Quickly-assembled safe shed frame

By designing the fast -loading safety scaffolding, using the combination of supporting columns, steel steel support beams and card holes to solve the problem of low recycling and utilization of existing scaffolding, tedious and low safety, and achieve rapid construction , High -intensity and safe shed.

CN222414234UActive Publication Date: 2025-01-28LONGYANG JIANGONG GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421146984.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-24
Publication Date
2025-01-28
Estimated Expiration
2034-05-24

AI Technical Summary

Technical Problem

The existing sheds are in the problem of low recycling rate, cumbersome construction process and low safety and stability.

Method used

A fast -installed safety scaffold is designed, including the basic frame unit, the top board and the top plate connector. The basic framework unit consists of supporting columns, assembly substrates, anchor plates, and beams. The beam is the steel structure of the industrial type. The top plate connector forms a card hoop form between the top board and the beam.

Benefits of technology

Realize the rapid construction of work sheds at the construction site, and support fast -molecation and recycling repetitive utilization, which improves the intensity and safety of the scaffolding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222414234U_ABST
    Figure CN222414234U_ABST
Patent Text Reader

Abstract

A fast-assembly safety shed frame comprises a foundation frame unit, a top plate and a top plate connecting piece. The foundation frame unit comprises a supporting stand column, an assembling base plate is fixedly arranged on the supporting stand column, and an anchoring plate is arranged at the bottom of the supporting stand column. A joist is arranged on the assembly base plate, and the joist is of an I-shaped steel structure; a top plate is arranged on the joist, and a top plate connecting piece is arranged between the top plate and the joist; and the top plate connecting piece is in a hoop form and is clamped outside the top plate and the joist. According to the utility model, the preassembling and assembling holes are arranged among the connecting pieces, so that the work shed can be quickly built in a time-saving and labor-saving manner on the construction site, and the equipment can be quickly disassembled and recycled based on the quick assembling structure of the connecting pieces. Compared with a work shed in the prior art, the work shed is higher in strength and safety and higher in safety popularization value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of work sheds, in particular to a quick-install safety shed. Background Art

[0002] Safety scaffolding is usually built at the construction site to place electrical appliances, on-site mixing tanks and other equipment. The scaffolding includes at least a pile foundation and a top plate. In the prior art, the construction of the scaffolding usually uses pipe fittings and pipe connectors to support the frame, and configures the scaffolding roof through welding, anchoring, etc. The scaffolding built in this way has the disadvantage of low recycling rate, and the construction process is relatively cumbersome, and the safety and stability are relatively low. In view of the above situation, there is currently a lack of corresponding solutions. Utility Model Content

[0003] The purpose of the utility model is to overcome the shortcomings of the prior art and provide a quick-install safety shed with a simple structure, high stability and safety, and especially quick construction and recyclability.

[0004] The equipment includes a basic frame unit, a top plate and top plate connectors;

[0005] The basic frame unit comprises a supporting column, on which an assembly base plate is fixedly arranged, and an anchor plate is arranged at the bottom;

[0006] The effect achieved by this is that the supporting columns are anchored to the bottom surface or concrete works at the construction site using anchor plates;

[0007] A joist is provided on the assembly base plate, and the joist is an I-beam structure;

[0008] A top plate is arranged on the joist, and a top plate connecting piece is arranged between the top plate and the joist;

[0009] The top plate connecting piece is in the form of a clamp, and the top plate connecting piece is clamped on the top plate and the outside of the joist, that is, the clamp is connected to the flange of the I-beam joist and the edge of the top plate.

[0010] The result is that once the supporting columns have been arranged, the scaffolding can be quickly arranged by erecting the support beams and subsequently assembling the top plate.

[0011] The beneficial effects of the utility model are: the utility model can save time and effort to quickly build a shed at the construction site through the provision of pre-installation and assembly holes between the connecting parts, and based on the quick-install structure of the connecting parts, the equipment can be quickly disassembled and recycled for reuse. Compared with the sheds in the prior art, it has higher strength and safety, and has more safety promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1It is a schematic diagram of the monomer structure of a quick-install safety shed described in the utility model;

[0013] Figure 2 is based on Figure 1 Schematic diagram of the assembly structure;

[0014] Figure 3 is based on Figure 1 or Figure 2 The direction is the main viewing direction, and the side viewing angle is a schematic diagram of the preferred implementation method;

[0015] Reference numerals:

[0016] 1-top plate 2-top plate connector 3-joist 4-oblique support corbel 5-support column 6-top plate support rod

[0017] 51-Assembly base plate 52-Anchor plate 53-Pre-installation foundation

[0018] The realization of the purpose, functional features and advantages of the utility model will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0019] Reference Figure 1 , Figure 2 The utility model discloses a quick-install safety shed, comprising a basic frame unit, a top plate 1 and a top plate connector;

[0020] The basic frame unit comprises a support column 5, on which a mounting base plate 51 is fixedly arranged, and an anchor plate 52 is arranged at the bottom;

[0021] The effect achieved by this is that the support column 5 is anchored to the bottom surface or concrete work at the construction site by means of the anchor plate 52;

[0022] The assembly base plate 51 is provided with a support beam 3, and the support beam 3 is an I-beam structure;

[0023] A top plate 1 is arranged on the joist 3, and a top plate connector is arranged between the top plate 1 and the joist 3;

[0024] The top plate connector is in the form of a clamp, and the top plate connector is clamped on the outside of the top plate 1 and the joist 3. That is, the clamp is connected to the flange of the I-beam joist 3 and the edge of the top plate 1.

