Wind power civil engineering pre-embedded base
By adopting a combination design of drilling device and protection device in the wind power civil base, the problems of poor stability and low installation efficiency in the existing technology are solved, and higher stability and collision prevention capabilities are achieved, and wind power is improved. Overall performance of civil base.
Patent Information
- Application Number
- CN202420710257.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2034-04-08
AI Technical Summary
The installation structure of existing wind power civil engineering bases has poor stability, and the base installation and disassembly efficiency is low, and it is susceptible to damage from external impacts.
Design a wind power civil engineering pre-embedded base, adopting drilling device and protection device, and realizes an easy-to-disassemble structure through the combination of plug columns, threaded rods, propulsion device and conical rods, and through the fixing sleeves, brackets and railings. Protective devices improve collision resistance.
It improves the stability of the plug and installation structure, simplifies the installation and disassembly process of the base, enhances the anti-collision capability of the base, and improves the overall use efficiency and safety.
Smart Images

Figure CN222349745U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of wind power civil construction foundation, in particular to a wind power civil construction pre-buried base. Background Art
[0002] With the development of clean energy, wind power generation has become an important source of energy for the new generation. In wind power generation projects, civil engineering plays a vital role. During the construction process, it is necessary to build an independent foundation to provide a basis for the subsequent construction of wind power fans.
[0003] The Chinese utility model patent, application number 202322266933.2 discloses a wind power civil engineering steel structure base, which is installed by threading a fastening screw with a threaded hole 2 of the base so that an insertion rod and a cone 1 are inserted into the ground, and then the connection and installation between the insertion rod and the ground are reinforced by a reinforcement component, so that the support stability of the steel structure base is better, thereby improving the overall stability of the entire steel structure building.
[0004] The installation structure disclosed in the above-mentioned prior art patent only consists of the insertion of a cone and a rod and the fixation to the ground, and has poor stability. When the base is installed and disassembled, the installation structure needs to be repeatedly dismantled and fixed, which is inefficient.
[0005] In addition, after the wind turbine base is installed, due to the lack of protective measures, the support columns and the entire base are easily damaged or displaced in the event of external impact, affecting its use. Utility Model Content
[0006] In the above background, the utility model proposes a pre-buried foundation for wind power civil engineering, including a foundation, a support column, and a drilling device. The support column and the drilling device are both installed on the foundation. The drilling device includes an insertion column, a threaded rod, a propulsion device, and a conical rod. The base is provided with a positioning hole for passing the insertion column. The conical rods are two in number and are laterally symmetrically arranged. The side surfaces of the insertion column are provided with entry and exit holes for the conical rods to pass through. The propulsion device is used to convert the longitudinal screwing action of the threaded rod into the lateral screwing action of the conical rod.
[0007] The idea of the utility model is that: through the improvement of the structural design, the overall design of the base is designed to be an easy-to-disassemble structure, and the base and the supporting columns on the base are protected by adding an anti-collision protection device.
[0008] Preferably, a propulsion device installation groove is provided in the plug column, and the propulsion device includes a support member, a support rod, a rack, a gear, a first bevel gear, a second bevel gear, and a support frame. The support member is installed at the end of the threaded rod, and the number of the support rod and the support frame is two. The two ends of the support rod are respectively hinged to the support member and the support frame, and each support frame is installed with a conical rod. The support frame is provided with a groove, and the gear, the first bevel gear, and the second bevel gear are installed in the groove. The rack is installed on the top of the support frame, the gear and the rack are arranged correspondingly, the first bevel gear is installed coaxially with the gear, and the second bevel gear is installed at the end center of the conical rod, and the first bevel gear and the second bevel gear are meshed with each other at a vertical angle.
[0009] Preferably, the propulsion device also includes a limit rod, a slider, and a slide groove. The slide groove is arranged on the inner wall of the column. The longitudinal length of the slide groove is arranged corresponding to the lifting height of the support member. The slider is located in the slide groove. The two ends of the limit rod are respectively connected to the support member and the slider.
[0010] Preferably, the drilling device further comprises a limiting ring, the bottom of which is provided with a threaded ring connected to the threaded groove at the top of the plug column.
[0011] Preferably, the propulsion device also includes a convex block and a convex block mounting groove, the convex block mounting groove is inserted into the inner wall of the column, the convex block is connected to the bottom of the support frame and is installed in the convex block mounting groove, and the convex block is also provided with a first spring located between the convex block and the inner wall of the column.
[0012] Preferably, the base is cylindrical, and the number of the drilling devices is 4, which are symmetrically installed on the base at equal intervals.
