Concrete bridge guardrail construction device

By designing a concrete bridge guardrail construction device including hanging baskets and positioning components, it solves the problem of high physical energy consumption, large safety hazards, and unstable construction during the construction process, and achieves high -efficiency and safe bridge guardrails.

CN222412652UActive Publication Date: 2025-01-28NO 2 ENG CO LTD OF CCCC FIRST HARBOR ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420917518.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2025-01-28
Estimated Expiration
2034-04-29

AI Technical Summary

Technical Problem

During the construction of concrete bridge guardrails, workers need to frequently climb bridges, resulting in high physical consumption, high safety risks, and unstable construction under heavy wind. It is difficult for the existing technology to effectively solve these problems.

Method used

The construction device of a concrete bridge guardrail is designed, including a square framework basket and positioning component connected from twelve framework rods. The positioning component can be adjusted according to the width of the bridge guardrail through the horizontal rod and vertical pole connected to the bridge, and moved on the bridge guardrail through the mobile wheel to simplify the change in the construction location.

Benefits of technology

This device is fixed on the bridge guardrail, reducing the number of climbing times of operators, saving physical strength, and improving construction safety and stability. At the same time, the flexibility and reusable use of positioning components reduced construction costs and improved construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222412652U_ABST
    Figure CN222412652U_ABST
Patent Text Reader

Abstract

The utility model discloses a concrete bridge guardrail construction device, and belongs to the field of bridge construction equipment. The device comprises a hanging basket and a positioning assembly. The hanging basket is a cube frame formed by connecting twelve frame rod pieces. The positioning assembly is used for fixing the hanging basket to the construction position of the concrete bridge guardrail. The positioning assembly comprises a first vertical rod, a first horizontal rod, a second horizontal rod and a second vertical rod. The first vertical rod is provided with a first end and a second end, and the first end of the first vertical rod is connected with the hanging basket; the first horizontal rod is provided with a first end and a second end, the first end of the first horizontal rod is connected with the second end of the first vertical rod, and the first horizontal rod is perpendicular to the first vertical rod; the second horizontal rod is provided with a hollow cavity, the second end of the first horizontal rod is inserted into the hollow cavity of the second horizontal rod, and the second horizontal rod is slidably connected with the first horizontal rod; and the second vertical rod is vertically connected with the second horizontal rod. The concrete bridge guardrail construction device is simple in structure, firm, durable and capable of guaranteeing safety of operators and improving construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of bridge construction equipment, in particular to a concrete bridge guardrail construction device. Background Art

[0002] Concrete bridge guardrails are indispensable protective structures on both sides of the beam surface. After the concrete is poured on the guardrails, the outside of the bridge guardrails needs to be repaired, demolded, and decorated. The construction involves high-altitude operations and has high safety risks. At present, after the workers complete the construction within a certain range, they must first return to the beam surface and then flip out the guardrail from another position to work. This consumes a lot of physical energy for the workers and poses great safety hazards during the operation. When constructing the outside of the bridge guardrail, the workers wear safety belts and use the work rope to work on the outside. When the wind is strong on site, the workers will swing left and right due to the influence of the wind and cannot work stably. If a car crane is used to suspend the cage for operation, two people are required to pull the wind rope for stability. In addition, the moving work is cumbersome when changing the construction position, and the manpower and material resources are consumed a lot, and the construction efficiency is low. Summary of the invention

[0003] In view of the deficiencies existing in the related art, the purpose of the present utility model is to provide a concrete bridge guardrail construction device to solve the problems raised in the above-mentioned background technology.

[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0005] A concrete bridge guardrail construction device, comprising:

[0006] The hanging basket is a cubic frame connected by twelve frame rods;

[0007] Positioning assembly, which is used to fix the hanging basket at the construction position of the concrete bridge guardrail. The positioning assembly includes:

[0008] A first vertical rod, the first vertical rod having a first end and a second end, the first end of the first vertical rod being connected to the hanging basket;

[0009] A first horizontal rod, the first horizontal rod having a first end and a second end, the first end of the first horizontal rod being connected to the second end of the first vertical rod, the first horizontal rod being perpendicular to the first vertical rod;

[0010] A second horizontal rod, wherein the second horizontal rod has a hollow cavity, the second end of the first horizontal rod is inserted into the hollow cavity of the second horizontal rod, and the second horizontal rod is slidably connected to the first horizontal rod;

[0011] A second vertical rod is vertically connected to the second horizontal rod.

