Hot galvanizing tank with anti-splashing structure

By setting splash -proof hoods on the main body of the hot -dip galvanized groove and using sliding strips and locking structures, the problem of zinc liquid splashing in the existing technology is solved, and the effective splash anti -splash anti -splash anti -splash anti -splashing of zinc liquid is realized. At the same time, ensure production efficiency.

CN222411765UActive Publication Date: 2025-01-28BENGBU WENXIN METAL MATERIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421683035.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2025-01-28
Estimated Expiration
2034-07-16

AI Technical Summary

Technical Problem

During the use of existing hot-dip galvanized hangers, it is necessary to design a splash-proof mechanism to slow down the operating speed to reduce zinc liquid splashing, affect production efficiency, or increase manufacturing and maintenance costs by optimizing the hanger design.

Method used

Design a hot -dip galvanized slot with an external splash structure. By setting up splash -proof cover and splash anti -splash cover two on the subject, and using the structure of sliding strips, installation sliding, locking rods and lock slots to achieve splash antiplication anti -splash anti -anti -splash anti -splash anti -splash -proof The rapid stitching and unlocking of the cover, increase the side of the main body in disguise to prevent zinc liquid from splashing.

Benefits of technology

Effectively prevent zinc liquid splash, reduce manufacturing costs, ensure production efficiency, simplify maintenance process, and reduce maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222411765U_ABST
    Figure CN222411765U_ABST
Patent Text Reader

Abstract

The utility model provides a hot galvanizing bath with a splash-proof structure, which comprises a main body, a splash-proof cover I and a splash-proof cover II, the main body is a hot galvanizing bath, and a group of sliding chutes are respectively arranged at the front and back positions of the left side of the top of the main body. Compared with the prior art, the anti-splashing device has the advantages that the first anti-splashing cover, the second anti-splashing cover and the splicing rod are arranged, the first anti-splashing cover and the second anti-splashing cover can be spliced and fixed into a whole, so that the height of the side face of the main body is increased in a disguised mode, and then liquid zinc can be prevented from splashing out; according to the splash-proof cover, the splash-proof cover I and the splash-proof cover II can be conveniently unlocked while the splash-proof cover I and the splash-proof cover II are conveniently mounted, so that the splash-proof cover I and the splash-proof cover II are respectively taken down through disconnection of the mounting sliding strip and the mounting sliding groove, the splash-proof cover I and the splash-proof cover II are conveniently maintained, the maintenance cost can be reduced, and the service life of the splash-proof cover I and the splash-proof cover II is prolonged. Meanwhile, the operation and the use are convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of galvanizing, and particularly relates to a hot-dip galvanizing tank with an anti-splashing structure. Background Art

[0002] The hot-dip galvanizing tank is one of the core equipment for the hot-dip galvanizing process. It is a container for high-temperature zinc liquid. The workpiece is suspended in the galvanizing tank by a hanger and immersed in the zinc liquid to complete the galvanizing. The galvanizing tank is usually made of high-temperature resistant and corrosion-resistant materials, such as stainless steel or special alloys, to ensure stability and service life in high-temperature environments. The existing hot-dip galvanizing hanger needs to be designed with an anti-splash mechanism during use to deal with the problem of zinc liquid splashing. The splashing zinc liquid not only wastes materials, but also may cause damage to equipment and operators. The conventional response method is to slow down the operation speed of the hanger to reduce the probability of zinc liquid splashing due to impact. Although slowing down the operation speed can reduce splashing, it will affect production efficiency, prolong the process time, and is not conducive to large-scale production. Secondly, the hanger is optimized to reduce splashing. Although the optimized hanger design can effectively reduce splashing, the customized design increases the manufacturing and maintenance costs. Therefore, it is hoped that a new structure will be proposed to solve the above problems. Utility Model Content

[0003] In view of the deficiencies in the prior art, the utility model aims to provide a hot-dip galvanizing tank with an anti-splashing structure.

