Rapid drilling rig for hydrogeological exploration

By introducing rotating mechanisms and protective devices into the hydrogeological drilling device, the problems of low efficiency and insufficient safety of manual drilling are solved, and the effect of improving drilling efficiency and enhancing safety is achieved.

CN222333688UInactive Publication Date: 2025-01-10SHANDONG PROVINCIAL GEOLOGICAL & MINERAL EXPLORATION & DEV BUREAU 801 HYDROGEOLOGY & ENG GEOLOGY BRIGADE (SHANDONG PROVINCIAL GEOLOGICAL & MINERAL ENG EXPLORATION INST)

Patent Information

Application Number
CN202421305996.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2025-01-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the drilling process, existing hydrogeological drilling devices require manual hand-held handles to push the drill rod downward. Especially when operating on hard rocks, the physical strength requirements for the staff are high and low efficiency, making it difficult to complete drilling quickly.

Method used

A rapid drilling device including a rotating mechanism is designed to drive the drilling rod by meshing the driving gear with the driven gear and driving the screw, and to enhance the operation convenience through the telescopic rod and the protective cartridge. Security.

Benefits of technology

This allows staff to drill the drill rod into the hard ground easily and quickly, greatly reducing the difficulty of drilling, improving drilling efficiency, and improving safety through the cooperation of protective cartridges and springs to prevent stones from splashing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222333688U_ABST
    Figure CN222333688U_ABST
Patent Text Reader

Abstract

The utility model discloses a rapid drilling device for hydrogeological exploration, and belongs to the technical field of equipment for hydrogeological exploration. A rapid drilling device for hydrogeological exploration comprises a mounting seat, a drilling mechanism is mounted on the mounting seat and comprises a connecting seat, a drill rod is detachably mounted on one side of the connecting seat, a rotating mechanism is mounted on one side of the drill rod, a lead screw is rotationally connected to a fixing frame, and a driven gear is fixedly connected to the end of the lead screw; a handle is installed on one side of the connecting rod, and the connecting rod is fixedly sleeved with a driving gear. According to the technical scheme, the lead screw, the driving gear and the driven gear are matched, and the diameter size of the driving gear is smaller than that of the driven gear, so that a worker can easily and quickly drill the drill rod into the hard ground by rotating the handle, the drilling difficulty is greatly reduced, and the drilling efficiency is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of equipment for hydrogeological exploration, and more specifically, to a rapid drilling device for hydrogeological exploration. Background Art

[0002] When conducting hydrogeological surveys, the rapid and accurate acquisition of underground information is related to the reliability of the entire exploration results. Therefore, in order to improve exploration efficiency and ensure the reliability of exploration results, relevant staff often use fast drilling devices for hydrogeological surveys to quickly and accurately obtain underground soil and rock sample information.

[0003] The document with the prior art publication number CN217632246U provides a portable drilling device for hydrogeological drilling, which is stable and easy to operate during drilling work, and has the characteristics of being detachable and can effectively reduce the volume during transportation, making it easy to carry.

[0004] Although the above-mentioned existing technical solutions have the function of geological drilling, they still have the following defects: when drilling with the above-mentioned technical solutions, the user needs to manually hold the handle to push the drill rod downward to ensure that the drill rod is drilled smoothly. However, in the process of geological drilling, workers often need to drill holes in hard rocks, which not only requires high physical strength of the workers, but also has low efficiency and is difficult to complete the drilling work quickly. In view of this, we propose a fast drilling device for hydrogeological exploration. Utility Model Content

[0005] 1. Technical issues to be solved

[0006] The purpose of the present application is to provide a rapid drilling device for hydrogeological exploration, which solves the problem in the prior art that the user needs to manually hold the handle to push the drill rod downward. However, in the process of geological drilling, workers often need to drill holes in hard rocks, which not only places high physical demands on the workers, but also has low efficiency and is difficult to complete the drilling work quickly. The technical problem is that the workers can easily and quickly drill the drill rod into the hard ground by turning the handle, which greatly reduces the difficulty of drilling and effectively improves the drilling efficiency.

