Drainage structure for post-cast strip pouring

By setting up a drainage structure of the diversion pipe, drainage valve and grouting valve in the construction of the rear pouring belt, the problems of water seepage and water accumulation in front of the sealing of the rear pouring belt are solved, ensuring the construction environment is dry, and the construction quality and efficiency are improved.

CN222456103UActive Publication Date: 2025-02-11CSCEC PERAL RIVER INT DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421068031.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-16
Publication Date
2025-02-11
Estimated Expiration
2034-05-16

AI Technical Summary

Technical Problem

There is no structural plate before the rear pouring belt is closed, and only an ordinary concrete cushion layer is available, which can easily lead to water seepage and water accumulation, affecting the construction quality of the rear pouring belt.

Method used

A drainage structure for pouring after pouring tape is designed, including a diversion pipe, a drainage valve and a grouting valve, which drains the foundation water through the diversion pipe to ensure the dry construction environment of the rear pouring tape.

Benefits of technology

It effectively avoids the accumulation of water in the permeable cushion layer affecting the construction quality of the post-watering belt, ensures the molding quality of the post-watering belt, reduces the risk of leakage, and improves the construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222456103U_ABST
    Figure CN222456103U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and particularly discloses a drainage structure for post-cast strip pouring, which comprises a flow guide pipe, a drainage valve and a grouting valve. The length of the flow guide pipe corresponds to the thickness of the cushion layer, and the top end of the flow guide pipe is consistent with the top surface of the cushion layer; the drainage valve is arranged at the top end of the flow guide pipe; the grouting valve is arranged on the side face of the upper end of the flow guide pipe, and the height of the grouting valve is smaller than that of the flow guide valve. According to the post-cast strip construction method, the drainage structure is arranged, and the post-cast strip construction method is formed in the region rich in water content based on the drainage structure, so that it is guaranteed that the post-cast strip pouring environment is dry and free of water, the post-cast strip forming quality is guaranteed, and the post-cast strip leakage risk is reduced. According to the method, the problem that the construction quality of the post-cast strip is affected by water seepage, water accumulation, water gushing and the like caused by later sealing of the post-cast strip in a traditional construction method is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a drainage structure for pouring a post-casting belt. Background Art

[0002] Post-cast strips are a construction technology in construction projects, mainly used to control concrete shrinkage and temperature stress and prevent cracks in concrete structures. Post-cast strips are usually set in certain parts of the structure, such as beams, slabs, columns, walls, etc., to separate and control concrete shrinkage. Reasonable setting of post-cast strips can improve the stability and durability of the structure. The construction method of post-cast strips has been widely used in construction projects.

[0003] However, the sealing time of the post-casting strip is generally long, and there is no structural slab before sealing, only the cushion layer to isolate the foundation. The cushion layer is generally ordinary concrete, without anti-seepage design requirements, which is easy to cause water seepage and water accumulation before the post-casting strip is closed, and may even cause gushing in the rainy season. In this case, if drainage treatment is not carried out, too much water will accumulate during the construction of the post-casting strip, resulting in poor molding quality of the post-casting strip and a high risk of leakage in the later period; especially when constructing in a foundation with rich water content, before the bottom plate post-casting strip is closed, there is only a cushion layer in the post-casting strip area to isolate the foundation and the room. If the cushion layer construction quality is poor, or it is not closed for a long time, water will penetrate the cushion layer, causing water accumulation in the post-casting strip, seriously affecting the subsequent post-casting strip construction quality. Utility Model Content

[0004] The technical problem solved by the utility model is how to prevent the accumulation of water penetrating the cushion layer from affecting the construction quality of the post-casting belt.

[0005] The purpose of the utility model can be achieved through the following technical solutions:

[0006] A drainage structure for pouring a post-cast strip, comprising:

[0007] A flow guide pipe, the length of which corresponds to the thickness of the cushion layer, and when in use, the top of the flow guide pipe is consistent with the top surface of the cushion layer;

[0008] A drainage valve, the drainage valve is arranged at the top of the diversion tube;

[0009] A grouting valve is arranged on the upper end side of the diversion pipe, and the height of the grouting valve is lower than the height of the diversion valve.

[0010] In one solution of the utility model: the grouting valve is a one-way valve.

[0011] In one solution of the utility model: a connecting portion is arranged on the outer side of the grouting valve, and the connecting portion and the side wall of the guide pipe are enclosed to form a grouting space.

[0012] In one solution of the utility model: a fixing part is fixedly connected to the top end of the guide tube, and when in use, the fixing part and the cushion layer are fixed by a fixing piece.

[0013] In one solution of the utility model: a rubber ring is arranged between the fixing portion and the cushion layer.

[0014] In one solution of the utility model: the fixing portion is fixed to the flow guide pipe by welding.

[0015] In one embodiment of the present invention, the flow guide pipe is a galvanized steel pipe, and the fixing portion is a galvanized steel plate.

[0016] Beneficial effects of the utility model:

[0017] This application sets up a drainage structure, and forms a post-casting strip construction method in areas with rich water content based on the drainage structure, which ensures that the casting environment of the post-casting strip is dry and water-free, ensures the molding quality of the post-casting strip, and reduces the risk of leakage of the post-casting strip. This method avoids the problems of water seepage, water accumulation, and water gushing caused by the late closure of the post-casting strip in the traditional construction method, which affect the construction quality of the post-casting strip. It effectively solves the problems of construction difficulties and unstable quality existing in the prior art, and improves construction efficiency and quality.

[0018] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0020] Figure 1 It is a schematic diagram of the planar structure of the utility model when viewed from above;

[0021] Figure 2 This utility model Figure 1 Schematic diagram of the cross-section structure in.

