Foundation bolt fixing structure

By designing a anchor bolt fixing structure including base plate, mounting plate, threaded rod and clamping plate, the deviation and displacement of anchor bolts during the pre-embedding process is solved, the installation accuracy and safety are improved, and the installation is reduced. Waste of materials.

CN222435542UActive Publication Date: 2025-02-07HEBEI JINPEDA METAL TOOLS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421131821.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-22
Publication Date
2025-02-07
Estimated Expiration
2034-05-22

AI Technical Summary

Technical Problem

Existing anchor bolts are prone to deviation and displacement during the pre-embedding process, which affects the installation and construction safety of the steel structure main body, and has poor protective and rust-proofing effects.

Method used

A anchor bolt fixing structure is designed, including a base plate, mounting plate, threaded rod and clamping plate. Through the synergy of these components, two anchor bolts can be fixed simultaneously to prevent deviation and displacement, and through the limiting plate and Reinforce the rod to improve stability.

Benefits of technology

It effectively avoids deviations in anchor bolts during pre-embedding, improves the installation accuracy of the steel structure main body and building safety, and reduces material waste and facilitates reuse.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222435542U_ABST
    Figure CN222435542U_ABST
Patent Text Reader

Abstract

The utility model discloses a foundation bolt fixing structure which comprises a bottom plate, four installation plates are fixedly connected to the bottom plate, two supporting rods are connected to each installation plate in a sliding mode, the two supporting rods penetrate through the side walls of the installation plates, one ends of the two supporting rods are fixedly connected with a clamping plate, and the other ends of the two supporting rods are fixedly connected with the clamping plate. Every two clamping plates are oppositely arranged, each mounting plate is in threaded connection with a threaded rod, and the threaded rods penetrate through the side walls of the mounting plates. According to the utility model, the foundation bolts can be prevented from deviating in the pre-embedding process, so that the installation of a steel structure main body and the safety of a building are not influenced; according to the foundation bolt fixing structure, the situation that the fixing precision cannot meet the installation requirement due to large displacement of the embedded foundation bolt after concrete forming caused by vibration generated during pouring is prevented, the fixing structure can be reused, and waste of materials is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of anchor bolts, in particular to an anchor bolt fixing structure. Background Art

[0002] During the construction process, compared with traditional reinforced concrete buildings, steel structure buildings using bolts are more common and require greater precision. Currently, many industrial buildings have many large or small anchor bolts for the installation of equipment or connectors. When the anchor bolts are installed on the concrete foundation, the embedded part of the bolts is buried in the concrete. When the concrete solidifies, the exposed end is used to connect objects.

[0003] The anchor bolts on the market have a simple structure during use. When embedded, they are prone to sinking and displacement due to the small bottom area, and the overall stability is not strong. Deviations in the embedding process of the anchor bolts will directly affect the installation of the main steel structure and the safety of the building; and the protection is poor and the anti-rust effect is not good, which brings troubles to people's use; in addition, when pouring concrete, the impact force of the concrete leakage and the vibration generated when the concrete vibrator contacts the steel bars or iron parts often cause the embedded anchor bolts to have a large displacement after the concrete is formed, resulting in the fixing accuracy of the anchor bolts cannot meet the installation requirements. In order to solve the above problems, we designed an anchor bolt fixing structure. Utility Model Content

[0004] The utility model provides an anchor bolt fixing structure to solve the problems raised in the above background technology.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A foundation bolt fixing structure comprises a base plate, four mounting plates are fixedly connected to the base plate, two support rods are slidably connected to each mounting plate, two support rods pass through the side walls of the mounting plate, one end of the two support rods is fixedly connected to a clamping plate, every two clamping plates are arranged opposite to each other, each mounting plate is threadedly connected to a threaded rod, the threaded rod passes through the side walls of the mounting plate, one end of the threaded rod is rotatably connected to the side walls of the clamping plate, four through-set positioning holes are provided on the base plate, every two of the positioning holes are located between the two mounting plates, an anchor bolt is penetrated in each of the positioning holes, and a through-set pouring port is provided on the base plate.

[0007] Preferably, a plurality of fixing holes are provided on the bottom plate and are evenly distributed along the circumferential direction of the bottom plate.

