Multipurpose scaffold vertical rod fixing device

Through the bolt connection technology of multi-purpose scaffolding vertical pole fixing device, the problems of complex welding operations and difficult elevation adjustment are solved, and the convenient fixation and elevation adjustment of vertical poles and steel beams are achieved. It is suitable for a variety of scenarios and reduces labor and materials and energy consumption reduce fire hazards.

CN222333244UInactive Publication Date: 2025-01-10王天亮
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421153832.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-24
Publication Date
2025-01-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The prior art requires welding operations when fixing scaffolding vertical poles and steel beams. The operation is complicated and inconvenient for position adjustment, and the elevation adjustment of the vertical poles cannot be achieved. The fixing method is one-time, resulting in waste of labor and material and fire protection risks.

Method used

A multi-purpose scaffolding pole fixing device including base, lead screw, adjustment nut, steel pipe column and clip is adopted to fix and elevation adjustment between the pole and the steel beam through bolt connection to avoid welding operations.

Benefits of technology

It realizes convenient fixation and elevation adjustment of vertical poles and steel beams, saves labor, materials and energy, reduces fire hazards, is suitable for a variety of application scenarios, and does not damage components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222333244U_ABST
    Figure CN222333244U_ABST
Patent Text Reader

Abstract

The utility model provides a multipurpose scaffold vertical rod fixing device which comprises a base which is a square steel plate and is placed on an I-shaped steel beam; the lead screw is fixed above the base; the adjusting nut is located on the lead screw, and the adjusting nut is in threaded connection with the lead screw; the steel pipe stand column is arranged on the lead screw in a sleeving mode, and the steel pipe stand column is located above the adjusting nut; the clamping piece is located below the I-shaped steel beam, and the clamping piece is detachably connected with the base. The fixing problem of the vertical rod and the steel beam is solved, meanwhile, the elevation of the vertical rod can be adjusted, and the device is suitable for the conditions of inconsistent floor elevations, local plate lifting and the like; the vertical rods and the steel beam are fixed by matching the bolts with the clamping pieces, so that mounting and dismounting are simple and convenient, only the bolts need to be operated, welding operation is avoided, and labor, materials and energy are saved; and welding and cutting operation is avoided through bolt fixation, and the steel beam component and the vertical rod are not damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, and in particular relates to a multi-purpose scaffolding upright fixing device. Background Art

[0002] Scaffolding is widely used in the field of construction. It includes fastener-type steel pipe scaffolding, disc-type steel pipe scaffolding, etc., and its functions include protective external scaffolding, formwork support, etc. When the formwork support poles are set within the post-casting zone and the floor opening, or when the external scaffolding adopts a cantilever frame, an I-beam must be set as the basis of the scaffolding poles, so the fixation of the scaffolding poles on the steel beams becomes a problem that must be solved.

[0003] According to the traditional process, the pole is usually welded to the steel beam, or a short steel bar is welded on the steel beam and the pole is inserted into the steel bar for fixing. The above methods require welding operations, which are complicated to operate and will cause a certain degree of damage to the steel beam components; and the fixing method is a one-time implementation. If the position of the pole is changed, the original welding point must be cut off and re-welded, resulting in a waste of labor and materials; at the same time, this method can only solve the positioning of the pole, but cannot solve the problem of adjusting the elevation of the pole. Utility Model Content

[0004] In order to solve the above problems, the utility model provides a multi-purpose scaffolding upright pole fixing device.

[0005] The utility model discloses a multi-purpose scaffolding upright fixing device, comprising: a base, which is a square steel plate and is placed on an I-beam; a lead screw, which is fixed above the base; an adjusting nut, which is located on the lead screw and is threadedly connected to the lead screw; a steel pipe upright column, which is sleeved on the lead screw and is located above the adjusting nut; and a clip, which is located below the I-beam and is detachably connected to the base.

[0006] The detachable connection is a bolt connection.

[0007] The base is a 150×150 mm steel plate, the side length of the base is greater than the width of the I-beam, and four bolt holes are provided at the four corners of the base.

[0008] There are four clips, each of which is provided with a bolt hole. The positions of the bolt holes on the base and the clip correspond to each other, and the inner diameters of the bolt holes on the base and the clip are the same. The clip is a 50×70mm steel plate clip.

[0009] The clip comprises a first clip and a second clip, wherein the first clip and the second clip are both provided with bolt holes, a slot is provided on the side of the first clip, and an insertion rod is fixed on the side of the second clip, wherein the slot and the insertion rod match each other.

