Fabricated building drainage structure
Through the design of the drainage structure of the water shell, oblique board, the promotion component and cleaning component, the problem of accumulation of dust and debris in the drainage device in prefabricated steel structures caused by the accumulation of dust and miscellaneous materials caused by the accumulation of blocking and cleaning. Practice normally.
Patent Information
- Application Number
- CN202421169655.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-27
- Publication Date
- 2025-01-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the drainage device of prefabricated steel structure buildings, dust and debris are easily accumulated inside the sink, resulting in blockage of the drainage pipe and inability to drain effectively.
A drainage structure includes a drainage structure that includes water chips, oblique boards, pushing components, support components, support components, collecting shells, motors, cleaning components, and opening and closing components. This structure uses water shells and oblique plates to flow the rainwater to the filter plate, and the cleaning component of the component and motor -driven cleaning components can effectively clean up the garbage on the filter plate to prevent blocking.
The effective filtering and cleaning of garbage impurities in rainwater during the drainage process was achieved, and the waste drainage pipes were avoided by the garbage, which ensured the normal progress of drainage and facilitated the use of staff.
Smart Images

Figure CN222413335U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of drainage of assembled buildings, in particular to a drainage structure for assembled buildings. Background Art
[0002] Prefabricated steel structure buildings are assembled buildings made of steel parts. Compared with prefabricated concrete buildings, prefabricated steel structure buildings have the following advantages: there are no on-site cast-in-place nodes, the installation speed is faster, and the construction quality is easier to ensure; the steel structure is a ductile material with better seismic performance; compared with the concrete structure, the steel structure has a lighter weight and a lower foundation cost; the steel structure is a recyclable material and is more environmentally friendly. Prefabricated steel structure buildings need to install drainage devices to divert and discharge rainwater.
[0003] Publication No. (CN216156987U) discloses a drainage structure for assembled steel structure buildings, including a drainage pipe, the top of the drainage pipe is connected to a water receiving trough, the front of the water receiving trough is provided with a strip hole, the outer side of the drainage pipe is movably connected to a reciprocating mechanism passing through the strip hole, the reciprocating mechanism is provided with two scrapers located inside the water receiving trough, the outer side of the drainage pipe is fixedly connected to a mounting block, and the inside of the mounting block is provided with a transmission rod threadedly connected to the reciprocating mechanism. The drainage structure for assembled steel structure buildings has the advantages of being easy to discharge dust and debris, and solves the problem in the prior art that a drainage device is usually installed on the side of an assembled steel structure building, and the drainage device usually includes a water receiving trough and a discharge pipe, which is used to discharge rainwater sliding down from the roof, but dust and debris are easily accumulated inside the water receiving trough, and the dust and debris have poor fluidity and are not easy to be discharged from the drainage pipe.
[0004] Although the comparative document can clean the garbage inside the sink, it is unable to collect the dust and debris after cleaning, resulting in the blockage of the sink and the drain pipe after long-term use, and the water cannot be drained, which is not conducive to the use of staff. For this reason, we propose a drainage structure for prefabricated buildings. Utility Model Content
[0005] In view of the deficiencies in the prior art, the utility model provides a drainage structure for an assembled building to solve the above-mentioned problems.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a drainage structure for assembled buildings, comprising a drainage pipe, characterized in that the top of the drainage pipe is connected to a water collecting shell, and two symmetrically distributed inclined plates are fixedly connected to the top of the inner wall of the water collecting shell, a pushing assembly is provided on one side of the water collecting shell, a supporting assembly is provided on one side of the water collecting shell, one side of the water collecting shell is connected to a collecting shell, a motor is provided on the top of the collecting shell, a cleaning assembly is provided inside the collecting shell, the collecting shell is connected to a connecting pipe, the other end of the connecting pipe is connected to the outside of the drainage pipe, and an opening and closing assembly is provided on the outside of the collecting shell.
[0007] Preferably, a first filter plate is fixedly connected to the bottom of the inner wall of the water collecting shell, the first filter plate is located outside the drain pipe, and a second filter plate is fixedly connected to the bottom of the inner wall of the water collecting shell.
[0008] Preferably, the pushing assembly comprises a cylinder fixedly mounted on one side of the water collecting shell, the cylinder extends to the interior of the water collecting shell, and the output end of the cylinder is fixedly connected to a scraper.