[0013] Preferably, the wind power civil engineering embedded base further includes a protection device, which includes a fixing sleeve, a bracket, and a railing. The fixing sleeve is sleeved on the support column, and the two ends of the bracket are respectively connected to the fixing sleeve and the railing.
[0014] Preferably, the brackets and the railings corresponding to the brackets are installed at equal intervals in the circumferential direction of the fixing sleeve.
[0015] Preferably, the bracket and the railing are connected to each other via a second spring.
[0016] The beneficial effect of the utility model is that compared with the prior art, the wind power civil engineering embedded base of the utility model is connected with the two support frames by rotation at one end of the two support rods under the threaded rod, so that the threaded rod can push the support frame in the column and the conical rod on one side thereof to move while rotating, and insert it horizontally into the underground, thereby increasing the resistance of the column to the ground, making it difficult for the column to fall off, which is beneficial to improving the stability of the column and the installation structure, and under the action of the bevel gear set, the first gear and the conical rod are transmitted, and the first bevel gear is displaced accordingly, and drives the conical rod to rotate through engagement with the rack, so that it is convenient for it to drill the soil horizontally, and at the same time, the threaded connection limit ring on the top of the column, cooperates with the insertion of the column to the base, can be disassembled and the restriction on the base is released, so that the base can be directly taken out without repeatedly removing the column, and the efficiency is high.
[0017] By providing a protective device including a fixing sleeve, a bracket and a railing, the base is protected as a whole and the anti-collision capability is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some specific implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0019] Figure 1 The overall structural diagram of the pre-buried foundation for wind power construction is shown;
[0020] Figure 2 Show Figure 1 A partial enlarged view of part A;
[0021] Figure 3 Show Figure 1 A schematic cross-sectional view of the middle plug column;
[0022] Figure 4 A schematic diagram of the structure of the limit ring is shown;
[0023] Figure 5 A schematic diagram showing the structure of the convex block mounting groove;
[0024] Figure 6 A schematic diagram showing the structure of a convex block is shown;
[0025] Figure 7 A schematic diagram showing the overall structure of a wind power civil engineering embedded foundation with a protective device;
[0026] Figure 8 A schematic diagram of the plan layout of the protection device is shown.
[0027] The reference numerals are as follows:
[0028] 1. Base, 2. Support column, 3. Drilling device, 4. Protective device;
[0029] 11. Insert column, 12. Threaded rod, 13. Propelling device, 14. Conical rod, 15. Positioning hole, 16. Inlet and outlet holes, 17. Propelling device mounting groove, 18. Limiting ring;
[0030] 101. Support member, 102. Support rod, 103. Rack, 104. Gear, 105. First bevel gear, 106. Second bevel gear, 107. Support frame, 108. Groove, 109. Limit rod, 110. Slider, 111. Slide groove, 112. Threaded ring, 113. Convex block, 114. Convex block mounting groove, 115. First spring, 116. Fixed sleeve, 117. Bracket, 118. Railing, 119. Second spring, 120. Threaded groove. DETAILED DESCRIPTION
[0031] Example 1
[0032] Figure 1 This is a pre-buried foundation for wind power construction proposed by the utility model. The structural shape and size ratio in the figure are for reference only.
[0033] The embedded base structure includes a base 1, a support column 2, and a drilling device 3. The base 1 and the support column 1 are both cylindrical. The support column 2 is installed above the base 1. There are multiple drilling devices 3, which are positioned and installed through positioning holes 15 arranged at equal intervals in the circumferential direction of the base 1.
[0034] like Figure 2 , Figure 3 As shown, each drilling device 3 includes a column 11, a threaded rod 12, a propulsion device 13, and a conical rod 14. The column 11 passes through the middle of the positioning hole 15, and the threaded rod 12 is longitudinally installed in the middle of the column 11 with the top exposed. There are two conical rods 14, and the two conical rods 14 are symmetrically arranged in the horizontal direction. The side of the column 11 is provided with an entry and exit hole 16 for facilitating the entry and exit of the tip of the conical rod 14. A propulsion device installation groove 17 is provided inside the column 11 for installing the propulsion device 13 and the conical rod 14. The propulsion device 13 is installed between the threaded rod 12 and the conical rod 14, and its function is to convert the longitudinal rotation in or out of the threaded rod 12 into the lateral rotation in or out of the conical rod 14.