[0004] The utility model is realized by the following technical scheme: a hot-dip galvanizing tank with an anti-splash structure, comprising: a main body, a first anti-splash cover and a second anti-splash cover, the main body is a hot-dip galvanizing tank, and a group of slide grooves are respectively opened at the front and rear positions of the left side of the top of the main body;

[0005] A set of splash shield 1 is provided on the left side of the top of the main body, a set of splash shield 2 is provided on the right side of the splash shield 1, a set of installation slide bars are provided at the front and rear positions of the bottom of the splash shield 1, a set of splicing rods are provided at the front and rear positions of the right side of the splash shield 1, and a locking groove is provided on the right side of the top of the splicing rod;

[0006] A group of splicing grooves are respectively opened at the front and rear positions on the left side of the second splash guard, a splicing socket is provided on the left side of each group of splicing grooves, a group of telescopic chambers are opened above each group of splicing grooves, an unlocking button is provided above the telescopic chamber, a reset spring is provided inside the telescopic chamber, a baffle is provided below the reset spring, and a locking rod is provided below the baffle.

[0007] As a preferred embodiment, the structures on the left and right sides of the top of the main body are completely identical and are arranged in mirror symmetry, and the structures on the bottoms of the splash guard 1 and the splash guard 2 are completely identical and are arranged in mirror symmetry.

[0008] As a preferred embodiment, the splash shield 1 and the splash shield 2 are both C-shaped structures, and the length, width and height of the splash shield 1 and the splash shield 2 are the same.

[0009] As a preferred embodiment, the outer side of the installation slide bar is wrapped with a metal cladding, the material of the metal cladding is stainless steel, and the total thickness of the metal cladding and the installation slide bar is less than the width of the installation slide groove.

[0010] As a preferred embodiment, the mounting slide bar and the mounting slide groove are both L-shaped structures, and the side of the mounting slide groove away from the center line of the main body is a through structure. The length of the mounting slide bar is equal to the length of the mounting slide groove. In actual use, two workers pull the splash shield one to the left, so that the two groups of mounting slide bars on the left side slide away from the two groups of mounting slide grooves until the two groups of mounting slide bars are completely separated from the two groups of mounting slide grooves, thereby removing the splash shield one, and then the other two workers pull the splash shield two to the right, so that the two groups of mounting slide bars on the right side slide away from the two groups of mounting slide grooves until the two groups of mounting slide bars are completely separated from the two groups of mounting slide grooves, thereby removing the splash shield two, and then the splash shield one and the splash shield two can be maintained and cleaned respectively, which is simple to operate and easy to maintain.

[0011] As a preferred embodiment, a group of pull rods are fixed at the bottom of the unlocking button, the bottom of the pull rods penetrates downward through the top of the telescopic cavity and extends into the telescopic cavity, and the bottom of the pull rods passes downward through the reset spring and is connected to the top of the baffle.

[0012] As a preferred embodiment, the left and right sides of the top of the baffle are glued and fixed to the bottom of the return spring, the top of the return spring is fixed to the top of the telescopic cavity, and the baffle and the locking rod are an integrated structure;

[0013] An extension hole is provided through the bottom of the telescopic cavity, and the bottom of the locking rod passes through the extension hole and extends into the splicing groove. The bottom of the locking rod and the locking groove are both wedge-shaped structures with the inclined surface facing left. The length and width of the bottom of the locking rod are smaller than the length and width of the locking groove. In actual use, two workers respectively pinch the two sets of unlocking buttons and lift them upward, so that the pull rod drives the locking rod to move upward through the baffle and squeeze the reset spring. The bottoms of the two sets of locking rods detach upward from the two sets of locking grooves, releasing the locking relationship between the locking rod and the splicing rod.

[0014] After adopting the above technical scheme, the beneficial effects of the utility model are as follows: by arranging the splash shield one, the splash shield two and the splicing rod, the splash shield one and the splash shield two can be spliced ​​and fixed into a whole, thereby increasing the height of the side of the main body in disguised form, thereby preventing the zinc liquid from splashing out, and saving the manufacturing cost, without reducing the speed to prevent splashing out, thereby ensuring the production efficiency, and by arranging the installation slide bar, the installation slide groove, the locking rod and the locking groove, it is convenient to install the splash shield one and the splash shield two, and it is convenient to release the locking state of the splash shield one and the splash shield two, so that the splash shield one and the splash shield two can be removed respectively by disconnecting the installation slide bar and the installation slide groove, thereby facilitating the maintenance of the splash shield one and the splash shield two, thereby reducing the maintenance cost and facilitating operation and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0016] Figure 1 The utility model is a schematic diagram of a hot-dip galvanizing tank with an anti-splash structure.

