Road drainage structure

By designing multiple sewer wells on municipal roads to connect to the sewer and setting up drainage structures with mesh frames and leak holes in the sewer wells, the problem of untimely rainwater seepage in the existing technology is solved, the drainage speed and efficiency are improved, and Effectively filter debris to ensure smooth sewer channels.

CN222456321UActive Publication Date: 2025-02-11WUHAN MUNICIPAL ENG MECHANIZED CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421236303.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2025-02-11
Estimated Expiration
2034-06-03

AI Technical Summary

Technical Problem

In the existing municipal road drainage structure, the number of drainage pipes buried in the filter layer of the permeable roadbed is limited, resulting in untimely rainwater seepage, resulting in high moisture content on the road surface, affecting subsequent rainwater seepage.

Method used

Design a road drainage structure, including burying curbs between the driving lane and the sidewalk, setting up sewer wells at equal intervals along the length of the driving lane and the sidewalk, the sewer wells are connected to the sewer, and the drainage connection between the two is achieved through the connecting wells. , and set up mesh frames and leak holes in the sewer well for filtering.

Benefits of technology

By increasing the number of sewage wells, the drainage speed of rainwater is improved, ensuring that rainwater can be discharged in time, reducing the moisture content of the road surface, improving the seepage effect of subsequent rainwater, and effectively filtering debris and reducing blockage through the design of mesh frames and leaking holes. risk.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222456321U_ABST
    Figure CN222456321U_ABST
Patent Text Reader

Abstract

The utility model relates to a road drainage structure which comprises a carriageway, a sidewalk and curbstone pre-buried between the carriageway and the sidewalk, a plurality of carriageway sewer wells are arranged at the position, close to the sidewalk, of the carriageway in the length direction of the sidewalk at equal intervals, and a sewer is built under the carriageway sewer wells in the carriageway. The traffic lane sewer well is communicated with the sewer, a plurality of sidewalk sewer wells are arranged at the positions, close to the traffic lane, of the sidewalk at equal intervals in the length direction of the sidewalk, the sidewalk sewer wells are communicated with the sewer through communicating wells, road surface well lids are arranged in well mouths of the traffic lane sewer well and the sidewalk sewer wells, and grating openings are formed in the road surface well lids. The drainage structure has the advantages that the drainage wells are additionally arranged on the sidewalk, drainage is conducted at the two positions of the sidewalk and the roadway at the same time, the number of the drainage wells is increased, the drainage speed is increased, the two drainage wells share one sewer, and construction is easy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of drainage, in particular to a road drainage structure. Background Art

[0002] There are three types of drainage methods for municipal roads: open, concealed and mixed. The open type is composed of street gutters, side ditches, drainage ditches, etc., which are open ditches or open channels; the concealed type uses concealed pipes for drainage, including street gutters, rainwater outlets, connecting pipes, trunk and branch pipes, various inspection wells and outlets; the mixed type is a combination of open and concealed drainage methods.

[0003] The National Patent Network has published a municipal road drainage structure with authorization number CN214613408U. "The pavement structure of the municipal road includes a surface layer, a permeable roadbed, a filter layer and a roadbed from top to bottom. The filter layer is buried with multiple drainage pipes connecting the permeable roadbed and the drainage ditch." This method uses the permeable roadbed to infiltrate rainwater on the road surface and discharge it into the drainage ditch through the drainage pipe. The rainwater infiltration is comprehensive, but the number of drainage pipes is limited. When the infiltrated rainwater cannot be discharged in time, it will accumulate in the road surface, making the water content of the road surface higher, affecting the subsequent infiltration of rainwater. Utility Model Content

[0004] The technical problem to be solved by the utility model is to provide a road drainage structure to overcome the deficiencies in the above-mentioned prior art.

[0005] The utility model solves the above-mentioned technical problem with the following technical solution: a road drainage structure, comprising: a carriageway, a sidewalk and a curbstone pre-buried between the carriageway and the sidewalk, a plurality of carriageway drainage wells are arranged at equal intervals along the length direction of the carriageway near the sidewalk, a sewer is built in the carriageway just below the carriageway drainage well, the carriageway drainage well is connected with the sewer, a plurality of sidewalk drainage wells are arranged at equal intervals along the length direction of the sidewalk near the carriageway, the sidewalk drainage well is connected with the sewer through a connecting well, and pavement manhole covers are arranged in the wellheads of the carriageway drainage well and the sidewalk drainage well, and the pavement manhole covers have grille openings.

[0006] On the basis of the above technical solution, the present invention can also be improved as follows.

[0007] Preferably, the sidewalk sewer is higher than the sewer.

[0008] Preferably, the connecting well is inclined obliquely downward from the sidewalk sewer well toward the sewer.

[0009] Preferably, the sidewalk is higher than the carriageway, and the curbstone is higher than the sidewalk.

[0010] Preferably, the curbstone is 5-10 cm above the sidewalk.