[0035] The specific structure of the propulsion device 13 and the connection parts with the threaded rod 12 is as follows:
[0036] A support member 101 is provided at the rear end of the threaded rod 12, and the support member 101 is hinged to two support rods 102, and the other ends of the support rods 102 are each hinged to a support frame 107, and a rack 103 is transversely fixedly installed on the plug column 11 at a position above the support frame 107, and the gear 104 and the rack 103 form a gear rack mechanism. A groove 108 for installing the first bevel gear 105, the second bevel gear 106 and the gear 103 is provided on the support frame 107, and the first bevel gear 105 is coaxially installed with the gear 104. The second bevel gear 106 is installed at the axial center of the conical rod 14, and the horizontal first bevel gear 105 and the longitudinal second bevel gear 106 mesh with each other at a vertical angle. When the threaded rod 12 is screwed in, the support frame 107 moves horizontally, the gear 104 and the rack 103 engage to produce horizontal rotation, and the first bevel gear 105 synchronized with the gear 104 engages with the second bevel gear 106, converting the horizontal rotation into the longitudinal screwing of the conical rod 14, so that the conical rod 14 passes through the entry and exit hole 16 and enters the underground soil layer. On the contrary, when the threaded rod 12 is screwed out, the conical rod 14 retreats, leaves the soil layer and returns to the inside of the plug.
[0037] like Figure 4 As shown, in order to fix the column 11 and control the depth of the column 11 buried in the ground, the base of this embodiment is also provided with a limiting ring 18 at the top of the base 1, and the limiting ring 18 is provided with a threaded ring 112. The inner side of the top of the column 11 is provided with a threaded groove 120 corresponding to the threaded ring 112, and the actual burial depth of the column 11 is controlled by screwing the threaded ring 112 on the limiting ring 18 in and out.
[0038] In order to maintain the stability of the threaded rod 12 during the lifting process, the base of this embodiment is further provided with a limit rod 109, a slider 110, and a slide groove 111. The slide groove 111 is provided on the inner wall of the plug column 11, and its length is set corresponding to the lifting height of the threaded rod 12. The slider 110 is installed in the slide groove 111, and the two ends of the limit rod 109 are respectively connected to the support member 101 and the slider 110. When the threaded rod 12 is lifted and lowered, the limit rod 109 plays a role in ensuring that the threaded rod 12 does not tilt longitudinally.
[0039] like Figure 5 , Figure 6As shown, in order to control the travel distance of the conical rod 14 when it enters the soil layer and maintain the stability of the conical rod 14 when it moves, the base of this embodiment is also provided with a convex block 113, a convex block mounting groove 114 and a first spring 115. The convex block mounting groove 114 is installed in the plug column 11 and extends to the inner wall of the plug column 11. The convex block 113 is arranged in the convex block mounting groove 114 and is connected to the bottom of the support frame 107. The first spring 115 is arranged between the convex block 113 and the inner wall of the plug column 11. When the conical rod 14 is screwed into the soil layer, the support frame 107 slides in the convex block mounting groove 114 driven by the convex block 113 to keep the conical rod 14 moving smoothly. The first spring 115 controls the depth of the conical rod 14 screwed into the soil layer.
[0040] Example 2
[0041] like Figure 7 , Figure 8 As shown, in order to protect the embedded base 1 and support column 2, the base of this embodiment is also provided with a protection device 4.
[0042] The protection device 4 includes a fixing sleeve 116 , a bracket 117 , a railing 118 and a second spring 119 .
[0043] The fixing sleeve 116 is composed of two semicircular annular sleeves, which are integrally sleeved on the support column 2. A plurality of brackets 117 are evenly spaced and connected to the outside of the fixing sleeve 116. The other end of each bracket 117 is connected to a railing 118 via a second spring 119. When there is an external impact, the railing 118 bears the impact force, and the second spring 119 absorbs the impact energy to protect the support column 2 and the base 1 thereunder.
[0044] The wind power civil engineering pre-buried foundation provided by the utility model adopts the method of sequentially passing a plurality of plug posts 11 through a plurality of positioning holes 15 in the body of the foundation 1, so that one end of the plug posts 11 is inserted into the ground, and then the threaded rod 12 inside the plug posts 11 is rotated, and the two support rods 102 at the bottom of the lower end support member 101 are respectively connected with the rotation of the two support frames 107, so as to push the two support frames 107 to move laterally, and the conical rods 14 on one side of the two support frames 107 are respectively passed through the inlet and outlet holes 16 on both sides of the plug posts 11 and inserted into the soil, and since the gear 104 at the top of the support frame 107 is meshed with the rack 103 inside the plug posts, the gear 104 rotates with the movement of the support frame 107, and the first bevel gear 105 and the second bevel gear 106 are meshed, and the first bevel gear 105 and the second bevel gear 106 are respectively fixedly connected with the conical rod 14 and the gear 104, the gear 104 drives the conical rod 14 to rotate, and the soil is drilled. After the fixing of the plug posts 11 is completed, the threaded rings 112 at the bottom of the plurality of limit rings 18 are aligned with the threaded grooves 120 at the tops of the plurality of plug posts 11 in sequence, and the limit rings 18 are installed on the plurality of plug posts 11 by rotation to limit the position of the base 1 body. Similarly, when the base 1 needs to be disassembled, the plurality of limit rings 18 are rotated in the reverse direction to separate the limit rings 18 from the plug posts 11, and the threaded rods 12 are screwed out in the reverse direction to make the conical rods 14 leave the soil layer and be retracted into the plug posts 11, so that the base 1 can be separated from the plurality of plug posts 11. According to the needs, the fixing sleeve 116 can be sleeved on the support column, so that the plurality of brackets 117 and railings 118 outside the fixing sleeve 116 surround the base 1 and the support column 2 to protect the base 1 and the support column 2.
