Waterproof coiled material laying device for building roof layer
By using electric push rods and adjustment boxes in the waterproof roll laying device for building roof layer to adjust the height of the grinding wheel, the problem that the existing device cannot effectively deal with local protrusions of the base layer and improves the laying quality.
Patent Information
- Application Number
- CN202421056909.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-15
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2034-05-15
AI Technical Summary
The existing building roof layer waterproofing roll laying device cannot adjust the height of the grinding wheel, resulting in the inability to effectively deal with local protrusions on the base layer, affecting the laying quality.
The telescopic movement of the electric push rod drives the lifting and lowering movement of the adjustment box, and adjusts the height of the grinding wheel.
The height of the grinding wheel is adjusted according to the local protrusion of the base layer, and the effectiveness of grinding work and laying quality are improved.
Smart Images

Figure CN222477979U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a waterproofing coiled material laying device for building roofing. Background Art
[0002] The waterproofing roll material laying device for building roof layer refers to a device that puts the waterproofing roll material on a reel, and then spreads the roll material through the guidance of rollers. While the roll material is being spread, the flame from a flamethrower is used to heat the roll material so that the roll material is adhered to the building surface.
[0003] The existing patent document CN 220704955 U discloses a waterproofing coil material laying device for building roofing, comprising a vehicle body, a free width customization component, a grinding component, a cleaning component, a baking component, an auxiliary component and a handle, wherein the free width customization component is fixedly arranged at the upper end of the vehicle body, the grinding component is arranged at the lower end of the vehicle body, and the cleaning component is arranged at the lower end of the vehicle body; this device can adapt to complex construction environments, and the grinding component cleans local protrusions on the base layer to avoid affecting the laying quality of the coil material; however, since the height of the grinding wheel cannot be adjusted, effective grinding work cannot be performed according to the specific situation of cleaning the local protrusions on the base layer. Utility Model Content
[0004] In view of the above problems, the purpose of the utility model is to provide a waterproofing roll material laying device for building roofing, which solves the problem that the height of the grinding wheel cannot be adjusted, and thus effective grinding work cannot be performed according to the specific circumstances of cleaning local protrusions on the base layer. The electric push rod performs telescopic movement, and in the process drives the adjustment box to move up and down, thereby realizing the adjustment of the height of the grinding wheel.
[0005] To achieve the above purpose, the utility model adopts the following technical solution: a waterproofing coil material laying device for building roofing layer, comprising a body component, an adjustment component, a grinding component, a cleaning component, and a laying component, wherein the body component comprises a body frame, the adjustment component comprises an electric push rod, the grinding component comprises a linkage shaft, the cleaning component comprises a connecting frame, the laying component comprises a supporting plate, the output end of the electric push rod is connected with an adjustment box, a first motor is arranged on the inner side of the adjustment box, a second partition is connected with the inner wall of the adjustment box, a rotating rod is connected with the output end of the first motor, a transmission wheel is arranged on the outer ring of the rotating rod, a driven wheel is arranged on the inner side of the adjustment box, a grinding wheel is connected with the lower end of the linkage shaft, a third motor is connected with the top of the support plate, an auxiliary roller is connected with the output end of the third motor, an end of the auxiliary roller away from the third motor is connected with a mounting seat, a laying roller is connected with the bottom of the body frame, and a spray gun is connected with the lower end of the body frame.
[0006] The beneficial effects of the utility model are as follows: when the use height of the grinding wheel needs to be adjusted, the operation of the electric push rod is started, and then the electric push rod performs telescopic movement, and in this process drives the adjustment box to move up and down, thereby realizing the adjustment of the use height of the grinding wheel; when the driven wheel rotates driven by the transmission wheel, the driven wheel rotates the linkage shaft to drive the synchronous rotation of the grinding wheel, and the grinding of the local protrusion is realized through the rotation of the grinding wheel.
