One-step wet-process chemical plating equipment for composite material

By designing a one-step wet plating equipment for composite materials, the tight adhesion between copper foil and substrate and the uniform deposition of metal layers were achieved, solving the problem of uneven density and thickness in aluminum battery production and improving processing quality and efficiency.

CN222411826UActive Publication Date: 2025-01-28HUIZHOU YILING INTELLIGENT EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421258207.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2025-01-28
Estimated Expiration
2034-06-04

AI Technical Summary

Technical Problem

In current aluminum battery production, poor substrate adaptability leads to poor bonding between copper and the substrate, uneven metal layer thickness, low processing efficiency, and the need for pretreatment of the deposition solution on other equipment, which affects production efficiency.

Method used

Design a one-step wet chemical plating equipment for composite materials, including unwinding, coating, drying and deposition devices. Through multiple deposition tanks in stages, combined with a pre-drying mechanism and auxiliary tank treatment, uniform adhesion of the metal layer and efficient treatment of the deposition solution are achieved.

Benefits of technology

It improves the adhesion and thickness uniformity of the metal layer, reduces the transfer time of the deposition solution, and enhances processing quality and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222411826U_ABST
    Figure CN222411826U_ABST
Patent Text Reader

Abstract

The utility model relates to composite material one-step wet-process chemical plating equipment, which comprises an unwinding device, an unwinding device, a chemical plating device and a chemical plating device, the unwinding device is used for storing a material roll and unwinding a coiled material on the material roll and comprises an unwinding base, an unwinding support is arranged on the unwinding base, and the unwinding support is connected to the unwinding base in a sliding mode; the coating device is used for sequentially coating the two opposite surfaces of the coiled material and comprises a coating base and a coating support connected to the coating base in a sliding mode, a pre-drying mechanism is installed on the coating support, and the pre-drying mechanism is used for pre-drying the coiled material with one surface coated; the drying device is used for drying the surface of the coated coiled material; the deposition device comprises a plurality of deposition tanks and auxiliary tanks, the deposition tanks are sequentially arranged in the conveying direction of the coiled material, deposition liquid is contained in the deposition tanks and used for conducting chemical deposition on the two faces of the immersed coiled material, and the auxiliary tanks are sequentially arranged on one side of the deposition tanks and used for conducting pretreatment and aftertreatment on the deposition liquid. According to the utility model, the surface of the coiled material is pretreated by arranging the coating device, so that the adhesion tightness of a metal layer and the coiled material is enhanced; by arranging the multiple deposition tanks, step-by-step multiple deposition on the surface of the coiled material is achieved, a metal layer with the uniform thickness is obtained, and the machining quality is improved; and through the arrangement of the multiple auxiliary tanks, the deposition liquid can be subjected to pretreatment and aftertreatment work, treatment work does not need to be conducted on other equipment, the transfer time is saved, and the machining efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of lithium battery production and manufacturing, in particular to one-step wet chemical plating equipment for composite materials. Background Art

[0002] Currently, in the production of aluminum batteries, copper foil is usually used as a component of the negative electrode because of its strong conductivity, soft texture, and non-reaction with lithium.

[0003] Chemical plating (also known as chemical plating) is a new type of surface treatment technology. This technology has attracted increasing attention for its advantages of energy saving and environmental protection. Among them, the one-step wet process is a chemical plating method for producing composite copper foil. It mainly immerses the substrate in a solution containing polymers and other additives in a wet process, and then treats it under specific conditions to deposit copper on the surface of the substrate and combine with the substrate to form a strong composite structure, thereby obtaining a composite copper foil. This method can also be used to produce other composite materials with specific properties and uses.

[0004] However, in the actual production process, it was found that the adaptability of some substrates was poor, resulting in poor tightness when copper was combined with them, and the metal layer was loose. In addition, the one-step wet process equipment in the prior art usually only performs a single deposition. Although this method can greatly shorten the processing time, the deposition rate is difficult to control, and a single deposition can easily lead to uneven thickness of the metal layer, affecting the quality of the finished product. In addition, the deposition liquid needs to undergo pre-treatment processes such as filtration and stirring before deposition. Such processes are usually performed on other equipment, so a certain transfer time is required, which reduces the processing efficiency. Utility Model Content

[0005] In view of this, the purpose of the utility model is to provide a one-step wet chemical plating device for composite materials with tight adhesion, uniform metal layer and high processing efficiency.

[0006] A one-step wet chemical plating device for composite materials comprises: an unwinding device for storing a material roll and unwinding a coil on the material roll, comprising an unwinding base, on which an unwinding bracket is provided, and the unwinding bracket is slidably connected to the unwinding base; a coating device for successively coating two opposite sides of a coil, comprising a coating base and a coating bracket slidably connected to the coating base, on which a pre-drying mechanism is installed, and the pre-drying mechanism is used to pre-dry the coil after one side of the coating is completed; a drying device for drying the surface of the coated coil; a deposition device, comprising a plurality of deposition troughs and auxiliary troughs, wherein the plurality of deposition troughs are arranged in sequence along the conveying direction of the coil, the deposition troughs contain a deposition liquid for chemically depositing both sides of the immersed coil, and the plurality of auxiliary troughs are arranged in sequence on one side of the deposition trough for pre-treating and post-treating the deposition liquid.