[0012] In some embodiments, a plurality of first positioning holes are formed on the first horizontal rod, and a plurality of second positioning holes are formed on the second horizontal rod, and the plurality of first positioning holes correspond to the second positioning holes one by one.

[0013] In some of the embodiments, the concrete bridge guardrail construction device further includes a positioning pin, which is inserted into the first positioning hole and the second positioning hole to lock the first horizontal rod and the second horizontal rod.

[0014] In some embodiments, a plurality of supporting rods are disposed on the bottom surface of the hanging basket, and the plurality of supporting rods are fixed to the hanging basket in a grid shape.

[0015] In some of the embodiments, a bottom plate is disposed on the plurality of support rods.

[0016] In some embodiments, the concrete bridge guardrail construction device further includes a limiting component, and the limiting component includes:

[0017] A first limiter, the first limiter is disposed on the first horizontal rod and is set at a set distance from the second end of the first horizontal rod;

[0018] The second limiting member is arranged at the opening of the hollow cavity of the second horizontal rod. When the first horizontal rod and the second horizontal rod slide relatively to a set position, the first limiting member abuts against the second limiting member.

[0019] In some of the embodiments, four reinforcement rods are respectively provided on the four sides of the hanging basket, and the four reinforcement rods are fixed to the hanging basket in a crisscross pattern.

[0020] In some of the embodiments, the concrete bridge guardrail construction device also includes a moving wheel, and a plurality of moving wheels are provided, and the plurality of moving wheels are arranged on the contact surface between the positioning component and the concrete bridge guardrail.

[0021] In some of these embodiments, the twelve frame members are angle steels.

[0022] In some embodiments, two groups of positioning components are provided, and the two groups of positioning components are fixed on the same side of the hanging basket.

[0023] Compared with the prior art, the beneficial effects of the utility model are:

[0024] 1. The concrete bridge guardrail construction device provided by the utility model consists of a hanging basket and a positioning assembly, which has a simple structure, is sturdy and durable, and the positioning assembly can be moved along the bridge guardrail. After the construction of the outer side of the entire concrete bridge guardrail is completed, the device is hoisted down as a whole using a lifting equipment without repeated hoisting, which saves the cost of using mechanical equipment and improves construction efficiency.

[0025] 2. The positioning assembly of the concrete bridge guardrail construction device provided by the utility model includes a second horizontal rod and a first horizontal rod that are slidably connected, which can be adjusted according to the width of the bridge guardrail and is suitable for operations on the outside of guardrails of various sizes. It has high flexibility, is reusable, has low construction cost, and is energy-saving and environmentally friendly.

[0026] 3. The contact surface between the positioning component and the concrete bridge guardrail of the concrete bridge guardrail construction device provided by the utility model is provided with a plurality of moving wheels. After the operator stands in the hanging basket and completes the construction of a certain work point, there is no need to repeatedly climb the concrete bridge guardrail. The entire device can be moved to the next work point through the moving wheels, which saves the operator's physical strength and has high safety and stability. The setting of the moving wheels reduces the friction between the positioning component and the concrete bridge guardrail, facilitates movement, and prevents damage to the guardrail. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0028] Figure 1 This is a front view of an embodiment of the concrete bridge guardrail construction device of the utility model;

[0029] Figure 2 It is a side view of an embodiment of the concrete bridge guardrail construction device of the utility model;

[0030] Figure 3 A top view of an embodiment of the concrete bridge guardrail construction device of the utility model;

[0031] Figure 4 This is a schematic diagram of a limiting component of an embodiment of the concrete bridge guardrail construction device of the utility model.

