Manufacturing tool for hinged joint steel pipe assembly

By designing a manufacturing equipment for hinged steel pipe assembly, using the positioning structure to fix the transition joint, steel pipe and hinge joint, solve the problem of large parallel parallel deviation in the existing technology, and achieve higher welding parallelism. Accuracy and product size accuracy.

CN222404048UActive Publication Date: 2025-01-28RUIFANDE SHANGHAI MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421088456.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-01-28
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

In the prior art, the parallelism of the installation surface of the articulated joint steel pipe assembly has a large deviation, resulting in one end not being tightly locked or unable to be installed during installation.

Method used

Design a manufacture of hinged joint steel pipe assembly, including the bottom plate and positioning structure. The positioning structure includes the first fixing part, the second fixing part, and the third fixing part. The transition joint, steel pipe and hinge joint are fixed on the bottom plate through these fixed pieces to ensure the accuracy of the parallelism of the installation surface.

Benefits of technology

Through the use of this work, the accuracy of welding parallelism can be improved during the production process of the hinge -tank steel pipe assembly, and the accuracy of the product size is ensured during the inspection process, and the diverse fabric requirements in the hydraulic system are met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222404048U_ABST
    Figure CN222404048U_ABST
Patent Text Reader

Abstract

The utility model provides a manufacturing tool for a hinged joint steel pipe assembly, which comprises a bottom plate, a positioning structure corresponding to the assembly size of the hinged joint steel pipe assembly is arranged on the bottom plate, and the hinged joint steel pipe assembly comprises a transition joint, steel pipes welded at two ends of the transition joint and hinged joints welded on the steel pipes. The positioning structure comprises a first fixing piece corresponding to the assembly size of the transition joint, a second fixing piece corresponding to the assembly size of the steel pipe and a third fixing piece corresponding to the assembly size of the hinged joint, and the second fixing piece is arranged between the first fixing piece and the third fixing piece; the tool has the following beneficial effects that the accuracy of the welding parallelism of the hinged joint steel pipe assembly can be improved when the hinged joint steel pipe assembly is manufactured, and the tool can be used for size inspection after the hinged joint steel pipe assembly is manufactured; and the requirement that the actual pipe distribution of the hinged joint steel pipe assembly in a hydraulic system is more diversified is fully met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of manufacturing an articulated joint steel pipe assembly, in particular to a manufacturing tool for an articulated joint steel pipe assembly. Background Art

[0002] In the hydraulic piping system, the relative parallelism of the installation surface of the steel pipe assembly is also a very important requirement, especially for the brake steel pipe part. The brake steel pipe part of many models is connected by the brake valve to the steel pipe assembly transition joint and then extended to the brake system at both ends from the transition joint. In this case, the installation parallelism requirements of the steel pipe assembly are very high, because the size and installation surface of the steel pipe assembly are fixed after welding. Any slight deviation in the parallelism of the steel pipe assembly will cause one end to not be locked during installation, resulting in oil leakage and inability to install. That is, the parallelism requirements of the installation surface of the articulated joint steel pipe assembly are high during production. If the deviation of the parallelism of the installation surface is large, it will lead to the inability to lock or install during installation. Therefore, this design is to ensure the parallelism requirements of the installation surface of the steel pipe assembly when the welded parts are not in the same plane. Utility Model Content

[0003] In view of the above-mentioned shortcomings of the prior art, the purpose of the utility model is to provide a manufacturing tool for an articulated joint steel pipe assembly, which is used to solve the problem of large deviation in parallelism of the mounting surface of the manufactured articulated joint steel pipe assembly in the prior art.

[0004] In order to achieve the above purpose and other related purposes, the utility model provides the following technical solutions:

[0005] A manufacturing tool for an articulated joint steel pipe assembly comprises a base plate, on which a positioning structure is provided corresponding to the assembly dimensions of the articulated joint steel pipe assembly, the articulated joint steel pipe assembly comprises a transition joint, steel pipes welded at both ends of the transition joint and an articulated joint welded on the steel pipe, the positioning structure comprises a first fixing member corresponding to the assembly dimensions of the transition joint, a second fixing member corresponding to the assembly dimensions of the steel pipe and a third fixing member corresponding to the assembly dimensions of the articulated joint, the second fixing member being arranged between the first fixing member and the third fixing member.