[0007] In the above technical scheme, the material coil is installed on the unwinding device and unwound by the unwinding device. After the coil is led out, it passes through the coating device, the drying device and the deposition device in sequence. The surface of the coil is pretreated by the coating device and the drying device to enhance the tightness of subsequent metal ions adhering to the coil. The coil is passed through a plurality of deposition troughs arranged in sequence in the deposition device to achieve multiple step-by-step deposition on the surface of the coil to obtain a more uniform metal layer.

[0008] Among them, the coating device can coat the two opposite sides of the coil successively, so that the coating is attached to the two sides of the coil, changing the surface properties of the coil, strengthening the adhesion effect between the metal ions and the coil during the subsequent chemical deposition, and making the combination between the two closer. The pre-drying mechanism can pre-dry the coil after the coating on one side of the coil is completed, so that the coating on this side is initially solidified and forms a semi-solidified state, so as to avoid the coating on this side flowing and converging in a certain direction under the action of vibration or other external forces when the other side is coated later, thereby affecting the uniformity of the coating. After the coating on the other side is completed, it is immediately sent to the drying device for drying. Dry to solidify the coatings on both sides; multiple deposition tanks in the deposition device are arranged in sequence, and each deposition tank is provided with a deposition liquid. By adjusting the components and concentration ratio of the deposition liquid, the deposition rate of the metal ions can be controlled, and the metal layer is deposited on the surface of the coil in steps for multiple times, so that the thickness of the final metal layer is more uniform, thereby improving the processing quality; in addition, a sub-tank is arranged on one side of the deposition tank, and the deposition liquid can be filtered, mixed, and processed before being loaded into the deposition tank. At the same time, the deposition liquid can also be post-processed after the deposition work is completed, and there is no need to perform processing work on other equipment, thereby saving transfer time and improving processing efficiency.

[0009] Therefore, the composite material one-step wet chemical plating equipment of the present application can pre-treat the surface of the coil by coating the coating device and the pre-drying mechanism therein before chemical deposition on the coil, thereby forming a uniform coating on the surface of the coil, changing the surface properties of the coil, and helping to enhance the tightness of metal ions adhering to the coil during deposition; by setting up multiple deposition tanks, multiple step-by-step deposition on the surface of the coil is achieved to obtain a metal layer with uniform thickness, thereby improving the processing quality; by setting up multiple sub-tanks, the deposition liquid can be pre-treated and post-treated, without the need for processing on other equipment, saving transfer time and improving processing efficiency.

[0010] In an optional implementation, the unwinding bracket is provided with an unwinding roller, an unwinding drive, an appearance detection unit, two anti-static rollers and a plurality of feeding rollers; the unwinding roller is rotatably mounted on the unwinding bracket, the output end of the unwinding drive is connected to one end of the unwinding roller, the appearance detection unit is arranged on the side of the unwinding roller that unwinds the coil, and is used to detect the surface of the coil; the two anti-static rollers are arranged at the rear section of the appearance detection unit and are respectively in contact with the two sides of the coil; and the plurality of feeding rollers are arranged at intervals on the unwinding rack.

[0011] In the above technical scheme, when unwinding, the material roll is installed on the unwinding roller, and the unwinding roller is driven to rotate by the unwinding drive member to perform automatic unwinding. The coil released by the unwinding roller first passes through the appearance inspection unit. The appearance inspection unit can perform appearance inspection on the surface of the coil to detect its surface smoothness and flatness, and issue a prompt when it is unqualified, reminding the staff to deal with it to avoid subsequent invalid processing; two anti-static rollers are located on the rear side of the appearance inspection unit, respectively arranged on both sides of the coil, and in contact with the surface of the coil. The anti-static rollers can remove static electricity on the surface of the coil to prevent the coil from absorbing dust or other impurities in the air; multiple loading rollers are arranged at intervals to guide the coil.

[0012] In an optional implementation, the coating bracket is provided with a traction roller, a traction drive, two coating rollers, a coating drive and a plurality of feed rollers, the traction roller is rotatably mounted on the coating bracket, the output end of the traction drive is connected to one end of the traction roller, two coating rollers are rotatably mounted on the coating bracket, the coating drive is connected to one end of the coating roller, and a plurality of feed rollers are spaced apart on the unwinding rack.

[0013] In the above technical solution, the traction roller rotates under the drive of the traction drive member, and is used to provide traction for the coil and drive the coil to move. The two coating rollers are used to coat the surface of the coil by rolling so that the coating adheres to the surface of the coil. Multiple feeding rollers are arranged at intervals to guide the coil.

[0014] In an optional implementation, the two coating rollers coat opposite sides of the coil respectively, and the pre-drying mechanism is arranged on the side of the coil between the two coating rollers and faces the side coated by the previous coating roller.

[0015] In the above technical scheme, the two coating rollers coat the two sides of the coil successively, and the pre-drying mechanism is arranged on one side of the coil path between the two coating rollers and on the side of the side that is coated first, wherein the pre-drying mechanism is parallel and opposite to the side of the coil that is coated first, ensuring uniform heating so that the coating on this side forms a uniform semi-cured coating.