[0010] A gasket is installed between the base and the clamp, and the gasket is a 25×25mm square steel gasket, and the gasket is located on the outside of the I-beam.

[0011] The diameter of the steel pipe column is 48 mm, and the diameter of the lead screw is 38 mm.

[0012] The lead screw is fixedly connected to the base, and the adjusting nut is fixedly connected to the steel pipe column.

[0013] The beneficial effects of the utility model are:

[0014] 1. The utility model is suitable for fixing steel pipe uprights and I-beams when the formwork support crosses the post-casting strip and the floor opening, fixing the cantilever scaffolding uprights and steel beams, and has a wide range of applications;

[0015] 2. It not only solves the problem of fixing the steel pipe pole and the I-beam, but also can adjust the elevation of the steel pipe pole, which is suitable for situations such as inconsistent floor elevations and partial lifting plates;

[0016] 3. The steel pipe uprights and I-beams are fixed with bolts and clips. Installation and removal are simple and convenient. Only bolts need to be operated, which avoids welding operations and saves labor, materials and energy.

[0017] 4. Bolt fixing avoids welding and cutting operations, and does not damage the steel beam components or the poles themselves;

[0018] 5. Avoid welding operations, reduce fire hazards, reduce environmental pollution, and be beneficial to energy conservation and environmental protection;

[0019] 6. The main components are made of steel pipes, bolts, etc. commonly used in construction projects. Local materials are used to achieve customized and standardized processing. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 The utility model relates to a multi-purpose scaffolding upright pole fixing device.

[0021] Figure 2 yes Figure 1 A cross-sectional view of the 1-1 surface.

[0022] Figure 3 yes Figure 1 Cross-sectional view of surface 2-2.

[0023] Figure 4 It is a side view of the clip of Example 1 of the utility model.

[0024] Figure 5 It is a schematic structural diagram of the first clip of Example 2 of the utility model.

[0025] Figure 6 It is a schematic structural diagram of the second clip of Example 2 of the utility model.

[0026] Figure 7 It is an overall view of the clip of Example 2 of the present utility model.

[0027] Reference numerals:

[0028] Steel pipe column 1; screw 2; adjusting nut 3; base 4; clip 5; I-beam 6; gasket 7; bolt 8; first clip 9; second clip 10; slot 11; plug rod 12; bolt hole 13. DETAILED DESCRIPTION

[0029] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but cannot be understood as limiting the present invention.

[0030] like Figure 1-Figure 7 As shown, the utility model of the multi-purpose scaffolding upright fixing device comprises: a base 4, a screw 2, an adjusting nut 3, a steel pipe column 1 and a clip 5, the base 4 is a square steel plate, and the base 4 is placed on an I-beam 6; the base 4 is a 150×150mm steel plate, the side length of the base 4 is greater than the width of the I-beam 6, and four φ10 bolt holes are opened at the four corners of the base 4 for fixing the clip 5.

[0031] The lead screw 2 is fixed above the base 4 . Specifically, the lead screw 2 is welded at a middle position above the base 4 . The adjusting nut 3 is located on the lead screw 2 , and the adjusting nut 3 is threadedly connected to the lead screw 2 .

[0032] The steel pipe column 1 is sleeved on the lead screw 2, and the adjusting nut 3 and the lead screw 2 are used to adjust the elevation of the steel pipe column 1. The diameter of the steel pipe column 1 is 48 mm, and the diameter of the lead screw 2 is 38 mm. The steel pipe column 1 is located above the adjusting nut 3. Specifically, the adjusting nut 3 is fixedly connected to the steel pipe column 1 by welding. When the adjusting nut 3 moves up and down along the lead screw 2, it will drive the steel pipe column 1 to move up and down. During the up and down movement, the steel pipe column 1 rotates with the adjusting nut 3.

[0033] Furthermore, the adjusting nut 3 and the steel pipe column 1 can also be rotatably connected via a bearing. The inner diameter of the bearing is larger than the outer diameter of the lead screw 2, the inner ring of the bearing is fixed to the top surface of the adjusting nut 3, and the outer ring of the bearing is fixedly connected to the steel pipe column 1 by welding. When the adjusting nut 3 rotates, the steel pipe column 1 can be driven to move up and down via the bearing, and during the up and down movement, the steel pipe column 1 may not rotate with the adjusting nut 3.

[0034] The clip 5 is located below the I-beam 6, and the clip 5 is detachably connected to the base 4. Specifically, the clip 5 has two embodiments, and the detachable connection is a bolt connection.

