Bridge anti-settlement structure

By using the connecting structure of multi-stage support plates and elastic telescopic rods in the bridge, the problem that the prior art cannot effectively offset the bridge settlement, achieving higher settlement resistance and longer bridge service life.

CN222456159UActive Publication Date: 2025-02-11CHINA CONSTR SEVENTH ENG DIVISION CORP LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421095593.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-02-11
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

The existing bridge pile foundation anti-settlement device can only prevent bridge settlement to a certain extent, and cannot effectively offset settlement, resulting in the bridge's possible deformation, cracking or even breaking.

Method used

Multi-stage support plates and multiple elastic telescopic rods are used to connect each part of the bridge to form a whole to improve the overall anti-settlement capability of the bridge, and offset the settlement through the deformation and reset mechanism of the elastic telescopic rod.

Benefits of technology

It effectively improves the overall settlement resistance of the bridge and can offset settlement, reduces deformation and damage of the bridge, and extends the service life of the bridge.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222456159U_ABST
    Figure CN222456159U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of bridge maintenance, and particularly relates to a bridge anti-sedimentation structure which comprises a bridge column, supporting plates and telescopic rods, the bottom of the bridge column is fixed in a soil layer, and the first supporting plate is arranged in the soil layer and fixed to the periphery of the bridge column; the second supporting plate is arranged on the soil layer and fixed to the periphery of the bridge column, and the bottom of the second supporting plate is fixed to the surface of the soil layer; the first elastic telescopic rod is arranged in a soil layer, the bottom of the first elastic telescopic rod is fixed to the top of the first supporting plate, and the top of the first elastic telescopic rod is fixed to the bottom of the second supporting plate; the third supporting plate is arranged in the middle of the bridge columns, the third supporting plate is at least in friction connection with the two bridge columns, the multiple stages of supporting plates and the multiple elastic telescopic rods are used for connecting all parts of the bridge, and settlement can be counteracted while the overall anti-settlement capacity of the bridge is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridge maintenance, in particular to a bridge anti-settling structure. Background Art

[0002] Bridges generally refer to structures built on rivers, lakes, and seas to allow vehicles and pedestrians to pass smoothly. In order to adapt to the modern high-speed development of the transportation industry, bridges are also extended to buildings that cross mountain streams, poor geology, or meet other transportation needs to make passage more convenient. During the construction of bridges, soft foundation sections are often encountered. With the long-term use of bridges or vehicle overload, the bridge piles at different locations will have uneven settlement problems, which can easily cause deformation, cracking, or even breakage of the bridge.

[0003] The Chinese utility model patent with publication number CN219060104U and published on May 23, 2023 discloses an anti-settlement device for highway bridge pile foundation, including a pile body and a supporting pedestal, the supporting pedestal is connected to the top of the pile body by integral casting, the pile body is connected to the middle position of the bottom of the supporting pedestal, the outer ring of the pile body below the supporting pedestal is integrally connected with a ring block, the outer ring of the pile body directly below the ring block is sleeved with a support plate, and the bottom surface of the ring block is supported and abutted against the upper surface of the support plate, and auxiliary piles are vertically arranged at the four corners of the bottom of the support plate.

[0004] The above patent constructs auxiliary piles evenly vertically on the outer circle of the pile body, so that the upper support and locking support plate with a through hole are supported. During use, the support plate is subjected to the anti-settlement support force from a larger area of ​​soil, thereby ensuring the overall anti-settlement effect of the pile body. However, it can only prevent the settlement of the bridge to a certain extent and cannot offset the settlement. Utility Model Content

[0005] In view of the problems existing in the background technology, the utility model provides a bridge anti-settling structure, which uses a multi-stage support plate and a plurality of elastic telescopic rods to connect various parts of the bridge, which can offset the settlement while improving the overall anti-settling ability of the bridge.