[0009] Preferably, the support assembly comprises two symmetrically distributed telescopic sleeves fixedly mounted on one side of the water collecting shell, the telescopic sleeves extending into the interior of the water collecting shell, the interior of the telescopic sleeves being slidably connected with a telescopic rod, and the telescopic rod being fixedly connected to one end of the scraper.
[0010] Preferably, the top of the collecting shell is fixedly connected to a support frame, and the motor is fixedly mounted on the support frame.
[0011] Preferably, the cleaning assembly includes a rotating shaft fixedly connected to the output end of the motor, the rotating shaft extends to the interior of the collecting shell, and a brush plate is fixedly connected to the exterior of the rotating shaft.
[0012] Preferably, the opening and closing assembly comprises a door hinged to the outside of the collection shell, and a handle is fixedly connected to one end of the door.
[0013] Compared with the prior art, the utility model has the following beneficial effects: when it is necessary to drain the assembled building, the water on the roof of the building can be drained through the water collecting shell provided, and the rainwater can be directed to the top of the first filter plate through the two inclined plates provided, and the garbage impurities in the rainwater can be filtered through the first filter plate provided, and the cylinder can be started, and the output end of the cylinder drives the scraper to move, and the scraper will push the garbage impurities on the first filter plate into the interior of the collecting shell, and the motor can be started, and the output end of the motor drives the rotating shaft to rotate and the brush plate to rotate, and the brush plate can clean the second filter plate, avoiding the garbage impurities from clogging the second filter plate, and the garbage impurities inside the collecting shell can be collected by opening the box door, and the above structure is provided, which is convenient for the staff to perform drainage operations on the roof of the assembled building, and the garbage impurities in the rainwater can be filtered during drainage, avoiding the garbage clogging the drain pipe, causing the drain pipe to be blocked and unable to drain, which greatly facilitates the use of the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0015] Figure 2 It is a schematic diagram of the structure of the utility model in cross section;
[0016] Figure 3 It is a schematic diagram of the structure of the utility model in partial section;
[0017] Figure 4 It is a schematic structural diagram of a cross-section of the propulsion assembly of the utility model.
[0018] In the figure: 1. drain pipe; 2. water collecting shell; 3. inclined plate; 4. first filter plate; 5. cylinder; 6. scraper; 7. telescopic sleeve; 8. telescopic rod; 9. collecting shell; 10. support frame; 11. motor; 12. rotating shaft; 13. brush plate; 14. second filter plate; 15. connecting pipe; 16. box door; 17. handle. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] Example: Refer to Figure 1-4A drainage structure for assembled buildings includes a drainage pipe 1, characterized in that the top of the drainage pipe 1 is connected to a water collecting shell 2, two symmetrically distributed inclined plates 3 are fixedly connected to the top of the inner wall of the water collecting shell 2, a first filter plate 4 is fixedly connected to the bottom of the inner wall of the water collecting shell 2, the first filter plate 4 is located outside the drainage pipe 1, and a second filter plate 14 is fixedly connected to the bottom of the inner wall of the collection shell 9.
[0021] Specifically, a pushing component is provided on one side of the water collecting shell 2, and the pushing component includes a local cylinder 5 fixedly installed on one side of the water collecting shell 2, and the cylinder 5 extends to the interior of the water collecting shell 2. The output end of the cylinder 5 is fixedly connected with a scraper 6. Through the set pushing component, the garbage on the first filter plate 4 can be pushed into the interior of the collecting shell 9. A supporting component is provided on one side of the water collecting shell 2, and the supporting component includes two symmetrically distributed telescopic sleeves 7 fixedly installed on one side of the water collecting shell 2. The telescopic sleeve 7 extends to the interior of the water collecting shell 2, and the interior of the telescopic sleeve 7 is slidably connected with a telescopic rod 8, and the telescopic rod 8 is fixedly connected to one end of the scraper 6. Through the set supporting component, the scraper 6 can be made more stable when moving.
