Hyperbolic steel structure L-shaped working platform capable of being quickly assembled and disassembled

By designing an L-shaped work platform for quick assembly and disassembly of a hyperbolic steel structure, the problem of insufficient operating space in the dead corners outside the steel structure caused by traditional construction methods was solved, achieving a safe and stable operating environment and an efficient construction process.

CN222390953UInactive Publication Date: 2025-01-24CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421183411.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2025-01-24
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the installation and construction of steel structures, traditional erecting full-house scaffolding is difficult to provide stable personnel operation space, especially in blind spots on the outside of the steel structure, which poses safety hazards and low construction efficiency.

Method used

Design a dual -curve steel structure to quickly and remove the L -shaped operation platform. Through the combination of the rod, connecting rod, stepping on the pedal structure, the main platform connection fixed mechanism, sub -platform connection mechanism, and sub -platform support mechanism Provide stable operation space.

Benefits of technology

The platform can be easily installed and used, provides a safe and stable operating space, and improves construction safety and efficiency. It is especially suitable for node welding and painting construction at the outer dead ends of steel structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222390953U_ABST
    Figure CN222390953U_ABST
Patent Text Reader

Abstract

The utility model discloses a hyperbolic curve steel structure L-shaped work platform capable of being quickly assembled and disassembled, which belongs to the technical field of engineering construction and comprises a first vertical rod, a plurality of groups of connecting rods are arranged on the side edge of the first vertical rod, a second vertical rod is arranged at the other end of each connecting rod, and a pedal structure is hung at the upper end of each connecting rod. The main operation platform and the auxiliary operation platform can be installed and fixed through the bolts, then the pedals are installed on the main operation platform and the auxiliary operation platform through the hooks so that workers can conveniently conduct standing construction, and the auxiliary operation platform is installed on the side edge of the main operation platform so that the workers can conveniently conduct standing construction. The supporting structures are installed at the lower end of the main operation platform and the lower end of the auxiliary operation platform, the installation firmness of the auxiliary operation platform can be improved, and the problems that when the worker stands on the auxiliary operation platform, the overall stability of the auxiliary operation platform is poor, and potential safety hazards exist are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of engineering construction, and specifically relates to an L-shaped working platform for rapid assembly and disassembly of a hyperbolic steel structure. Background Art

[0002] With the rapid development of society, in order to meet the people's growing material and cultural needs, buildings have gradually changed from the most basic use functions to new buildings with ornamental and aesthetic features. As the most common building exterior decoration material, steel structures are increasingly being designed and used in buildings.

[0003] During the installation and construction of steel structures (such as hyperbolic steel structure decoration), welding, painting and other processes are required for steel structure components. When the operating position at the dead corner position such as the outside of the steel structure is too high to be constructed, the traditional construction method of erecting a full-floor scaffolding is time-consuming and labor-intensive. Measures such as articulated boom trucks and car ceiling baskets are difficult to provide a stable operating space for personnel. Therefore, an L-shaped installation platform suitable for node welding and painting construction at the dead corner position of the outside of the steel structure is studied, which can provide a safe and stable operating space for operators and improve construction safety and efficiency. Utility Model Content

[0004] In order to solve the problems raised in the above background technology, the utility model provides a hyperbolic steel structure fast assembly and disassembly L-shaped operating platform, which has the characteristic of convenient installation and use of the operating platform.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a hyperbolic steel structure quick-assembly and disassembly L-shaped work platform, comprising a first vertical pole, a plurality of connecting rods are arranged on the side of the first vertical pole, a second vertical pole is arranged on the other end of the connecting rod, a pedal structure is hung on the upper end of the connecting rod, a main platform connecting and fixing mechanism is arranged at the center position of the side of the first vertical pole and the second vertical pole, a secondary platform body is arranged on the other side of the second vertical pole, the second vertical pole and the secondary platform body are fixedly connected by the secondary platform connecting mechanism, and a secondary platform supporting mechanism is arranged at the lower end of the second vertical pole.