[0045] The above description of the proposed embodiments enables those skilled in the art to implement or use the utility model. It should be understood that the features disclosed in the above embodiments can be used alone or in combination, except where otherwise specified. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the utility model. Therefore, the utility model disclosed herein is not limited to the specific embodiments disclosed, but is intended to cover modifications within the spirit and scope of the utility model as defined in the appended claims.
Claims
1. A pre-buried foundation for wind power construction, comprising a foundation, a support column, and a drilling device, wherein the support column and the drilling device are both mounted on the foundation, characterized in that: The drilling device includes an insertion column, a threaded rod, a propulsion device, and a conical rod. The base is provided with a positioning hole for the insertion column. There are two conical rods, which are arranged symmetrically laterally. The side of the insertion column is provided with entry and exit holes for the conical rod to pass through. The propulsion device is used to convert the longitudinal screwing action of the threaded rod into the lateral screwing action of the conical rod.
2. The wind power civil engineering embedded foundation according to claim 1, characterized in that: A propulsion device installation groove is provided in the plug column, and the propulsion device includes a support member, a support rod, a rack, a gear, a first bevel gear, a second bevel gear, and a support frame. The support member is installed at the end of the threaded rod. There are two support rods and two support frames. The two ends of the support rod are respectively hinged to the support member and the support frame. Each support frame is installed with a conical rod. A groove is provided on the support frame. The gear, the first bevel gear, and the second bevel gear are installed in the groove. The rack is installed on the top of the support frame. The gear and the rack are arranged correspondingly. The first bevel gear is installed coaxially with the gear. The second bevel gear is installed at the center position of the end of the conical rod. The first bevel gear and the second bevel gear are meshed with each other at a vertical angle.
3. The wind power civil engineering pre-buried foundation according to claim 2 is characterized in that: The propulsion device also includes a limit rod, a slider, and a slide groove. The slide groove is arranged on the inner wall of the column. The longitudinal length of the slide groove is arranged corresponding to the lifting height of the support member. The slider is located in the slide groove. The two ends of the limit rod are respectively connected to the support member and the slider.
4. The wind power civil engineering embedded foundation according to claim 2, characterized in that: The drilling device also includes a limiting ring, and a threaded ring connected to the threaded groove at the top of the plug column is provided at the bottom of the limiting ring.
5. The wind power civil engineering embedded foundation according to claim 2, characterized in that: The propulsion device also includes a convex block and a convex block mounting groove, wherein the convex block mounting groove is inserted into the inner wall of the plug column, the convex block is connected to the bottom of the support frame and is installed in the convex block mounting groove, and a first spring is also provided in the convex block and located between the convex block and the inner wall of the plug column.
6. The wind power civil engineering embedded foundation according to claim 1, characterized in that: The base is cylindrical, and the number of the drilling devices is 4, which are symmetrically installed on the base at equal intervals.
7. The wind power civil engineering pre-buried foundation according to claim 1, characterized in that: The wind power civil engineering embedded base also includes a protection device, which includes a fixing sleeve, a bracket, and a railing. The fixing sleeve is sleeved on the support column, and the two ends of the bracket are respectively connected to the fixing sleeve and the railing.
8. The wind power civil engineering pre-buried foundation according to claim 7, characterized in that: The bracket and the railings corresponding to the bracket are installed at equal intervals in the circumferential direction of the fixing sleeve.
9. The wind power civil engineering pre-buried foundation according to claim 7, characterized in that: The bracket and the railing are connected to each other via a second spring.
Citation Information
Patent Citations
Wind power civil engineering steel structure base
CN220285442U
Cited By
Crane with reinforced base structure
CN120024806A