[0022] The reference numerals in the figure are:

[0023] 1. Flow guide pipe; 2. Drainage valve; 3. Grouting valve; 4. Fixed part; 5. Connecting part; 6. Rubber ring. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0026] In the description of the present utility model, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed" etc. are understood to exclude the number itself, and "above", "below", "within" etc. are understood to include the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0027] See also Figure 1-2 The utility model is a drainage structure for pouring post-casting strips, comprising: a diversion pipe 1, a diversion valve 2 and a grouting valve 3. The length of the diversion pipe 1 corresponds to the thickness of the cushion layer, and the length of the diversion pipe 1 can be slightly larger than the thickness of the cushion layer. When in use, the top of the diversion pipe 1 is roughly flush with the top surface of the cushion layer; the bottom of the diversion pipe 1 should be at the foundation position. The diversion pipe 1 can be a galvanized steel pipe. The diversion valve 2 is arranged at the top of the diversion pipe 1; it is opened during the drainage process, and can be closed to prevent water from continuing to gush out after the drainage is completed and the docking water pipe is removed. The grouting valve 3 is arranged on the upper side of the diversion pipe 1, and the height of the grouting valve 3 is lower than the height of the diversion valve 2. The grouting valve 3 is a one-way valve. When the grouting one-way valve is used to divert the tin-plated steel pipe for drainage, water cannot gush out from this valve. After the valve is closed after the drainage is completed, the plugging king is injected into the diversion galvanized steel pipe through the grouting one-way valve. Furthermore, a connection portion 5 is provided on the outer side of the grouting valve 3, and the connection portion 5 and the side wall of the flow guide pipe 1 are enclosed to form a grouting space, so that the grouting operation can be facilitated.

[0028] See also Figure 1-2In one embodiment of the utility model, a fixing portion 4 is fixedly connected to the top of the guide tube 1, and the fixing portion 4 is vertically arranged with respect to the tube wall of the guide tube 1. When in use, the fixing portion 4 is fixed to the cushion layer by a fixing member. The fixing member may be a fixing bolt, a pin, a screw or other similar fixing structure. The fixing portion 4 may be a galvanized steel plate. The fixing portion 4 may be welded and fixed to the guide tube 1 to form a whole. Furthermore, when in use, a rubber ring 6 may be arranged between the fixing portion 4 and the cushion layer to improve the sealing and waterproof performance.

[0029] The working principle of this utility model:

[0030] When the device is used, the installation point of the guide pipe 1 is first arranged according to the leakage situation of the cushion layer, and the cushion layer is chiseled after selection, and the chiseling process needs to be chiseled to the base layer; after the chiseling is completed, the guide pipe 1 is fixed in the hole chiseled in the cushion layer, and then the water pipe is connected to the upper end of the guide pipe 1, and the drainage valve 2 is opened to drain the water in the foundation to the drainage system for discharge, so as to ensure the dryness of the overall environment; the post-casting strip outside the drainage structure position is poured, and after the pouring is completed, the water pipe is taken out, the drainage valve 2 is closed, and then the leak-proof king is injected into the guide pipe 1 through the grouting valve 3 until the guide pipe 1 is filled; after the grouting is completed, there is no need to dismantle the device, and the waterproof mortar is directly used to smooth it, and the anti-water membrane is laid for waterproof reinforcement treatment; concrete is poured at the location of the drainage structure until it is flush with the post-casting strips at other locations.

[0031] This application sets up a drainage structure, and forms a post-casting strip construction method in areas with rich water content based on the drainage structure, which ensures that the casting environment of the post-casting strip is dry and water-free, ensures the molding quality of the post-casting strip, and reduces the risk of leakage of the post-casting strip. This method avoids the problems of water seepage, water accumulation, and water gushing caused by the late closure of the post-casting strip in the traditional construction method, which affect the construction quality of the post-casting strip. It effectively solves the problems of construction difficulties and unstable quality existing in the prior art, and improves construction efficiency and quality.

[0032] The above is a detailed description of an embodiment of the utility model, but the content is only a preferred embodiment of the utility model and cannot be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the claims of the utility model.

Claims

1. A drainage structure for pouring a post-cast strip, characterized in that: include: A flow guide pipe (1), wherein the length of the flow guide pipe (1) corresponds to the thickness of the cushion layer, and when in use, the top end of the flow guide pipe (1) is consistent with the top surface of the cushion layer; A drainage valve (2), wherein the drainage valve (2) is arranged at the top end of the drainage pipe (1); A grouting valve (3), wherein the grouting valve (3) is arranged on the upper side of the guide pipe (1), and the height of the grouting valve (3) is lower than the height of the drainage valve (2).

2. A drainage structure for pouring a post-cast strip according to claim 1, characterized in that: The grouting valve (3) is a one-way valve.

3. A drainage structure for pouring a post-cast strip according to claim 2, characterized in that: A connecting portion (5) is provided on the outer side of the grouting valve (3), and the connecting portion (5) and the side wall of the flow guide pipe (1) are combined to form a grouting space.

4. A drainage structure for pouring a post-cast strip according to claim 1, characterized in that: The top end of the flow guide tube (1) is fixedly connected to a fixing portion (4); when in use, the fixing portion (4) is fixed to the cushion layer via a fixing piece.

5. A drainage structure for pouring a post-cast strip according to claim 4, characterized in that: A rubber ring (6) is provided between the fixing portion (4) and the cushion layer.

6. A drainage structure for pouring a post-cast strip according to claim 5, characterized in that: The fixing portion (4) is fixed to the flow guide tube (1) by welding.

7. A drainage structure for pouring a post-cast strip according to claim 6, characterized in that: The flow guide pipe (1) is a galvanized steel pipe, and the fixing part (4) is a galvanized steel plate.