Air handling unit structure with fresh air pretreatment function

By using the pre -processing evaporator and evaporation equipment in the air -conditioning box structure, air humidification, and using the valve mechanism to control the flow of water in the water pipe, solve the problem that the existing air -conditioning box structure is difficult to humidify and cannot effectively control the water pipe, and realizes the air conditioning box. The structure of the air and the effective control of water pipes.

CN222417796UActive Publication Date: 2025-01-28SHANGHAI FEIZHONG REFRIGERATION EQUIP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420983790.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-08
Publication Date
2025-01-28
Estimated Expiration
2034-05-08

AI Technical Summary

Technical Problem

When the existing air conditioning box structure treats the air, it is difficult to effectively humidify, resulting in dry air discharged; at the same time, the water pipe cannot be effectively controlled, resulting in excessive water source during humidification, which may cause the equipment to fail to operate normally.

Method used

A new air -conditioning box structure with new air treatment is designed. The pre -processing evaporator and evaporation equipment are used to humidify the air, and the water flow of the water in the water pipe is controlled by the valve mechanism to ensure an appropriate amount of water supply evaporation equipment.

Benefits of technology

The effective humidification of the air -conditioning box structure to the air is achieved, ensuring the moderate air humidity excreted, and effectively controlling the flow of water sources in the water pipe, avoiding the problem of abnormal equipment operation caused by excess water sources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222417796U_ABST
    Figure CN222417796U_ABST
Patent Text Reader

Abstract

The utility model discloses an air handling unit structure with a fresh air pretreatment function, and relates to the technical field of air handling units. The device comprises a frame, a foaming heat preservation plate is fixedly arranged on the outer surface of the frame, an air return opening is formed in one side of the foaming heat preservation plate, a fresh air opening is formed in the upper end of the foaming heat preservation plate, an air outlet is formed in the upper end of the foaming heat preservation plate, and a maintenance room is fixedly arranged on the inner surface of the foaming heat preservation plate. A pretreatment evaporator is fixedly arranged on one side of the maintenance chamber, a water outlet pipe is fixedly arranged at the lower end of the pretreatment evaporator, a valve mechanism is fixedly arranged at one end of the water outlet pipe, a water inlet pipe is fixedly arranged at one end of the valve mechanism, and evaporation equipment is fixedly arranged at one end of the water inlet pipe; according to the air conditioning box structure, the air conditioning box structure can effectively humidify air through the pretreatment evaporator and the evaporation equipment, and the air conditioning box structure can effectively control the water pipe through the valve mechanism.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of air conditioning boxes, and in particular to an air conditioning box structure with fresh air pretreatment. Background Art

[0002] An air conditioning box, also known as a combined air conditioning unit, is a device specially used to process air. It has the functions of cooling, dehumidifying, heating and humidifying, filtering and purifying, supplying and returning air, and introducing fresh air. It is mainly used in industry, medicine and health, large and medium-sized buildings, such as hotels, luxury commercial facilities, sports and entertainment centers and other places.

[0003] After checking the announcement number: CN220250281U, an air-conditioning box structure and an air-conditioning are disclosed. This technology discloses "including a box body and an inspection panel, a maintenance port is arranged on the top of the box body, the inspection panel includes an inspection part and a shielding part, the shielding part is installed on the left and right panels and the bracket of the nylon filter by screws, and the inspection part is arranged at the inspection port and other technical solutions, which have the characteristics that when the box body needs to be opened for inspection, one side of the inspection part is pulled up, and the other side of the inspection part is rotated relative to the box body to open the inspection port, so as to facilitate the maintenance of the electrical equipment in the box body. When the inspection part closes the inspection port, one side of the inspection part is rotated and connected to the box body, and the other side of the inspection part is fitted with the shielding part, so that the inspection port of the box body is in a closed state. The inspection panel adopts a split design to divide it into two parts. Compared with the traditional top panel, it is more convenient and quick to disassemble and assemble, and several screws used to connect the inspection panel and the front panel of the box body can be omitted, thereby improving the efficiency of disassembly and assembly and other technical effects";

[0004] With respect to the above-mentioned related technologies, the inventors believe that when the air-conditioning box structures of the prior art process the air, most of the air-conditioning box structures cannot effectively humidify the air, resulting in the air discharged from the air-conditioning box structures being relatively dry. Moreover, when the air-conditioning box structures of the prior art process the air, most of the air-conditioning box structures cannot effectively control the water pipes, resulting in the excessive water in the air-conditioning box structures during humidification, which can easily cause the equipment to not operate normally. Utility Model Content

[0005] The purpose of the present application is to provide an air conditioning box structure with fresh air pretreatment to improve the problem that most air conditioning box structures cannot effectively humidify the air and most air conditioning box structures cannot effectively control the water pipes.