[0006] Preferably, the connecting rod is fixedly connected to the vertical pole 1 and the vertical pole 2 by bolt 1, and screw holes corresponding to the bolt 1 are provided at both ends of the connecting rod.

[0007] Preferably, the pedal structure includes a hook and a pedal body, the pedal body is arranged at the upper end of the connecting rod, and hooks corresponding to the connecting rod are arranged at both ends of the pedal body.

[0008] Preferably, the main platform connection and fixing mechanism includes a connecting seat 1, a bolt 2, a bolt 3, a clamp 1, a clamp 2 and a bolt 4. A connecting seat 1 is arranged on the surface of the center position of the vertical pole 1. The connecting seat 1 and the vertical pole 1 are fixedly connected by bolt 2. A clamp 1 is arranged on the other side of the connecting seat 1. The connecting seat 1 and the clamp 1 are fixedly connected by bolt 3. A clamp 2 is arranged on the other side of the clamp 1. The clamp 1 and the clamp 2 are fixedly connected by bolt 4.

[0009] Preferably, the upper end surface of the vertical pole 1 is provided with a mounting screw hole 1 corresponding to the second bolt, and the side end surface of the vertical pole 1 is provided with a mounting screw hole 2 corresponding to the second bolt.

[0010] Preferably, the sub-platform connecting mechanism includes a connecting seat 2, a bolt 5, a connecting seat 3 and a bolt 6. The connecting seat 2 is arranged on the surface of one end of the vertical pole 2, and the connecting seat 3 is arranged on the side of the sub-platform body. The connecting seat 2 and the vertical pole 2 as well as the connecting seat 3 and the sub-platform body are fixedly connected by bolt 6, and the connecting seat 2 and the connecting seat 3 are fixedly connected by bolt 5.

[0011] Preferably, the sub-platform supporting mechanism comprises an oblique support rod, a connecting seat four, a connecting seat five, a bolt seven, a connecting seat six, a bolt eight and a support rod. A connecting seat six is ​​arranged on the surface of the vertical pole two, and the connecting seat six is ​​fixedly connected to the vertical pole two by bolt eight. The lower end of the connecting seat six is ​​fixedly connected with the support rod. A connecting seat five is arranged on the other side surface of the sub-platform body, and the connecting seat five is fixedly connected to the sub-platform body by bolt seven. The lower end of the connecting seat five is fixedly connected with the connecting seat four, and an oblique support rod is arranged on the side of the support rod.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. The utility model can install and fix the main operating platform and the auxiliary operating platform by bolts, and then install the pedal on the main operating platform and the auxiliary operating platform by hooks, so as to facilitate workers to perform standing construction. By installing the auxiliary operating platform on the side of the main operating platform, it is convenient for workers to use it according to the construction environment.

[0014] 2. The utility model can improve the installation reliability of the auxiliary operating platform by installing a supporting structure at the lower ends of the main operating platform and the auxiliary operating platform, thereby avoiding the problem of poor overall stability of the auxiliary operating platform and potential safety hazards caused by workers standing on the auxiliary operating platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional diagram of the utility model;

[0016] Figure 2 A three-dimensional diagram of the position of the upright pole of the utility model;

[0017] Figure 3 A three-dimensional diagram of the pedal position of the utility model;

[0018] Figure 4 It is a three-dimensional diagram of the main platform connection and fixing mechanism of the utility model;

[0019] Figure 5 A three-dimensional diagram of the installation screw hole position of the utility model;

[0020] Figure 6 It is a three-dimensional diagram of the auxiliary platform connection mechanism of the utility model;

[0021] Figure 7 It is a three-dimensional diagram of the auxiliary platform support mechanism of the utility model;