[0011] Preferably, a well frame is provided in the carriageway sewer well and the sidewalk sewer well, embedded parts are installed on the outer wall of the well frame, the embedded parts extend to the corresponding position of the carriageway or sidewalk and are fixed, a joist is installed at the bottom of the well frame, a net frame is provided in the well frame above the joist, a handle is installed on the net frame, and drainage holes are evenly opened at the bottom of the net frame.

[0012] Preferably, the carriageway is arranged in a slope direction with a higher middle and lower sides, and the sidewalk is arranged in a slope direction toward the carriageway.

[0013] The beneficial effects of the utility model are:

[0014] 1. This drainage structure adds a sewer well at the sidewalk position, and drains water from both the sidewalk and the roadway at the same time, which increases the number of sewer wells and improves the drainage speed. In addition, the two sewer wells share one sewer, which is simple to construct.

[0015] 2. The drainage structure adds a mesh frame in the sewer for additional filtration, and cooperates with the road manhole cover to block and filter the road debris, thus reducing the debris from entering the sewer;

[0016] 3. The drainage structure adopts a downward placement of the mesh frame. When cleaning the internal debris, remove the pavement manhole cover, then lift the mesh frame to dump the internal debris, which is quick and convenient to clean. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a structural diagram of Embodiment 1 of the present utility model;

[0018] Figure 2 It is a partial enlarged view of the utility model;

[0019] Figure 3 This is a schematic diagram of the installation of the net frame in the utility model;

[0020] Figure 4 It is a bottom view of the well frame in the utility model;

[0021] Figure 5 This is a structural diagram of Embodiment 2 of the present utility model;

[0022] Figure 6 It is a cross-sectional view of the second embodiment of the present utility model;

[0023] Figure 7 It is a schematic diagram of the installation of the sidewalk bricks in the utility model.

[0024] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0025] In the figure: 1. Driving lane; 2. Sidewalk; 3. Sewer; 4. Driving lane sewer; 5. Sidewalk sewer; 6. Connecting well; 7. Road manhole cover; 8. Manhole frame; 9. Mesh frame; 10. Curbstone; 11. Grille opening; 12. Leakage hole; 13. Handle; 14. Embedded parts; 15. Support beam; 16. Green belt; 17. Non-motorized vehicle lane; 18. Non-motorized vehicle lane sewer; 19. Sidewalk brick; 20. Edge notch. DETAILED DESCRIPTION

[0026] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0027] Example 1

[0028] like Figure 1 to Figure 4 As shown, a road drainage structure includes: a lane 1 and a sidewalk 2. The dividing line between the lane 1 and the sidewalk 2 in the attached figure is for the convenience of understanding the division between the lane 1 and the sidewalk 2, and does not mean that the lane 1 and the sidewalk 2 are independent. In actual construction, the lane 1 and the sidewalk 2 are constructed as a whole. At the same time, the lane 1 is set with a slope that is high in the middle and low on both sides, and the sidewalk 2 is also set with a slope toward the lane 1. The sidewalk 2 is higher than the lane 1, and a curbstone 10 is pre-buried at the connection between the sidewalk 2 and the lane 1;

[0029] A plurality of carriageway sewers 4 are provided at equal intervals along the length direction of the carriageway 1 on both sides near the sidewalk 2. A sewer 3 is built in the carriageway 1 directly below the carriageway sewer 4, and the carriageway sewer 4 is connected with the sewer 3. A plurality of sidewalk sewers 5 are provided at equal intervals along the length direction of the sidewalk 2 near the carriageway 1. The sidewalk sewer 5 is connected with the sewer 3 through a built connecting well 6. The connecting well 6 is inclined with one end of the sidewalk sewer 5 being higher than the sewer 3 and the other end being lower. Roadway sewers 4 and sidewalk sewers 5 are both provided with road manhole covers 7 at their wellheads, and grille openings 11 are provided on the road manhole covers 7.

[0030] When it rains, rainwater at the position of the driving lane 1 will first gather to both sides, and then flow into the sewer 3 through the driving lane sewer well 4. Rainwater at the position of the sidewalk 2 will first gather to the position of the curb 10, and then flow into the connecting well 6 through the sidewalk sewer well 5, and finally flow into the sewer 3 for unified drainage. Rainwater at the position of the sidewalk 2 will first be discharged through all its own sewer wells. When the rainfall is heavy or the drainage is not timely, the rainwater will flow over the curb 10 to the driving lane 1, and then be discharged through the driving lane sewer well 4, forming a double drainage structure of the driving lane 1 and the sidewalk 2. Overall, the number of sewer wells is increased and the drainage speed of rainwater is improved.

[0031] In this embodiment, the curbstone 10 is higher than the sidewalk 2 by 5-10 cm.

[0032] The curbstone 10 is set higher than the sidewalk 2, so that the rainfall at the sidewalk 2 can be accumulated, so that it can be discharged from the sidewalk sewer 5 as much as possible, delaying the spread to the lane 1, and sharing the drainage pressure of the lane sewer 4, while also reducing the amount of water on the lane 1.

