Isolation sand paving auxiliary part and isolation sand paving assembly
By designing an isolation sand laying auxiliary component including a positioning part, through holes and collection part, the problem of difficulty in flattening and easy dropping during the isolation sand laying process is solved, and the rapid flattening and effective collection of isolation sand is achieved.
Patent Information
- Application Number
- CN202421069274.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-15
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2034-05-15
AI Technical Summary
During the laying of isolation sand, it is difficult to keep the upper surface of isolation sand parallel to the horizontal plane, and at the same time, isolation sand is prone to falling into the equipment, resulting in difficulty in cleaning.
An isolation sand laying auxiliary member is provided, including a positioning part, a through hole and a collection part, which is in contact with the crucible tray through the positioning part, which is used to lay isolation sand, and a collection part is used to collect the dropped isolation sand.
The rapid laying of isolated sand is achieved, ensuring that its upper surface is parallel to the horizontal plane, and avoiding the isolation sand falling into the interior of the equipment, simplifying the cleaning process.
Smart Images

Figure CN222476829U_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to the technical field of isolation sand paving, and in particular, to an isolation sand paving auxiliary part and an isolation sand paving assembly. Background Art
[0002] At present, the mainstream methods for growing sapphire single crystals in the world are as follows: guided mold method, pulling method, heat exchange method and kilosynthesis method. The kilosynthesis method is conducive to growing large-size, low-defect-density, high-quality sapphire single crystals, so it has greater advantages. In the actual use of the equipment, the crucible tray and the crucible are easily connected together after high-temperature firing, so a layer of isolation sand (such as zirconium oxide sand) needs to be laid between the crucible and the crucible tray to prevent the crucible and the crucible tray from being connected together. However, in the process of laying the isolation sand, the isolation sand is usually scraped flat by manual means, and it is difficult to keep the upper surface of the isolation sand level with the crucible tray, that is, the upper surface of the isolation sand is parallel to the horizontal plane, and the isolation sand is also easy to fall into the equipment during the scraping process, which is very troublesome to clean. Utility Model Content
[0003] The purpose of the present disclosure is to provide an isolation sand paving auxiliary part and an isolation sand paving assembly to solve the technical problems existing in the related art.
[0004] In order to achieve the above-mentioned purpose, the present disclosure provides, on one hand, an auxiliary part for leveling isolation sand, which is used to cooperate with a scraper to level the isolation sand on the crucible tray of a sapphire single crystal furnace, and includes a positioning part, a through hole and a collecting part; the positioning part is used to be placed on the crucible tray, the positioning part has a first surface and a second surface opposite to each other in a vertical direction, the first surface and the second surface are both planes parallel to a horizontal plane, and the second surface is used to contact the top surface of the crucible tray; the through hole is formed on the positioning part and penetrates the first surface and the second surface in a vertical direction, the aperture of the through hole is set to be smaller than the diameter of the crucible tray, the through hole is used for the isolation sand to pass through, so that the isolation sand can be laid on the top surface of the crucible tray, and the first surface is used to contact the scraper during the process of the scraper leveling the isolation sand; the collecting part is connected to the positioning part and has a collecting groove, the collecting groove is located outside the through hole and is configured to be able to collect the isolation sand that falls during the process of the scraper leveling the isolation sand.
[0005] Optionally, the isolation sand leveling auxiliary component also includes a convex portion, which protrudes from the second surface in a direction away from the first surface, and the convex portion and the second surface together define a receiving groove for accommodating at least a portion of the crucible tray, and the convex portion is used to abut against the outer peripheral surface of the crucible tray.
[0006] Optionally, the convex portion is a side wall of the collecting portion close to the positioning portion.
[0007] Optionally, the convex portion is a bump formed on the second surface, and the collecting portion is located on a side of the bump away from the through hole.
[0008] Optionally, an end surface of the collecting portion close to the first surface is flush with the first surface, and a notch of the collecting groove is flush with the first surface.
[0009] Optionally, the collecting portion surrounds the positioning portion, and the collecting groove is formed as an annular groove surrounding the through hole.
[0010] Optionally, the through hole is formed as a circular hole, and the collecting groove is formed as an annular groove.
[0011] Optionally, the groove wall of the collecting groove close to the through hole is formed as an inclined groove wall, and the distance between one end of the inclined groove wall close to the first surface and the axis of the through hole is smaller than the distance between one end of the inclined groove wall away from the first surface and the axis of the through hole.
[0012] Optionally, the auxiliary component is manufactured in one piece.
[0013] The present disclosure provides, in another aspect, an isolation sand leveling assembly for leveling isolation sand on a crucible tray of a sapphire single crystal furnace, comprising a scraper and the above-mentioned isolation sand leveling auxiliary component.