[0016] In an optional implementation, the sedimentation trough is provided with two baffles and a plurality of guide rollers, the two baffles are arranged obliquely to the two side walls of the sedimentation trough, the sedimentation liquid is contained between the two baffles, the plurality of guide rollers are distributed at intervals inside the sedimentation trough and above the intervals between adjacent sedimentation troughs, and at least one guide roller is immersed in the sedimentation liquid in the sedimentation trough.

[0017] In the above technical scheme, two baffles are arranged inside the deposition trough, and the two baffles are inclined with respect to the side walls of the deposition, so that a cavity is formed between the baffles, the side walls and the bottom surface of the deposition trough. The volume of the deposition trough can be reduced without affecting the deposition, thereby effectively reducing the consumption of the deposition liquid and saving costs; a plurality of guide rollers are used to guide the coiled material, and by immersing part of the guide rollers in the deposition liquid, the coiled material is driven to be immersed in the deposition liquid and fully contacted with the deposition liquid, wherein a guide roller is also arranged above the interval between adjacent deposition troughs, for leading the coiled material out of or into the deposition trough.

[0018] In an optional implementation, a plurality of first adjustment units and second adjustment units are respectively provided on both sides of the sedimentation trough, and the two ends of the guide roller are respectively connected to the first adjustment unit and the second adjustment unit, the first adjustment unit is used to adjust the horizontal direction of the guide roller, and the second adjustment unit is used to adjust the up and down direction of the guide roller.

[0019] In the above technical scheme, the first adjusting unit is arranged on one side of the sedimentation trough, and the second adjusting unit is arranged on the other side of the sedimentation trough. The two ends of each guide roller are respectively connected to a first adjusting unit and a second adjusting unit. Through the first adjusting unit and the second adjusting unit, the direction of the guide roller can be adjusted so that the guide roller is always in the correct direction, ensuring that the coil is transported normally according to the preset path to prevent deviation.

[0020] In an optional implementation, the first adjustment unit and the second adjustment unit both include a sliding block and a fixed seat, the end of the guide roller shaft is connected to the sliding block, the sliding block is slidably connected to the fixed seat, mounting plates are provided on both sides of the fixed seat, fasteners are provided on the mounting plates, and the fasteners are threadedly connected to the mounting plates.

[0021] In the above technical solution, the sliding block in the first adjusting unit can only slide horizontally left and right on the fixed seat, and the sliding block in the second adjusting unit can only slide up and down on the fixed seat. Accordingly, the mounting plates in the first adjusting unit are arranged on the left and right sides of the fixed seat, and the mounting plates in the second adjusting unit are arranged on the upper and lower sides of the fixed seat. Fasteners are threadedly connected on the mounting plates, and the sliding block can be locked or loosened by rotating the fasteners.

[0022] In an optional implementation, the sedimentation tank is provided with a circulation component, the circulation component includes a circulation power component and a circulation pipeline, the circulation power component is installed on the outer surface of the sedimentation tank, the circulation pipeline is connected to the interior of the sedimentation tank, and the circulation power component is connected to the circulation pipeline.

[0023] In the above technical solution, the circulation pipeline is connected to the inside of the sedimentation tank, and the circulation power component can suck the sedimentation liquid in the sedimentation tank into the circulation pipeline and then send it back to the sedimentation tank, so as to realize the circulation flow of the sedimentation liquid between the circulation pipeline and the sedimentation tank, effectively increase the fluidity of the sedimentation liquid, make the various components in the sedimentation liquid evenly distributed, avoid local concentrations that are too high or too low, and make the thickness of the metal layer obtained by deposition more uniform.

[0024] In an optional implementation, a cavity is provided inside the auxiliary tank for storing sedimentation liquid, the auxiliary tank is connected to the interior of the sedimentation tank through a pipeline structure, and a plurality of filters and a power pump are installed on the auxiliary tank.

[0025] In the above technical solution, the cavity inside the sub-tank for storing the sedimentation liquid is connected to the inside of the sedimentation tank through a pipeline structure, which is convenient for sending the sedimentation liquid into the sedimentation tank, or for directing the sedimentation liquid in the sedimentation tank to the sub-tank. The sub-tank is installed with a number of filters and power pumps according to the components and needs of the sedimentation liquid in each sedimentation tank. The filter element is used to filter the sedimentation liquid when it enters the sub-tank, and the power pump can provide power to help stir the sedimentation liquid, so as to promote its rapid and even mixing.

[0026] In an optional implementation, an adjustment component is provided on the unwinding base and the coating base, and the adjustment component includes an adjustment block, an adjustment rod and an adjustment knob. The adjustment block is installed on the unwinding base or the coating base, the adjustment rod is passed through the adjustment block and is threadedly connected to the adjustment block, one end of the adjustment rod is connected to the adjustment knob, and the other end is connected to the unwinding bracket or the coating bracket.

[0027] In the above technical solution, the adjustment block is fixedly installed on the unwinding base or the coating base, and the adjustment knob can be rotated to drive the adjustment rod to rotate. Since the adjustment rod is threadedly connected to the adjustment block, the adjustment rod can move in the axial direction when it rotates, thereby driving the unwinding bracket or the coating bracket to move, thereby realizing the position adjustment of the unwinding bracket or the coating bracket. The structure is simple and the operation is easy. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0029] Figure 1 It is a schematic structural diagram of a one-step wet plating device for composite materials according to one embodiment.