[0022] In the figure: 1. upright pole 1; 2. main platform connection fixing mechanism; 21. connection seat 1; 22. bolt 2; 23. bolt 3; 24. clamp 1; 25. clamp 2; 26. bolt 4; 27. mounting screw hole 1; 28. mounting screw hole 2; 3. auxiliary platform connection mechanism; 31. connection seat 2; 32. bolt 5; 33. connection seat 3; 34. bolt 6; 4. auxiliary platform support mechanism; 41. oblique support rod; 42. connection seat 4; 43. connection seat 5; 44. bolt 7; 45. connection seat 6; 46. bolt 8; 47. support rod; 5. auxiliary platform body; 6. upright pole 2; 7. pedal structure; 71. hook; 72. pedal body; 8. connecting rod; 9. screw hole; 10. bolt 1. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] See also Figure 1-7 The utility model provides the following technical solutions: a hyperbolic steel structure quick assembly and disassembly L-shaped work platform, including a vertical pole 1, a plurality of connecting rods 8 are arranged on the side of the vertical pole 1, a vertical pole 2 6 is arranged on the other end of the connecting rod 8, a pedal structure 7 is hung on the upper end of the connecting rod 8, a main platform connecting and fixing mechanism 2 is arranged at the center position of the side of the vertical pole 1 and the vertical pole 2 6, a secondary platform body 5 is arranged on the other side of the vertical pole 2 6, the vertical pole 2 6 and the secondary platform body 5 are fixedly connected by the secondary platform connecting mechanism 3, and a secondary platform supporting mechanism 4 is arranged at the lower end of the vertical pole 2 6.

[0025] Specifically, the connecting rod 8 is fixedly connected to the vertical rod 1 and the vertical rod 2 6 by a bolt 10, and screw holes 9 corresponding to the bolts 10 are provided at both ends of the connecting rod 8.

[0026] By adopting the above technical solution, the main operating platform can be assembled and fixed by using the bolts 10 to cooperate with the screw holes 9 at both ends of the connecting rod 8.

[0027] Specifically, the pedal structure 7 includes a hook 71 and a pedal body 72. The pedal body 72 is disposed at the upper end of the connecting rod 8, and hooks 71 corresponding to the connecting rod 8 are disposed at both ends of the pedal body 72.

[0028] By adopting the above technical solution, the pedal body 72 is respectively installed at the position between the two groups of connecting rods 8 through the hook 71, so as to facilitate the workers to stand on the main operating platform.

[0029] Specifically, the main platform connection and fixing mechanism 2 includes a connection seat 1 21, a bolt 22, a bolt 3 23, a clamp 1 24, a clamp 25 and a bolt 4 26. A connection seat 1 21 is provided on the surface of the center position of the vertical pole 1. The connection seat 1 21 and the vertical pole 1 are fixedly connected by the bolt 22. A clamp 1 24 is provided on the other side of the connection seat 1 21. The connection seat 1 21 and the clamp 1 24 are fixedly connected by the bolt 3 23. A clamp 25 is provided on the other side of the clamp 1 24. The clamp 1 24 and the clamp 2 25 are fixedly connected by the bolt 4 26.

[0030] By adopting the above technical solution, the connecting seat 21 is installed on the surface of the vertical pole 1 through the bolt 22, and the clamp 24 is installed on the side of the connecting seat 21 through the bolt 3 23, the steel pipe on the side of the building tower body is pressed against the clamp 1 24, and the clamp 1 24 is connected to the clamp 2 25 through the bolt 4 26, so that the main operating platform can be connected and fixed to the steel pipe on the side of the building tower body.

[0031] Specifically, the upper end surface of the vertical pole 1 is provided with a mounting screw hole 27 corresponding to the second bolt 22, and the side end surface of the vertical pole 1 is provided with a mounting screw hole 28 corresponding to the second bolt 22.

[0032] By adopting the above technical solution, by respectively opening mounting screw hole 1 27 and mounting screw hole 28 corresponding to bolt 22 on the upper end face and side end face of vertical pole 1, the main platform connecting and fixing mechanism 2 can be adapted to the installation of horizontal bars and longitudinal bars on the side of the building tower body, so as to enhance its installation diversity.