[0008] Preferably, the bottom side walls of the anchor bolts are fixedly connected with limiting plates.

[0009] Preferably, a plurality of reinforcing rods are fixedly connected to the upper side wall of the limiting plate, and one end of the plurality of reinforcing rods is fixedly connected to the side wall of the anchor bolt.

[0010] Preferably, one end of the threaded rod is fixedly connected to a rotating handle.

[0011] Preferably, two grooves with arc-shaped cross sections are provided on the side wall of the clamping plate.

[0012] Preferably, the pouring port is located at the center of the base plate.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] Through the function of the mounting plate, threaded rod and clamping plate, two anchor bolts can be fixed at the same time, which can avoid deviation of the anchor bolts during the pre-embedding process, affecting the installation of the main steel structure and the safety of the building; concrete is poured through grouting in the pouring box, and the base plate is installed around the pouring through the fixing holes to prevent vibration during pouring from causing large displacement of the pre-embedded anchor bolts after the concrete is formed, resulting in the fixing accuracy failing to meet the installation requirements, and this fixed structure can be reused to reduce material waste.

[0015] The above description is only an overview of the technical solution of the utility model. In order to more clearly understand the technical means of the utility model and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiment of the utility model with the accompanying drawings. The specific implementation method of the utility model is given in detail by the following embodiments and their drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present application. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0017] Figure 1 This is a schematic diagram of a front cross-sectional structure of an anchor bolt fixing structure proposed by the utility model;

[0018] Figure 2 This is a schematic diagram of a top view and cross-section structure of an anchor bolt fixing structure proposed by the utility model;

[0019] Figure 3 The present invention provides a schematic diagram of the three-dimensional structure of an anchor bolt of an anchor bolt fixing structure.

[0020] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0021] 1. Base plate; 2. Casting port; 3. Anchor bolt; 4. Positioning hole; 5. Fixing hole; 6. Mounting plate; 7. Threaded rod; 8. Turn handle; 9. Clamping plate; 10. Limiting plate; 11. Reinforcement rod; 12. Support rod. DETAILED DESCRIPTION

[0022] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention. The present invention is described in more detail in the following paragraphs by way of example with reference to the accompanying drawings. The advantages and features of the present invention will become clearer according to the following description and claims. It should be noted that the drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0023] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be a component centered. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may also be a component centered. When a component is considered to be "set on" another component, it may be directly set on the other component or there may also be a component centered. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0024] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0025] See also Figure 1-3 In the embodiment of the utility model, a foundation bolt fixing structure includes a base plate 1, four mounting plates 6 are fixedly connected to the base plate 1, two support rods 12 are slidably connected to each mounting plate 6, the two support rods 12 both penetrate the side walls of the mounting plate 6, one end of the two support rods 12 is fixedly connected to a clamping plate 9, every two clamping plates 9 are arranged opposite to each other, each mounting plate 6 is threadedly connected to a threaded rod 7, the threaded rod 7 penetrates the side walls of the mounting plate 6, one end of the threaded rod 7 is rotatably connected to the side walls of the clamping plate 9, four through-set positioning holes 4 are provided on the base plate 1, every two positioning holes 4 are located between the two mounting plates 6, each positioning hole 4 is penetrated with an anchor bolt 3, and a through-set pouring port 2 is provided on the base plate 1.

[0026] In an optional embodiment, a plurality of fixing holes 5 are formed on the bottom plate 1 and are evenly distributed along the circumferential direction of the bottom plate 1 .

[0027] It should be noted that fixing parts such as latches are passed through the fixing holes 5 to fix the base plate 1 .

[0028] In an optional embodiment, the bottom side walls of the anchor bolts 3 are fixedly connected to limit plates 10 .

[0029] It should be noted that increasing the bottom end area of ​​the anchor bolt 3 can improve the stabilizing effect of the anchor bolt 3 .

[0030] In an optional embodiment, a plurality of reinforcing rods 11 are fixedly connected to the upper side wall of the limiting plate 10 , and one end of the plurality of reinforcing rods 11 is fixedly connected to the side wall of the anchor bolt 3 .

[0031] It should be noted that the stabilizing effect between the limiting plate 10 and the anchor bolt 3 is further improved.