[0030] Figure 2 This is a stereoscopic diagram of the unwinding device and the coating device described in this application.

[0031] Figure 3 It is a schematic diagram of the structure when the coil passes through the unwinding device and the coating device.

[0032] Figure 4 It is a three-dimensional diagram of the deposition device described in this application.

[0033] Figure 5 for Figure 4 Enlarged view of position A in the middle.

[0034] Figure 6 for Figure 4 Enlarged view of position B in the middle.

[0035] Figure 7 for Figure 4 Enlarged view of position C in the middle.

[0036] Figure 8 This is a front view of the deposition device described in this application.

[0037] Fig. 9 for Figure 8 Enlarged view of position D in the middle.

[0038] Fig.10 for Figure 8 Enlarged view of position E in the middle

[0039] Fig.11 Schematic diagram of the internal structure of the two sedimentation tanks.

[0040] Description of reference numerals in the figures:

[0041] 1-unwinding device; 11-unwinding base; 12-unwinding bracket; 13-unwinding roller; 14-unwinding driving member; 15-appearance detection unit; 16-static removal roller; 17-feeding roller; 18-adjustment assembly; 181-adjustment block; 182-adjustment rod; 183-adjustment knob;

[0042] 2-coating device; 21-coating base; 22-coating bracket; 23-traction roller; 24-traction drive; 25-coating roller; 26-coating drive; 27-feeding roller; 28-pressing roller; 29-pre-drying mechanism;

[0043] 3-drying device; 31-oven;

[0044] 4-deposition device; 41-deposition trough; 411-baffle; 412-sealing structure; 42-guide roller; 43-first adjustment unit; 431-sliding block; 432-fixed seat; 433-mounting plate; 434-fastener; 44-second adjustment unit; 45-pressure roller; 451-support rod; 452-sliding rod; 46-pillar; 47-circulation component; 471-circulation power part; 472-circulation pipeline; 48-auxiliary tank; 481-filter element; 482-power pump; 49-transfer mechanism; 491-transfer roller; 492-transfer drive part. DETAILED DESCRIPTION

[0045] The following will further describe the one-step wet chemical plating equipment for composite materials of the utility model in combination with specific embodiments and drawings. The drawings are only used for exemplary descriptions, and only show schematic diagrams, not actual drawings, and cannot be understood as limitations on this patent; in order to better illustrate the embodiments of the utility model, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.

[0046] Please refer to Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 8In a preferred embodiment, the present embodiment provides a one-step wet chemical plating device for composite materials, comprising: an unwinding device 1, for storing a material roll and unwinding a coil on the material roll, comprising an unwinding base 11, on which an unwinding bracket 12 is provided, and the unwinding bracket 12 is slidably connected to the unwinding base 11; a coating device 2, for coating two opposite sides of the coil in sequence, comprising a coating base 21, and a coating bracket 22 slidably connected to the coating base 21, on which a coating bracket 22 is installed A pre-drying mechanism 29, the pre-drying mechanism 29 is used to pre-dry the coil after one side is coated; a drying device 3, used to dry the surface of the coil after coating; a deposition device 4, including a plurality of deposition troughs 41 and auxiliary troughs 48, the plurality of deposition troughs 41 are arranged in sequence along the conveying direction of the coil, the deposition troughs 41 are filled with deposition liquid, which is used to chemically deposit on both sides of the immersed coil, and the plurality of auxiliary troughs 48 are arranged in sequence on one side of the deposition trough 41, which is used to pre-treat and post-treat the deposition liquid.

[0047] In this embodiment, the material coil is installed on the unwinding device 1 and is unwound by the unwinding device 1. After the coil is led out, it passes through the coating device 2, the drying device 3 and the deposition device 4 in sequence. The surface of the coil is pretreated by the coating device 2 and the drying device 3 to enhance the tightness of subsequent metal ions adhering to the coil, and the coil passes through a plurality of sequentially arranged deposition slots 41 in the deposition device 4 to achieve multiple step-by-step deposition on the surface of the coil to obtain a more uniform metal layer.

[0048] Among them, the coating device 2 can coat the two opposite sides of the coil successively, so that the coating is attached to the two sides of the coil, changing the surface properties of the coil, strengthening the adhesion effect between the metal ions and the coil during the subsequent chemical deposition, and making the combination between the two closer. The pre-drying mechanism 29 can pre-dry the coil after the coating on one side of the coil is completed, so that the coating on this side is initially solidified to form a semi-solidified state, so as to avoid the coating on this side flowing and converging in a certain direction under the action of vibration or other external forces when the other side is coated later, thereby affecting the uniformity of the coating. After the coating on the other side is completed, it is immediately sent to the drying device 3 for drying, so that the two sides are The coating on the surface is solidified; the multiple deposition tanks 41 in the deposition device 4 are arranged in sequence, and each deposition tank 41 is provided with a deposition liquid. By adjusting the components and concentration ratio of the deposition liquid, the deposition rate of the metal ions can be controlled, and the metal layer is deposited on the surface of the coil in steps for multiple times, so that the thickness of the final metal layer is more uniform, thereby improving the processing quality; in addition, a sub-tank 48 is provided on one side of the deposition tank 41, and the deposition liquid can be filtered, mixed, etc. and processed before being loaded into the deposition tank 41. At the same time, the deposition liquid can also be post-processed after the deposition work is completed, and there is no need to perform processing work on other equipment, thereby saving transfer time and improving processing efficiency.