[0007] 2. Technical solution

[0008] The embodiment of the present application provides a rapid drilling device for hydrogeological exploration, comprising: a mounting seat, a drilling mechanism is installed on the mounting seat, the drilling mechanism includes a connecting seat, a drill rod is detachably installed on one side of the connecting seat, a rotating mechanism is installed on one side of the drill rod, the rotating mechanism is used to drive the drill rod to rotate, a driving frame is installed on one side of the drill rod, a fixing frame is fixed on the mounting seat, a screw rod is rotatably connected to the fixing frame, the driving frame is threadedly connected to the screw rod, the driving frame is limited by the fixing frame and is slidably connected to the fixing frame, a driven gear is fixedly connected to the end of the screw rod, a connecting rod is also rotatably connected to the mounting seat, a handle is installed on one side of the connecting rod, a driving gear is sleeved and fixed on the connecting rod, the driving gear is meshed and connected with the driven gear, and the diameter of the driving gear is smaller than the diameter of the driven gear.

[0009] By adopting the above technical solution, the staff aligns the drill rod with the designated position, and the drill rod rotates under the action of the rotating mechanism. Then the staff holds the handle to rotate the connecting rod, and the driving gear rotates. Since the driving gear is meshed with the driven gear and the diameter of the driving gear is smaller than the diameter of the driven gear, the screw rotates, and the driving frame drives the drill rod downward. This method allows the staff to drill the drill rod into the hard ground easily and quickly, greatly reducing the difficulty of drilling and effectively improving the drilling efficiency.

[0010] As an optional solution to the technical solution of the present application document, the rotating mechanism includes an electric motor fixedly mounted on a mounting seat, a spline rod is fixedly connected to the output end of the motor, a spline cylinder is sleeved on the outer side of the spline rod, the spline cylinder is fixedly connected to the connecting seat, and the spline cylinder is restricted by the driving frame and is rotatably connected thereto.

[0011] By adopting the above technical solution, under the action of the motor, the spline rod drives the spline cylinder and the drill rod to rotate.

[0012] As an optional solution of the technical solution of the present application document, a telescopic rod is fixedly installed on one side of the handle, and the other end of the telescopic rod is connected and fixed to the connecting rod.

[0013] By adopting the above technical solution and adjusting the length of the telescopic rod, the staff can rotate the connecting rod more easily.

[0014] As an optional solution of the technical solution of the present application document, a protective tube is provided under the drill rod, and the drill rod and the protective tube are clearance-matched.

[0015] By adopting the above technical solution, the protective tube is always covered on the outside of the drill rod to prevent stones generated during the drilling process from splashing randomly, thereby effectively improving the safety of the technical solution.

[0016] As an optional solution of the technical solution of the present application document, a plurality of sliding rods are slidably connected to one side of the driving frame, the sliding rods are fixedly connected to the protective tube, and a plurality of springs are fixedly connected between the sliding rods and the driving frame.

[0017] By adopting the above technical solution, the setting of the spring enables the protective tube to be tightly covered on the outside of the drill rod, further reducing the probability of stones scattering.

[0018] 3. Beneficial effects

[0019] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:

[0020] 1. The technical solution of the present application uses the cooperation between the screw, the driving gear and the driven gear, and the diameter of the driving gear is smaller than the diameter of the driven gear, so that the staff can easily and quickly drill the drill rod into the hard ground by turning the handle, which greatly reduces the difficulty of drilling and effectively improves the drilling efficiency.

