Rapid installation device for cement concrete road reinforcing steel bar pull rod

By designing a cement concrete road with hard rods and lower pillars, the reinforced tiles are installed at the rapid installation of the reinforced stratules, which solves the problem of time and effort to place the process of reinforced tiles and put into the concrete concrete. Improve.

CN222412545UActive Publication Date: 2025-01-28HEBEI WATER CONSERVANCY ENG BUREAU GRP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421200221.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2025-01-28
Estimated Expiration
2034-05-29

AI Technical Summary

Technical Problem

When laying cement concrete roads, the placement and pressing of steel bars into cement concrete one by one is time-consuming and labor-intensive, and it is difficult to ensure the quality of the project.

Method used

Designed a kind of cement concrete road reinforced tiles to quickly install the device, including the lower pressure column arranged by the hard rod and the equivalence of spacing. Press the tie rod and quickly press it into the concrete concrete.

Benefits of technology

The rapid positioning and installation of the reinforced tile rod, improving the construction speed and efficiency, ensuring the quality of the project, and shortening the construction period.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222412545U_ABST
    Figure CN222412545U_ABST
Patent Text Reader

Abstract

The utility model provides a cement concrete road reinforcement pull rod rapid installation device which comprises a hard rod, a plurality of pressing columns are arranged on the hard rod at equal intervals, the pressing columns are perpendicular to the hard rod, the pressing columns are parallel to one another, the arrangement interval of the pressing columns is equal to the blanking required distance of reinforcement pull rods, and the distance between the pressing columns is equal to the blanking required distance of the reinforcement pull rods. The length of the downward pressing column is equal to the required installation depth of the steel bar pull rod, a positioning device is arranged at the lower end of the downward pressing column and used for positioning the steel bar pull rod, and the two ends of the hard rod are each provided with a handle. And when the hard rod is pressed downwards, the pressing column applies pressure to the steel bar pull rod and presses the steel bar pull rod into cement concrete. The rapid installation device can rapidly position the positions of the steel bar pull rods at a time and rapidly press the steel bar pull rods into cement concrete at a time, efficiency is high, operation is convenient, and the construction speed is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a road construction auxiliary device, in particular to a cement concrete road steel bar pull rod quick installation device. Background Art

[0002] When laying cement concrete roads, the general construction method is half-width construction or single-width construction. For example, for a 6m wide road, when half-width construction is performed, half of the road is laid first, that is, a 3m wide road is laid first. During the laying process, a steel bar is placed at a certain distance. The other half needs to be constructed after the half-width concrete is poured and maintained for three days, which increases the template removal work and maintenance time. When laying the other half of the 3m road, the steel bar is combined with the other half of the road surface. When single-width construction is performed, 6m wide cement concrete is laid, and the steel bar is placed one by one in the cement concrete, and then the cement concrete is waited for to solidify. The spacing between the steel bar is about 90cm. Placing the steel bar one by one is time-consuming and labor-intensive, slow, and difficult to ensure the quality of the project.

[0003] The above information disclosed in the background technology section is only used to enhance the understanding of the background of the present invention and therefore it may include information that does not constitute the prior art known to a person of ordinary skill in the art. Utility Model Content

[0004] The utility model aims to overcome the above-mentioned deficiencies of the prior art and provide a cement concrete road reinforcement rod quick installation device which can improve the construction speed.

[0005] Additional aspects and advantages of the present invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the present invention.

[0006] According to one aspect of the utility model, a quick installation device for steel bar tie rods on cement concrete roads comprises a hard rod on which a plurality of pressure columns are arranged at equal intervals, the pressure columns are perpendicular to the hard rod, the plurality of pressure columns are parallel to each other, the arrangement spacing of the pressure columns is equal to the required cutting distance of the steel bar tie rod, the length of the pressure columns is equal to the required installation depth of the steel bar tie rod, a positioning device is provided at the lower end of the pressure column, the positioning device positions the steel bar tie rod, and a handle is provided at each end of the hard rod; when the hard rod is pressed downward, the pressure column applies pressure to the steel bar tie rod and presses the steel bar tie rod into the cement concrete.

[0007] According to one embodiment of the present utility model, the hard rod and the downward pressure column are both steel pipes.

[0008] According to one embodiment of the present invention, the diameter of the hard rod is 50 mm.

[0009] According to an embodiment of the present utility model, the lower pressure column is welded to the hard rod.

[0010] According to one embodiment of the present utility model, the arrangement spacing of the lower pressure columns is 90 cm.

[0011] According to one implementation of the utility model, the length of the pressure column is 10 cm.

[0012] According to one embodiment of the utility model, the positioning device is two steel columns welded to the lower end of the lower pressure column.

[0013] According to one embodiment of the present invention, the length of the steel column is 3 cm and the diameter is 14 mm.