[0033] Specifically, the auxiliary platform connection mechanism 3 includes a second connection seat 31, a fifth bolt 32, a third connection seat 33 and a sixth bolt 34. The second connection seat 31 is provided on one end surface of the second vertical rod 6, and the third connection seat 33 is provided on the side of the auxiliary platform body 5. The second connection seat 31 and the second vertical rod 6 as well as the third connection seat 33 and the auxiliary platform body 5 are fixedly connected by the sixth bolt 34, and the second connection seat 31 and the third connection seat 33 are fixedly connected by the fifth bolt 32.

[0034] By adopting the above technical solution, by installing the connecting seat 2 31 on the surface of the vertical pole 2 6 through the bolt 6 34, and then installing the connecting seat 33 on the side surface of the sub-platform body 5 through the bolt 6 34, and finally fixing the connecting seat 2 31 and the connecting seat 3 33 through the bolt 5 32, the installation and fixation of the sub-platform body 5 can be achieved.

[0035] Specifically, the auxiliary platform support mechanism 4 includes an oblique support rod 41, a connecting seat four 42, a connecting seat five 43, a bolt seven 44, a connecting seat six 45, a bolt eight 46 and a support rod 47. A connecting seat six 45 is arranged on the surface of the vertical rod two 6. The connecting seat six 45 and the vertical rod two 6 are fixedly connected by bolt eight 46. The lower end of the connecting seat six 45 is fixedly connected with the support rod 47. A connecting seat five 43 is arranged on the other side surface of the auxiliary platform body 5. The connecting seat five 43 and the auxiliary platform body 5 are fixedly connected by bolt seven 44. The lower end of the connecting seat five 43 is fixedly connected with the connecting seat four 42. The side of the support rod 47 is provided with an oblique support rod 41.

[0036] By adopting the above technical solution, the connecting seat six 45 is fixed to the vertical pole two 6 by bolt eight 46, and the connecting seat five 43 is fixedly connected to the sub-platform body 5 by bolt seven 44, and then the support rod 47 is installed and fixed to the connecting seat six 45, the connecting seat four 42 is installed and fixed to the connecting seat five 43, and the oblique support rod 41 is installed on the side of the support rod 47 and the connecting seat four 42, so as to improve the installation reliability of the sub-platform body 5.

[0037] Working principle and use process of the utility model: When the utility model is in use, the main operating platform can be assembled and fixed by the bolt 10 cooperating with the screw holes 9 at both ends of the connecting rod 8, and the pedal body 72 is respectively installed at the position between the two groups of connecting rods 8 through the hook 71, so that the workers can stand on the main operating platform. The connecting seat 21 is installed on the surface of the vertical pole 1 through the bolt 22, and the clamp 24 is installed on the side of the connecting seat 21 through the bolt 3 23, and the steel pipe on the side of the building tower body is pressed against the clamp 24, and then the clamp 24 is connected with the clamp 25 through the bolt 4 26, so that the main operating platform can be connected and fixed to the steel pipe on the side of the building tower body, and the main platform can be made by opening the mounting screw hole 1 27 and the mounting screw hole 28 corresponding to the bolt 22 on the upper end face and the side end face of the vertical pole 1. The connecting and fixing mechanism 2 can adapt to the installation of horizontal bars and longitudinal bars on the side of the building tower body to improve its installation diversity. By installing the connecting seat 2 31 on the surface of the vertical pole 2 6 through the bolt 6 34, and then installing the connecting seat 33 on the side surface of the sub-platform body 5 through the bolt 6 34, and finally fixing the connecting seat 2 31 with the connecting seat 3 33 through the bolt 5 32, the installation and fixation of the sub-platform body 5 can be achieved. The connecting seat 6 45 is fixed to the vertical pole 2 6 through the bolt 8 46, and the connecting seat 5 43 is fixedly connected to the sub-platform body 5 through the bolt 7 44, and then the support rod 47 is installed and fixed to the connecting seat 6 45, the connecting seat 4 42 is installed and fixed to the connecting seat 5 43, and the oblique support rod 41 is installed on the side of the support rod 47 and the connecting seat 4 42, so as to improve the installation reliability of the sub-platform body 5.