[0006] In one embodiment of the utility model, the first fixing member includes a positioning pin for fixing the transition joint on the base plate, and the positioning pin includes a pin installed on the base plate and a positioning ring threadedly connected to the pin. This technical solution can fix the transition joint on the base plate by threading the positioning ring and the pin, which facilitates the subsequent production of the articulated joint steel pipe assembly.

[0007] In one embodiment of the utility model, the second fixing member includes a first positioning block for fixing the steel pipe on the base plate and a second positioning block located on the side of the first positioning block, and the first positioning block and the second positioning block are both provided with a slot that matches the shape of the steel pipe and is clamped with the steel pipe. This technical solution can fix the steel pipe on the base plate by clamping the steel pipe in the slots on the first positioning block and the second positioning block, thereby facilitating the subsequent production of the articulated joint steel pipe assembly.

[0008] In an embodiment of the present invention, the first positioning block and the second positioning block are located between the positioning pin and the third fixing member, and the first positioning block is located on the side of the positioning pin, and the second positioning block is located on the side of the third fixing member.

[0009] In one embodiment of the utility model, the third fixing member includes a positioning flange for fixing the articulated joint on the base plate and located on the side of the second positioning block, and the positioning flange is provided with a positioning column that matches the shape of the articulated joint and is clamped with the articulated joint. This technical solution can fix the articulated joint on the base plate by clamping the positioning column with the articulated joint, thereby facilitating the subsequent production of the articulated joint steel pipe assembly.

[0010] In one embodiment of the utility model, a first mounting hole threadedly connected to the bottom of the pin is provided on the base plate, and a second mounting hole for installing a positioning flange is also provided on the base plate, and the screw on the positioning flange is threadedly connected to the second mounting hole. This technical solution can install the positioning pin on the base plate by threading the pin with the first mounting hole, thereby facilitating the staff to replace the positioning pin, and can also install the positioning flange on the base plate by threading the screw on the positioning flange with the second mounting hole, thereby facilitating the staff to replace the positioning flange.

[0011] As described above, the manufacturing tooling of the hinged joint steel pipe assembly of the utility model has the following beneficial effects:

[0012] The first fixing member, the second fixing member and the third fixing member in the utility model are all set according to the assembly dimensions of the articulated joint steel pipe assembly, and under the action of the first fixing member, the second fixing member and the third fixing member, the parts of the articulated joint steel pipe assembly to be welded can be fixed on the manufacturing tooling, so the accuracy of the welding parallelism of the articulated joint steel pipe assembly can be improved during manufacturing, and the tooling can also be used to perform dimensional inspection after the articulated joint steel pipe assembly is manufactured, which fully meets the requirements of more diverse actual piping layout of the articulated joint steel pipe assembly in the hydraulic system, and allows ordinary workers to transfer the control of dimensions to the control of dimensions by tooling, greatly improving the accuracy of product dimensions. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a three-dimensional schematic diagram showing the overall structure of the manufacturing tooling of the hinged joint steel pipe assembly disclosed in the embodiment of the utility model;

[0014] Figure 2 The figure shows a top view of an articulated joint steel pipe assembly in a manufacturing tool for the articulated joint steel pipe assembly disclosed in an embodiment of the utility model;

[0015] Figure 3 It is a top view schematic diagram showing the hinged joint steel pipe assembly installed on the tooling in the manufacturing tooling of the hinged joint steel pipe assembly disclosed in the embodiment of the utility model;

[0016] Figure 4 Shown are schematic diagrams of a front view (upper) and a top view (lower) of a positioning pin in a manufacturing tool for an articulated joint steel pipe assembly disclosed in an embodiment of the utility model;

[0017] Figure 5 Shown are schematic diagrams of a front cross-section (upper) and a top view (lower) of a positioning flange in a manufacturing tool for an articulated joint steel pipe assembly disclosed in an embodiment of the present utility model.