[0007] For the trough through which the coiled material passes during laying:
[0008] As a further improvement of the above technical solution: the top of the vehicle body frame is connected to a handlebar, the inner side of the vehicle body frame is provided with a clearance groove, and the lower end of the vehicle body frame is connected to a universal wheel.
[0009] The beneficial effect of this improvement is that when in use, the handlebars are held and the device is moved by the universal wheels, and the groove is provided to allow the roll material to pass through the groove during the laying process.
[0010] To adjust the height of the grinding wheel:
[0011] As a further improvement of the above technical solution: the top of the electric push rod is connected to the inner wall of the installation groove, and the electric push rod is electrically connected to the operation panel.
[0012] The beneficial effect of this improvement is that when the use height of the grinding wheel needs to be adjusted, the operation of the electric push rod is started, and then the electric push rod performs telescopic movement, and in the process drives the adjustment box to move up and down, thereby achieving the adjustment of the use height of the grinding wheel.
[0013] In order to ensure the stability of the rotating rod during the rotation process:
[0014] As a further improvement of the above technical solution: the first motor is electrically connected to the operation panel, the top of the second partition is connected to the first partition, and the end of the rotating rod away from the first motor passes through the first partition and extends to be rotatably connected to the inner wall of the adjustment box.
[0015] The beneficial effect of this improvement is: after the adjustment of the height of the grinding wheel is completed, the movement of the first motor is started, the first motor works and drives the rotating rod to rotate, and the first partition is set to ensure the stability of the rotating rod during the rotation process.
[0016] In order for the transmission wheel to drive the driven wheel to rotate during the rotation process:
[0017] As a further improvement of the above technical solution: the peripheral surface of the second partition is connected to the inner wall of the adjustment box, and the driving wheel is meshed and transmission-connected with the driven wheel.
[0018] The beneficial effect of this improvement is that when the rotating rod is driven by the first motor to rotate, the rotating rod drives the transmission wheel to rotate synchronously during the rotation process, and then the transmission wheel drives the driven wheel to rotate during the rotation process.
[0019] In order to achieve the grinding work of local protrusions by rotating the grinding wheel:
[0020] As a further improvement of the above technical solution: one end of the linkage shaft away from the grinding wheel passes through the second partition plate and extends to be connected to the driven wheel, and the grinding wheel is rotatably connected to the adjustment box.
[0021] The beneficial effect of this improvement is that when the driven wheel rotates driven by the transmission wheel, the driven wheel rotates the linkage shaft to drive the grinding wheel to rotate synchronously, and the grinding work of the local protrusion is achieved through the rotation of the grinding wheel.
[0022] In order for the second motor to work and drive the cleaning brush to rotate:
[0023] As a further improvement of the above technical solution: a second motor is arranged at one end of the connecting frame, a cleaning brush is connected to the output end of the second motor, a recovery box is connected to the bottom of the vehicle body frame, the second motor is connected to the vehicle body frame through the connecting frame, the end of the cleaning brush away from the second motor is rotatably connected to the vehicle body frame, and a groove for rotating the cleaning brush is provided at the lower part of the vehicle body frame.
[0024] The beneficial effect of this improvement is that after the second motor is started, the second motor works and drives the cleaning brush to rotate, and the cleaning brush cleans the dust after grinding and the original garbage on the base layer into the recycling box for temporary storage.
[0025] To spray-bake the bottom of the coil:
[0026] As a further improvement of the above technical solution: a positioning plate is connected to the top of the vehicle body frame, one end of the positioning plate is connected to a winding roller, the laying roller is rotatably connected to the vehicle body frame through a bracket, an air box with a control valve is provided on the top of the vehicle body frame, and the spray gun is connected to the air box on the vehicle body frame.
[0027] The beneficial effects of this improvement are: when in use, the coil is placed on the winding roller, the control valve of the air box is opened, the gas is transmitted from the air box to the spray gun, the spray gun bakes the bottom of the coil, the handle is pulled to move the body frame, the coil is baked, and adhered to the base of the building. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a side structural schematic diagram of the utility model.