[0049] Therefore, the composite material one-step wet chemical plating equipment of the present application can pre-treat the surface of the coil by coating the coating device 2 and the pre-drying mechanism 29 therein before chemical deposition on the coil, thereby forming a uniform coating on the surface of the coil, changing the surface properties of the coil, and helping to enhance the tightness of metal ions adhering to the coil during deposition; by setting up multiple deposition tanks 41, multiple step-by-step deposition on the surface of the coil is achieved to obtain a metal layer with uniform thickness, thereby improving the processing quality; by setting up multiple auxiliary tanks 48, the deposition liquid can be pre-treated and post-treated, without the need for processing on other equipment, thus saving transfer time and improving processing efficiency.

[0050] It should be noted that the composite material one-step wet chemical plating equipment of the present application can be used not only for the production of composite copper foil, but also for the production of other composite materials with specific properties and uses.

[0051] Please refer to Figure 2 and Figure 3 In this embodiment, the unwinding bracket 12 is provided with an unwinding roller 13, an unwinding drive 14, an appearance detection unit 15, two anti-static rollers 16 and a plurality of feeding rollers 17. The unwinding roller 13 is rotatably mounted on the unwinding bracket 12, and the output end of the unwinding drive 14 is connected to one end of the unwinding roller 13. The appearance detection unit 15 is arranged on the side of the unwinding roller 13 that unwinds the coil, and is used to detect the surface of the coil. The two anti-static rollers 16 are arranged at the rear section of the appearance detection unit 15, and are respectively in contact with the two sides of the coil. The plurality of feeding rollers 17 are arranged at intervals on the unwinding rack.

[0052] During the unwinding operation, the material roll is mounted on the unwinding roller 13, and the unwinding roller 13 is driven to rotate by the unwinding driving member 14 for automatic unwinding. The coil released by the unwinding roller 13 first passes through the appearance inspection unit 15. The appearance inspection unit 15 can perform an appearance inspection on the surface of the coil to detect its surface smoothness and flatness, and issue a prompt when it is unqualified, reminding the staff to deal with it to avoid subsequent invalid processing; two anti-static rollers 16 are located on the rear side of the appearance inspection unit 15, respectively arranged on both sides of the coil, and in contact with the surface of the coil. The anti-static rollers 16 can remove static electricity on the surface of the coil to prevent the coil from absorbing dust or other impurities in the air; multiple loading rollers 17 are arranged at intervals to guide the coil.

[0053] Please continue to refer to Figure 2 and Figure 3In this embodiment, the coating bracket 22 is provided with a traction roller 23, a traction drive 24, two coating rollers 25, a coating drive 26 and a plurality of feed rollers 27. The traction roller 23 is rotatably mounted on the coating bracket 22, the output end of the traction drive 24 is connected to one end of the traction roller 23, the two coating rollers 25 are rotatably mounted on the coating bracket 22, the coating drive 26 is connected to one end of the coating roller 25, and the plurality of feed rollers 27 are arranged at intervals on the unwinding rack.

[0054] In the present embodiment, specifically, the traction roller 23 rotates under the drive of the traction driving member 24, and is used to provide traction for the coil and drive the coil to move, wherein a pressure roller 28 is provided on one side of the traction roller 23, and the pressure roller 28 abuts against the traction roller 23, and the coil passes through the abutment between the pressure roller 28 and the traction roller 23, and the pressure roller 28 is used to provide a certain pressure to prevent the coil from slipping and ensure the normal transportation of the coil, and the two coating rollers 25 are used to coat the surface of the coil by rolling so that the surface of the coil is adhered to the coating, and the plurality of feeding rollers 27 are arranged at intervals to guide the coil.

[0055] Please refer to Figure 3 In this embodiment, the two coating rollers 25 coat the opposite sides of the coil respectively, and the pre-drying mechanism 29 is arranged on the side of the coil between the two coating rollers 25, and is opposite to the side coated by the coating roller 25 of the previous section.

[0056] In this embodiment, the two coating rollers 25 coat the two sides of the coil successively, and the pre-drying mechanism 29 is arranged on one side of the coil path between the two coating rollers 25, and is located on the side of the side that is coated first, wherein the pre-drying mechanism 29 is parallel and opposite to the side of the coil that is coated first, ensuring uniform heating so that the coating on this side forms a uniform semi-cured coating.

[0057] It should be noted that the coating after being processed by the pre-drying mechanism 29 is in a semi-cured state and has not been completely cured. After the coating on the other side of the coil is completed, it is sent to the drying device 3 for baking. The baking of the drying device 3 makes the coating on both sides of the coil completely cured to form a stable coating.

[0058] Please refer to Fig.11 In this embodiment, the sedimentation trough 41 is provided with two baffles 411 and a plurality of guide rollers 42. The two baffles 411 are arranged obliquely to the two side walls of the sedimentation trough 41. The sedimentation liquid is contained between the two baffles 411. The plurality of guide rollers 42 are distributed at intervals inside the sedimentation trough 41 and above the intervals between adjacent sedimentation troughs 41, and at least one guide roller 42 is immersed in the sedimentation liquid in the sedimentation trough 41.