[0014] Through the above technical solution, when it is necessary to lay isolation sand on the crucible tray, the second surface of the positioning part of the isolation sand paving auxiliary piece can be placed on the top surface of the crucible tray so that the second surface is parallel to the top surface of the crucible tray, and the isolation sand is poured into the through hole to lay the isolation sand on the top surface of the crucible tray. After the isolation sand accumulates and overflows the through hole, the isolation sand is scraped flat by a scraper. In the process of scraping the isolation sand flat, the scraper contacts the first surface of the positioning part, and the first surface plays a positioning role in the movement of the scraper to ensure that the upper surface of the isolation sand can be flush with the first surface of the positioning part, that is, parallel to the horizontal plane, so as to achieve the effect of quickly paving the isolation sand. In the process of scraping the isolation sand flat, the excess isolation sand is scraped by the scraper to the collection part for collection, so as to prevent the isolation sand from falling into the equipment. After the isolation sand is leveled, the isolation sand paving auxiliary piece can be moved away in the vertical upward direction, so that the operation of laying the isolation sand on the crucible tray can be completed.
[0015] Other features and advantages of the present disclosure will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The accompanying drawings are used to provide a further understanding of the present disclosure and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present disclosure but do not constitute a limitation of the present disclosure. In the accompanying drawings:
[0017] Figure 1 is a schematic diagram of a three-dimensional structure of an isolation sand paving auxiliary component provided by an exemplary embodiment of the present disclosure;
[0018] Figure 2 is a three-dimensional structural schematic diagram of an isolation sand paving auxiliary member provided by an exemplary embodiment of the present disclosure (with Figure 1 different perspectives);
[0019] Figure 3 is a schematic cross-sectional structure diagram of an isolation sand paving auxiliary component provided by an exemplary embodiment of the present disclosure;
[0020] Figure 4 yes Figure 3 An enlarged schematic diagram of an exemplary embodiment at A;
[0021] Figure 5 yes Figure 3 A is an enlarged schematic diagram of another exemplary embodiment;
[0022] Figure 6 is a schematic diagram of the use process of the isolation sand paving assembly provided by an exemplary embodiment of the present disclosure;
[0023] Figure 7 yes Figure 6 Schematic diagram of the cross-sectional structure.
[0024] Description of Reference Numerals
[0025] 100-Isolation sand leveling auxiliary parts; 200-Scraper; 300-Crucible tray; 400-Isolation sand;
[0026] 110 - positioning portion; 111 - first surface; 112 - second surface; 120 - through hole; 130 - collecting portion; 131 - collecting groove; 132 - inclined groove wall; 140 - convex portion; 141 - receiving groove. DETAILED DESCRIPTION
[0027] The specific implementation of the present disclosure is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described herein is only used to illustrate and explain the present disclosure, and is not used to limit the present disclosure.
[0028] In the description of the present disclosure, it should be understood that the terms "upper", "lower", "top", and "bottom" are usually defined by the "upper", "lower", "top", and "bottom" of the crucible tray 300 in a normal use state. In addition, the terms "inside and outside" refer to the inside and outside of the corresponding structural contours. In addition, the terms "first", "second", etc. are only used to distinguish one element from another element, and do not have order and importance.
[0029] In the description of the present disclosure, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "connect", "connected", and "installed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present disclosure can be understood according to specific circumstances.
[0030] In order to solve the defects that the existing isolation sand 400 laid on the crucible tray 300 is difficult to lay flat and easy to fall into the inside of the equipment, the present disclosure provides an isolation sand laying auxiliary part 100 on one hand, which is used to cooperate with the scraper 200 to lay the isolation sand 400 flat on the crucible tray 300 of the sapphire single crystal furnace.
[0031] like Figures 1 to 7 As shown, the isolation sand leveling auxiliary member 100 includes a positioning portion 110, a through hole 120, and a collecting portion 130. The positioning portion 110 is used to be placed on the crucible tray 300. The positioning portion 110 has a first surface 111 and a second surface 112 opposite to each other in the vertical direction. The first surface 111 and the second surface 112 are both planes parallel to the horizontal plane. The second surface 112 is used to contact the top surface of the crucible tray 300. The through hole 120 is formed on the positioning portion 110 and penetrates the first surface 111 and the second surface 112 in the vertical direction. The aperture of the through hole 120 is set to be smaller than the diameter of the crucible tray 300. The through hole 120 is used to allow the isolation sand 400 to pass through so that the isolation sand 400 can be laid on the top surface of the crucible tray 300. The first surface 111 is used to contact the scraper 200 when the scraper 200 is scraping the isolation sand 400. The collecting portion 130 is connected to the positioning portion 110 and has a collecting groove 131 . The collecting groove 131 is located outside the through hole 120 and is configured to collect the fallen isolation sand 400 when the scraper 200 scrapes the isolation sand 400 .