[0017] Figure 2 It is a schematic diagram of the structure of point A of the utility model.

[0018] Figure 3 It is a schematic diagram of the structure of B of the utility model.

[0019] Figure 4 The utility model is a schematic diagram of the internal structure of a telescopic cavity in a hot-dip galvanizing tank with an anti-splash structure.

[0020] In the figure, 100-main body, 110-splash cover 1, 120-splash cover 2, 130-metal cladding, 140-installation slide groove, 150-installation slide bar;

[0021] 160-splicing socket, 170-splicing rod, 180-unlocking button, 190-splicing groove, 200-telescopic cavity, 210-reset spring, 220-pull rod, 230-baffle, 240-extending hole, 250-locking rod, 260-locking groove. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only one end of the utility model, not the whole end. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figures 1 to 4 : A hot dip galvanizing tank with an anti-splash structure, comprising: a main body 100, a splash shield 1 110 and a splash shield 2 120, the main body 100 is a hot dip galvanizing tank, and a group of slide grooves are respectively opened at the front and rear positions of the left side of the top of the main body 100;

[0024] A splash shield 1 110 is provided on the left side of the top of the main body 100, a splash shield 2 120 is provided on the right side of the splash shield 110, a group of installation slide bars 150 are provided at the front and rear positions of the bottom of the splash shield 110, a group of splicing rods 170 are provided at the front and rear positions of the right side of the splash shield 110, and a locking groove 260 is provided on the right side of the top of the splicing rod 170;

[0025] A group of splicing grooves 190 are respectively opened at the front and rear positions of the left side of the splash shield 120, and a splicing socket 160 is penetrated on the left side of each group of splicing grooves 190. A group of telescopic chambers 200 are opened above each group of splicing grooves 190, and an unlocking button 180 is arranged above the telescopic chamber 200. A return spring 210 is arranged inside the telescopic chamber 200, a baffle 230 is arranged below the return spring 210, and a locking rod 250 is arranged below the baffle 230.

[0026] The structures of the left and right sides of the top of the main body 100 are completely identical and are arranged in a mirror-symmetrical manner. The structures of the bottoms of the splash shield 110 and the splash shield 2 120 are completely identical and are arranged in a mirror-symmetrical manner.

[0027] The splash shield 1 110 and the splash shield 2 120 are both C-shaped structures, and the length, width and height of the splash shield 1 110 and the splash shield 2 120 are the same.

[0028] The outer side of the installation slide bar 150 is wrapped with a metal cladding 130 . The metal cladding 130 is made of stainless steel. The total thickness of the metal cladding 130 and the installation slide bar 150 is less than the width of the installation slide groove 140 .

[0029] The mounting slide bar 150 and the mounting groove 140 are both L-shaped structures, and the side of the mounting groove 140 away from the center line of the main body 100 is a through structure. The length of the mounting slide bar 150 is equal to the length of the mounting groove 140. In actual use, two workers pull the splash guard 1 10 to the left, so that the two groups of mounting slide bars 150 on the left side slide out of the two groups of mounting grooves 140 until the two groups of mounting slide bars 150 are completely separated from the two groups of mounting grooves 140, thereby removing the splash guard 1 10, and then the other two workers pull the splash guard 2 120 to the right, so that the two groups of mounting slide bars 150 on the right side slide out of the two groups of mounting grooves 140 until the two groups of mounting slide bars 150 are completely separated from the two groups of mounting grooves 140, thereby removing the splash guard 2 120, and then the splash guard 1 10 and the splash guard 2 120 can be maintained and cleaned respectively, which is simple to operate and easy to maintain.

