Steel pipe pile grouting sealing cover with pressure gauge

By installing a pressure gauge on the grouting sealing cover of the steel pipe pile to monitor the grouting pressure in real time, the problem of inaccurate pressure control in the traditional grouting method is solved, and the grouting quality and project safety are improved.

CN222390447UActive Publication Date: 2025-01-24SHANXI LIUJIAN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421171530.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-27
Publication Date
2025-01-24
Estimated Expiration
2034-05-27

AI Technical Summary

Technical Problem

Traditional grouting methods have problems such as inaccurate pressure control and difficult to monitor and evaluate the grouting effect in steel pipe pile support projects, which affects the quality and safety of the project.

Method used

The steel pipe pile with a pressure meter is designed to sink and seal the cover. By installing the pressure gauge on the grouting pipe, the grouting pressure is monitored in real time to ensure that it is within the scope of the design and safety standards.

Benefits of technology

The precise control of grouting pressure is achieved, the uniformity and fullness of grouting are ensured, the support strength and overall stability of the steel pipe piles are improved, and the safety hazards during construction are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390447U_ABST
    Figure CN222390447U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building grouting, in particular to a steel pipe pile grouting sealing cover with a pressure gauge. Comprising a steel pipe pile, the steel pipe pile is arranged in the middle of side slope soil, a sealing cover is installed at the top of the steel pipe pile in a threaded mode, a grouting opening is formed in the middle of the sealing cover in a penetrating mode, a grouting pipe is inserted into the grouting opening, a sealing cover is installed between the grouting pipe and the grouting opening, and a pressure gauge is installed on the upper side of the grouting pipe. And a valve is fixedly mounted on the outer side of the grouting pipe. By effectively controlling and monitoring the grouting pressure, the risk of soil body damage caused by overlarge pressure is reduced, and the safety of foundation pit supporting engineering is improved. And in addition, by means of real-time pressure monitoring, constructors can rapidly adjust grouting parameters, the construction process is optimized, and the grouting operation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building grouting, in particular to a steel pipe pile grouting sealing cover with a pressure gauge. Background Art

[0002] In municipal foundation pit support projects, steel pipe piles are widely used, but their support effect depends largely on the quality of grouting. Traditional grouting methods have many limitations, which not only affect the progress of the project, but also may cause hidden dangers to the safety of the project.

[0003] First, traditional grouting methods often rely on workers' experience and feelings to control grouting pressure, which lacks precision and easily leads to unstable grouting pressure. Excessive pressure may damage the soil around the pile and affect the stability of the foundation pit; while too little pressure may lead to insufficient grouting, voids inside the pile, and reduced support strength.

[0004] Secondly, due to the inability to accurately monitor the pressure changes during the grouting process, it is difficult to ensure the uniformity and fullness of the grouting with traditional methods. This may lead to uneven distribution of grout inside the steel pipe pile, forming local weak points, thus affecting the overall support effect.

[0005] In addition, it is difficult to visually inspect and evaluate the grouting effect after the traditional grouting method is completed. In this case, once the grouting is not full or has defects, it is difficult to detect and correct them in time, which may bring safety hazards in the subsequent construction process.

[0006] In view of the above problems, the steel pipe pile grouting cap with pressure gauge developed by us is particularly important. It effectively solves the problems of inaccurate pressure control and difficult to ensure grouting effect in traditional methods, and greatly improves the quality and safety of municipal foundation pit support projects. Utility Model Content

[0007] In order to solve the above technical problems, we provide a steel pipe pile grouting sealing cover with a pressure gauge.

[0008] The technical solution adopted by the utility model is: a steel pipe pile grouting sealing cover with a pressure gauge, comprising a steel pipe pile, wherein the steel pipe pile is in the middle of the slope soil, a sealing cover is threadedly installed on the top of the steel pipe pile, a grouting port is penetrated through the middle of the sealing cover, a grouting pipe is inserted in the grouting port, a sealing cover is installed between the grouting pipe and the grouting port, a pressure gauge is installed on the upper side of the grouting pipe, and a valve is fixedly installed on the outer side of the grouting pipe.

[0009] As a further improvement of the utility model, a plurality of slurry outlets are evenly opened on the outer side of the steel pipe pile.

[0010] As a further improvement of the utility model, a pressure relief valve is installed on the upper side of the sealing cover.

[0011] As a further improvement of the utility model, an observation port is installed on one side of the pressure relief valve.

[0012] As a further improvement of the utility model, the sealing cover is made of rubber material.