[0006] The technical solution of the utility model is as follows:

[0007] A bridge anti-settling structure comprises a bridge column, a support plate and a telescopic rod, wherein the bottom of the bridge column is fixed in a soil layer, a first support plate is arranged in the soil layer and fixed to the outer periphery of the bridge column; a second support plate is arranged on the soil layer, the second support plate is fixed to the outer periphery of the bridge column, and the bottom of the second support plate is fixed to the surface of the soil layer; a first elastic telescopic rod is arranged in the soil layer, the bottom of the first elastic telescopic rod is fixed to the top of the first support plate, and the top of the first elastic telescopic rod is fixed to the bottom of the second support plate; a third support plate is arranged in the middle of the bridge column, and the third support plate is frictionally connected to at least two bridge columns; a plurality of second elastic telescopic rods are obliquely arranged between the second support plate and the third support plate, and every two second elastic telescopic rods form a connecting assembly, the tops of the two second elastic telescopic rods are connected to the bottom of the third support plate by a hinge, and the bottoms of the two second elastic telescopic rods are respectively connected to the top of a second support plate by a hinge.

[0008] Furthermore, a cement column is fixed at the bottom of the bridge column, and the bottom of the first support plate is fixed to the top of the cement column.

[0009] Furthermore, the first elastic telescopic rod includes a shell and at least one spring, and the spring is fixed inside the shell in the telescopic direction of the shell.

[0010] Furthermore, pegs are fixed to the bottom of the first support plate.

[0011] The utility model has the following beneficial effects:

[0012] 1. The utility model uses a multi-stage support plate and a plurality of elastic telescopic rods to connect various parts of the bridge, which can offset the settlement while improving the overall anti-settlement ability of the bridge.

[0013] 2. The utility model connects the above-ground part of the bridge column with the underground part and the adjacent bridge wall columns, so that the various parts of the bridge column form a whole, jointly resist the effect of settlement, and improve the overall anti-settlement performance.

[0014] 3. When the bridge column of the utility model sinks, the first elastic telescopic rod and / or the second elastic telescopic rod will be deformed. After the deformation occurs, the spring will drive the telescopic rod to reset under the action of elastic force, and then the telescopic rod will drive the bridge column to reset through the support plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the utility model;

[0016] Figure 2 It is a structural schematic diagram of the first elastic telescopic rod.

[0017] The reference numerals in the figure are as follows:

[0018] 1. Bridge column; 11. Cement column; 2. First support plate; 3. Second support plate; 4. Third support plate; 5. First elastic telescopic rod; 51. Shell; 52. Spring; 6. Second elastic telescopic rod; 61. Hinge; 7. Soil layer; 8. Pile nails. DETAILED DESCRIPTION

[0019] The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.

[0020] like Figure 1-Figure 2 As shown, the anti-settling structure of the bridge of this embodiment includes a bridge column 1, a support plate and a telescopic rod. The bottom of the bridge column 1 is fixed in the soil layer 7, and the first support plate 2 is arranged in the soil layer 7 and fixed to the outer periphery of the bridge column 1; the second support plate 3 is arranged on the soil layer 7, the second support plate 3 is fixed to the outer periphery of the bridge column 1, and the bottom of the second support plate 3 is fixed to the surface of the soil layer 7; the first elastic telescopic rod 5 is arranged in the soil layer 7, the bottom of the first elastic telescopic rod 5 is fixed to the top of the first support plate 2, and the top of the first elastic telescopic rod 5 is fixed to the bottom of the second support plate 3; the third support plate 4 is arranged in the middle of the bridge column 1, and the third support plate 4 is frictionally connected to at least two bridge columns 1; a plurality of second elastic telescopic rods 6 are obliquely arranged between the second support plate 3 and the third support plate 4, and every two second elastic telescopic rods 6 form a connecting assembly, and the tops of the two second elastic telescopic rods 6 are connected to the bottom of the third support plate 4 through a hinge 61, and the bottoms of the two second elastic telescopic rods 6 are respectively connected to the top of a second support plate 3 through a hinge 61.

[0021] The utility model uses a first elastic telescopic rod 5 to connect the first underground support plate 2 and the second ground support plate 3, and uses a second elastic telescopic rod 6 to connect the second ground support plate 3 and the third support plate 4 in the middle of the bridge column 1. Through this structure, the various parts of the bridge column 1 are connected to form a whole, which can jointly resist the occurrence of settlement and improve the overall anti-sedimentation ability.