[0030] A set of pull rods 220 are fixed at the bottom of the unlocking button 180 . The bottom of the pull rods 220 passes through the top of the telescopic cavity 200 downward and extends into the interior of the telescopic cavity 200 . The bottom of the pull rods 220 passes through the return spring 210 downward and is connected to the top of the baffle 230 .

[0031] The left and right sides of the top of the baffle 230 are glued and fixed to the bottom of the return spring 210, the top of the return spring 210 is fixed to the top of the telescopic chamber 200, and the baffle 230 and the locking rod 250 are an integrated structure;

[0032] An extension hole 240 is formed at the bottom of the telescopic cavity 200, and the bottom of the locking rod 250 passes through the extension hole 240 and extends into the interior of the splicing groove 190. The bottom of the locking rod 250 and the locking groove 260 are both wedge-shaped structures with the inclined surface facing left. The length and width of the bottom of the locking rod 250 are smaller than the length and width of the locking groove 260. In actual use, two workers respectively pinch the two sets of unlocking buttons 180 and lift them upward, so that the pull rod 220 drives the locking rod 250 to move upward through the baffle 230 and squeeze the reset spring 210. The bottoms of the two sets of locking rods 250 detach upward from the two sets of locking grooves 260, and the locking relationship between the locking rod 250 and the splicing rod 170 is released.

[0033] Example 1: Please refer to Figures 1 to 4When in actual use, first, two workers pick up the splash shield 110, align the right sides of the two groups of installation slide bars 150 with the left sides of the two groups of installation slots 140 on the left, and then push the splash shield 110 to the left. The metal cladding 130 wrapped around the outside of the installation slide bar 150 can make the sliding smoother, making it easier for the installation slide bar 150 and the installation slot 140 to be slidably connected, and the splash shield 110 is installed. At this time, the two workers support the splash shield 110 to temporarily fix it, and the other two workers pick up the splash shield 2 120, align the left sides of the two groups of installation slide bars 150 with the right sides of the two groups of installation slots 140 on the right, and then push it to the left. When the splash shield 2 120 slowly approaches the splash shield 1 10 to the left, the two groups of splicing rods 170 on the right side of the splash shield 110 are inserted to the left into the two groups of splicing slots 190 through the two groups of splicing sockets 160 on the left side of the splash shield.

[0034] When the splicing rod 170 contacts the bottom of the locking rod 250, since the bottom of the locking rod 250 is a wedge-shaped structure with the inclined surface facing left, the locking rod 250 is squeezed to move upward and the return spring 210 is squeezed through the baffle 230 to shrink and accumulate force. When the locking groove 260 moves to be opposite to the bottom of the locking rod 250, the bottom of the locking rod 250 is no longer squeezed, and the return spring 210 rebounds to push the bottom of the locking rod 250 into the locking groove 260, thereby locking the locking rod 250. After the two sets of locking rods 250 are locked, the splash guard 1 10 and the splash guard 2 120 are completely fixed and locked. When hot-dip galvanizing is performed, the splash guard 1 10 and the splash guard 2 120 play a role in disguisedly increasing the side of the main body 100, thereby effectively preventing zinc liquid from splashing out, reducing manufacturing costs, and at the same time, since there is no need to reduce the hot-dip galvanizing speed to prevent splashing out, production efficiency is guaranteed.

[0035] Example 2: Please refer to Figures 1 to 4After the hot-dip galvanizing operation is completed, the splash shield 1 10 and the splash shield 2 120 need to be maintained and cleaned to ensure the service life of the splash shield 1 10 and the splash shield 2 120. At this time, two workers pinch the two sets of unlocking buttons 180 respectively and lift them upward, so that the pull rod 220 drives the locking rod 250 to move upward through the baffle 230 and squeeze the reset spring 210. The bottoms of the two sets of locking rods 250 are disengaged upward from the inside of the two sets of locking grooves 260, and the locking relationship between the locking rod 250 and the splicing rod 170 is released. Then the other two workers pull the splash shield 110 to the left. The two groups of installation slides 150 on the left side are slid and disengaged from the two groups of installation grooves 140 until the two groups of installation slides 150 are completely disengaged from the two groups of installation grooves 140, thereby removing the splash shield 1 10. Then the other two workers pull the splash shield 2 120 to the right, so that the two groups of installation slides 150 on the right side are slid and disengaged from the two groups of installation grooves 140 until the two groups of installation slides 150 are completely disengaged from the two groups of installation grooves 140, thereby removing the splash shield 2 120. Then, the splash shield 1 10 and the splash shield 2 120 can be maintained and cleaned respectively, which is simple to operate and easy to maintain.