[0021] 2. The technical solution of the present application uses a telescopic rod to adjust the length of the telescopic rod so that the staff can turn the connecting rod more easily. At the same time, through the cooperation between the protective tube and the spring, the protective tube can be covered on the outside of the drill rod to prevent stones generated during the drilling process from splashing randomly, thereby effectively improving the safety of the present technical solution. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 This is a schematic diagram of the overall structure of a fast drilling device for hydrogeological exploration disclosed in a preferred embodiment of the present application;

[0023] Figure 2 A schematic diagram of a partial structure of one side of a mounting seat in a fast drilling device for hydrogeological exploration disclosed in a preferred embodiment of the present application;

[0024] Figure 3 A schematic diagram of the structure of a drilling mechanism in a fast drilling device for hydrogeological exploration disclosed in a preferred embodiment of the present application;

[0025] Figure 4 A schematic cross-sectional view of the structure of a protective tube in a fast drilling device for hydrogeological exploration disclosed in a preferred embodiment of the present application;

[0026] Explanation of the numbers in the figure: 1. Mounting seat; 2. Screw rod; 3. Driving gear; 4. Handle; 5. Drill rod; 6. Driven gear; 7. Telescopic rod; 8. Protective tube; 9. Connecting rod; 10. Spline rod; 11. Motor; 12. Connecting seat; 13. Spline tube; 14. Fixed frame; 15. Sliding rod; 16. Driving frame; 17. Spring. DETAILED DESCRIPTION

[0027] The present application is further described in detail below in conjunction with the accompanying drawings.

[0028] Reference Figure 1 , Figure 2 and Figure 3 The embodiment of the present application discloses a rapid drilling device for hydrogeological exploration, comprising: a mounting seat 1, a drilling mechanism is installed on the mounting seat 1, the drilling mechanism includes a connecting seat 12, a drill rod 5 is detachably installed on one side of the connecting seat 12, a rotating mechanism is installed on one side of the drill rod 5, the rotating mechanism is used to drive the drill rod 5 to rotate, a driving frame 16 is installed on one side of the drill rod 5, a fixed frame 14 is fixed on the mounting seat 1, a screw rod 2 is rotatably connected to the fixing frame 14, the driving frame 16 is threadedly connected to the screw rod 2, the driving frame 16 is limited by the fixing frame 14 and is slidably connected thereto, a driven gear 6 is fixedly connected to the end of the screw rod 2, a connecting rod 9 is also rotatably connected to the mounting seat 1, a handle 4 is installed on one side of the connecting rod 9, a driving gear 3 is sleeved and fixed on the connecting rod 9, the driving gear 3 is meshed and connected with the driven gear 6, and the diameter of the driving gear 3 is smaller than the diameter of the driven gear 6.

[0029] The rotating mechanism includes an electric motor 11 fixedly mounted on a mounting base 1, a spline rod 10 being fixedly connected to the output end of the electric motor 11, a spline cylinder 13 being sleeved on the outer side of the spline rod 10, the spline cylinder 13 being fixedly connected to a connecting base 12, and the spline cylinder 13 being restricted by a driving frame 16 and being rotationally connected therewith.

[0030] The staff aligns the drill rod 5 to the designated position, and under the action of the motor 11, the spline rod 10 drives the spline cylinder 13 and the drill rod 5 to rotate. The staff holds the handle 4 to rotate the connecting rod 9, and the driving gear 3 rotates. Since the driving gear 3 is meshed with the driven gear 6 and the diameter of the driving gear 3 is smaller than the diameter of the driven gear 6, the screw 2 rotates, and the driving frame 16 then drives the spline cylinder 13 and the drill rod 5 to move downward.

[0031] This method enables the staff to drill the drill rod 5 into the hard ground easily and quickly, greatly reducing the drilling difficulty and effectively improving the drilling efficiency.

[0032] Reference Figure 1 and Figure 2 A telescopic rod 7 is fixedly installed on one side of the handle 4. By adjusting the length of the telescopic rod 7, the staff can rotate the connecting rod 9 more effortlessly. The other end of the telescopic rod 7 is connected and fixed to the connecting rod 9.

[0033] Reference Figure 1 , Figure 2 and Figure 4 A protective tube 8 is sleeved under the drill rod 5, and the drill rod 5 and the protective tube 8 are clearance-matched.

