Temporary construction temporary bridge

By using the combination of steel structure and connecting parts in the temporary construction bridge, the problem of inconvenient installation and disassembly in existing technologies is solved, and the convenient connection and disassembly of the steel structure of the steel and steel structures are realized to ensure the integrity of the structure. Sexual and reusable.

CN222412581UActive Publication Date: 2025-01-28展翔
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421209856.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-30
Publication Date
2025-01-28
Estimated Expiration
2034-05-30

AI Technical Summary

Technical Problem

During the installation and disassembly of existing temporary construction bridges, the welding method is not convenient for disassembly, and bolt connections require holes, which affects the original structure of I-shaped steel.

Method used

The steel structure set with symmetrical settings is connected to the steel structure with the steel structure through the connector. Move upwards to achieve a stable connection between work steel and steel structure.

Benefits of technology

The convenient connection and disassembly of the construction steel and steel structure are realized, and the structure of the steel steel is not destroyed, and the disassembly is convenient. It can be reused.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222412581U_ABST
    Figure CN222412581U_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary construction temporary bridge, which belongs to the technical field of building construction, and adopts the technical scheme that the temporary construction temporary bridge is characterized by comprising symmetrically arranged steel structures, a plurality of I-shaped steel arranged on the two steel structures, and a plurality of connecting pieces for connecting the I-shaped steel and the steel structures, the connecting pieces are located at the two ends of the I-shaped steel and comprise U-shaped bases, lifting structures are arranged in the U-shaped bases in a sliding mode, one ends of the lifting structures are sleeved with vertical rods, upper clamping blocks are fixedly arranged above the other ends of the lifting structures, limiting plates are fixedly arranged at the lower ends of the vertical rods, and nuts are arranged on the vertical rods and located above the lifting structures in a threaded connection mode. A horizontal plate is fixedly arranged at one end, close to the stand column, of the upper part of the inner wall of the U-shaped groove; the stand column is provided with an installation hole allowing the upper clamping block to penetrate out. The temporary bridge for temporary construction has the advantage that the temporary bridge for temporary construction is provided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building construction, in particular to a temporary construction bridge. Background Art

[0002] During the construction process, if you encounter ditches, deep pits and pipe troughs, you need to build temporary bridges to facilitate the safe and smooth passage of vehicles and construction workers. At present, the common method is to use a symmetrically set steel frame structure, install I-beams on the steel frame structure, and lay steel plates or wooden boards on the I-beams. In this way, welding or bolting is generally used when installing I-beams. When welding is used for fixing, it is inconvenient to disassemble later; when bolting is used, it is necessary to drill holes in the I-beam, which changes the original structure of the I-beam and affects its later use. Utility Model Content

[0003] The utility model aims to provide a temporary construction bridge.

[0004] The utility model is realized by the following measures: a temporary construction bridge, characterized in that it comprises a symmetrically arranged steel structure, a plurality of I-beams arranged on two steel structures, and a plurality of connecting pieces connecting the I-beams and the steel structure;

[0005] The steel structure includes an upper crossbeam, a lower crossbeam, and a plurality of columns connecting the upper crossbeam and the lower crossbeam;

[0006] The connecting piece is located at both ends of the I-beam, and the connecting piece includes a U-shaped base, a lifting structure is slidably arranged in the U-shaped base, one end of the lifting structure is sleeved with a vertical rod, an upper clamping block is fixedly arranged above the other end of the lifting structure, a limit plate is fixedly arranged at the lower end of the vertical rod, and a nut is arranged on the vertical rod and above the lifting structure through a threaded connection;

[0007] A U-shaped groove is opened at a position of the lower cross beam close to the column, and a horizontal plate is fixedly arranged at an upper part of the inner wall of the U-shaped groove and at one end close to the column, and there is a gap between the two horizontal plates;

[0008] The column is provided with a mounting hole allowing the upper clamping block to pass through;

[0009] The limit plate can extend from the area where the horizontal plate is not provided into the U-shaped groove, the vertical rod can extend into the interval, and the limit plate can be stuck under the two horizontal plates;

[0010] The I-beam is located between the vertical rod and the column, and the screw rod is rotated to move the lifting structure upward, so that the inner wall of the upper clamping block contacts the outer wall of the column.