[0032] In the figure:

[0033] 1. Hanging basket; 11. Frame rod; 12. Support rod; 13. Bottom plate; 14. Reinforcement rod; 2. Positioning assembly; 21. First vertical rod; 22. First horizontal rod; 221. First positioning hole; 23. Second horizontal rod; 231. Second positioning hole; 24. Second vertical rod; 3. Limiting assembly; 31. First limiting member; 32. Second limiting member; 4. Moving wheel. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0035] In the description of the present invention, it should be understood that the terms "center", "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0036] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0037] See attached Figures 1 to 4 , a schematic embodiment of the concrete bridge guardrail construction device proposed by the utility model is given, and the concrete bridge guardrail construction device is composed of a hanging basket 1 and a positioning assembly 2, wherein the positioning assembly 2 includes a first vertical rod 21, a first horizontal rod 22, a second horizontal rod 23 and a second vertical rod 24.

[0038] The hanging basket 1 is a cubic frame formed by connecting twelve frame rods 11. In this embodiment, the frame rods 11 are selected as angle steel keels, and the size of the angle steel keels is 5cm×5cm×5mm. The angle steel keels have the advantages of light weight, high rigidity, fire resistance, insect resistance, no deformation, firmness and not easy to crack. The size of the hanging basket 1 is 1.5m×0.75m×0.65m, and the maximum allowable load of the hanging basket 1 is 300kg. The operator stands on the hanging basket 1 to perform construction on the outside of the concrete bridge guardrail, which has high safety and stability.

[0039] The hanging basket 1 is fixed at the construction position outside the concrete bridge guardrail by the positioning assembly 2. In the positioning assembly 2, the first vertical rod 21 has a first end and a second end, and the first end of the first vertical rod 21 is connected to the hanging basket 1. The first horizontal rod 22 has a first end and a second end, and the first end of the first horizontal rod 22 is connected to the second end of the first vertical rod 21, and the first horizontal rod 22 is perpendicular to the first vertical rod 21. The second horizontal rod 23 has a hollow cavity, and the second end of the first horizontal rod 22 is inserted into the hollow cavity of the second horizontal rod 23, and the second horizontal rod 23 is slidably connected to the first horizontal rod 22. The second vertical rod 24 is vertically connected to the second horizontal rod 23. The first vertical rod 21, the first horizontal rod 22, the second horizontal rod 23 and the second vertical rod 24 form a positioning assembly 2 of a U-shaped structure, which is clamped on the concrete bridge guardrail, and the positioning assembly 2 can slide along the concrete bridge guardrail, so as to adjust the position of the concrete bridge guardrail construction device according to the operation point. In this embodiment, the first vertical rod 21 and the first horizontal rod 22 are square steel tubes with a size of 5 cm×5 cm×5 mm, and the second vertical rod 24 and the second horizontal rod 23 are square steel tubes with a size of 6 cm×6 cm×6 mm. The first vertical rod 21, the first horizontal rod 22 and the second horizontal rod 23 are 1 meter long, and the second vertical rod 24 is 0.5 meter long.

[0040] In order to prevent the positioning component 2 from damaging the concrete bridge guardrail when sliding along the concrete bridge guardrail, the concrete bridge guardrail construction device also includes a moving wheel 4, and a plurality of moving wheels 4 are provided. The plurality of moving wheels 4 are arranged on the contact surface between the positioning component 2 and the concrete bridge guardrail, thereby reducing the friction between the positioning component 2 and the concrete bridge guardrail, facilitating movement, and preventing damage to the guardrail. In this embodiment, see the attached Figure 1 Taking practical applications into consideration, four moving wheels 4 are provided on a positioning assembly 2, wherein one moving wheel 4 is provided on the second vertical rod 24, one moving wheel 4 is provided on the second horizontal rod 23, and the other two moving wheels 4 are provided on the first vertical rod 21.

[0041] When the positioning assembly 2 is clamped on the concrete bridge guardrail, the concrete bridge guardrail is located between the first vertical rod 21 and the second vertical rod 24. The first horizontal rod 22 is slidably connected to the second horizontal rod 23 to adjust the distance between the first vertical rod 21 and the second vertical rod 24, so that the concrete bridge guardrail construction device of this embodiment can be applied to bridge guardrails of various widths and sizes. One concrete bridge guardrail construction device can be reused and applied to different bridge guardrail constructions, with high flexibility, low construction cost, energy saving and environmental protection.