[0025] The effect achieved by this is that after the support columns 5 are arranged, the scaffolding can be quickly arranged by erecting the support beams 3 and subsequently assembling the top plate 1.

[0026] Furthermore, the support column 5 is an I-beam structure; a reinforcing rib plate is integrally connected between the support column 5 and the assembly base plate 51 and the anchor plate 52, and the reinforcing rib plate is arranged outside the wing plate of the support column 5.

[0027] Furthermore, assembly holes are correspondingly provided between the assembly base plate 51 and the joist 3; the assembly base plate 51 and the joist 3 are fixed by bolt connectors.

[0028] Furthermore, an oblique supporting corbel 4 is provided between the supporting column 5 and the joist 3;

[0029] The oblique supporting corbel 4 comprises two mounting plates respectively fitted to the supporting column 5 and the wing plate of the joist 3, and a connecting rod is arranged between the mounting plates;

[0030] Assembly holes are correspondingly provided between the mounting plate, the support column 5 and the wing plate of the joist 3, and the oblique supporting corbel 4 is fastened to the support column 5 and the wing plate of the joist 3 by bolt connectors.

[0031] Furthermore, the top plate 1 is a color steel tile.

[0032] Furthermore, the top plate connecting member is in the form of a channel steel, including a clamping plate and a connecting plate on two opposite sides;

[0033] A fastening bolt is provided through any clamping plate of the top plate connecting member.

[0034] Preferably, the spacing between the two clamping plates of the top plate connector corresponds to the thickness of the flange of the joist 3 and the top plate 1, thereby achieving the effect of quick clamping.

[0035] Example 1, refer to the accompanying drawings of the specification Figure 3 The basic frame unit interval array is provided with multiple groups, that is, the supporting frame foundation of the shed is formed in this way.

[0036] Example 2, refer to the accompanying drawings of the specification Figure 3 A top plate support rod 6 is arranged in an array between the basic frame units, and the top plate support rod 6 is fixedly arranged between the support beams 3 of two spaced basic mining construction units through bolt connectors.

[0037] Preferably, assembly holes are provided between the two ends of the top plate support rod 6 and the upper wing plate of the support beam 3, and the assembly holes on the upper wing plate of the support beam 3 are arranged in an array;

[0038] The two ends of the top plate supporting rod 6 are provided with avoidance notches, and the assembly holes are provided on the rod body below the avoidance notches.

[0039] Example 3, refer to the accompanying drawings of the specification Figure 2 A pre-installed foundation 53 is fixedly arranged under the anchor plate 52, and the pre-installed foundation 53 is a rod structure. The effect achieved by this is that the supporting column 5 is pre-installed and quickly assembled at the construction site by pre-embedding the pre-installed foundation 53 and cooperating with pouring concrete.

[0040] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above exemplary embodiments, and can be implemented in other specific forms without departing from the spirit or basic features of the utility model. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the utility model is limited by the attached claims rather than the above description, and it is intended to include all changes within the meaning and scope of the equivalent elements of the claims. Any figure mark in the claims should not be regarded as limiting the claims.

[0041] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A quick-install safety shed, comprising a basic frame unit, a top plate and a top plate connector; the basic frame unit comprises a supporting column, characterized in that: The support column is fixedly provided with an assembly base plate, and an anchor plate is provided at the bottom thereof; A joist is provided on the assembly base plate, and the joist is an I-beam structure; A top plate is arranged on the joist, and a top plate connecting piece is arranged between the top plate and the joist; The top plate connecting piece is in the form of a clamp, and the top plate connecting piece is clamped on the top plate and the outside of the supporting beam.

2. A quick-install safety scaffold according to claim 1, characterized in that: The support column is an I-beam structure; a reinforcing rib plate is integrally connected between the support column, the assembly base plate and the anchor plate, and the reinforcing base plate is arranged outside the wing plate of the support column.

3. A quick-install safety scaffold according to claim 1, characterized in that: Assembly holes are correspondingly arranged between the assembly base plate and the joist; the assembly base plate and the joist are fixed by bolt connectors.

4. A quick-install safety scaffold according to claim 1, characterized in that: An oblique supporting corbel is provided between the supporting column and the supporting beam; The oblique supporting corbel comprises two mounting plates respectively fitted to the supporting column and the joist wing plate, and a connecting rod is arranged between the mounting plates; Assembly holes are correspondingly arranged between the mounting plate, the supporting column and the wing plate of the joist, and the oblique supporting corbel is fastened to the supporting column and the wing plate of the joist by bolt connectors.

5. The quick-install safety scaffolding according to claim 1, characterized in that: The top plate is a colored steel tile.

6. A quick-install safety scaffold according to claim 1, characterized in that: The top plate connecting piece is in the form of a channel steel, including a clamping plate and a connecting plate on two opposite sides; A fastening bolt is provided through any clamping plate of the top plate connecting member.

7. The quick-install safety scaffold according to claim 1, characterized in that: The basic frame unit spacing array is provided with multiple groups.

8. The quick-install safety scaffolding according to claim 1, characterized in that: Roof support rods are arranged in array between the basic frame units, and the roof support rods are fixedly arranged between the support beams of two basic mining construction units arranged at intervals through bolt connectors.

9. The quick-install safety scaffolding according to claim 1, characterized in that: A pre-installed foundation is fixedly arranged under the anchor plate, and the pre-installed foundation is a rod structure.