is obtained: it is realized that the connection part of the safety belt is distributed in an extended length interval, which is convenient for the working range of construction workers, and the third unexpected technical effect is obtained: it is realized that the connection points are prevented from being distributed on the pier cap beam block, and the pier cap beam block is used as a support body, and the fourth unexpected technical effect is obtained: it is realized that the vehicle body can support the steel wire rope 2 movably.

[0067] In the second embodiment of the utility model, the steel wire rope 2 and the support seat assembly are connected to each other in a manner that a safety belt connecting rope body is provided in a hollow position at the high-altitude working place on the top of the bridge pier.

[0068] In this embodiment, the support base assembly is connected to the steel wire rope 2 in a manner of performing an end-tightening connection.

[0069] In this embodiment, the support seat assembly includes a pre-buried steel bar 1 or includes a moving vehicle 4 and a pressing screw 6 .

[0070] In this embodiment, a first accessory device is further included and is arranged on the steel wire rope 2 , and the first accessory device is arranged as a steel wire rope buckle 3 .

[0071] In this embodiment, a second accessory device is further included and is arranged on the support seat assembly. The second accessory device is arranged as a stopper 5 .

[0072] The second embodiment of the present utility model is based on the first embodiment.

[0073] The utility model has the following characteristics:

[0074] 1. Due to the design of the steel wire rope 2 and the support seat assembly, the safety belt is fixed through the steel wire rope 2, and the end of the steel wire rope 2 is tightened and connected through the support seat assembly, so that an empty safety belt connecting rope body is provided at the high-altitude working place on the top of the bridge pier, and the technical problem of missing safety belt fixing points caused by using pre-embedded cushion stone steel bars as safety belt fixing points is solved, thereby meeting the need for fixing the safety belt at the high-altitude working place on the top of the bridge pier.

[0075] 2. Due to the design of the embedded steel bar 1, the support connection at the fixed position on the pier cap beam block is realized.

[0076] 3. Due to the design of the moving vehicle 4 and the clamping screw 6, a movable support connection is achieved on the pier cap beam stopper.

[0077] 4. Due to the design of the wire rope buckle 3, the end of the wire rope 2 can be connected.

[0078] 5. Due to the design of the top brake 5, the mobile vehicle 4 can be braked and fixedly connected.

[0079] 6. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the utility model, and is not a technical feature calculated by formula or obtained through a limited number of tests. Tests have shown that the technical features of this numerical range have achieved good technical effects.

[0080] 7. Due to the design of the technical features of the utility model and the effects of the individual and combined technical features, experiments have shown that the performance indicators of the utility model are at least 1.7 times the existing performance indicators, and the evaluation shows that the utility model has a good market value.

[0081] There are other technical features for connecting the steel wire rope 2 and the support seat assembly with a hollow safety belt connecting rope body at the high-altitude work place on the top of the pier, which are all embodiments of the present utility model, and the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, Patent Implementation Rules and Examination Guidelines, all possible combinations of the technical features in the above-mentioned embodiments will no longer be described.

[0082] Therefore, in the technical field of safety belt fixing devices used for high-altitude operations on the top of bridge piers, all technical contents including a steel wire rope 2 arranged to span over the top of the bridge pier and a support seat assembly arranged between the steel wire rope 2 and the bridge pier cap beam block are within the protection scope of the present utility model.

Claims

1. A safety belt fixing device for high-altitude work on the top of a bridge pier, characterized by: The invention comprises a steel wire rope (2) arranged to span the space above the top of the bridge pier, and a support seat assembly arranged between the steel wire rope (2) and the bridge pier cap beam stopper. The support seat assembly includes a pre-buried steel bar (1) or a moving vehicle (4) and a pressing screw (6). It also includes a first accessory device and the first accessory device is arranged on the steel wire rope (2), and the first accessory device is arranged as a steel wire rope buckle (3). It also includes a second accessory device and the second accessory device is arranged on the support seat assembly, and the second accessory device is arranged as a top stopper (5). A steel wire rope (2) is arranged on the embedded steel bar (1), and a steel wire rope buckle (3) is arranged on the end of the steel wire rope (2).

2. The safety belt fixing device for high-altitude operation on the top of a bridge pier according to claim 1 is characterized in that: The steel wire rope (2) and the support seat assembly are connected to each other in a manner that a safety belt connecting rope body is provided in a hollow position at the high-altitude working place on the top of the bridge pier.

3. The safety belt fixing device for high-altitude operation on the top of a bridge pier according to claim 2 is characterized in that: The support base assembly is connected to the steel wire rope (2) in a manner of performing a tightening connection at the end.

4. The safety belt fixing device for high-altitude operation on the top of a bridge pier according to claim 1 is characterized in that: The steel wire rope (2) is configured as a single-strand rope and the end of the steel wire rope (2) is configured to be connected to the embedded steel bar (1) in a through-type manner, the end of the steel wire rope (2) is configured to be connected to the steel wire rope buckle (3) and the steel wire rope (2) is configured to be connected to the safety belt in a through-type manner, Or, the embedded steel bar (1) is configured to include an outer rod (11) and an inner rod (12), and the end of the outer rod (11) is configured to be connected to the inner end of the inner rod (12), the outer rod (11) is configured to be connected to the steel wire rope (2), and the outer rod (11) is arranged on the upper end surface of the pier cap beam stopper, the inner rod (12) is arranged in the concrete of the pier cap beam stopper, and the transverse part of the inner rod (12) is configured to be connected to the steel skeleton of the pier cap beam stopper, the outer rod (11) is configured to be a C-shaped rod-shaped body, and the inner rod (12) is configured to be an L-shaped rod-shaped body, Alternatively, the wire rope buckle (3) is configured as a wire rope U-shaped buckle and the wire rope buckle (3) is configured to be connected to the wire rope (2).

