Smoke leakage prevention treatment structure in lifting process of casting mold electric induction furnace feeding opening

By using exhaust dust collecting smoke pipe and dust collecting negative pressure jacket structure during the feed port lift of cast induction furnace, the problem of flue gas leakage is solved, the on-site operating environment and resource utilization are improved, and processing costs are reduced.

CN222352921UActive Publication Date: 2025-01-14HUNAN SANLI GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323332100.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-07
Publication Date
2025-01-14
Estimated Expiration
2033-12-07

AI Technical Summary

Technical Problem

During the electrolytic zinc melting and casting process, flue gas leakage occurs when the induction furnace feed port is lifted, affecting the on-site operating environment, sanitation and resource utilization, and increasing processing costs.

Method used

A flue gas leakage prevention treatment structure during the feed port lifting of cast induction electric furnace was designed, including exhaust dust collection smoke pipe and dust collection negative pressure jacket structure. The dust collection negative pressure jacket is connected to the exhaust dust collection smoke through the communication pipe. The pipe uses external suction force to collect and discharge the flue gas to avoid leakage of smoke.

Benefits of technology

It effectively prevents the leakage of flue gas during the lifting process, reduces the impact on the on-site operating environment, sanitation and resource utilization, and simplifies the dust accumulation and cleaning process, reducing processing costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222352921U_ABST
    Figure CN222352921U_ABST
Patent Text Reader

Abstract

The utility model relates to a smoke leakage prevention processing structure in the lifting process of a casting mold electric induction furnace feeding opening, and aims to solve the technical problems that smoke leaks when a current feeding opening and a furnace body are freely lifted through a traveling crane, and the field operation environment, the field sanitation, the resource utilization rate and the machining cost are easily affected. A through hole is formed in the center of the top end of the furnace body and heat preservation structure, a tail gas dust collecting smoke pipe is fixedly installed in the through hole, a slagging-off opening is formed in the top of one side of the furnace body and heat preservation structure, a feeding opening is formed in the center of the side, facing the slagging-off opening, of the top of the furnace body and heat preservation structure, and a feeding pipe is movably installed in the feeding opening. According to the lifting furnace, the problem of smoke leakage in the lifting process can be avoided, and the influences on the field operation environment, the field sanitation, the resource utilization rate and the machining cost are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of casting induction electric furnaces, in particular to a smoke leakage prevention processing structure during the lifting process of a feeding port of a casting induction electric furnace. Background Art

[0002] At present, environmental protection and process technology are developing towards high quality and refinement, and are in an important stage of industrial transformation and upgrading. Environmental protection, occupational health and resource utilization are gradually deepening.

[0003] Existing technologies such as Figure 1 As shown: During the electrolytic zinc smelting process, after the "zinc scale stuck" fault occurs at the feed port of the induction furnace, the workshop operator generally lifts and swings the feed port. When the feed port is lifted and swung, gaps are generated, causing smoke leakage, further affecting the on-site operating environment and on-site hygiene.

[0004] Ammonium chloride is added to the electrolytic zinc induction furnace to solve the problem of zinc inclusion in zinc slag, so a large amount of smoke is generated in the furnace. Since the feeding port and the furnace body are movably connected, they can be lifted freely by a crane. However, during the lifting process, smoke will leak out, which can easily affect the on-site operating environment, on-site hygiene, resource utilization and processing costs.

[0005] In view of this, we propose a smoke leakage prevention and treatment structure during the lifting process of the feeding port of the casting induction furnace. Utility Model Content

[0006] The purpose of the utility model is to overcome the shortcomings of the prior art, meet actual needs, and provide a smoke leakage prevention treatment structure during the lifting process of the feeding port of a casting induction furnace, so as to solve the technical problems that the current feeding port and the furnace body leak smoke when they are freely lifted by a crane, which is easy to affect the on-site operating environment, on-site hygiene, resource utilization and processing costs.

[0007] In order to achieve the purpose of the utility model, the technical solution adopted by the utility model is: designing a fume leakage prevention and treatment structure during the lifting process of the feeding port of a casting induction furnace, including a furnace body and a heat preservation structure;

[0008] A through hole is centrally provided at the top of the furnace body and the insulation structure, and an exhaust dust collecting smoke pipe is fixedly installed in the through hole; a slag removal port is provided at the top of one side of the furnace body and the insulation structure, and a feeding port is centrally provided on the side of the top of the furnace body and the insulation structure facing the slag removal port, a feeding pipe is movably installed in the feeding port, and a jacket structure fixedly installed on the top of the furnace body and the insulation structure is sleeved on the outer edge surface;

[0009] The jacket structure includes a dust collecting negative pressure jacket mounted on a feeding pipe, and the dust collecting negative pressure jacket is welded and fixed to the top of the furnace body and the insulation structure; a jacket cover plate mounted on the feeding pipe is detachably installed on the top of the dust collecting negative pressure jacket, and a circular groove for fixing a connecting pipe is provided on one side of the outer edge surface of the dust collecting negative pressure jacket, and the connecting pipe is connected to the exhaust dust collecting smoke pipe at one end away from the dust collecting negative pressure jacket.

