Pipe connecting device for water conservancy and hydropower engineering
By designing a water conservancy and hydropower engineering connection device including guide rollers, rotating mechanisms and limiting mechanisms, the problem of difficulty in aligning the bolt holes of the water pipe flange is solved, and the efficiency and stability of the water pipe connection are improved.
Patent Information
- Application Number
- CN202421385232.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2034-06-18
AI Technical Summary
The existing connecting pipe devices for water conservancy and hydropower projects cannot effectively adjust the alignment of the bolt holes of the water pipe flange, resulting in inefficient water pipe connections with flanges.
A take-over device including a first wheel, a placement plate, a support plate, an electric telescopic rod, a V-shaped block, a support roller, a guide roller and a rotating mechanism are designed. By cooperating with the guide roller and the second hand wheel, the water pipe with flanges can be rotated to align the bolt holes of the adjacent flanges; at the same time, the limiting mechanism and the clamping block ensure that the water pipe is no longer misaligned after being in a suitable position.
It effectively solves the problem of bolt hole alignment of water pipe flange, improves the efficiency and stability of water pipe connection with flanges, and facilitates the operation of staff.
Smart Images

Figure CN222437201U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy projects, in particular to a connecting pipe device for water conservancy and hydropower projects. Background Art
[0002] Water pipes are water supply pipelines. Modern decoration water pipes are all constructed by buried wall. There are three types of water pipes. The first type is metal pipes, such as hot-dip cast iron pipes, copper pipes, and stainless steel pipes lined with plastic. The second type is plastic-clad metal pipes, such as steel-plastic composite pipes and aluminum-plastic composite pipes. The third type is plastic pipes, such as PB.
[0003] In the patent with the authorization announcement number CN216843389U, a high-sealing pipe connection device for water conservancy and hydropower engineering is provided with a positioning and clamping mechanism, which can help workers quickly clamp and position the water pipes, thereby improving the splicing efficiency of the water pipes. It is only necessary to put the water pipes into the V-shaped block above the sliding body at the upper end of the base, and then rotate the fixing frame to wrap the water pipes. Since a spring plate is provided on the inner side of the fixing frame, the fixing frame will not cause excessive pressure to cause deformation of the water pipes when clamping the water pipes, so that the spring plate can play a buffering role, making the structure of the device reasonable and stable, and increasing practicality;
[0004] However, the above patent still has the following problems: most of the pipes used in water conservancy are currently connected by flanges. After the water pipes are placed on the inner side of the V-shaped block, when the flange bolt holes of the two water pipes are not aligned, the V-shaped block cannot rotate the water pipes to adjust the positions of the flange bolt holes, which is not conducive to the workers to connect the water pipes with flanges. Therefore, a connecting device for water conservancy and hydropower engineering is proposed to address the above problems. Utility Model Content
[0005] The technical problem to be solved by the utility model overcomes the existing defects and can effectively solve the problems in the background technology.
[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0007] A connecting pipe device for water conservancy and hydropower engineering, comprising a first wheel and a placing plate, a placing plate is provided at the top of the first wheel, support plates are fixedly connected to both sides of the top of the placing plate, a first electric telescopic rod is fixedly connected to the inner side of the support plate, the other end of the first electric telescopic rod is fixedly connected to the bottom plate, a second wheel is provided on the lower side of the bottom plate, a second electric telescopic rod is fixedly connected to the top of the bottom plate, a V-shaped block is fixedly connected to the top of the second electric telescopic rod, a supporting roller is rotatably connected to the inner side of the V-shaped block, a limiting mechanism is provided at the bottom end of the supporting roller, a cross plate is fixedly connected to one end of the V-shaped block, a bearing is fixedly connected to the inner side of the cross plate, a third electric telescopic rod is fixedly connected to the inner side of the bearing, and a rotating mechanism is provided at one end of the third electric telescopic rod.
[0008] Preferably, the rotating mechanism comprises a connecting plate fixedly connected to the third electric telescopic rod, both sides of the bottom end of the connecting plate are fixedly connected to side plates, and one end of the side plate is rotatably connected to a guide roller.
[0009] Preferably, there are two guide rollers, which are symmetrically distributed on both sides of the vertical center line of the V-shaped block, and one end of one of the guide rollers is fixedly connected to the second hand wheel.