[0059] Two baffles 411 are arranged inside the sedimentation tank 41, and the two baffles 411 are inclined with respect to the side walls of the sedimentation. Specifically, in order to facilitate the installation of the guide roller 42, the two baffles 411 are arranged on the two side walls perpendicular to the end faces of the guide rollers in the sedimentation tank 41, and no baffles 411 are arranged on the two side walls parallel to the end faces of the guide rollers 42, so as to make way for the installation of the guide rollers 42 and facilitate the installation of the guide rollers 42; wherein, both ends of the guide rollers 42 located inside the sedimentation tank 41 penetrate the side walls of the sedimentation tank 41, and a sealing structure 412 is arranged at the penetration to prevent leakage; in this embodiment, by arranging an inclined baffle 411 inside the sedimentation tank 41, a cavity is formed between the baffle 411, the side walls and the bottom surface of the sedimentation tank 41, so as to reduce the volume of the sedimentation tank 41 without affecting the sedimentation, thereby effectively reducing the consumption of the sedimentation liquid and saving costs;

[0060] A plurality of guide rollers 42 are used to guide the coiled material. Some of the guide rollers 42 are immersed in the deposition liquid, which can drive the coiled material to be immersed in the deposition liquid and fully contact with the deposition liquid. A guide roller 42 is also arranged above the interval between adjacent deposition troughs 41, which is used to lead the coiled material out of or into the deposition trough 41. At the same time, a pressure roller 45 is arranged on one side of the guide roller 42 there, and the pressure roller 45 is in contact with the guide roller 42. After the coiled material passes through the deposition liquid in the deposition trough 41, there is usually a certain amount of liquid remaining on its surface, which makes it easy to slip. A certain pressure is applied by the pressure roller 45 to avoid the occurrence of slipping and ensure the normal transportation of the coiled material.

[0061] Specifically, refer to Fig. 9 and Fig.10 The two ends of the pressure roller 45 are installed through a support rod 451, and a slide rod 452 is slidably sleeved on the support rod 451. The two ends of the pressure roller 45 are connected to the slide rod 452, and the slide rod 452 can slide up and down on the support rod 451, so that the position of the pressure roller 45 can be adjusted.

[0062] It should be noted that the number of guide rollers 42 can be set according to processing requirements such as the running speed and soaking time of the coil, and accordingly, the length of each deposition trough 41 can also be set according to the processing requirements of the section.

[0063] Please refer to Figures 4 to 6 A plurality of first adjustment units 43 and second adjustment units 44 are respectively provided on both sides of the sedimentation trough 41, and both ends of the guide roller 42 are respectively connected to the first adjustment unit 43 and the second adjustment unit 44, the first adjustment unit 43 is used to adjust the horizontal direction of the guide roller 42, and the second adjustment unit 44 is used to adjust the up and down directions of the guide roller 42.

[0064] In this embodiment, the first adjusting unit 43 is arranged on one side of the deposition trough 41, and the second adjusting unit 44 is arranged on the other side of the deposition trough 41. Specifically, a plurality of pillars 46 are arranged on both sides of the deposition trough 41, and the first adjusting unit 43 and the second adjusting unit 44 are both installed on the pillars 46. The two ends of each guide roller 42 are respectively connected to a first adjusting unit 43 and a second adjusting unit 44. Through the first adjusting unit 43 and the second adjusting unit 44, the direction of the guide roller 42 can be adjusted so that the guide roller 42 is always in the correct direction, ensuring that the coil is transported normally along the preset path to prevent deviation.

[0065] Reference Figures 4 to 6 , Figures 8 to 10 The first adjusting unit 43 and the second adjusting unit 44 both include a sliding block 431 and a fixed seat 432. The end of the guide roller shaft 42 is connected to the sliding block 431. The sliding block 431 is slidably connected to the fixed seat 432. Mounting plates 433 are provided on both sides of the fixed seat 432. Fasteners 434 are provided on the mounting plates 433. The fasteners 434 are threadedly connected to the mounting plates 433.

[0066] In this embodiment, the sliding block 431 in the first adjusting unit 43 can only slide horizontally left and right on the fixed seat 432, and the sliding block 431 in the second adjusting unit 44 can only slide up and down on the fixed seat 432. Accordingly, the mounting plate 433 in the first adjusting unit 43 is arranged on the left and right sides of the fixed seat 432, and the mounting plate 433 in the second adjusting unit 44 is arranged on the upper and lower sides of the fixed seat 432. The mounting plate 433 is threadedly connected with a fastener 434, and the sliding block 431 can be locked or loosened by rotating the fastener 434.

[0067] It should be noted that the horizontal left and right directions in this embodiment are Fig. 9 and Fig.10 The left and right direction in .

[0068] Please refer to Figures 8 to 10 The sedimentation tank 41 is provided with a circulation component 47, and the circulation component 47 includes a circulation power part 471 and a circulation pipeline 472. The circulation power part 471 is installed on the outer surface of the sedimentation tank 41, and the circulation pipeline 472 is connected to the interior of the sedimentation tank 41. The circulation power part 471 is connected to the circulation pipeline 472.