[0014] According to one embodiment of the present utility model, the number of the pressure columns is 6.

[0015] It can be seen from the above technical solution that the advantages and positive effects of the utility model are:

[0016] The utility model discloses a cement concrete road steel bar pull rod quick installation device, can quickly locate the position of the steel bar pull rod at one time, and quickly press the steel bar pull rod into the cement concrete at one time, has high efficiency, is easy to operate, and improves the construction speed. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the specific embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the specific embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0018] Figure 1 It is a schematic diagram of a cement concrete road reinforcement rod quick installation device of the utility model;

[0019] Figure 2 yes Figure 1 The local enlarged view of point I in the middle;

[0020] Figure 3 It is a schematic diagram of the combination of a cement concrete road steel bar tie rod quick installation device and a steel bar tie rod.

[0021] In the figure: 1. Hard rod; 2. Downward pressure column; 3. Positioning device; 4. Handle; 5. Steel bar pull rod. DETAILED DESCRIPTION

[0022] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0023] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0024] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0025] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or can communicate with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0026] like Figures 1 to 3 As shown, the embodiment of the utility model discloses a cement concrete road reinforcement rod quick installation device. The device comprises a hard rod 1, on which a plurality of pressure columns 2 are arranged at equal intervals, the pressure columns 2 are perpendicular to the hard rod 1, and the pressure columns 2 are parallel to each other.

[0027] The arrangement spacing of these lower pressure columns 2 is equal to the required cutting distance of the steel bar tie rod 5, the length of the lower pressure column 2 is equal to the required installation depth of the steel bar tie rod 5, and a positioning device 3 is provided at the lower end of the lower pressure column 2, and the positioning device 3 positions the steel bar tie rod 5. A handle 4 is provided at each end of the hard rod 1.

[0028] See also Figure 3 The quick installation device can press the steel bar tie rod 5 into cement concrete. When the hard rod 1 is pressed down, the lower pressure column 2 applies pressure to the steel bar tie rod 5 and presses the steel bar tie rod into cement concrete.

[0029] In one embodiment, the hard rod 1 and the pressure column 2 are both steel pipes. The hard rod 1 can also be made of other materials such as a wooden rod. When a steel pipe is used, the hard rod 1 and the pressure column 2 can be made of a steel pipe with a diameter of 50 mm. That is, the diameters of the hard rod 1 and the pressure column 2 are both 50 mm. In this embodiment, the hard rod 1 can be made of a whole steel pipe, but in other embodiments, the hard rod 1 can also be made of two steel pipes spliced ​​together. When splicing, flanges are welded at the ends of the two steel pipes, and the two flanges are fixed together by bolts to achieve the purpose of connecting to a complete hard rod. Alternatively, a wooden stick or steel pipe is set as an intermediate connecting piece, and the two ends of the intermediate connecting piece are respectively inserted into the ends of the two steel pipes. The diameter of the wooden stick or steel pipe is roughly equal to the inner diameter of the hard rod 1, and the two steel pipes can also be connected to form a complete hard rod. When the hard rod is spliced, it can be disassembled and shortened in length, so that it can be placed in the truck bed of a vehicle, and can be transported using a small vehicle, which improves the flexibility during transfer.

[0030] In one embodiment, the lower pressure column 2 is welded to the hard rod 1. When the lower pressure column 2 is welded to the hard rod 1, the connection is reliable and compact. In addition, the lower pressure column 2 can also be fixed to the hard rod 1 by a connecting member such as a bolt. The lower pressure column 2 can also be made of materials such as an aluminum tube to reduce weight and make it more convenient for operators to operate.

[0031] In one embodiment, the arrangement spacing of the pressure column 2 is 90cm and the length is 10cm. That is to say, the required installation depth of the steel bar pull rod 5 pressed into the cement concrete is 10cm, and the required spacing for blanking is 90cm. The arrangement spacing refers to the distance between two adjacent pressure columns 2. When measuring, it can be the closest distance between the outer walls of the two pressure columns 2, or it can be the distance between the center lines of the two pressure columns 2. The difference in the measured values ​​of the two can be regarded as an acceptable error range, because the positioning accuracy requirements of the pressure column 2 are not high. According to different requirements, the arrangement spacing of the pressure column 2 can be set to different values.

[0032] In one embodiment, the positioning device 3 is two steel columns welded to the lower end of the lower pressure column 2. The length of the steel column is 3 cm and the diameter is 14 mm. The number of the lower pressure columns 2 is 6.