[0042] In order to ensure accurate positioning when the first horizontal rod 22 and the second horizontal rod 23 slide relative to each other to adjust the distance, and to improve the working efficiency of adjusting the distance, a plurality of first positioning holes 221 are provided on the first horizontal rod 22, and a plurality of second positioning holes 231 are provided on the second horizontal rod 23, and the plurality of first positioning holes 221 and the second positioning holes 231 correspond one to one. In this embodiment, the plurality of first positioning holes 221 are provided on two sides of the first horizontal rod 22, and the plurality of second positioning holes 231 are provided on two sides of the second horizontal rod 23, and the first positioning holes 221 and the second positioning holes 231 are holes with a diameter of 1 cm.

[0043] In order to maintain stability after the first horizontal rod 22 and the second horizontal rod 23 slide relative to each other to the set distance required for construction, the concrete bridge guardrail construction device also includes a positioning pin, which is inserted into the first positioning hole 221 and the second positioning hole 231 to lock the first horizontal rod 22 and the second horizontal rod 23. Ensure that during the construction process, the first horizontal rod 22 and the second horizontal rod 23 no longer slide relative to each other, ensuring construction safety. In some embodiments, the positioning pin can be replaced with a matching bolt and nut.

[0044] When the first horizontal rod 22 and the second horizontal rod 23 slide relative to each other to adjust the distance, in order to ensure that the two will not fall off and separate when sliding to the limit distance, the concrete bridge guardrail construction device also includes a limit assembly 3, and the limit assembly 3 includes a first limit member 31 and a second limit member 32. The first limit member 31 is arranged on the first horizontal rod 22, and is set at a set distance from the second end of the first horizontal rod 22. The second limit member 32 is arranged at the opening of the hollow cavity of the second horizontal rod 23. When the first horizontal rod 22 and the second horizontal rod 23 slide relative to each other to the set position, the first limit member 31 abuts against the second limit member 32. The abutting first limit member 31 and the second limit member 32 limit the first horizontal rod 22 and the second horizontal rod 23 from continuing to slide after sliding relative to each other to the limit distance, thereby ensuring the overall stability of the device.

[0045] In order to ensure that the concrete bridge guardrail construction device can be conveniently and stably moved along the concrete bridge guardrail, in this embodiment, two groups of positioning components 2 are provided, and the two groups of positioning components 2 are fixed on the same side of the hanging basket 1. After the workers complete the construction of a certain work point, the workers on the bridge push the device to move the entire device to the next work point.

[0046] In order to make the workers stand stably when performing construction work in the hanging basket 1, a plurality of support rods 12 are provided on the bottom surface of the hanging basket 1, and the plurality of support rods 12 are fixedly connected to the hanging basket 1 in a grid shape. The provision of the support rods 12 enhances the stability of the hanging basket 1, and the workers stand on the support rods 12 to perform construction work, further ensuring the personal safety of the workers.

[0047] When carrying out construction work, workers will carry items for construction. In order to prevent the items for construction from falling, in this embodiment, a bottom plate 13 is provided on the plurality of support rods 12, and the bottom plate 13 can catch the construction items that accidentally fall. In some embodiments, the bottom plate 13 is a wooden template, and the wooden template is laid on the plurality of support rods 12. In some embodiments, the bottom plate 13 can also be a steel plate, and the steel plate is welded on the plurality of support rods 12.

[0048] In order to further improve the stability of the hanging basket 1 , four reinforcement rods 14 are respectively provided on the four sides of the hanging basket 1 , and the four reinforcement rods 14 are fixed to the hanging basket 1 in a crisscross shape.

[0049] In the above-mentioned schematic embodiment, the concrete bridge guardrail construction device consists of a hanging basket and a positioning assembly, which has a simple structure and is sturdy and durable. The positioning assembly can move along the bridge guardrail. After the construction of the outer side of the entire concrete bridge guardrail is completed, the device is lifted down as a whole using lifting equipment without the need for repeated lifting, thereby saving the cost of using machinery and equipment and improving construction efficiency.

[0050] The following is combined with Figures 1 to 4 The working process of an embodiment of the concrete bridge guardrail construction device of the utility model is described as follows:

[0051] First, determine the width of the concrete bridge guardrail, remove the positioning pins inserted in the first positioning hole 221 and the second positioning hole 231, slide the first horizontal rod 22 and the second horizontal rod 23 relative to each other, adjust the distance between the first vertical rod 21 and the second vertical rod 24 to be slightly larger than the width of the concrete bridge guardrail, and then insert the positioning pins in the first positioning hole 221 and the second positioning hole 231 to lock the first horizontal rod 22 and the second horizontal rod 23. During the adjustment process, the first limit member 31 and the second limit member 32 ensure that the first horizontal rod 22 and the second horizontal rod 23 do not separate and fall off.