[0069] The circulation pipeline 472 is connected to the interior of the deposition tank 41. The circulation power part 471 can suck the deposition liquid in the deposition tank 41 into the circulation pipeline 472 and then send it back to the deposition tank 41, so as to realize the circulation flow of the deposition liquid between the circulation pipeline 472 and the deposition tank 41, effectively increase the fluidity of the deposition liquid, make the components in the deposition liquid evenly distributed, avoid local concentration being too high or too low, and make the thickness of the metal layer obtained by deposition more uniform.

[0070] Specifically, Fig. 9 For example, in this embodiment, the circulating power parts 471 are arranged at intervals on the two side surfaces of the sedimentation tank 41, with two arranged on each side, and each circulating power part 471 is connected to a circulation pipeline 472. By arranging the circulating power parts 471 and the circulation pipeline 472 at intervals, the sedimentation liquid can be drawn out from different positions of the sedimentation tank 41 for circulation, avoiding the local concentration of the sedimentation liquid being too high or too low, and making the sedimentation liquid more uniform.

[0071] Please refer to Fig.10 In another embodiment, three circulation power parts 471 are arranged on the two side surfaces of the sedimentation tank 41 at intervals, wherein the circulation power parts 471 on both sides are connected to a circulation pipeline 472, and the circulation power part 471 in the middle is connected to two circulation pipelines 472, and the two circulation pipelines 472 are respectively connected to the circulation pipelines 472 on both sides. During specific operation, the circulation power part 471 in the middle can extract the sedimentation liquid and send it to the circulation pipelines 472 on both sides through the two connected circulation pipelines 472, and the circulation power parts 471 and circulation pipelines 472 on both sides normally extract the sedimentation liquid and send it back to the sedimentation tank 41. By setting in this way, the mixing effect of the sedimentation liquid at each position in the sedimentation tank 41 can be enhanced, the formation of local concentration gradients can be effectively prevented, and the sedimentation liquid can be made more uniform.

[0072] Please refer to Figure 4 and Figure 8 In this embodiment, a cavity is provided inside the auxiliary tank 48 for storing the sedimentation liquid. The auxiliary tank 48 is connected to the interior of the sedimentation tank 41 through a pipeline structure. A plurality of filters 481 and a power pump 482 are installed on the auxiliary tank 48.

[0073] The cavity inside the sub-tank 48 for storing the sedimentation liquid is connected to the inside of the sedimentation tank 41 through a pipeline structure, which is convenient for sending the sedimentation liquid into the sedimentation tank 41, or for directing the sedimentation liquid in the sedimentation tank 41 to the sub-tank 48. The sub-tank 48 is installed with a plurality of filters 481 and a power pump 482 according to the components and needs of the sedimentation liquid in each sedimentation tank 41. The filter 481 is used to filter the sedimentation liquid when it enters the sub-tank 48, and the power pump 482 can provide power to help stir the sedimentation liquid, so as to promote its rapid and uniform mixing.

[0074] It should be noted that the auxiliary tank 48 and the sedimentation tank 41 are not necessarily arranged one-to-one. Depending on the components of the sedimentation liquid in the sedimentation tank 41, there may be a situation where one auxiliary tank 48 corresponds to multiple sedimentation tanks 41, such as Figure 4 and Figure 8 As shown in , it is set according to actual needs during specific implementation; at the same time, the number of filters 481 and power pumps 482 is also allocated and set according to actual needs.

[0075] Please refer to Figure 1 The drying device 3 includes a plurality of ovens 31, which are arranged in sequence along the conveying direction of the coiled material. The coiled material after coating is baked by the plurality of ovens 31 to ensure that the coating is completely cured.

[0076] Please refer to Figure 4 , Figure 7 and Figure 8 The deposition device 4 also includes a transfer mechanism 49, which is arranged on one side of the deposition device 4 close to the drying device 3 and is used to guide the coil sent out of the oven 31. The transfer mechanism 49 is provided with a transfer roller 491 and a transfer drive 492. The transfer drive 492 is connected to one end of the transfer roller 491 and is used to drive the transfer roller 491 to rotate, thereby driving the coil to move along the conveying path.

[0077] Please refer to Figure 2 and Figure 3 The unwinding base 11 and the coating base 21 are both provided with an adjustment component 18, and the adjustment component 18 includes an adjustment block 181, an adjustment rod 182 and an adjustment knob 183. The adjustment block 181 is installed on the unwinding base 11 or the coating base 21, and the adjustment rod 182 is passed through the adjustment block 181 and is threadedly connected to the adjustment block 181. One end of the adjustment rod 182 is connected to the adjustment knob 183, and the other end is connected to the unwinding bracket 12 or the coating bracket 22.

[0078] In this embodiment, the adjustment block 181 is fixedly installed on the unwinding base 11 or the coating base 21, and the adjustment knob 183 can be rotated to drive the adjustment rod 182 to rotate. Since the adjustment rod 182 is threadedly connected to the adjustment block 181, the adjustment rod 182 can move in the axial direction when it rotates, thereby driving the unwinding bracket 12 or the coating bracket 22 to move, thereby realizing the position adjustment of the unwinding bracket 12 or the coating bracket 22. The structure is simple and the operation is easy.