[0011] Lower clamping plates are symmetrically arranged below the lifting structure and on both sides of the vertical rod, and the lower clamping plates can contact the I-beam.

[0012] Two adjacent columns are connected by diagonal braces.

[0013] The lifting structure may be a rectangular steel plate or a rectangular column, and the specific shape depends on the actual situation.

[0014] The upper clamping block may be a rectangular block, and the upper portion of a surface close to the column is an inclined surface.

[0015] A plate is laid on the I-beam, and the plate may be a rectangular wooden board or a steel plate.

[0016] The method of use is to place two steel structures on both sides of the ditch, deep pit and pipeline groove, which generally need to be fixed by stakes or expansion bolts or anchors; place the I-beams on the lower crossbeam in sequence, make the I-beams close to the columns, and sleeve the lifting structure on the vertical rods; extend the upper clamping block into the mounting hole on the columns and at the same time extend the limit plate into the U-shaped groove, move the vertical rod to the interval until the vertical rod is close to the I-beam, and extend the upper clamping block out of the mounting hole; rotate the screw rod, and the lifting structure moves up along the side wall of the U-shaped seat until the inner wall of the upper clamping block contacts the outer wall of the column; rotate the nut and tighten the nut to make the upper end face of the limit plate abut against the lower end face of the horizontal plate, and the nut abuts against the upper end face of the lifting structure.

[0017] The beneficial effects of the technical solution provided by the embodiment of the utility model are: the I-beam is connected to the steel structure by a connecting piece, the structure of the I-beam is not damaged, and it is easy to disassemble and assemble and can be reused. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solution of the present utility model, a brief introduction will be given to the drawings used in the embodiments below. Obviously, the drawings listed below are only some embodiments of the present utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the utility model;

[0020] Figure 2 yes Figure 1 A partial enlarged view of the middle A;

[0021] Figure 3 is with Figure 1 Schematic diagram of the structure at different angles;

[0022] Figure 4 yes Figure 3 A partial enlarged view of point B in the middle;

[0023] Figure 5 It is a structural diagram of the connecting parts.

[0024] In the attached drawings, the components represented by each number are listed as follows: 1. Steel structure; 2. I-beam; 3. Connector; 4. U-shaped groove; 5. Spacer; 6. Plate; 7. Mounting hole; 101. Lower crossbeam; 102. Upper crossbeam; 103. Column; 104. Diagonal brace; 301. U-shaped base; 302. Lifting structure; 303. Vertical rod; 304. Nut; 305. Screw; 306. Lower clamp; 307. Upper clamp; 308. Limit plate; 309. Threaded through hole. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail in combination with the embodiments below. Of course, the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0026] See also Figure 1-Figure 5 A temporary construction bridge, characterized in that it comprises a symmetrically arranged steel structure 1, a plurality of I-beams 2 arranged on two steel structures 1, and a plurality of connecting members 3 connecting the I-beams 2 and the steel structures 1;

[0027] The steel structure 1 includes an upper beam 102, a lower beam 101, and a plurality of columns 103 connecting the upper beam 102 and the lower beam 101;

[0028] The connecting member 3 is located at both ends of the I-beam 2, and the connecting member 3 includes a U-shaped base 301, and a lifting structure 302 is slidably arranged in the U-shaped base 301, and a vertical rod 303 is sleeved at one end of the lifting structure 302, and an upper clamping block 307 is fixedly arranged above the other end of the lifting structure 302, and a limit plate 308 is fixedly arranged at the lower end of the vertical rod 303, and a nut 304 is arranged on the vertical rod 303 and located above the lifting structure 302 through a threaded connection; a threaded through hole 309 cooperating with the screw rod 305 is arranged on the lifting structure 302;

[0029] A U-shaped groove 4 is opened at the position of the lower cross beam 101 near the column 103, and a horizontal plate is fixedly arranged at the upper part of the inner wall of the U-shaped groove 4 and at one end near the column 103, and there is a gap 5 between the two horizontal plates;

[0030] The column 103 is provided with a mounting hole 7 for allowing the upper clamping block 307 to pass through;

[0031] The limiting plate 308 can extend into the U-shaped groove 4 from the area where the horizontal plate is not provided, the vertical rod 303 can extend into the interval 5, and the limiting plate 308 can be stuck under the two horizontal plates;

[0032] The I-beam 2 is located between the vertical rod 303 and the column 103 . The screw rod 305 is rotated to move the lifting structure 302 upward, and the inner wall of the upper clamping block 307 contacts the outer wall of the column 103 .