[0022] Furthermore, a cement column 11 is fixed at the bottom of the bridge column 1 , and the bottom of the first support plate 2 is fixed to the top of the cement column 11 .

[0023] The cement column 11 reinforces the bridge column 1 to improve the stability of the bridge column 1 .

[0024] Furthermore, the first elastic telescopic rod 5 includes a shell 51 and at least one spring 52 , and the spring 52 is fixed inside the shell 51 in the telescopic direction of the shell 51 .

[0025] The first elastic telescopic rod 5 has the same structure as the second elastic telescopic rod 6. When the bridge column 1 sinks, the first elastic telescopic rod 5 and / or the second elastic telescopic rod 6 will be deformed. After the deformation occurs, the spring 52 will drive the outer shell 51 to reset under the action of elastic force, and then the first elastic telescopic rod 5 will drive the underground part of the bridge column 1 to reset through the first support plate 2 and the second support plate 3; and the second elastic telescopic rod 6 will drive the above-ground part of the bridge column 1 to reset through the second support plate 3 and the third support plate 4.

[0026] Furthermore, a pile nail 8 is fixed to the bottom of the first support plate 2 .

[0027] The pile nails 8 reinforce the first support plate 2 to further improve the stability of the bridge column 1 .

[0028] The method of using the utility model is:

[0029] The utility model uses a first elastic telescopic rod 5 to connect the first support plate 2 underground and the second support plate 3 on the ground, and uses a second elastic telescopic rod 6 to connect the second support plate 3 on the ground and the third support plate 4 in the middle of the bridge column 1. Through this structure, the various parts of the bridge column 1 are connected to form a whole, which jointly resists the occurrence of settlement and improves the overall anti-settlement ability. When the bridge column 1 settles, the first elastic telescopic rod 5 and / or the second elastic telescopic rod 6 will deform. After the deformation occurs, the spring 52 will drive the shell 51 to reset under the action of elastic force, and then the first elastic telescopic rod 5 drives the underground part of the bridge column 1 to reset through the first support plate 2 and the second support plate 3; and the second elastic telescopic rod 6 drives the above-ground part of the bridge column 1 to reset through the second support plate 3 and the third support plate 4.

[0030] The above are only embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A bridge anti-settlement structure, characterized in that: The invention comprises a bridge column (1), a support plate and a telescopic rod, wherein the bottom of the bridge column (1) is fixed in a soil layer (7), a first support plate (2) is arranged in the soil layer (7) and is fixed to the outer periphery of the bridge column (1); a second support plate (3) is arranged on the soil layer (7), the second support plate (3) is fixed to the outer periphery of the bridge column (1), and the bottom of the second support plate (3) is fixed to the surface of the soil layer (7); a first elastic telescopic rod (5) is arranged in the soil layer (7), the bottom of the first elastic telescopic rod (5) is fixed to the top of the first support plate (2), and the top of the first elastic telescopic rod (5) is fixed to the second support plate (3). The bottoms of the support plates (3) are fixed; the third support plate (4) is arranged in the middle of the bridge column (1), and the third support plate (4) is frictionally connected to at least two bridge columns (1); a plurality of second elastic telescopic rods (6) are obliquely arranged between the second support plate (3) and the third support plate (4), and every two second elastic telescopic rods (6) form a connection assembly, the tops of the two second elastic telescopic rods (6) are connected to the bottom of the third support plate (4) through a hinge (61), and the bottoms of the two second elastic telescopic rods (6) are respectively connected to the top of a second support plate (3) through a hinge (61).

2. The anti-settling structure for a bridge according to claim 1, characterized in that: A cement column (11) is fixed to the bottom of the bridge column (1), and the bottom of the first support plate (2) is fixed to the top of the cement column (11).

3. The anti-settling structure for a bridge according to claim 1, characterized in that: The first elastic telescopic rod (5) comprises a shell (51) and at least one spring (52), wherein the spring (52) is fixed inside the shell (51) in the telescopic direction of the shell (51).

4. The anti-settling structure for a bridge according to claim 1, characterized in that: A pile nail (8) is fixed to the bottom of the first support plate (2).

Citation Information

Patent Citations

  • Anti-settlement device for highway bridge pile foundation

    CN219060104U