[0018] Component number description

[0019] 1. Bottom plate; 2. First fixing member; 201. Pin; 202. Positioning ring; 3. Second fixing member; 301. First positioning block; 302. Second positioning block; 4. Third fixing member; 401. Positioning flange; 5. Slot; 6. Positioning column; 7. Articulated joint steel pipe assembly; 701. Transition joint; 702. Steel pipe; 703. Articulated joint; 8. Through hole. DETAILED DESCRIPTION

[0020] The following specific embodiments illustrate the implementation of the present invention, and those familiar with the technology can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0021] See also Figures 1 to 4The utility model provides a manufacturing tool for an articulated joint steel pipe assembly, comprising a bottom plate 1, a positioning structure is provided on the bottom plate 1 corresponding to the assembly size of the articulated joint steel pipe assembly 7, the articulated joint steel pipe assembly 7 comprises a transition joint 701, steel pipes 702 welded at both ends of the transition joint 701 and an articulated joint 703 welded on the steel pipe 702, the positioning structure comprises a first fixing member 2 corresponding to the assembly size of the transition joint 701, a second fixing member 3 corresponding to the assembly size of the steel pipe 702 and a third fixing member 4 corresponding to the assembly size of the articulated joint 703. The fixing member 4 and the second fixing member 3 are arranged between the first fixing member 2 and the third fixing member 4. The first fixing member 2 includes a positioning pin for fixing the transition joint 701 on the base plate 1. The positioning pin includes a pin 201 installed on the base plate 1 and a positioning ring 202 threadedly connected to the pin 201. A first mounting hole threadedly connected to the bottom of the pin 201 is opened on the base plate 1. The transition joint 701 can be fixed on the base plate 1 by threading the positioning ring 202 with the pin 201, which is convenient for the subsequent production of the articulated joint steel pipe assembly 7.

[0022] exist Figure 1 and Figure 3 In the embodiment, the second fixing member 3 includes a first positioning block 301 for fixing the steel pipe 702 on the base plate 1 and a second positioning block 302 located on the side of the first positioning block 301. The first positioning block 301 and the second positioning block 302 are both provided with a slot 5 that matches the shape of the steel pipe 702 and is clamped with the steel pipe 702. The number of the first positioning block 301 and the second positioning block 302 are both two. The two first positioning blocks 301 and the second positioning blocks 302 are symmetrically arranged on the base plate 1 along the center line in the length direction of the base plate 1. The first positioning block 301 and the second positioning block 302 are located between the positioning pin and the third fixing member 4, and the first positioning block 301 is located on the side of the positioning pin, and the second positioning block 302 is located on the side of the third fixing member 4. By clamping the steel pipe 702 in the slot 5 on the first positioning block 301 and the second positioning block 302, the steel pipe 702 can be fixed on the base plate 1, which is convenient for the subsequent production of the articulated joint steel pipe assembly 7.

[0023] exist Figure 1 , Figure 3 and Figure 5In the figure, the third fixing member 4 includes a positioning flange 401 for fixing the articulated joint 703 on the base plate 1 and located on the side of the second positioning block 302. The base plate 1 is also provided with a second mounting hole for installing the positioning flange 401. The screws on the positioning flange 401 are threadedly connected to the second mounting hole. The positioning flange 401 is provided with a through hole 8 for the screw to pass through. The positioning flange 401 is provided with a positioning column 6 that matches the shape of the articulated joint 703 and is clamped with the articulated joint 703. The positioning column 6 and the positioning flange 401 are integrally formed. By clamping the positioning column 6 with the articulated joint 703, the articulated joint 703 can be fixed on the base plate 1, which is convenient for the subsequent production of the articulated joint steel pipe assembly 7.

[0024] Specifically, the utility model uses the drawing of the articulated joint steel pipe assembly 7 to draw a three-dimensional stereogram, and designs the positions of the first mounting hole and the second mounting hole and the positions and sizes of the parts included in the first fixing member 2 to the third fixing member 4 according to the size of the drawing, and the locating pin and the locating flange 401 can be designed according to the assembly sizes of different articulated joint steel pipe assemblies 7, so this manufacturing tool can allow articulated joint steel pipe assemblies 7 of different assembly sizes to be used; when using the manufacturing tool, first fix the parts of the articulated joint steel pipe assembly 7 to be welded on the tool in turn for spot welding, and after the spot welding is completed, the articulated joint steel pipe assembly 7 is fully welded to complete the production of the assembly, which makes it easier to manufacture on the surface. The articulated joint steel pipe assembly 7 with high requirements for parallelism can be manufactured quickly and accurately, so that the product quality is greatly guaranteed and the production personnel are convenient to operate. In addition, the manufacturing tool can also be used as an inspection tool. Before using the articulated joint steel pipe assembly 7, the articulated joint steel pipe assembly 7 is placed on the manufacturing tool. If the articulated joint steel pipe assembly 7 can be placed on the manufacturing tool, it means that the size of the articulated joint steel pipe assembly 7 is qualified. If not, the size of the articulated joint steel pipe assembly 7 is unqualified. Therefore, the utility model can not only improve the accuracy of the welding parallelism of the articulated joint steel pipe assembly 7 during manufacturing, but also use this tool to perform size inspection after the articulated joint steel pipe assembly 7 is manufactured.