[0010] Preferably, a fixing ring is welded and fixed on the top of the outer edge of the dust collecting negative pressure jacket, and a plurality of through holes are provided in a circular array on the top of the jacket cover plate, and fixing bolts threadedly connected to the fixing ring are movably provided in the plurality of through holes.

[0011] Preferably, a zinc sheet feeding inlet is provided at the top of one side of the outer edge surface of the feeding pipe, and an anti-backflow flap for blocking the zinc sheet feeding inlet is rotatably installed between the tops on both sides of the zinc sheet feeding inlet.

[0012] Preferably, an annular fixing plate is welded and fixedly installed on the bottom of the outer edge surface of the feeding pipe, and the annular fixing plate covers the top of the feeding port.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. Thanks to the setting of the jacket structure on the feeding pipe, the dust collecting negative pressure jacket equipped with the jacket cover is connected to the exhaust dust collecting duct through the connecting pipe. When the feeding pipe is lifted, the suction force generated by the induced draft fan of the external exhaust dust collecting tower cooperates with the exhaust dust collecting duct and the connecting pipe to complete the collection and discharge of the flue gas, thereby avoiding the problem of flue gas leakage during the lifting process and reducing the impact on the on-site operating environment, on-site hygiene, resource utilization and processing costs.

[0015] 2. Thanks to the setting of the jacket cover and the dust collecting negative pressure jacket with a fixing ring, the jacket cover can be removed from the top of the fixing ring by unscrewing a plurality of fixing bolts, which makes it convenient for the staff to clean the dust accumulated in the dust collecting negative pressure jacket and is easy to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of a traditional smoke leakage prevention treatment structure;

[0017] Figure 2 It is a schematic diagram of the overall structure of the utility model.

[0018] In the figure: 1. furnace body and insulation structure; 101. slag removal port; 2. tail gas dust collection smoke pipe; 3. feeding pipe; 301. zinc sheet feeding inlet; 4. dust collection negative pressure jacket; 5. jacket cover; 6. connecting pipe; 7. backflow prevention flap; 8. annular fixing plate; 9. fixing ring. DETAILED DESCRIPTION

[0019] The utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0020] A fume leakage prevention and treatment structure for the process of lifting the feeding port of a casting induction furnace, see Figure 2 , including a furnace body and a thermal insulation structure 1, a through hole is centrally provided at the top of the furnace body and the thermal insulation structure 1, and an exhaust dust collecting smoke pipe 2 is fixedly installed in the through hole, a slag removal port 101 is provided at the top of one side of the furnace body and the thermal insulation structure 1, and a feeding port is centrally provided on the side of the top of the furnace body and the thermal insulation structure 1 facing the slag removal port 101, a feeding pipe 3 is movably installed in the feeding port, and a jacket structure fixedly installed on the top of the furnace body and the thermal insulation structure 1 is sleeved on the outer edge surface, the jacket structure includes a dust collecting negative pressure jacket 4 sleeved on the feeding pipe 3, and the dust collecting negative pressure jacket 4 is welded and fixed to the top of the furnace body and the thermal insulation structure 1, the dust collecting negative pressure jacket The top of 4 is detachably mounted with a jacket cover plate 5 which is sleeved on the feeding pipe 3, and a circular groove for fixing a connecting pipe 6 is provided on one side of the outer edge surface of the dust collecting negative pressure jacket 4, and the connecting pipe 6 is connected to the exhaust gas dust collecting smoke pipe 2 at one end away from the dust collecting negative pressure jacket 4, and the dust collecting negative pressure jacket 4 equipped with the jacket cover plate 5 is connected to the exhaust gas dust collecting smoke pipe 2 through the connecting pipe 6, so that when the feeding pipe 3 is lifted, the suction force generated by the induced draft fan of the external exhaust gas dust collecting tower cooperates with the exhaust gas dust collecting smoke pipe 2 and the connecting pipe 6 to complete the collection and discharge of the smoke, thereby avoiding the problem of smoke leakage during the lifting process and reducing the impact on the on-site operating environment, on-site hygiene, resource utilization and processing costs.