[0006] The present application provides an air conditioning box structure with fresh air pretreatment, which adopts the following technical solution:

[0007] An air conditioning box structure with fresh air pretreatment comprises a frame, a foam insulation board is fixedly provided on the outer surface of the frame, a return air port is opened on one side of the foam insulation board, a fresh air port is opened on the upper end of the foam insulation board, an air outlet is opened on the upper end of the foam insulation board, a maintenance room is fixedly provided on the inner surface of the foam insulation board, a pretreatment evaporator is fixedly provided on one side of the maintenance room, a water outlet pipe is fixedly provided on the lower end of the pretreatment evaporator, a valve mechanism is fixedly provided on one end of the water outlet pipe, a water inlet pipe is fixedly provided on one end of the valve mechanism, an evaporation device is fixedly provided on one end of the water inlet pipe, and an air mixing chamber is opened on one side of the evaporation device.

[0008] By adopting the above technical scheme, when the air-conditioning box structure needs to be used, fresh air enters the maintenance room through the fresh air inlet at the upper end of the foam insulation board on the frame, and then can be filtered through the pre-treatment evaporator. The filtered fresh air and the air entering from the return air port are humidified together through the evaporation equipment, and then mixed in the mixing air chamber, and then discharged from the air outlet together. The water source required by the evaporation equipment is provided by the pre-treatment evaporator, and is transported in conjunction with the water outlet pipe, the water inlet pipe and the valve mechanism, thereby achieving the purpose of the air-conditioning box structure to effectively humidify the air.

[0009] Optionally, the valve mechanism includes a valve frame, a cylinder is provided at the upper end of the valve frame, a sliding rod is fixedly provided at the output end of the cylinder, a cut-off block is fixedly provided at the lower end of the sliding rod, a cut-off plate is fixedly provided on the inner surface of the valve frame, and a cut-off groove is provided on one side of the cut-off plate for use with the cut-off block.

[0010] By adopting the above technical solution, the cylinder on the valve frame is started through the valve mechanism, so that the output end of the cylinder can drive the sliding rod to move, and the sliding rod can drive the cut-off block to move, so that the cut-off block can engage with the cut-off groove on the cut-off plate, so that the water source can be controlled, thereby achieving the purpose of the air-conditioning box structure being able to effectively control the water pipe.

[0011] Optionally, filter screens are fixedly provided on the inner surfaces of the return air inlet, the fresh air inlet and the air outlet.

[0012] By adopting the above technical solution, the return air inlet, fresh air inlet and air outlet can filter out debris through the filter screen to avoid affecting the air cleanliness.

[0013] Optionally, an external maintenance door is rotatably provided on one side of the foam insulation board, and an internal maintenance door is rotatably provided on one side of the maintenance room.

[0014] By adopting the above technical solution, maintenance personnel can repair the internal structure through the external maintenance door and can repair the pretreatment evaporator through the internal maintenance door.

[0015] Optionally, a pretreatment water receiving pan is fixedly provided on one side of the pretreatment evaporator, and an evaporation water receiving pan is fixedly provided on one side of the evaporation device.

[0016] By adopting the above technical solution, the pretreatment evaporator and the evaporation equipment can receive the water droplets condensed from the steam through the pretreatment water receiving tray and the evaporation water receiving tray respectively.

[0017] Optionally, a support frame is fixedly provided at the lower end of the cylinder, and the lower end of the support frame is fixedly connected to the upper end of the valve frame.

[0018] By adopting the above technical solution, the cylinder can be fixed on the upper end of the valve frame through the support frame.

[0019] Optionally, threaded grooves for use with the water outlet pipe and the water inlet pipe are respectively provided on both sides of the valve frame.

[0020] By adopting the above technical solution, the valve frame can be connected to the water outlet pipe and the water inlet pipe through the threaded groove.

[0021] Optionally, sealing rubber rings for use with the water outlet pipe and the water inlet pipe are fixedly provided on both sides of the valve frame.

[0022] By adopting the above technical solution, the water outlet pipe and the water inlet pipe can prevent water leakage when the water source is transported through the sealing rubber ring.

[0023] In summary, the present application includes at least one of the following beneficial technical effects:

[0024] 1. The utility model uses a pre-treatment evaporator and an evaporation device to effectively mix air with steam when the air conditioning box structure needs to humidify the air, thereby humidifying the air, thereby realizing that the air conditioning box structure can effectively humidify the air;

[0025] 2. The utility model uses a valve mechanism to control the flow of water inside the water pipe when the air conditioning box structure needs to use the steam equipment, thereby avoiding excessive water addition to the steam equipment, thereby achieving the air conditioning box structure can effectively control the water pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the structure of the utility model.