[0034] A plurality of slide bars 15 are slidably connected to one side of the driving frame 16 . The slide bars 15 are fixedly connected to the protective tube 8 . A plurality of springs 17 are fixedly connected between the slide bars 15 and the driving frame 16 .

[0035] While the driving frame 16 drives the drill rod 5 to move downward, under the action of the slide bar 15 and the spring 17, the protective tube 8 can always be tightly covered on the outside of the drill rod 5, reducing the probability of stones scattering and effectively improving the safety of the technical solution.

[0036] The present application provides a screw rod 2, a driving gear 3 and a driven gear 6, so that the staff can easily and quickly drill the drill rod 5 into the hard ground, greatly reducing the difficulty of drilling; and by providing a protective tube 8 and a spring 17, it can prevent the stones generated during the drilling process from splashing randomly, effectively improving the safety of the present technical solution.

[0037] The implementation principle of the fast drilling device for hydrogeological exploration in the embodiment of the present application is as follows: when the relevant staff needs to use the technical solution for geological drilling, the staff first aligns the drill rod 5 with the designated position, and under the action of the motor 11, the spline rod 10 drives the spline cylinder 13 and the drill rod 5 to rotate. Then the staff holds the handle 4 to rotate the connecting rod 9, the driving gear 3 drives the screw 2 to rotate, and the driving frame 16 then drives the spline cylinder 13 and the drill rod 5 to move downward.

[0038] During the period when the driving frame 16 drives the drill rod 5 to move downward, under the action of the slide bar 15 and the spring 17, the protective tube 8 can always be tightly covered on the outside of the drill rod 5, reducing the probability of stones scattering. In this way, the geological drilling operation can be completed.

Claims

1. A rapid drilling device for hydrogeological exploration, characterized in that: The invention comprises: a mounting seat, a drilling mechanism is installed on the mounting seat, the drilling mechanism comprises a connecting seat, a drill rod is detachably installed on one side of the connecting seat, a rotating mechanism is installed on one side of the drill rod, the rotating mechanism is used to drive the drill rod to rotate, a driving frame is installed on one side of the drill rod, a fixing frame is fixed on the mounting seat, a screw rod is rotatably connected to the fixing frame, the driving frame is threadedly connected to the screw rod, the driving frame is limited by the fixing frame and is slidably connected thereto, a driven gear is fixedly connected to the end of the screw rod, a connecting rod is also rotatably connected to the mounting seat, a handle is installed on one side of the connecting rod, a driving gear is sleeved and fixed on the connecting rod, the driving gear is meshed and connected with the driven gear, and the diameter size of the driving gear is smaller than the diameter size of the driven gear.

2. The rapid drilling device for hydrogeological exploration according to claim 1, characterized in that: The rotating mechanism includes an electric motor fixedly mounted on a mounting seat, the output end of the electric motor is fixedly connected to a spline rod, a spline cylinder is sleeved on the outer side of the spline rod, the spline cylinder is fixedly connected to a connecting seat, and the spline cylinder is limited by a driving frame and is rotationally connected to the driving frame.

3. The rapid drilling device for hydrogeological exploration according to claim 1, characterized in that: A telescopic rod is fixedly mounted on one side of the handle, and the other end of the telescopic rod is connected and fixed to the connecting rod.

4. The rapid drilling device for hydrogeological exploration according to claim 1, characterized in that: A protective tube is sleeved under the drill rod, and the drill rod and the protective tube are in clearance fit.

5. The rapid drilling device for hydrogeological exploration according to claim 4, characterized in that: A plurality of slide bars are slidably connected to one side of the driving frame, the slide bars are fixedly connected to the protective tube, and a plurality of springs are fixedly connected between the slide bars and the driving frame.

Citation Information

Patent Citations

  • Portable drilling device for hydrogeological drilling

    CN217632246U

Cited By

  • Vibration deviation prevention device for geological exploration drilling equipment

    CN120575816A