[0010] Preferably, a sleeve is fixedly connected to the bottom end of the horizontal plate, and the sleeve is rotatably connected to the third electric telescopic rod, a locking screw is spirally connected to the inner side of one end of the sleeve, and the locking screw is fitted with the third electric telescopic rod.
[0011] Preferably, the limiting mechanism includes a screw rod rotatably connected to the V-shaped block, the outer side of the screw rod is spirally connected to a first wedge block, and the first wedge block is slidably connected to the V-shaped block, one end of the first wedge block is slidably connected to a second wedge block, the top end of the second wedge block is fixedly connected to a support column, the top end of the support column is fixedly connected to a clamping block, and the clamping block is arranged on the lower side of the support roller, and one end of the screw rod is fixedly connected to a first hand wheel.
[0012] Preferably, the threads on both sides of the vertical center line of the screw are arranged in opposite directions, and the threads on the inner sides of the first wedge blocks on both sides of the vertical center line of the screw are adapted to the threads on both sides of the vertical center line of the screw.
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] 1. A connecting pipe device for water conservancy and hydropower engineering, through the side plate, guide roller, support roller and second hand wheel, when the water pipe with flange is placed on the support roller, the water pipe with flange is clamped by the guide roller, and then the guide roller is rotated by the second hand wheel, so that the guide roller rotates with the water pipe with flange, so that the bolt holes of adjacent flanges are aligned with each other, thereby facilitating the connection of adjacent water pipes with flanges.
[0015] 2. A connecting pipe device for water conservancy and hydropower engineering, which is equipped with a supporting roller, a screw rod, a first hand wheel, a first wedge block, a second wedge block, a supporting column, and a clamping block. When the water pipe with a flange is adjusted to a suitable position, the supporting roller is clamped and fixed by the clamping block to ensure that the supporting roller will not rotate, thereby ensuring that the water pipe with the flange will not rotate, preventing the bolt holes of adjacent flanges from being misaligned again, thereby facilitating the work of the staff. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0017] Figure 1 The utility model is a schematic diagram of the overall structure of a connecting pipe device for water conservancy and hydropower engineering.
[0018] Figure 2 The utility model is a schematic diagram of the installation structure of the third electric telescopic rod of the connecting pipe device for water conservancy and hydropower engineering.
[0019] In the figure: 1. first wheel; 2. placement plate; 3. support plate; 4. first electric telescopic rod; 5. bottom plate; 6. second wheel; 7. second electric telescopic rod; 8. V-shaped block; 9. support roller; 10. screw; 11. first hand wheel; 12. first wedge block; 13. second wedge block; 14. support column; 15. clamping block; 16. cross plate; 17. bearing; 18. sleeve; 19. third electric telescopic rod; 20. locking screw; 21. connecting plate; 22. side plate; 23. guide roller; 24. second hand wheel. DETAILED DESCRIPTION
[0020] The utility model is further described below in conjunction with specific implementation methods, wherein the accompanying drawings are only used for exemplary descriptions and represent only schematic diagrams rather than actual drawings, and cannot be understood as limitations on this patent. In order to better illustrate the specific implementation methods of the utility model, some parts of the accompanying drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the accompanying drawings may be omitted. Based on the specific implementation methods in the utility model, all other specific implementation methods obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0021] Example
[0022] like Figure 1-2 As shown, a pipe connection device for water conservancy and hydropower engineering comprises a first wheel 1 and a placement plate 2, wherein the placement plate 2 is arranged at the top of the first wheel 1, and support plates 3 are fixedly connected to both sides of the top of the placement plate 2, and a first electric telescopic rod 4 is fixedly connected to the inner side of the support plate 3, and a bottom plate 5 is fixedly connected to the other end of the first electric telescopic rod 4, and a second wheel 6 is arranged on the lower side of the bottom plate 5, and a second electric telescopic rod 7 is fixedly connected to the top of the bottom plate 5, and a V-shaped block 8 is fixedly connected to the top of the second electric telescopic rod 7, and a support roller 9 is rotatably connected to the inner side of the V-shaped block 8, A limiting mechanism is provided at the bottom end of the support roller 9, one end of the V-shaped block 8 is fixedly connected to a transverse plate 16, the inner side of the transverse plate 16 is fixedly connected to a bearing 17, the inner side of the bearing 17 is fixedly connected to a third electric telescopic rod 19, one end of the third electric telescopic rod 19 is provided with a rotating mechanism, the support roller 9 is used to facilitate the support of the water pipe, and the water pipe and the V-shaped block 8 are facilitated to rotate relative to each other under the action of the support roller 9, the bearing 17 is used to facilitate the third electric telescopic rod 19 to adjust the position with the rotating mechanism, and ensure that the rotating mechanism will not affect the placement of the water pipe on the support roller 9.