[0021] For further information, see Figure 2 A fixing ring 9 is welded and fixedly provided on the top of the outer edge surface of the dust collecting negative pressure jacket 4, and a plurality of through holes are opened in a circular array at the top of the jacket cover plate 5, and fixing bolts threadedly connected to the fixing ring 9 are movably provided in the plurality of through holes, a zinc sheet feeding inlet 301 is opened on the top of one side of the outer edge surface of the feeding pipe 3, and an anti-backflow flap 7 for blocking the zinc sheet feeding inlet 301 is rotatably installed between the tops on both sides of the zinc sheet feeding inlet 301, an annular fixing plate 8 is welded and fixedly installed on the bottom of the outer edge surface of the feeding pipe 3, and the annular fixing plate 8 covers the top of the feed port, and the jacket cover plate 5 can be removed from the top of the fixing ring 9 by unscrewing a plurality of fixing bolts, so that the staff can clean the dust accumulated in the dust collecting negative pressure jacket 4 conveniently, and it is easy to use.

[0022] Working principle: When in use, materials are added to the furnace body and the insulation structure 1 through the zinc sheet feeding inlet 301 on the feeding pipe 3 for processing. During the feeding process, the feeding pipe 3 needs to be lifted freely by the crane to move, thereby driving the annular fixed plate 8 to move up and abut against the bottom of the jacket cover 5, and then the suction force generated by the external exhaust gas dust collecting tower induced draft fan cooperates with the exhaust gas dust collecting smoke pipe 2 and the connecting pipe 6 to complete the collection and discharge of the flue gas, thereby avoiding the problem of smoke leakage during the lifting process, reducing the impact on the on-site operating environment, on-site hygiene, resource utilization and processing costs, and the jacket cover 5 can be removed from the top of the fixing ring 9 by unscrewing multiple fixing bolts, which is convenient for the staff to clean the dust accumulated in the dust collecting negative pressure jacket 4, and is easy to use.

[0023] The embodiments of the present invention disclose preferred embodiments, but are not limited thereto. A person skilled in the art can easily understand the spirit of the present invention based on the above embodiments and make different extensions and changes. However, as long as they do not deviate from the spirit of the present invention, they are all within the protection scope of the present invention.

Claims

1. A structure for preventing smoke leakage during the lifting process of a feeding port of a casting induction furnace, comprising a furnace body and a heat preservation structure (1); Features: A through hole is centrally provided at the top of the furnace body and the thermal insulation structure (1), and an exhaust dust collecting smoke pipe (2) is fixedly installed in the through hole; a slag removal opening (101) is provided at the top of one side of the furnace body and the thermal insulation structure (1), and a feed opening is centrally provided at the top of the furnace body and the thermal insulation structure (1) on a side facing the slag removal opening (101); a feeding pipe (3) is movably installed in the feeding opening, and a jacket structure fixedly installed on the top of the furnace body and the thermal insulation structure (1) is sleeved on the outer edge surface; The jacket structure comprises a dust collecting negative pressure jacket (4) sleeved on a feeding pipe (3), and the dust collecting negative pressure jacket (4) is welded and fixed to the top of the furnace body and the insulation structure (1), the top of the dust collecting negative pressure jacket (4) is detachably mounted with a jacket cover plate (5) sleeved on the feeding pipe (3), and a circular groove for fixing a connecting pipe (6) is provided on one side of the outer edge surface of the dust collecting negative pressure jacket (4), and the end of the connecting pipe (6) away from the dust collecting negative pressure jacket (4) is connected to the exhaust dust collecting smoke pipe (2).

2. The smoke leakage prevention structure during the lifting process of the casting induction furnace charging port according to claim 1 is characterized in that: A fixing ring (9) is welded and fixedly arranged at the top of the outer edge surface of the dust collecting negative pressure jacket (4), and a plurality of through holes are provided in a circular array at the top end of the jacket cover plate (5), and fixing bolts which are threadedly connected to the fixing ring (9) are movably arranged in the plurality of through holes.

3. The smoke leakage prevention treatment structure during the lifting process of the casting induction furnace charging port according to claim 1 is characterized in that: A zinc sheet feeding inlet (301) is provided at the top of one side of the outer edge surface of the feeding pipe (3), and a backflow prevention flap (7) for sealing the zinc sheet feeding inlet (301) is rotatably installed between the tops of both sides of the zinc sheet feeding inlet (301).

4. The smoke leakage prevention structure during the lifting process of the casting induction furnace charging port according to claim 1 is characterized in that: An annular fixing plate (8) is welded and fixedly installed at the bottom of the outer edge of the feeding pipe (3), and the annular fixing plate (8) covers the top of the feeding port.