[0027] Figure 2 It is a schematic diagram of the structural section of the utility model.

[0028] Figure 3 It is a schematic cross-sectional view of the valve mechanism structure of the utility model.

[0029] In the figure, 1. frame; 2. foam insulation board; 3. valve mechanism; 4. fresh air inlet; 5. return air inlet; 6. filter screen; 7. external maintenance door; 20. air outlet; 21. maintenance room; 22. pretreatment evaporator; 23. internal maintenance door; 24. water outlet pipe; 25. pretreatment water tray; 26. water inlet pipe; 27. evaporation water tray; 28. evaporation equipment; 29. ​​air mixing chamber; 30. valve frame; 31. cylinder; 32. support frame; 33. sliding rod; 34. stop block; 35. stop groove; 36. stop plate; 37. sealing rubber ring; 38. threaded groove. DETAILED DESCRIPTION

[0030] The following is combined with Figure 1 -Attached Figure 3 , further details of this application are given.

[0031] Example 1

[0032] An air conditioning box structure with fresh air pretreatment, referring to Figure 1 and Figure 2 , comprising a frame 1, a foam insulation board 2 is fixedly provided on the outer surface of the frame 1, a return air port 5 is provided on one side of the foam insulation board 2, a fresh air port 4 is provided on the upper end of the foam insulation board 2, an air outlet 20 is provided on the upper end of the foam insulation board 2, a maintenance room 21 is fixedly provided on the inner surface of the foam insulation board 2, a pretreatment evaporator 22 is fixedly provided on one side of the maintenance room 21, a water outlet pipe 24 is fixedly provided on the lower end of the pretreatment evaporator 22, a valve mechanism 3 is fixedly provided on one end of the water outlet pipe 24, a water inlet pipe 26 is fixedly provided on one end of the valve mechanism 3, an evaporation device 28 is fixedly provided on one end of the water inlet pipe 26, the A mixing chamber 29 is provided on one side of the evaporation device 28. When the air conditioning box structure needs to be used, fresh air enters the maintenance room 21 through the fresh air outlet 4 at the upper end of the foam insulation board 2 on the frame 1, and then can be filtered through the pre-treatment evaporator 22. The filtered fresh air and the air entering from the return air outlet 5 are humidified together through the evaporation device 28, and then mixed in the mixing chamber 29, and then discharged together from the air outlet 20. The water source required by the evaporation device 28 is provided by the pre-treatment evaporator 22, and is transported in conjunction with the water outlet pipe 24, the water inlet pipe 26 and the valve mechanism 3, so that the air conditioning box structure can effectively humidify the air.

[0033] Reference Figure 2 The inner surfaces of the return air inlet 5, the fresh air inlet 4 and the air outlet 20 are fixedly provided with a filter screen plate 6, and the return air inlet 5, the fresh air inlet 4 and the air outlet 20 can filter out debris through the filter screen plate 6 to avoid affecting the air cleanliness.

[0034] Reference Figure 2An external maintenance door 7 is rotatably provided on one side of the foam insulation board 2, and an internal maintenance door 23 is rotatably provided on one side of the maintenance room 21. Maintenance personnel can repair the internal structure through the external maintenance door 7 and can repair the pretreatment evaporator 22 through the internal maintenance door 23.

[0035] Reference Figure 2 A pretreatment water receiving tray 25 is fixedly provided on one side of the pretreatment evaporator 22, and an evaporation water receiving tray 27 is fixedly provided on one side of the evaporation device 28. The pretreatment evaporator 22 and the evaporation device 28 can receive water droplets condensed from steam through the pretreatment water receiving tray 25 and the evaporation water receiving tray 27 respectively.

[0036] The implementation principle of the embodiment of the present application is as follows: when the air-conditioning box structure needs to be used, fresh air conditioning enters the maintenance room 21 through the fresh air outlet 4 at the upper end of the foam insulation board 2 on the frame 1, and then can be filtered through the pre-treatment evaporator 22. The filtered fresh air and the air entering from the return air outlet 5 are humidified together through the evaporation device 28, and then mixed in the mixing chamber 29, and then discharged together from the air outlet 20. The water source required by the evaporation device 28 is provided by the pre-treatment evaporator 22, and is transported in conjunction with the water outlet pipe 24, the water inlet pipe 26 and the valve mechanism 3, thereby achieving the purpose of the air-conditioning box structure being able to effectively humidify the air.