[0025] The first fixing member 2, the second fixing member 3 and the third fixing member 4 in the utility model are all set according to the assembly size of the articulated joint steel pipe assembly 7, and under the action of the first fixing member 2, the second fixing member 3 and the third fixing member 4, the parts of the articulated joint steel pipe assembly 7 to be welded can be fixed on the manufacturing tooling, so not only can the accuracy of the welding parallelism of the articulated joint steel pipe assembly 7 be improved during manufacturing, but also the size inspection can be carried out by using this tooling after the articulated joint steel pipe assembly 7 is manufactured, which fully meets the requirements of more diverse actual pipe layout of the articulated joint steel pipe assembly 7 in the hydraulic system, and allows ordinary workers to transfer the control of size to the control of size by tooling, which greatly improves the accuracy of product size; in addition, the utility model improves production efficiency, ensures the size of the product, reduces the difficulty of inspection, and provides greater guarantee for the original design and layout of the product.

[0026] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. All equivalent modifications or changes made by those skilled in the art without departing from the spirit and technical ideas disclosed in the present invention shall still be covered by the claims of the present invention.

Claims

1. A tool for manufacturing an articulated joint steel pipe assembly, comprising a bottom plate (1), characterized in that: A positioning structure is provided on the bottom plate (1) corresponding to the assembly dimensions of the hinged joint steel pipe assembly (7); the hinged joint steel pipe assembly (7) comprises a transition joint (701), steel pipes (702) welded at both ends of the transition joint (701), and a hinged joint (703) welded to the steel pipe (702); the positioning structure comprises a first fixing member (2) corresponding to the assembly dimensions of the transition joint (701), a second fixing member (3) corresponding to the assembly dimensions of the steel pipe (702), and a third fixing member (4) corresponding to the assembly dimensions of the hinged joint (703); the second fixing member (3) is arranged between the first fixing member (2) and the third fixing member (4).

2. The manufacturing tooling for the hinged joint steel pipe assembly according to claim 1 is characterized in that: The first fixing member (2) comprises a positioning pin for fixing the transition joint (701) on the base plate (1), and the positioning pin comprises a pin (201) mounted on the base plate (1) and a positioning ring (202) threadedly connected to the pin (201).

3. The manufacturing tooling for the hinged joint steel pipe assembly according to claim 2 is characterized in that: The second fixing member (3) comprises a first positioning block (301) for fixing the steel pipe (702) on the bottom plate (1) and a second positioning block (302) located on the side of the first positioning block (301), and the first positioning block (301) and the second positioning block (302) are both provided with a clamping groove (5) matching the shape of the steel pipe (702) and clamped with the steel pipe (702).

4. The manufacturing tooling for the hinged joint steel pipe assembly according to claim 3 is characterized in that: The first positioning block (301) and the second positioning block (302) are located between the positioning pin and the third fixing member (4), and the first positioning block (301) is located on the side of the positioning pin, and the second positioning block (302) is located on the side of the third fixing member (4).

5. The manufacturing tooling for the hinged joint steel pipe assembly according to claim 3 is characterized in that: The third fixing member (4) comprises a positioning flange (401) for fixing the hinged joint (703) on the base plate (1) and located on the side of the second positioning block (302); the positioning flange (401) is provided with a positioning column (6) matching the shape of the hinged joint (703) and being clamped with the hinged joint (703).

6. The manufacturing tooling for the hinged joint steel pipe assembly according to claim 5 is characterized in that: The base plate (1) is provided with a first mounting hole threadedly connected to the bottom of the pin (201), and the base plate (1) is also provided with a second mounting hole for mounting a positioning flange (401), and the screw on the positioning flange (401) is threadedly connected to the second mounting hole.