[0029] Figure 2It is a structural schematic diagram of the vehicle body frame of the utility model.
[0030] Figure 3 It is a schematic cross-sectional structural diagram of the regulating box of the utility model.
[0031] Figure 4 for Figure 3 Schematic diagram of the enlarged structure at point A in the middle.
[0032] Figure 5 It is a schematic diagram of the side cross-sectional structure of the vehicle body frame of the utility model.
[0033] In the figure: 1. body assembly; 11. body frame; 12. handlebar; 13. clearance groove; 14. universal wheel; 15. installation groove; 2. adjustment assembly; 21. electric push rod; 22. adjustment box; 23. first motor; 24. first partition; 25. second partition; 26. rotating rod; 27. transmission wheel; 28. driven wheel; 3. grinding assembly; 31. linkage shaft; 32. grinding wheel; 33. positioning plate; 34. reel roller; 4. cleaning assembly; 41. connecting frame; 42. second motor; 43. cleaning brush; 44. recycling box; 5. laying assembly; 51. support plate; 52. third motor; 53. auxiliary roller; 54. mounting seat; 55. laying roller; 56. spray gun. DETAILED DESCRIPTION
[0034] In order to enable those skilled in the art to better understand the technical solution of the utility model, the utility model is described in detail below in conjunction with the accompanying drawings. The description in this part is only exemplary and explanatory and should not have any limiting effect on the protection scope of the utility model.
[0035] like Figure 1-5As shown, a waterproofing coil material laying device for building roofing layer comprises a body component 1, an adjusting component 2, a grinding component 3, a cleaning component 4 and a laying component 5, wherein the body component 1 comprises a body frame 11, the adjusting component 2 comprises an electric push rod 21, the grinding component 3 comprises a linkage shaft 31, the cleaning component 4 comprises a connecting frame 41, the laying component 5 comprises a supporting plate 51, the output end of the electric push rod 21 is connected to an adjusting box 22, a first motor 23 is arranged on the inner side of the adjusting box 22, a second partition plate 25 is connected to the inner wall of the adjusting box 22, a rotating rod 26 is connected to the output end of the first motor 23, a transmission wheel 27 is arranged on the outer ring of the rotating rod 26, and a transmission wheel 27 is arranged on the outer ring of the adjusting box 22. A driven wheel 28 is arranged on the inner side, a grinding wheel 32 is connected to the lower end of the linkage shaft 31, a third motor 52 is connected to the top of the support plate 51, an auxiliary roller 53 is connected to the output end of the third motor 52, a mounting seat 54 is connected to the end of the auxiliary roller 53 away from the third motor 52, a laying roller 55 is connected to the bottom of the vehicle frame 11, a spray gun 56 is connected to the lower end of the vehicle frame 11, a handlebar 12 is connected to the top of the vehicle frame 11, a clearance groove 13 is provided on the inner side of the vehicle frame 11, and a universal wheel 14 is connected to the lower end of the vehicle frame 11; when in use, the handlebar 12 is held and the device is moved by the universal wheel 14, and the clearance groove 13 is provided for coiling the material During the laying process, the top of the electric push rod 21 is connected to the inner wall of the installation groove 15, and the electric push rod 21 is electrically connected to the operation panel; when the use height of the grinding wheel 32 needs to be adjusted, the operation of the electric push rod 21 is started, and then the electric push rod 21 performs telescopic movement, and in this process drives the lifting and moving of the adjustment box 22, thereby realizing the adjustment of the use height of the grinding wheel 32, the first motor 23 is electrically connected to the operation panel, the top of the second partition 25 is connected to the first partition 24, and the end of the rotating rod 26 away from the first motor 23 passes through the first partition 24 and extends to the inner wall of the adjustment box 22 for rotation connection; after completing the adjustment of the use height of the grinding wheel 32, start The movement of the first motor 23, the first motor 23 works and drives the rotating rod 26 to rotate. The first partition plate 24 is provided to ensure the stability of the rotating rod 26 during the rotation process. The circumference of the second partition plate 25 is connected to the inner wall of the adjustment box 22, and the transmission wheel 27 is meshed and transmission-connected with the