[0037] Example 2

[0038] The difference between this embodiment and embodiment 1 is that:

[0039] Reference Figure 3 The valve mechanism 3 includes a valve frame 30, a cylinder 31 is provided at the upper end of the valve frame 30, a sliding rod 33 is fixedly provided at the output end of the cylinder 31, a cut-off block 34 is fixedly provided at the lower end of the sliding rod 33, a cut-off plate 36 is fixedly provided on the inner surface of the valve frame 30, and a cut-off groove 35 used in conjunction with the cut-off block 34 is opened on one side of the cut-off plate 36. The cylinder 31 on the valve frame 30 is started through the valve mechanism 3, so that the output end of the cylinder 31 can drive the sliding rod 33 to move, so that the sliding rod 33 can drive the cut-off block 34 to move, so that the cut-off block 34 can be engaged with the cut-off groove 35 on the cut-off plate 36, so that the water source can be controlled, thereby achieving the purpose that the air conditioning box structure can effectively control the water pipe.

[0040] Reference Figure 3 A support frame 32 is fixedly provided at the lower end of the cylinder 31 , and the lower end of the support frame 32 is fixedly connected to the upper end of the valve frame 30 , and the cylinder 31 can be fixed on the upper end of the valve frame 30 through the support frame 32 .

[0041] Reference Figure 3, thread grooves 38 for use with the water outlet pipe 24 and the water inlet pipe 26 are respectively opened on both sides of the valve frame 30, and the valve frame 30 can be connected to the water outlet pipe 24 and the water inlet pipe 26 through the thread grooves 38.

[0042] Reference Figure 3 Both sides of the valve frame 30 are fixed with sealing rubber rings 37 used in conjunction with the water outlet pipe 24 and the water inlet pipe 26. The sealing rubber rings 37 can prevent water leakage when the water source is transported.

[0043] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An air conditioning box structure with fresh air pretreatment, comprising a frame (1), characterized in that: A foam insulation board (2) is fixedly provided on the outer surface of the frame (1), a return air port (5) is provided on one side of the foam insulation board (2), a fresh air port (4) is provided on the upper end of the foam insulation board (2), an air outlet (20) is provided on the upper end of the foam insulation board (2), a maintenance room (21) is fixedly provided on the inner surface of the foam insulation board (2), a pretreatment evaporator (22) is fixedly provided on one side of the maintenance room (21), a water outlet pipe (24) is fixedly provided on the lower end of the pretreatment evaporator (22), a valve mechanism (3) is fixedly provided on one end of the water outlet pipe (24), a water inlet pipe (26) is fixedly provided on one end of the valve mechanism (3), an evaporation device (28) is fixedly provided on one end of the water inlet pipe (26), and an air mixing chamber (29) is provided on one side of the evaporation device (28).

2. The air conditioning box structure with fresh air pretreatment according to claim 1 is characterized in that: The valve mechanism (3) comprises a valve frame (30), a cylinder (31) is provided at the upper end of the valve frame (30), a sliding rod (33) is fixedly provided at the output end of the cylinder (31), a cut-off block (34) is fixedly provided at the lower end of the sliding rod (33), a cut-off plate (36) is fixedly provided on the inner surface of the valve frame (30), and a cut-off groove (35) for use with the cut-off block (34) is provided on one side of the cut-off plate (36).

3. The air conditioning box structure with fresh air pretreatment according to claim 1 is characterized in that: The inner surfaces of the return air port (5), the fresh air port (4) and the air outlet (20) are all fixedly provided with a filter screen plate (6).

4. The air conditioning box structure with fresh air pretreatment according to claim 1 is characterized in that: An external maintenance door (7) is rotatably provided on one side of the foam insulation board (2), and an internal maintenance door (23) is rotatably provided on one side of the maintenance chamber (21).

5. The air conditioning box structure with fresh air pretreatment according to claim 1 is characterized in that: A pretreatment water receiving tray (25) is fixedly provided on one side of the pretreatment evaporator (22), and an evaporation water receiving tray (27) is fixedly provided on one side of the evaporation device (28).

6. The air conditioning box structure with fresh air pretreatment according to claim 2 is characterized in that: A support frame (32) is fixedly provided at the lower end of the cylinder (31), and the lower end of the support frame (32) is fixedly connected to the upper end of the valve frame (30).

7. The air conditioning box structure with fresh air pretreatment according to claim 2 is characterized in that: The valve frame (30) is provided with thread grooves (38) on both sides thereof for use in conjunction with the water outlet pipe (24) and the water inlet pipe (26).

8. The air conditioning box structure with fresh air pretreatment according to claim 2 is characterized in that: Sealing rubber rings (37) that cooperate with the water outlet pipe (24) and the water inlet pipe (26) are fixedly provided on both sides of the valve frame (30).

Citation Information

Patent Citations

  • Air conditioner box body structure and air conditioner

    CN220250281U