[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A hyperbolic steel structure quick assembly and disassembly L-shaped work platform, comprising a vertical pole 1, characterized in that: A plurality of connecting rods are arranged on the side of the vertical pole one, a vertical pole two is arranged at the other end of the connecting rod, a pedal structure is hung on the upper end of the connecting rod, a main platform connecting and fixing mechanism is arranged at the center position of the side of the vertical pole one and the vertical pole two, a secondary platform body is arranged on the other side of the vertical pole two, the vertical pole two and the secondary platform body are fixedly connected by the secondary platform connecting mechanism, and a secondary platform supporting mechanism is arranged at the lower end of the vertical pole two.

2. The hyperbolic steel structure quick assembly and disassembly L-shaped work platform according to claim 1, characterized in that: The connecting rod is fixedly connected to the vertical pole 1 and the vertical pole 2 by means of bolt 1, and screw holes corresponding to the bolt 1 are provided at both ends of the connecting rod.

3. The hyperbolic steel structure quick assembly and disassembly L-shaped work platform according to claim 1, characterized in that: The pedal structure comprises a hook and a pedal body. The pedal body is arranged at the upper end of the connecting rod, and hooks corresponding to the connecting rod are arranged at both ends of the pedal body.

4. The hyperbolic steel structure quick assembly and disassembly L-shaped work platform according to claim 1, characterized in that: The main platform connection and fixing mechanism includes a connecting seat 1, a bolt 2, a bolt 3, a clamp 1, a clamp 2 and a bolt 4. A connecting seat 1 is arranged on the surface of the center position of the vertical pole 1. The connecting seat 1 and the vertical pole 1 are fixedly connected by bolt 2. A clamp 1 is arranged on the other side of the connecting seat 1. The connecting seat 1 and the clamp 1 are fixedly connected by bolt 3. A clamp 2 is arranged on the other side of the clamp 1. The clamp 1 and the clamp 2 are fixedly connected by bolt 4.

5. The hyperbolic steel structure quick assembly and disassembly L-shaped work platform according to claim 4, characterized in that: The upper end surface of the vertical pole 1 is provided with a mounting screw hole 1 corresponding to the second bolt, and the side end surface of the vertical pole 1 is provided with a mounting screw hole 2 corresponding to the second bolt.

6. The hyperbolic steel structure quick assembly and disassembly L-shaped work platform according to claim 1, characterized in that: The sub-platform connecting mechanism includes a connecting seat 2, a bolt 5, a connecting seat 3 and a bolt 6. The connecting seat 2 is arranged on the surface of one end of the vertical pole 2, and the connecting seat 3 is arranged on the side of the sub-platform body. The connecting seat 2 and the vertical pole 2 as well as the connecting seat 3 and the sub-platform body are fixedly connected by bolt 6, and the connecting seat 2 and the connecting seat 3 are fixedly connected by bolt 5.

7. The hyperbolic steel structure quick assembly and disassembly L-shaped work platform according to claim 1, characterized in that: The sub-platform support mechanism includes an oblique support rod, a connecting seat four, a connecting seat five, a bolt seven, a connecting seat six, a bolt eight and a support rod. A connecting seat six is ​​arranged on the surface of the vertical pole two, and the connecting seat six is ​​fixedly connected to the vertical pole two by bolt eight. The lower end of the connecting seat six is ​​fixedly connected with the support rod. A connecting seat five is arranged on the other side surface of the sub-platform body, and the connecting seat five is fixedly connected to the sub-platform body by bolt seven. The lower end of the connecting seat five is fixedly connected with the connecting seat four, and an oblique support rod is arranged on the side of the support rod.