driven wheel 28; when the rotating rod 26 rotates under the drive of the first motor 23, the rotating rod 26 drives the synchronous rotation of the transmission wheel 27 during the rotation process, and then the transmission wheel 27 drives the rotation of the driven wheel 28 during the rotation process, and the end of the linkage shaft 31 away from the grinding wheel 32 passes through the second partition plate 25 and extends to be connected to the driven wheel 28, and the grinding wheel 32 is rotationally connected to the adjustment box 22;When the driven wheel 28 rotates driven by the transmission wheel 27, the driven wheel 28 rotates the linkage shaft 31 to drive the synchronous rotation of the grinding wheel 32, and the grinding work of the local protrusion is realized by the rotation of the grinding wheel 32. A second motor 42 is provided at one end of the connecting frame 41, and a cleaning brush 43 is connected to the output end of the second motor 42. A recovery box 44 is connected to the bottom of the body frame 11. The second motor 42 is connected to the body frame 11 through the connecting frame 41, and the end of the cleaning brush 43 away from the second motor 42 is rotatably connected to the body frame 11. A slot for the cleaning brush 43 to rotate is provided at the lower part of the body frame 11. After the second motor 42 is started, the second motor 42 works and drives the cleaning brush 43 to rotate. The cleaning brush 43 rotates, and the cleaning brush 43 cleans the dust after grinding and the original garbage on the base layer into the recycling box 44 for temporary storage. The top of the vehicle frame 11 is connected with a positioning plate 33, and one end of the positioning plate 33 is connected with a reel roller 34. The laying roller 55 is rotatably connected with the vehicle frame 11 through a bracket. The top of the vehicle frame 11 is provided with an air box with a control valve, and the spray gun 56 is connected with the air box on the vehicle frame 11. When in use, the coil is placed on the reel roller 34, the control valve of the air box is opened, and the gas is transmitted from the air box to the spray gun 56, and the spray gun 56 bakes the bottom of the coil, and the handlebar 12 is pulled to move the vehicle frame 11, and the coil is baked and adhered to the base layer of the building. ;
[0036] The working principle of the utility model is as follows: when in use, the coil is sleeved on the winding roller 34, the control valve of the air box is opened, and the gas is transmitted from the air box to the spray gun 56, the spray gun 56 bakes the bottom of the coil, and the handlebar 12 is pulled to move the body frame 11, the coil is baked, and pasted on the base of the building, and the groove 13 is set for the coil to pass through during the laying process. When the use height of the grinding wheel 32 needs to be adjusted, the operation of the electric push rod 21 is started, and then the electric push rod 21 performs telescopic movement, and in this process drives the lifting and moving of the adjustment box 22, thereby realizing the adjustment of the use height of the grinding wheel 32, and the movement of the first motor 23 is started. The first motor 23 works and drives the rotating rod 26 to rotate. The first partition plate 24 is set to ensure the stability of the rotating rod 26 during the rotation process. When the rotating rod 26 is driven by the first motor 23, the electric push rod 21 is started. During rotation, the rotating rod 26 drives the synchronous rotation of the transmission wheel 27 during the rotation process, and then the transmission wheel 27 drives the rotation of the driven wheel 28 during the rotation process. When the driven wheel 28 rotates under the drive of the transmission wheel 27, the driven wheel 28 rotates the linkage shaft 31 to drive the synchronous rotation of the grinding wheel 32, and the grinding of the local protrusion is achieved through the rotation of the grinding wheel 32. After starting the operation of the second motor 42, the second motor 42 works and drives the rotation of the cleaning brush 43. The cleaning brush 43 cleans the dust after grinding and the original garbage on the base layer into the recycling box 44 for temporary storage. The spray gun 56 achieves the purpose of baking the bottom of the coil, and the relevant principles involved in this structure are publicly available prior art, and the components are all general standard parts or components known to technical personnel in this field. Its structure and principles can be known to technical personnel through technical manuals or through conventional experimental methods.