[0023] As a further improvement of the utility model, Figure 1-2 As shown, the rotating mechanism includes a connecting plate 21 fixedly connected to the third electric telescopic rod 19, and side plates 22 are fixedly connected to both sides of the bottom end of the connecting plate 21. One end of the side plate 22 is rotatably connected to a guide roller 23. When the water pipe with a flange is placed on the supporting roller 9, the water pipe with a flange is clamped by the guide roller 23, and then the guide roller 23 is rotated with the water pipe with the flange, so that the bolt holes of adjacent flanges are aligned with each other, thereby facilitating the connection of adjacent water pipes with flanges.
[0024] As a further improvement of the utility model, Figure 1-2As shown, there are two guide rollers 23, which are symmetrically distributed on both sides of the vertical center line of the V-shaped block 8. One end of one of the guide rollers 23 is fixedly connected to a second hand wheel 24. The two guide rollers 23 can improve the stability of the water pipe clamping, and the second hand wheel 24 can facilitate the staff to rotate the guide roller 23.
[0025] As a further improvement of the utility model, Figure 1-2 As shown, the bottom end of the horizontal plate 16 is fixedly connected with a sleeve 18, and the sleeve 18 is rotatably connected with the third electric telescopic rod 19. A locking screw 20 is spirally connected to the inner side of one end of the sleeve 18, and the locking screw 20 is fitted with the third electric telescopic rod 19. The locking screw 20 can be used to clamp and fix the third electric telescopic rod 19, so that the third electric telescopic rod 19 will not rotate arbitrarily.
[0026] As a further improvement of the utility model, Figure 1-2 As shown, the limiting mechanism includes a screw rod 10 rotatably connected to the V-shaped block 8, the outer side of the screw rod 10 is spirally connected with a first wedge block 12, and the first wedge block 12 is slidably connected to the V-shaped block 8, one end of the first wedge block 12 is slidably connected to the second wedge block 13, the top of the second wedge block 13 is fixedly connected to a support column 14, the top of the support column 14 is fixedly connected to a clamping block 15, and the clamping block 15 is arranged on the lower side of the support roller 9, one end of the screw rod 10 is fixedly connected to a first hand wheel 11, when the water pipe with a flange is adjusted to a suitable position, the support roller 9 is clamped and fixed by the clamping block 15 to ensure that the support roller 9 does not rotate, thereby ensuring that the water pipe with a flange does not rotate, preventing the bolt holes of adjacent flanges from being misaligned again, thereby facilitating the work of the staff, and the height of the support column 14 can be designed according to actual needs to ensure that the clamping block 15 can be clamped together with the support roller 9.
[0027] As a further improvement of the utility model, Figure 1-2 As shown, the threads on both sides of the vertical center line of the screw 10 are arranged in opposite directions, and the threads inside the first wedge blocks 12 on both sides of the vertical center line of the screw 10 are adapted to the threads on both sides of the vertical center line of the screw 10, ensuring that the first wedge blocks 12 on both sides of the vertical center line of the screw 10 can move in opposite directions.
[0028] Workflow: When it is necessary to connect the water pipes with flanges, first place the two water pipes with flanges on the support roller 9 inside the V-shaped block 8, and then use the third electric telescopic rod 19 to clamp the water pipes with flanges through the connecting plate 21 and the side plate 22 with the guide roller 23. When it is necessary to adjust the position of the bolt hole of the flange, separate the clamping block 15 from the support roller 9, and then the staff uses the second hand wheel 24 to rotate the guide roller 23, so that the guide roller 23 rotates the water pipes with flanges on the support roller 9 until the bolt hole of the flange is in a suitable position, and then the staff uses the first hand wheel 1 1 with the screw rod 10 spirally rotates inside the first wedge block 12, so that the first wedge block 12 is clamped together with the support roller 9 through the second wedge block 13 and the support column 14 with the clamping block 15, so that the support roller 9 will not rotate, thereby ensuring that the water pipe with the flange will not rotate, preventing the bolt holes of the adjacent flanges from being misaligned again, thereby facilitating the work of the staff, and under the action of the first electric telescopic rod 4, the bottom plate 5, the second electric telescopic rod 7 and the V-shaped block 8 with the corresponding water pipes can be brought close to each other, and at the same time, under the action of the second electric telescopic rod 7, the height between the adjacent water pipes can be adjusted to ensure that the water pipes can be aligned.