[0033] like Figure 3As shown, when in use, two operators lift the hard rod 1 by the handles 4 at both ends of the hard rod 1, place the quick installation device on the center line of the road, and place a steel bar 5 at the positioning device 3 under each down-pressure column 2, that is, place the steel bar 5 between the two steel columns, and make the steel bar 5 roughly vertical to the hard rod 1, and the center point of the steel bar 5 is located at the center of the lower end of the down-pressure column 2. Then, press the hard rod 1 downward with force, the lower end of the down-pressure column 2 contacts the steel bar 5 and transmits pressure to the steel bar 5, and these steel bar 5 enter the cement concrete that has just been laid on the ground and has not yet hardened and is still in a flowing state under pressure. Then, lift the hard rod 1 upward, and the steel bar 5 remains in the cement concrete. The cement concrete road steel bar quick installation device can quickly locate the position of the steel bar 5 at one time, and quickly press these steel bar 5 into the cement concrete at one time, which is efficient, easy to operate, and improves the construction speed.

[0034] Compared with the traditional construction method, the present application can change the 6m wide concrete road from the original process of half-casting, first casting half, waiting for the cement concrete to solidify before removing the formwork and continuing to cast the other half, to the current one-time casting, thereby improving the efficiency of steel bar installation and providing a guarantee for the completion of the project on schedule. The application of the steel bar fast installation device shortens the construction period, improves the template turnover rate, reduces the investment in labor costs, and improves the economic benefits of the project.

[0035] The following is the test data on the test section.

[0036] A 270-meter concrete pavement of a certain road project was used as a test section. When the quick installation device was used for construction, the center line of the pavement was imported into the GPS in advance. One person stood at the longitudinal joint of the pavement and measured the center line position with the GPS, one person held one end of the tool, one person held the other end, and one person held a ruler to place the steel bar tie rod. After the steel bar tie rod was placed, it was pressed into the concrete, which was one round.

[0037] According to on-site statistics, it takes 20 seconds to find the center line, 10 seconds for 2 people to ensure the horizontal position, and 15 seconds for 1 person to place 6 steel bars and press them into the concrete. A total of 45 seconds

[0038] 301 steel rods need to be placed 51 times, 45 seconds each time, which means 38.25 minutes, with a rest time of 5 minutes, for a total of 43 minutes.

[0039] When using manual installation of a single steel bar, import the center line of the pavement into the GPS in advance. One person stands at the longitudinal joint of the pavement, holding the GPS to measure the center point and one end of the tool. Two people are needed to pull the line horizontally, and another person needs to hold the other end of the tool vertically to ensure that it is perpendicular to the longitudinal joint and start placing the steel bars with the tool and pressing them into the concrete. This is one round.

[0040] It takes 15 seconds to find the center line, 2 people pull the line horizontally for 10 seconds, and 1 person places a steel bar and presses it into the concrete for 5 seconds, for a total of 30 seconds. 301 steel bars need to be placed, 301 times, 30 seconds each time, which takes 150.5 minutes, and a rest time of 10 minutes, for a total of 160.5 minutes.

[0041] In summary, on the 270m test section, the use of this quick installation device saved 117.5 minutes and greatly improved the efficiency of steel bar tie rod installation.

[0042] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0043] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A cement concrete road reinforcement rod quick installation device, characterized in that: It includes a hard rod, on which a plurality of pressure columns are arranged at equal intervals, the pressure columns are perpendicular to the hard rod, and the plurality of pressure columns are parallel to each other. The arrangement spacing of the pressure columns is equal to the required cutting distance of the steel bar tie rod, the length of the pressure column is equal to the required installation depth of the steel bar tie rod, a positioning device is provided at the lower end of the pressure column, and the positioning device positions the steel bar tie rod, and a handle is provided at each end of the hard rod; when the hard rod is pressed downward, the pressure column applies pressure to the steel bar tie rod and presses the steel bar tie rod into cement concrete.

2. The cement concrete road reinforcement rod quick installation device according to claim 1 is characterized in that: The hard rod and the lower pressure column are both steel pipes.

3. The cement concrete road reinforcement rod quick installation device according to claim 2 is characterized in that: The diameter of the hard rod is 50 mm.

4. The cement concrete road reinforcement rod quick installation device according to claim 2 is characterized in that: The lower pressure column is welded to the hard rod.

5. The cement concrete road reinforcement rod quick installation device according to claim 1 is characterized in that: The arrangement spacing of the lower pressure columns is 90 cm.

6. The cement concrete road reinforcement rod quick installation device according to claim 1 is characterized in that: The length of the lower pressure column is 10 cm.

7. The cement concrete road reinforcement rod quick installation device according to claim 2 is characterized in that: The positioning device is two steel columns welded to the lower end of the lower pressure column.

8. The cement concrete road reinforcement rod quick installation device according to claim 7 is characterized in that: The length of the steel column is 3 cm and the diameter is 14 mm.

9. The cement concrete road reinforcement rod quick installation device according to claim 1, characterized in that: The number of the pressure columns is 6.

Citation Information

Cited By

  • Using method of cement concrete road reinforcing steel bar pull rod rapid installation device

    CN118375022A