5. The safety belt fixing device for high-altitude operation on the top of a bridge pier according to claim 4 is characterized in that: The embedded steel bars (1) and the steel wire ropes (2) are arranged to be distributed in a manner of end connection, and the embedded steel bars (1), the steel wire ropes (2) and the steel wire rope buckles (3) are arranged to be distributed in a manner of end compression connection. Alternatively, two pre-buried steel bars (1) are arranged on the steel wire rope (2), and at least three steel wire rope buckles (3) are arranged on the ends of the steel wire rope (2).

6. The safety belt fixing device for high-altitude operation on the top of a bridge pier according to claim 1 is characterized in that: A steel wire rope (2), a top brake (5) and a pressing screw (6) are respectively arranged on the moving vehicle (4), and a steel wire rope buckle (3) is arranged on the steel wire rope (2).

7. The safety belt fixing device for high-altitude operation on the top of a bridge pier according to claim 6 is characterized in that: The mobile vehicle (4) is arranged to include a frame part (41), a shaft part (42), a roller part (43) and an upper rod part (44), and a receiving hole body (45) and a leakage window body (46) are respectively arranged on the inner vertical parts of the frame part (41). The upper end face of the horizontal part of the frame part (41) is arranged to be connected with the end of the upper rod part (44), and the inner end face of the outer vertical part of the frame part (41) is arranged to be connected with the end of the shaft part (42). The shaft part (42) is arranged to be connected with the roller part (43) in a penetrating manner, and the receiving hole body (45) is arranged to be connected with the pressing screw (6) in a threaded manner. The lower end face of the inner vertical part of the frame part (41) is arranged to be connected with the top controller (5), and the upper rod part (44) is arranged to be connected with the steel wire rope (2). The frame part (41) is arranged to be a C-shaped frame body with an ear seat on the inner end face of the outer vertical part, and the shaft part (42) is arranged to be a rod-shaped body. The roller part (43) is arranged to be a cylindrical body with rake teeth on the outer peripheral side face, and the roller part (43) is arranged to be connected with the pier capping beam block. The upper rod part (44) is arranged to be a C-shaped rod-shaped body. The receiving hole body (45) is arranged to be a threaded hole, and the leakage window body (46) is arranged to be a circular hole body. Or, the top controller (5) is arranged to include a plate part (51), a screw part (52), a clamping nut part (53), a swing arm part (54), a top plate part (55) and a customized strip part (56), and a receiving groove body (57) is arranged on the plate part (51). The inner end face of the screw part (52) and the inner end face of the customized strip part (56) are respectively arranged to be connected with the peripheral side face of the top plate part (55), and the outer end of the screw part (52) is arranged to be connected with the receiving groove body (57) in a penetrating manner. The outer end of the screw part (52) is arranged to be connected with the clamping nut part (53) in a threaded manner, and the inner end face of the clamping nut part (53) is arranged to be in contact connection with the plate part (51). The lower end of the plate part (51) is arranged to be connected with the inclined part of the swing arm part (54) through a pin shaft, and the end of the longitudinal part of the swing arm part (54) is arranged to be connected with the center part of the top plate part (55). The upper end face of the plate part (51) is arranged to be connected with the mobile vehicle (4), and the plate part (51) is arranged to be a rectangular block. The screw part (52) is arranged to be a light column bolt, and the clamping nut part (53) is arranged to be a hexagonal nut. The inner end faces of the inner and outer clamping nut parts (53) are respectively arranged to be in contact connection with the plate part (51), and the swing arm part (54) is arranged to be an L-shaped rod-shaped body. The top plate part (55) is arranged to be a D-shaped seat body, and the customized strip part (56) is arranged to be a sheet body with an inclined surface at the outer end. The flat body of the top plate part (55) and the outer end of the customized strip part (56) are respectively arranged to be connected with the pier capping beam block, and the receiving groove body (57) is arranged to be a long strip hole body. Or, the pressing screw (6) is arranged to be a hexagonal bolt with a disc at the inner end, and the pressing screw (6) is arranged to be connected with the mobile vehicle (4) in a threaded manner. The disc of the pressing screw (6) is arranged to be in contact connection with the pier capping beam block.

8. The safety belt fixing device for high-altitude operation on the top of a bridge pier according to claim 7 is characterized in that: The moving vehicle (4), the top stopper (5), the pressing screw (6) and the steel wire rope (2) are arranged to be distributed in a manner of end-to-end movement connection. Alternatively, a moving vehicle (4), a top brake (5) and a plurality of pressing screws (6) are arranged to form a set of end components, two sets of end components are arranged on the wire rope (2), and the plate portion (51) is arranged to be connected to the vehicle frame portion (41).