[0032] Through the above technical solution, when it is necessary to lay isolation sand 400 on the crucible tray 300, the second surface 112 of the positioning portion 110 of the isolation sand leveling auxiliary component 100 can be placed on the top surface of the crucible tray 300 so that the second surface 112 is parallel to the top surface of the crucible tray 300, and the isolation sand 400 is poured into the through hole 120 to lay the isolation sand 400 on the top surface of the crucible tray 300. After the isolation sand 400 is accumulated to overflow the through hole 120, the isolation sand 400 is leveled by the scraper 200. In the process of the scraper 200 leveling the isolation sand 400, the scraper 200 contacts the first surface 111 of the positioning portion 110, and the first surface 111 plays a positioning role in the movement of the scraper 200 to ensure that the upper surface of the isolation sand 400 can be flush with the first surface 111 of the positioning portion 110, that is, parallel to the horizontal plane, thereby achieving the effect of quickly leveling the isolation sand 400. When the scraper 200 is used to scrape the isolation sand 400, the excess isolation sand 400 is scraped by the scraper 200 to the collecting portion 130 for collection, thereby preventing the isolation sand 400 from falling into the device. After the isolation sand 400 is leveled, the isolation sand leveling auxiliary member 100 can be moved vertically upward to complete the operation of laying the isolation sand 400 on the crucible tray 300.
[0033] In addition, since the aperture of the through hole 120 is smaller than the diameter of the crucible tray 300, when in use, one end of the through hole 120 can be covered by the top surface of the crucible tray 300, so that the isolation sand 400 poured from the through hole 120 will not fall from the through hole 120 to the bottom of the crucible tray 300.
[0034] Since the isolation sand 400 is used to prevent the crucible from sticking to the crucible tray 300, the isolation sand 400 can be isolation sand that can withstand a temperature of 2200° C., that is, the melting point of the isolation sand is higher than 2200° C., such as isolation sand 400 made of particles of non-metallic material. Optionally, the isolation sand 400 can be zirconia sand made of zirconium oxide.
[0035] like Figures 2 to 4 As shown, in some optional embodiments, the isolation sand leveling auxiliary component 100 also includes a protrusion 140, which protrudes from the second surface 112 in a direction away from the first surface 111, and the protrusion 140 and the second surface 112 together define a receiving groove 141 for accommodating at least a portion of the crucible tray 300, and the protrusion 140 is used to abut against the outer peripheral surface of the crucible tray 300.
[0036] The convex portion 140 and the second surface 112 are provided to jointly define a receiving groove 141, so that after the receiving groove 141 abuts against the outer peripheral surface of the crucible tray 300, the isolation sand leveling auxiliary component 100 can be fixed on the crucible tray 300 and the horizontal movement of the isolation sand leveling auxiliary component 100 is restricted, thereby limiting the position of the through hole 120 to be consistent, and further making the position of the laid isolation sand 400 consistent.
[0037] It should be noted that the protrusion 140 may be composed of one or more components, as long as the protrusion 140 and the second surface 112 can define a receiving groove 141 , and the present disclosure does not make any specific limitation on this.
[0038] In some optional embodiments, after the isolation sand leveling auxiliary component 100 is fixedly installed on the crucible tray 300 through the receiving groove 141, the through hole 120 is colinear with the axis of the crucible tray 300, that is, the through hole 120 is located exactly at the center of the crucible tray 300, so that the laid isolation sand 400 can also be located at the center of the crucible tray 300.
[0039] In some optional embodiments, the convex portion 140 may be a side wall of the collecting portion 130 close to the positioning portion 110. The convex portion 140 is set as a side wall of the collecting portion 130 close to the positioning portion 110, so that the convex portion 140 can constitute both the side wall of the receiving groove 141 and the side wall of the collecting portion 130, playing a dual-purpose role, making the structure of the isolation sand paving auxiliary component 100 more compact.
[0040] In some optional embodiments, the convex portion 140 may be a bump formed on the second surface 112, and the collecting portion 130 is located on the side of the bump away from the through hole 120. This arrangement enables the collecting groove 131 of the collecting portion 130 to have a greater depth and volume to collect more isolation sand 400.
[0041] In some optional embodiments, the end surface of the collecting portion 130 close to the first surface 111 is flush with the first surface 111, and the notch of the collecting groove 131 is flush with the first surface 111. In this way, when the scraper 200 is used to scrape off the excess isolation sand 400, the isolation sand 400 can be easily scraped into the collecting groove 131 without being interfered by the collecting portion 130.