[0079] In the description of the present invention, it should be understood that terms such as "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0080] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0081] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0082] Although the utility model is described in conjunction with the above specific embodiments, it is obvious that those skilled in the art can make many substitutions, modifications and changes based on the above content. Therefore, all such substitutions, improvements and changes are included in the spirit and scope of the appended claims.

Claims

1. A one-step wet chemical plating device for composite materials, characterized in that: include: An unwinding device, used for storing a material roll and unwinding the coiled material on the material roll, comprises an unwinding base, on which an unwinding bracket is provided, and the unwinding bracket is slidably connected to the unwinding base; A coating device, used for coating two opposite sides of a coiled material in sequence, comprising a coating base and a coating bracket slidably connected to the coating base, wherein a pre-drying mechanism is installed on the coating bracket, and the pre-drying mechanism is used for pre-drying the coiled material after one side of the coiled material is coated; A drying device, used to dry the surface of the coiled material after coating; The deposition device comprises a plurality of deposition troughs and auxiliary troughs. The plurality of deposition troughs are arranged in sequence along the conveying direction of the coil. The deposition troughs are filled with deposition liquid for chemical deposition on both sides of the immersed coil. The plurality of auxiliary troughs are arranged in sequence on one side of the deposition trough for pre-treatment and post-treatment of the deposition liquid.

2. The composite material one-step wet chemical plating equipment according to claim 1, characterized in that: The unwinding bracket is provided with an unwinding roller, an unwinding drive, an appearance detection unit, two anti-static rollers and a plurality of feeding rollers; the unwinding roller is rotatably mounted on the unwinding bracket, the output end of the unwinding drive is connected to one end of the unwinding roller, the appearance detection unit is arranged on the side of the unwinding roller that unwinds the coil, and is used to detect the surface of the coil; the two anti-static rollers are arranged at the rear section of the appearance detection unit and are respectively in contact with the two sides of the coil; the plurality of feeding rollers are arranged on the unwinding bracket at intervals.

3. The one-step wet chemical plating equipment for composite materials according to claim 1, characterized in that: The coating bracket is provided with a traction roller, a traction drive, two coating rollers, a coating drive and a plurality of feed rollers. The traction roller is rotatably mounted on the coating bracket, the output end of the traction drive is connected to one end of the traction roller, two coating rollers are rotatably mounted on the coating bracket, the coating drive is connected to one end of the coating roller, and a plurality of feed rollers are spaced apart on the unwinding bracket.

4. The one-step wet chemical plating equipment for composite materials according to claim 3, characterized in that: The two coating rollers coat the two opposite sides of the coil respectively, and the pre-drying mechanism is arranged on the side of the coil between the two coating rollers and faces the side coated by the coating roller of the previous section.

5. The one-step wet chemical plating equipment for composite materials according to claim 1, characterized in that: The sedimentation trough is provided with two baffles and a plurality of guide rollers, the two baffles are arranged obliquely to the two side walls in the sedimentation trough, the sedimentation liquid is contained between the two baffles, the plurality of guide rollers are distributed at intervals inside the sedimentation trough and above the intervals between adjacent sedimentation troughs, and at least one guide roller is immersed in the sedimentation liquid in the sedimentation trough.

6. The one-step wet chemical plating equipment for composite materials according to claim 5, characterized in that: A plurality of first adjustment units and second adjustment units are respectively arranged on both sides of the sedimentation trough, and both ends of the guide roller are respectively connected to the first adjustment unit and the second adjustment unit. The first adjustment unit is used to adjust the horizontal direction of the guide roller, and the second adjustment unit is used to adjust the up and down direction of the guide roller.

7. The one-step wet chemical plating equipment for composite materials according to claim 6, characterized in that: The first adjustment unit and the second adjustment unit both include a sliding block and a fixed seat, the end of the guide roller shaft is connected to the sliding block, the sliding block is slidably connected to the fixed seat, mounting plates are provided on both sides of the fixed seat, fasteners are provided on the mounting plates, and the fasteners are threadedly connected to the mounting plates.

8. The one-step wet chemical plating equipment for composite materials according to claim 1, characterized in that: The sedimentation tank is provided with a circulation component, and the circulation component includes a circulation power part and a circulation pipeline. The circulation power part is installed on the outer surface of the sedimentation tank, and the circulation pipeline is connected to the interior of the sedimentation tank. The circulation power part is connected to the circulation pipeline.

9. The one-step wet chemical plating equipment for composite materials according to claim 1, characterized in that: The auxiliary tank is provided with a cavity inside for storing sedimentation liquid. The auxiliary tank is connected with the inside of the sedimentation tank through a pipeline structure. A plurality of filters and a power pump are installed on the auxiliary tank.

10. The one-step wet chemical plating equipment for composite materials according to claim 1, characterized in that: The unwinding base and the coating base are both provided with an adjustment component, and the adjustment component includes an adjustment block, an adjustment rod and an adjustment knob. The adjustment block is installed on the unwinding base or the coating base, the adjustment rod is passed through the adjustment block and is threadedly connected to the adjustment block, one end of the adjustment rod is connected to the adjustment knob, and the other end is connected to the unwinding bracket or the coating bracket.