[0052] Then determine the operating point of the concrete bridge guardrail, use lifting equipment to lift the entire device to the operating point, clamp the positioning assembly 2 on the concrete bridge guardrail, remove the positioning pin again, slide the first horizontal rod 22 and the second horizontal rod 23 relative to each other, adjust the distance between the first vertical rod 21 and the second vertical rod 24 to the appropriate width, and insert the positioning pin.

[0053] The workers enter the hanging basket 1 and carry out construction at the work point. After the construction is completed, the workers on the bridge push the device, and the positioning component 2 slides along the concrete bridge guardrail through the moving wheels 4 to move the entire device to the next work point.

[0054] After the construction of the outer side of the concrete bridge guardrail along the entire line is completed, the entire device will be lowered using lifting equipment.

[0055] Finally, it should be noted that: the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0056] The above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model is described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the utility model can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the utility model, which should be included in the scope of the technical solution for which protection is requested in the utility model.

Claims

1. A concrete bridge guardrail construction device, characterized in that: include: A hanging basket, wherein the hanging basket is a cube frame formed by connecting twelve frame rods; A positioning assembly, the positioning assembly is used to fix the hanging basket at the construction position of the concrete bridge guardrail, and the positioning assembly includes: a first vertical rod, the first vertical rod having a first end and a second end, the first end of the first vertical rod being connected to the hanging basket; A first horizontal rod, the first horizontal rod having a first end and a second end, the first end of the first horizontal rod being connected to the second end of the first vertical rod, the first horizontal rod being perpendicular to the first vertical rod; a second horizontal rod, wherein the second horizontal rod has a hollow cavity, the second end of the first horizontal rod is inserted into the hollow cavity of the second horizontal rod, and the second horizontal rod is slidably connected to the first horizontal rod; A second vertical rod is vertically connected to the second horizontal rod.

2. The concrete bridge guardrail construction device according to claim 1 is characterized in that: The first horizontal rod is provided with a plurality of first positioning holes, and the second horizontal rod is provided with a plurality of second positioning holes, and the plurality of first positioning holes correspond to the plurality of second positioning holes one by one.

3. The concrete bridge guardrail construction device according to claim 2 is characterized in that: It also includes a positioning pin, which is inserted into the first positioning hole and the second positioning hole to lock the first horizontal rod and the second horizontal rod.

4. The concrete bridge guardrail construction device according to claim 1 is characterized in that: A plurality of supporting rods are arranged on the bottom surface of the hanging basket, and the plurality of supporting rods are fixed to the hanging basket in a grid shape.

5. The concrete bridge guardrail construction device according to claim 4 is characterized in that: A bottom plate is provided on the plurality of support rods.

6. The concrete bridge guardrail construction device according to claim 1, characterized in that: It also includes a limit assembly, which includes: A first limiting member, the first limiting member is disposed on the first horizontal rod and is set at a set distance from the second end of the first horizontal rod; The second position-limiting member is arranged at the opening of the hollow cavity of the second horizontal rod. When the first horizontal rod and the second horizontal rod slide relatively to a set position, the first position-limiting member abuts against the second position-limiting member.

7. The concrete bridge guardrail construction device according to claim 1, characterized in that: Four reinforcing rods are respectively arranged on the four sides of the hanging basket, and the four reinforcing rods are fixed to the hanging basket in a crisscross shape.

8. The concrete bridge guardrail construction device according to claim 1, characterized in that: It also includes moving wheels, and a plurality of the moving wheels are provided, and the plurality of the moving wheels are arranged on the contact surface between the positioning component and the concrete bridge guardrail.

9. The concrete bridge guardrail construction device according to any one of claims 1 to 8, characterized in that: The twelve frame members are angle steels.

10. The concrete bridge guardrail construction device according to any one of claims 1 to 8, characterized in that: The positioning components are provided with two groups, and the two groups of positioning components are fixed on the same side of the hanging basket.