[0022] Specifically, one side of the water collecting shell 2 is connected to the collecting shell 9, and a motor 11 is arranged on the top of the collecting shell 9. A support frame 10 is fixedly connected to the top of the collecting shell 9, and the motor 11 is fixedly mounted on the support frame 10. Through the support frame 10, the motor 11 will not idle when working. A cleaning component is arranged inside the collecting shell 9, and the cleaning component includes a rotating shaft 12 fixedly connected to the output end of the motor 11, and the rotating shaft 12 extends to the inside of the collecting shell 9. A brush plate 13 is fixedly connected to the outside of the rotating shaft 12, and the second filter plate 14 can be cleaned by the arranged cleaning component. The collecting shell 9 is connected to a connecting pipe 15, and the other end of the connecting pipe 15 is connected to the outside of the drain pipe 1. An opening and closing component is arranged on the outside of the collecting shell 9, and the opening and closing component includes a box door 16 hinged on the outside of the collecting shell 9, and one end of the box door 16 is fixedly connected to a handle 17. The collecting shell 9 can be opened by the arranged opening and closing component, and the garbage inside the collecting shell 9 can be taken out.
[0023] In use: when it is necessary to drain the assembled building, the water on the roof of the building can be drained through the water collecting shell 2, and the rainwater can be directed to the top of the first filter plate 4 through the two inclined plates 3. The garbage impurities in the rainwater can be filtered through the first filter plate 4. By starting the cylinder 5, the output end of the cylinder 5 drives the scraper 6 to move, and the scraper 6 will push the garbage impurities on the first filter plate 4 into the interior of the collecting shell 9. By starting the motor 11, the output end of the motor 11 drives the rotating shaft 12 to rotate and the brush plate 13 to rotate, and the brush plate 13 can clean the second filter plate 14 to avoid the garbage impurities blocking the second filter plate 14. By opening the box door 16, the garbage impurities inside the collecting shell 9 can be collected. The above structure is convenient for the staff to perform drainage operations on the roof of the assembled building. When draining, the garbage impurities in the rainwater can be filtered to avoid the garbage blocking the drain pipe 1, which causes the drain pipe 1 to be blocked and unable to drain, which greatly facilitates the use of the staff.
[0024] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0025] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A drainage structure for an assembled building, comprising a drainage pipe (1), characterized in that: The top of the drainage pipe (1) is connected to a water collecting shell (2), the top of the inner wall of the water collecting shell (2) is fixedly connected to two symmetrically distributed inclined plates (3), one side of the water collecting shell (2) is provided with a pushing assembly, one side of the water collecting shell (2) is provided with a supporting assembly, one side of the water collecting shell (2) is connected to a collecting shell (9), the top of the collecting shell (9) is provided with a motor (11), the interior of the collecting shell (9) is provided with a cleaning assembly, the collecting shell (9) is connected to a connecting pipe (15), the other end of the connecting pipe (15) is connected to the outside of the drainage pipe (1), and the outside of the collecting shell (9) is provided with an opening and closing assembly.
2. A drainage structure for assembled buildings according to claim 1, characterized in that: A first filter plate (4) is fixedly connected to the bottom of the inner wall of the water collection shell (2), and the first filter plate (4) is located outside the drain pipe (1). A second filter plate (14) is fixedly connected to the bottom of the inner wall of the collection shell (9).
3. The drainage structure for assembled buildings according to claim 1, characterized in that: The pushing assembly comprises a cylinder (5) fixedly mounted on one side of the water collecting shell (2), the cylinder (5) extending into the interior of the water collecting shell (2), and a scraper (6) fixedly connected to the output end of the cylinder (5).
4. A drainage structure for assembled buildings according to claim 3, characterized in that: The support assembly comprises two symmetrically distributed telescopic sleeves (7) fixedly mounted on one side of the water collecting shell (2), the telescopic sleeves (7) extending into the interior of the water collecting shell (2), a telescopic rod (8) slidably connected to the interior of the telescopic sleeve (7), and the telescopic rod (8) fixedly connected to one end of the scraper (6).
5. The drainage structure for assembled buildings according to claim 1, characterized in that: The top of the collecting shell (9) is fixedly connected to a support frame (10), and the motor (11) is fixedly mounted on the support frame (10).
6. The drainage structure for assembled buildings according to claim 1, characterized in that: The cleaning assembly comprises a rotating shaft (12) fixedly connected to the output end of the motor (11), the rotating shaft (12) extending to the interior of the collection shell (9), and a brush plate (13) fixedly connected to the exterior of the rotating shaft (12).
7. The drainage structure for assembled buildings according to claim 1, characterized in that: The opening and closing assembly comprises a box door (16) hinged to the outside of the collection shell (9), and one end of the box door (16) is fixedly connected to a handle (17).
Citation Information
Patent Citations
Drainage structure for fabricated steel structure building
CN216156987U