[0033] In this embodiment, a well frame 8 is provided in the carriageway sewer well 4 and the sidewalk sewer well 5. An embedded part 14 is welded and installed on the outer wall of the well frame 8. The embedded part 14 extends to the corresponding position of the carriageway 1 and the sidewalk 2 to be fixed. A support beam 15 is welded and installed at the bottom of the well frame 8. A mesh frame 9 is provided in the well frame 8 above the support beam 15. A handle 13 is welded and installed on the mesh frame 9. Leakage holes 12 are evenly arranged at the bottom of the mesh frame 9, and the diameter of the leakage holes 12 is 3 cm ± 1 cm.

[0034] During rain drainage, the grille opening 11 can first block some larger debris such as branches, discarded packaging bags, etc., and secondly, it can further block smaller debris such as leaves together with the leakage holes 12 on the mesh frame 9, thereby comprehensively achieving the debris filtering effect, reducing the probability of debris entering the sewer 3 and causing blockage, and ensuring the smooth flow of the sewer 3;

[0035] When the grille opening 11 or the water leakage hole 12 is blocked, the debris in the grille opening 11 can be directly cleared away, or the road surface manhole cover 7 can be removed first, the mesh frame 9 can be lifted out from the handle 13, the internal debris can be cleared out at once and then put back in, and the blocked debris can be cleaned quickly. When there is a heavy rainstorm or a short thunderstorm, the mesh frame 9 can be directly taken out and the road surface manhole cover 7 can be retained. This can increase the drainage speed. At the same time, the manhole opening is always protected by the manhole cover, and pedestrians and vehicles are not easy to fall into the well and get injured.

[0036] Example 2

[0037] like Figure 5 to Figure 7 As shown, the difference between this embodiment and embodiment 1 is that a green belt 16 and a non-motorized vehicle lane 17 are added, and the road manhole cover 7, manhole frame 8 and net frame 9 at the sidewalk 2 are moved to the non-motorized vehicle lane 17;

[0038] The road includes a carriageway 1, a sidewalk 2, a green belt 16 and a non-motorized vehicle lane 17, wherein the carriageway 1, the green belt 16, the non-motorized vehicle lane 17 and the sidewalk 2 are arranged in sequence, a non-motorized vehicle lane sewer 18 is built in the non-motorized vehicle lane 17, a plurality of non-motorized vehicle sewer wells 21 are built on the non-motorized vehicle lane 17 opposite to the non-motorized vehicle lane sewer 18, and a road surface manhole cover 7, a well frame 8 and a mesh frame 9 are also arranged at the position of the non-motorized vehicle sewer well 21;

[0039] The sidewalk 2 is paved with sidewalk bricks 19, the length and width of the top surface of the sidewalk bricks 19 are larger than the length and width of the bottom surface, and the sidewalk bricks 19 are evenly spaced with side notches 20 on the four sides. The sidewalk sewer 5 is built on the sidewalk 2 near the non-motorized vehicle lane 18. The sidewalk sewer 5 is arranged in a long groove shape, and the bottom of the sidewalk sewer 5 is connected to the non-motorized vehicle lane sewer 18 through a connecting well 6.

[0040] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A road drainage structure, comprising: A carriageway (1), a sidewalk (2) and a curbstone (10) pre-buried between the carriageway (1) and the sidewalk (2), characterized in that a plurality of carriageway sewers (4) are provided at equal intervals along the length direction of the carriageway (1) near the sidewalk (2), a sewer (3) is built in the carriageway (1) directly below the carriageway sewers (4), the carriageway sewers (4) are connected to the sewer (3), a plurality of sidewalk sewers (5) are provided at equal intervals along the length direction of the sidewalk (2) near the carriageway (1), the sidewalk sewers (5) are connected to the sewer (3) via a connecting well (6), and roadway sewers (4) and sidewalk sewers (5) are both provided with roadway covers (7) at their wellheads, the roadway sewers (4) and sidewalk sewers (5), and the roadway covers (7) have grille openings (11).

2. A road drainage structure according to claim 1, characterized in that: The sidewalk sewer well (5) is higher than the sewer (3).

3. A road drainage structure according to claim 2, characterized in that: The connecting well (6) is inclined obliquely downward from the sidewalk sewer well (5) toward the sewer (3).

4. A road drainage structure according to claim 1, characterized in that: The sidewalk (2) is higher than the carriageway (1), and the curbstone (10) is higher than the sidewalk (2).

5. A road drainage structure according to claim 4, characterized in that: The curbstone (10) is 5-10 cm higher than the sidewalk (2).

6. A road drainage structure according to claim 1, characterized in that: The roadway sewer well (4) and the sidewalk sewer well (5) are both provided with a well frame (8), the outer wall of the well frame (8) is provided with an embedded part (14), the embedded part (14) extends to the corresponding position of the roadway (1) or the sidewalk (2) and is fixed, a support beam (15) is installed at the bottom of the well frame (8), a net frame (9) is provided in the well frame (8) above the support beam (15), a handle (13) is installed on the net frame (9), and water leakage holes (12) are evenly opened at the bottom of the net frame (9).

7. A road drainage structure according to claim 1, characterized in that: The carriageway (1) is arranged in a sloping direction with a high middle and low sides, and the sidewalk (2) is arranged in a sloping direction towards the carriageway (1).