[0033] Lower clamping plates 306 are symmetrically arranged below the lifting structure 302 and on both sides of the vertical rod 303 , and the lower clamping plates 306 can contact the I-beam 2 .

[0034] Two adjacent columns 103 are connected via a diagonal brace 104 .

[0035] The lifting structure 302 can be a rectangular steel plate or a rectangular column, and the specific shape depends on the actual situation.

[0036] The upper clamping block 307 may be a rectangular block and the upper portion of the surface close to the column 103 may be an inclined surface.

[0037] A plate 6 is laid on the I-beam 2 , and the plate 6 may be a rectangular wooden board or a steel plate.

[0038] In terms of usage, two steel structures 1 are placed on both sides of ditches, deep pits and pipeline grooves, and generally need to be fixed by stakes or expansion bolts or anchors; the I-beams 2 are placed on the lower crossbeam 101 in sequence, so that the I-beams 2 are close to the columns 103, and the lifting structure 302 is sleeved on the vertical rod 303; the upper clamping block 307 is extended into the mounting hole 7 on the column 103, and the limiting plate 308 is extended into the U-shaped groove 4, and the vertical rod 303 is moved to the interval 5 until the vertical rod 303 is close to the I-beam 2, and the upper clamping block 307 is extended out of the mounting hole 7; the screw 305 is turned, and the lifting structure 302 moves up along the side wall of the U-shaped seat until the inner wall of the upper clamping block 307 contacts the outer wall of the column 103; the nut 304 is turned and the nut 304 is tightened and fixed, so that the upper end surface of the limiting plate 308 is against the lower end surface of the horizontal plate, and the nut 304 is against the upper end surface of the lifting structure 302.

[0039] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A temporary construction bridge, characterized in that: It includes symmetrically arranged steel structures, a plurality of I-beams arranged on two steel structures, and a plurality of connecting pieces connecting the I-beams and the steel structures; The steel structure includes an upper crossbeam, a lower crossbeam, and a plurality of columns connecting the upper crossbeam and the lower crossbeam; The connecting piece is located at both ends of the I-beam, and the connecting piece includes a U-shaped base, a lifting structure is slidably arranged in the U-shaped base, one end of the lifting structure is sleeved with a vertical rod, an upper clamping block is fixedly arranged above the other end of the lifting structure, a limit plate is fixedly arranged at the lower end of the vertical rod, and a nut is arranged on the vertical rod and above the lifting structure through a threaded connection; a threaded through hole matching with the screw rod is arranged on the lifting structure; A U-shaped groove is opened at a position of the lower cross beam close to the column, and a horizontal plate is fixedly arranged at an upper part of the inner wall of the U-shaped groove and at one end close to the column, and there is a gap between the two horizontal plates; The column is provided with a mounting hole allowing the upper clamping block to pass through; The limit plate can extend from the area where the horizontal plate is not provided into the U-shaped groove, the vertical rod can extend into the interval, and the limit plate can be stuck under the two horizontal plates; The I-beam is located between the vertical rod and the column, and the screw rod is rotated to move the lifting structure upward, so that the inner wall of the upper clamping block contacts the outer wall of the column.

2. The temporary construction bridge according to claim 1 is characterized in that: Lower clamping plates are symmetrically arranged below the lifting structure and on both sides of the vertical rod, and the lower clamping plates can contact the I-beam.

3. The temporary construction bridge according to claim 1 is characterized in that: Two adjacent columns are connected by diagonal braces.

4. The temporary construction bridge according to claim 1 is characterized in that: A plate is laid on the I-beam.