[0032] In an optional embodiment, one end of the threaded rod 7 is fixedly connected to a rotating handle 8 .

[0033] It should be noted that the rotation of the threaded rod 7 is controlled by rotating the handle 8 .

[0034] In an optional embodiment, two grooves with arc-shaped cross sections are provided on the side wall of the clamping plate 9 .

[0035] It should be noted that the cross-sectional shape is adapted to the anchor bolt 3 to improve the fixing effect.

[0036] In an optional embodiment, the pouring port 2 is located at the center of the base plate 1 .

[0037] It should be noted that it is convenient for grouting of concrete.

[0038] The working principle of the utility model is: when in use, first pass the anchor bolt 3 through 4, and then rotate the threaded rod 7 to make the two clamping plates 9 move toward the middle at the same time, clamp and fix the anchor bolt 3, prevent the anchor bolt 3 from deviating during the pre-embedding process, and affect the installation of the steel structure main body and the safety of the building. This clamping method is also convenient for disassembly of the fixed structure after the concrete is formed so that it can be used again. The base plate 1 is placed above the concrete to be poured, and the base plate 1 is fixed by passing the fixing parts such as the pin through the fixing hole 5. This can prevent the impact force of the concrete leakage and the vibration generated when the concrete vibrator contacts the steel bar or iron parts during the later concrete grouting, which causes the pre-embedded anchor bolt 3 to be greatly displaced after the concrete is formed, resulting in the fixing accuracy of the anchor bolt 3 failing to meet the installation requirements. The use of the limit plate 10 and the reinforcing rod 11 can increase the stability of the anchor bolt 3.

[0039] The above description is only a preferred embodiment of the utility model and does not impose any form of limitation on the utility model. Any ordinary technician in the industry can smoothly implement the utility model as shown in the drawings of the specification and described above. However, any equivalent changes, modifications and evolutions made by technicians familiar with the profession without departing from the scope of the technical solution of the utility model using the technical content disclosed above are all equivalent embodiments of the utility model. At the same time, any equivalent changes, modifications and evolutions made to the above embodiments based on the essential technology of the utility model are still within the protection scope of the technical solution of the utility model.

Claims

1. A foundation bolt fixing structure, comprising a base plate (1), characterized in that: Four mounting plates (6) are fixedly connected to the base plate (1), and each mounting plate (6) is slidably connected to two support rods (12), and the two support rods (12) pass through the side wall of the mounting plate (6). One end of the two support rods (12) is fixedly connected to a clamping plate (9), and each two clamping plates (9) are arranged opposite to each other. Each mounting plate (6) is threadedly connected to a threaded rod (7), and the threaded rod (7) passes through the side wall of the mounting plate (6). One end of the threaded rod (7) is rotatably connected to the side wall of the clamping plate (9). Four through-set positioning holes (4) are provided on the base plate (1), and each two of the positioning holes (4) are located between the two mounting plates (6). A foundation bolt (3) is penetrated in each positioning hole (4). A through-set pouring port (2) is provided on the base plate (1).

2. The anchor bolt fixing structure according to claim 1, characterized in that: The bottom plate (1) is provided with a plurality of fixing holes (5) which are arranged through the bottom plate (1), and the plurality of fixing holes (5) are evenly distributed along the circumferential direction of the bottom plate (1).

3. The anchor bolt fixing structure according to claim 2, characterized in that: The bottom side walls of the anchor bolts (3) are fixedly connected to limiting plates (10).

4. The anchor bolt fixing structure according to claim 3, characterized in that: A plurality of reinforcing rods (11) are fixedly connected to the upper side wall of the limiting plate (10), and one end of the plurality of reinforcing rods (11) is fixedly connected to the side wall of the anchor bolt (3).

5. The anchor bolt fixing structure according to claim 4, characterized in that: One end of the threaded rod (7) is fixedly connected to a rotating handle (8).

6. The anchor bolt fixing structure according to claim 5, characterized in that: Two grooves with arc-shaped cross sections are provided on the side wall of the clamping plate (9).

7. The anchor bolt fixing structure according to claim 6, characterized in that: The pouring port (2) is located at the center of the base plate (1).