[0042] like Figure 1 As shown, in some optional embodiments, the collecting portion 130 surrounds the positioning portion 110, and the collecting groove 131 is formed as an annular groove surrounding the through hole 120. The collecting groove 131 is set as an annular groove, so that the isolation sand 400 can be collected when the scraper 200 scrapes off the excess isolation sand 400 from any direction, thereby improving the convenience of using the isolation sand paving auxiliary component 100.
[0043] In some optional embodiments, the through hole 120 is formed as a circular hole, and the collecting groove 131 is formed as an annular groove.
[0044] Of course, in some other embodiments, the collecting groove 131 may also be a square annular groove or an annular groove of other shapes, and the present disclosure does not make any specific limitation on this.
[0045] like Figure 5 As shown, in some optional embodiments, the groove wall of the collecting groove 131 close to the through hole 120 is formed as an inclined groove wall 132, and the distance between the end of the inclined groove wall 132 close to the first surface 111 and the axis of the through hole 120 is smaller than the distance between the end of the inclined groove wall 132 away from the first surface 111 and the axis of the through hole 120. In this way, the opening of the collecting groove 131 can be closer to the through hole 120, so that the scraped isolation sand 400 can fall into the collecting groove 131 faster.
[0046] In some optional embodiments, the isolation sand leveling auxiliary component 100 is manufactured in one piece, so that the isolation sand leveling auxiliary component 100 can be easily manufactured and formed into an integral structure, which has higher strength and is easy to carry.
[0047] Based on the above-mentioned isolation sand leveling auxiliary component 100, the present disclosure provides an isolation sand leveling component in another aspect, which is used to level the isolation sand 400 on the crucible tray 300 of the sapphire single crystal furnace, and the isolation sand leveling component includes a scraper 200 and the above-mentioned isolation sand leveling auxiliary component 100. By scraping the scraper 200 on the first surface 111 of the isolation sand leveling auxiliary component 100, the excess isolation sand 400 can be scraped off, and the isolation sand 400 can achieve a leveling effect.
[0048] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.
[0049] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.
[0050] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.
Claims
1. An isolation sand leveling auxiliary part, used to cooperate with a scraper to level the isolation sand on the crucible tray of a sapphire single crystal furnace, characterized in that: include: A positioning portion, used to be placed on the crucible tray, the positioning portion having a first surface and a second surface opposite to each other in a vertical direction, the first surface and the second surface are both planes parallel to a horizontal plane, and the second surface is used to contact with a top surface of the crucible tray; a through hole formed on the positioning portion and penetrating the first surface and the second surface in a vertical direction, wherein the aperture of the through hole is set to be smaller than the diameter of the crucible tray, the through hole is used for allowing the isolation sand to pass through so that the isolation sand can be laid on the top surface of the crucible tray, and the first surface is used for contacting the scraper when the scraper is used to flatten the isolation sand; The collecting part is connected to the positioning part and has a collecting groove. The collecting groove is located outside the through hole and is configured to collect the fallen isolation sand when the scraper flattens the isolation sand.
2. The isolation sand paving auxiliary component according to claim 1, characterized in that: The isolation sand leveling auxiliary component also includes a convex portion, which protrudes from the second surface in a direction away from the first surface. The convex portion and the second surface together define a receiving groove for accommodating at least a portion of the crucible tray, and the convex portion is used to abut against the outer peripheral surface of the crucible tray.
3. The isolation sand paving auxiliary component according to claim 2, characterized in that: The convex portion is a side wall of the collecting portion close to the positioning portion.
4. The isolation sand paving auxiliary component according to claim 2, characterized in that: The convex portion is a bump formed on the second surface, and the collecting portion is located at a side of the bump away from the through hole.
5. The isolation sand paving auxiliary component according to claim 1, characterized in that: The end surface of the collecting portion close to the first surface is flush with the first surface, and the notch of the collecting groove is flush with the first surface.
6. The isolation sand paving auxiliary component according to any one of claims 1 to 5, characterized in that: The collecting portion surrounds the positioning portion, and the collecting groove is formed as an annular groove surrounding the through hole.
7. The isolation sand paving auxiliary component according to claim 6, characterized in that: The through hole is formed as a circular hole, and the collecting groove is formed as an annular groove.
8. The isolation sand paving auxiliary component according to any one of claims 1 to 5, characterized in that: The groove wall of the collecting groove close to the through hole is formed as an inclined groove wall, and the distance between one end of the inclined groove wall close to the first surface and the axis of the through hole is smaller than the distance between one end of the inclined groove wall away from the first surface and the axis of the through hole.
9. The isolation sand paving auxiliary component according to any one of claims 1 to 5, characterized in that: The isolation sand leveling auxiliary component is manufactured by integral molding.
10. An isolation sand leveling assembly, used for leveling isolation sand on a crucible tray of a sapphire single crystal furnace, characterized in that: The utility model comprises a scraper and the isolation sand leveling auxiliary member according to any one of claims 1-9.