[0029] The above is a preferred implementation mode of the utility model. The above shows and describes the basic principles and main features of the utility model and the advantages of the utility model. Technical personnel in this industry should understand that the utility model is not limited to the above embodiments. The above embodiments and descriptions are only for illustrating the principles of the utility model. Without departing from the protection scope of the utility model, the utility model will have various changes and improvements, and these changes and improvements all fall within the scope of the utility model to be protected. The protection scope of the utility model is defined by the attached claims and their equivalents.
Claims
1. A connecting pipe device for water conservancy and hydropower engineering, comprising a first wheel (1) and a placing plate (2), characterized in that: A placement plate (2) is provided at the top of the first wheel (1), and both sides of the top of the placement plate (2) are fixedly connected to support plates (3), the inner side of the support plate (3) is fixedly connected to a first electric telescopic rod (4), the other end of the first electric telescopic rod (4) is fixedly connected to a bottom plate (5), a second wheel (6) is provided on the lower side of the bottom plate (5), the top of the bottom plate (5) is fixedly connected to a second electric telescopic rod (7), the top of the second electric telescopic rod (7) is fixedly connected to a V-shaped block (8), the inner side of the V-shaped block (8) is rotatably connected to a support roller (9), a limiting mechanism is provided at the bottom end of the support roller (9), one end of the V-shaped block (8) is fixedly connected to a cross plate (16), the inner side of the cross plate (16) is fixedly connected to a bearing (17), the inner side of the bearing (17) is fixedly connected to a third electric telescopic rod (19), and one end of the third electric telescopic rod (19) is provided with a rotation mechanism.
2. A connecting pipe device for water conservancy and hydropower engineering according to claim 1, characterized in that: The rotating mechanism comprises a connecting plate (21) fixedly connected to the third electric telescopic rod (19), both sides of the bottom end of the connecting plate (21) are fixedly connected to side plates (22), and one end of the side plate (22) is rotatably connected to a guide roller (23).
3. A connecting pipe device for water conservancy and hydropower engineering according to claim 2, characterized in that: There are two guide rollers (23) symmetrically distributed on both sides of the vertical center line of the V-shaped block (8), and one end of one of the guide rollers (23) is fixedly connected to a second hand wheel (24).
4. A connecting pipe device for water conservancy and hydropower engineering according to claim 1, characterized in that: The bottom end of the horizontal plate (16) is fixedly connected to a sleeve (18), and the sleeve (18) is rotatably connected to a third electric telescopic rod (19); a locking screw (20) is spirally connected to the inner side of one end of the sleeve (18), and the locking screw (20) is fitted to the third electric telescopic rod (19).
5. A connecting pipe device for water conservancy and hydropower engineering according to claim 1, characterized in that: The limiting mechanism comprises a screw rod (10) rotatably connected to the V-shaped block (8); the outer side of the screw rod (10) is spirally connected to a first wedge block (12), and the first wedge block (12) is slidably connected to the V-shaped block (8); one end of the first wedge block (12) is slidably connected to a second wedge block (13); the top end of the second wedge block (13) is fixedly connected to a support column (14); the top end of the support column (14) is fixedly connected to a clamping block (15), and the clamping block (15) is arranged on the lower side of the support roller (9); one end of the screw rod (10) is fixedly connected to a first hand wheel (11).
6. A connecting pipe device for water conservancy and hydropower engineering according to claim 5, characterized in that: The threads on both sides of the vertical center line of the screw rod (10) are arranged in opposite directions, and the threads on the inner side of the first wedge block (12) on both sides of the vertical center line of the screw rod (10) are adapted to the threads on both sides of the vertical center line of the screw rod (10).
Citation Information
Patent Citations
High-sealing-performance pipe connecting device for water conservancy and hydropower engineering
CN216843389U