[0036] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A hot dip galvanizing tank with an anti-splash structure, comprising: A main body (100), a splash shield 1 (110) and a splash shield 2 (120), characterized in that: the main body (100) is a hot-dip galvanizing tank, and a group of slide grooves are respectively opened at the front and rear positions of the top left side of the main body (100); A splash shield 1 (110) is provided on the left side of the top of the main body (100), a splash shield 2 (120) is provided on the right side of the splash shield 1 (110), a group of mounting slide bars (150) are provided at the front and rear positions of the bottom of the splash shield 1 (110), a group of splicing rods (170) are provided at the front and rear positions of the right side of the splash shield 1 (110), and a locking groove (260) is provided on the right side of the top of the splicing rod (170); A group of splicing grooves (190) are respectively opened at the front and rear positions of the left side of the second splash shield (120), and a splicing socket (160) is provided through the left side of each group of splicing grooves (190). A group of telescopic cavities (200) is opened above each group of splicing grooves (190), and an unlocking button (180) is provided above the telescopic cavity (200). A return spring (210) is provided inside the telescopic cavity (200), a baffle (230) is provided below the return spring (210), and a locking rod (250) is provided below the baffle (230).

2. A hot dip galvanizing tank with an anti-splash structure as claimed in claim 1, characterized in that: The structures of the left and right sides of the top of the main body (100) are completely identical and are arranged in a mirror-image symmetry, and the structures of the bottoms of the first splash shield (110) and the second splash shield (120) are completely identical and are arranged in a mirror-image symmetry.

3. A hot dip galvanizing tank with an anti-splash structure as claimed in claim 2, characterized in that: The splash shield 1 (110) and the splash shield 2 (120) are both C-shaped structures, and the length, width and height of the splash shield 1 (110) and the splash shield 2 (120) are the same.

4. The hot dip galvanizing tank with anti-splashing structure according to claim 1, characterized in that: The installation slide bar (150) is wrapped with a metal cladding (130) on the outside, the metal cladding (130) is made of stainless steel, and the total thickness of the metal cladding (130) and the installation slide bar (150) is less than the width of the installation slide groove (140).

5. A hot dip galvanizing tank with an anti-splash structure as claimed in claim 4, characterized in that: The installation slide bar (150) and the installation slide groove (140) are both L-shaped structures, the side of the installation slide groove (140) away from the center line of the main body (100) is a through structure, and the length of the installation slide bar (150) is equal to the length of the installation slide groove (140).

6. The hot dip galvanizing tank with anti-splashing structure according to claim 1, characterized in that: A group of pull rods (220) are fixed to the bottom of the unlocking button (180), the bottom of the pull rods (220) penetrates downward through the top of the telescopic cavity (200) and extends into the interior of the telescopic cavity (200), and the bottom of the pull rods (220) passes downward through the return spring (210) and is connected to the top of the baffle (230).

7. A hot dip galvanizing tank with an anti-splash structure as claimed in claim 6, characterized in that: The left and right sides of the top of the baffle plate (230) are glued and fixed to the bottom of the return spring (210), the top of the return spring (210) is fixed to the top of the telescopic cavity (200), and the baffle plate (230) and the locking rod (250) are an integrated structure; A protruding hole (240) is formed through the bottom of the telescopic cavity, and the bottom of the locking rod (250) passes through the protruding hole (240) and extends into the interior of the splicing groove (190). The bottom of the locking rod (250) and the locking groove (260) are both wedge-shaped structures with the inclined surface facing leftward, and the length and width of the bottom of the locking rod (250) are both smaller than the length and width of the locking groove (260).