[0013] Compared with the prior art, the beneficial effects of the present invention are:

[0014] 1. The utility model uses a pressure gauge on the grouting pipeline to enable construction personnel to monitor the pressure changes during the grouting process in real time, thereby accurately controlling the grouting pressure to ensure that it is within the design and safety standards.

[0015] 2. The utility model can improve the quality of grouting: accurate pressure control helps to ensure the uniformity and fullness of grouting, reduces the internal voids and weak points of the pile body caused by insufficient or uneven grouting, thereby improving the supporting strength and overall stability of the steel pipe pile.

[0016] 3. The utility model reduces the risk of soil damage caused by excessive pressure and improves the safety of foundation pit support engineering by effectively controlling and monitoring grouting pressure. In addition, real-time pressure monitoring enables construction personnel to quickly adjust grouting parameters, optimize construction processes, and improve the efficiency of grouting operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0018] Figure 1 It is a schematic diagram of the structure of the utility model;

[0019] Figure 2 It is a top view of the sealing opening of the utility model.

[0020] In the figure - 1. pressure gauge; 2. valve; 3. sealing cover; 4. pressure relief valve; 41. observation port; 5. sealing cover; 6. steel pipe pile; 7. slurry outlet; 8. slope soil; 9. grouting pipe. DETAILED DESCRIPTION

[0021] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application may be combined with each other.

[0022] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiment of the present application will be clearly and completely described below in combination with the embodiment of the present application. Obviously, the described embodiment is only a part of the embodiment of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work should fall within the scope of protection of the present application.

[0023] like Figure 1 , 2 As shown, a steel pipe pile grouting sealing cover with a pressure gauge comprises a steel pipe pile 6, wherein the steel pipe pile 6 is in the middle of the slope soil 8, a sealing cover 5 is threadedly installed on the top of the steel pipe pile 6, a grouting port is penetrated through the middle of the sealing cover 5, a grouting pipe 9 is inserted in the grouting port, a sealing cover 3 is installed between the grouting pipe 9 and the grouting port, a pressure gauge 1 is installed on the upper side of the grouting pipe 9, and a valve 2 is fixedly installed on the outer side of the grouting pipe 9.

[0024] As a further improvement of the present invention, a plurality of slurry outlets 7 are evenly provided on the outer side of the steel pipe pile 6 .

[0025] As a further improvement of the present invention, a pressure relief valve 4 is installed on the upper side of the sealing cover 5 .

[0026] As a further improvement of the present invention, an observation port 41 is installed on one side of the pressure relief valve 4 .

[0027] As a further improvement of the present invention, the sealing cover 3 is made of rubber material.

[0028] The working principle of the utility model is: when working, install the sealing cover 5 on the upper side of the steel pipe pile 6 to be grouted, insert the grouting pipe 9 into the grouting port reserved by the sealing cover 5, and then use the sealing cover 3 to seal the gap between the grouting pipe 9 and the grouting port. Connect the grouting pipe 9, open the valve on the grouting pipe 9, and perform grouting. Observe the grouting pressure at any time through the pressure gauge 1 on the upper side of the grouting pipe 9, adjust the grouting pressure of the grouting pipe 9 at any time to ensure that the grouting is full. After the grouting is completed, observe the grouting situation in the steel pipe pile 6 through the observation port 41, and release the pressure through the pressure relief valve 4, and close the valve 2 to stop the grouting, and complete the work.

[0029] The above description is only the preferred embodiment of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A steel pipe pile grouting sealing cover with a pressure gauge, comprising a steel pipe pile, characterized in that: The steel pipe pile is in the middle of the slope soil, and a sealing cover is threadedly installed on the top of the steel pipe pile. A grouting port is opened through the middle of the sealing cover, a grouting pipe is inserted in the grouting port, a sealing cover is installed between the grouting pipe and the grouting port, a pressure gauge is installed on the upper side of the grouting pipe, and a valve is fixedly installed on the outside of the grouting pipe.

2. A steel pipe pile grouting sealing cover with a pressure gauge according to claim 1, characterized in that: A plurality of slurry outlets are evenly arranged on the outer side of the steel pipe pile.

3. The steel pipe pile grouting sealing cover with a pressure gauge according to claim 1, characterized in that: A pressure relief valve is installed on the upper side of the sealing cover.

4. A steel pipe pile grouting sealing cover with a pressure gauge according to claim 3, characterized in that: An observation port is installed on one side of the pressure relief valve.