[0035] Example 1

[0036] like Figure 1-Figure 4 As shown, there are four clips 5, each of which has a bolt hole, the positions of the bolt holes on the base 4 and the clip 5 correspond, and the inner diameters of the bolt holes on the base 4 and the clip 5 are the same, and the bolts 8 pass through the bolt holes on the base 4 and the clip 5 to connect the base 4 and the clip 5. The clip 5 is a 50×70mm steel plate clip.

[0037] A gasket 7 is installed between the base 4 and the clip 5. The gasket 7 is a 25×25 mm square steel gasket, and the gasket 7 is located outside the I-beam 6. When the bolt 8 is tightened, the base 4 and the clip 5 clamp the flange of the I-beam 6 to complete the fixation of the steel pipe upright 1.

[0038] Example 2

[0039] like Figure 5-Figure 7 As shown, the clip 5 includes a first clip 9 and a second clip 10, and the first clip 9 and the second clip 10 are each provided with two bolt holes 13, the positions of the bolt holes 13 correspond to the positions of the bolt holes on the base 4, and the inner diameters of the bolt holes 13 on the base 4, the first clip 9 and the second clip 10 are the same, and the bolts 8 pass through the bolt holes 13 on the base 4, the first clip 9 or the second clip 10 to connect the base 4 with the first clip 9 and the second clip 10.

[0040] Furthermore, a slot 11 is provided on the side of the first clamping piece 9 , and an inserting rod 12 is fixed on the side of the second clamping piece 10 , and the slot 11 and the inserting rod 12 match each other.

[0041] Before installing the bolts 8, it is necessary to first drill holes at the corresponding positions of the insertion rods 12 on the I-beam 6, insert the insertion rods 12 of the second clip 10 through the holes on the I-beam 6 into the slots 11 of the first clip 9, and then install the gaskets 7 between the base 4 and the first clip 9, and between the base 4 and the second clip 10, and finally tighten them with bolts 8.

[0042] The multi-purpose scaffolding pole fixing device of the utility model is simple and convenient to install and remove, and only needs to operate the bolts, avoiding welding operations, saving labor, materials and energy. The utility model is suitable for fixing steel pipe poles and I-beams when the formwork support crosses the post-casting strip and the floor opening, fixing the cantilever scaffolding poles and steel beams, and other application scenarios, and has a wide range of applications.

[0043] In the description of the present invention, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features.

[0044] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0045] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0046] In the present utility model, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0047] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are illustrative and cannot be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.

Claims

1. A multi-purpose scaffolding pole fixing device, characterized in that: include: A base, which is a square steel plate and is placed on an I-beam; A lead screw, wherein the lead screw is fixed above the base; An adjusting nut, wherein the adjusting nut is located on the lead screw and is threadably connected to the lead screw; A steel pipe column, wherein the steel pipe column is sleeved on the lead screw and is located above the adjusting nut; The clamp is located below the I-beam and is detachably connected to the base.

2. The multi-purpose scaffolding pole fixing device according to claim 1 is characterized in that: The detachable connection is a bolt connection.

3. The multi-purpose scaffolding pole fixing device according to claim 2 is characterized in that: The base is a 150×150 mm steel plate, the side length of the base is greater than the width of the I-beam, and four bolt holes are provided at the four corners of the base.

4. The multi-purpose scaffolding pole fixing device according to claim 3 is characterized in that: There are four clips, each of which is provided with a bolt hole. The positions of the bolt holes on the base and the clip correspond to each other, and the inner diameters of the bolt holes on the base and the clip are the same. The clip is a 50×70mm steel plate clip.

5. The multi-purpose scaffolding pole fixing device according to claim 3 is characterized in that: The clip comprises a first clip and a second clip, wherein the first clip and the second clip are both provided with bolt holes, a slot is provided on the side of the first clip, and an insertion rod is fixed on the side of the second clip, wherein the slot and the insertion rod match each other.

6. The multi-purpose scaffolding pole fixing device according to claim 4 or 5, characterized in that: A gasket is installed between the base and the clamp, and the gasket is a 25×25mm square steel gasket, and the gasket is located on the outside of the I-beam.

7. The multi-purpose scaffolding pole fixing device according to claim 1 is characterized in that: The diameter of the steel pipe column is 48 mm, and the diameter of the lead screw is 38 mm.

8. The multi-purpose scaffolding pole fixing device according to claim 1, characterized in that: The lead screw is fixedly connected to the base by welding, and the adjusting nut is fixedly connected to the steel pipe column.