[0037] It should be noted that, in this article, the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.
[0038] This article uses specific examples to illustrate the principles and implementation methods of the utility model. The above examples are only used to help understand the method and core ideas of the utility model. The above is only the preferred implementation method of the utility model. It should be pointed out that due to the limitations of textual expression, there are objectively infinite specific structures. For ordinary technicians in this technical field, without departing from the principle of the utility model, they can make several improvements, modifications or changes, and can also combine the above technical features in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the concept and technical solution of the utility model to other occasions without improvement, should be regarded as the protection scope of the utility model.
Claims
1. A waterproofing coiled material laying device for building roofing, comprising a body assembly (1), an adjustment assembly (2), a grinding assembly (3), a cleaning assembly (4), and a laying assembly (5), wherein the body assembly (1) comprises a body frame (11), the adjustment assembly (2) comprises an electric push rod (21), the grinding assembly (3) comprises a linkage shaft (31), the cleaning assembly (4) comprises a connecting frame (41), and the laying assembly (5) comprises a support plate (51), characterized in that: The output end of the electric push rod (21) is connected to an adjustment box (22), a first motor (23) is arranged inside the adjustment box (22), a second partition (25) is connected to the inner wall of the adjustment box (22), the output end of the first motor (23) is connected to a rotating rod (26), the outer ring of the rotating rod (26) is arranged with a transmission wheel (27), a driven wheel (28) is arranged inside the adjustment box (22), the lower end of the linkage shaft (31) is connected to a grinding wheel (32), the top of the support plate (51) is connected to a third motor (52), the output end of the third motor (52) is connected to an auxiliary roller (53), and the end of the auxiliary roller (53) away from the third motor (52) is connected to a mounting seat (54), the bottom of the vehicle frame (11) is connected to a laying roller (55), and the lower end of the vehicle frame (11) is connected to a spray gun (56).
2. A device for laying waterproofing rolls for building roofing according to claim 1, characterized in that: The top of the vehicle frame (11) is connected to a handlebar (12), the inner side of the vehicle frame (11) is provided with a clearance groove (13), and the lower end of the vehicle frame (11) is connected to a universal wheel (14).
3. A device for laying waterproofing roll material for building roofing according to claim 1, characterized in that: The top of the electric push rod (21) is connected to the inner wall of the mounting groove (15), and the electric push rod (21) is electrically connected to the operation panel.
4. A device for laying waterproofing roll material for building roofing according to claim 1, characterized in that: The first motor (23) is electrically connected to the operation panel, the top of the second partition (25) is connected to the first partition (24), and the end of the rotating rod (26) away from the first motor (23) passes through the first partition (24) and extends to be rotatably connected to the inner wall of the regulating box (22).
5. The device for laying waterproofing roll material for building roofing according to claim 1, characterized in that: The peripheral surface of the second partition plate (25) is connected to the inner wall of the regulating box (22), and the driving wheel (27) is meshingly connected to the driven wheel (28).
6. The device for laying waterproofing roll material for building roofing according to claim 1, characterized in that: One end of the linkage shaft (31) away from the grinding wheel (32) passes through the second partition plate (25) and extends to be connected to the driven wheel (28), and the grinding wheel (32) is rotatably connected to the adjustment box (22).
7. A device for laying waterproofing roll material for building roofing according to claim 1, characterized in that: A second motor (42) is disposed at one end of the connecting frame (41), a cleaning brush (43) is connected to the output end of the second motor (42), a recovery box (44) is connected to the bottom of the vehicle frame (11), the second motor (42) is connected to the vehicle frame (11) via the connecting frame (41), an end of the cleaning brush (43) away from the second motor (42) is rotatably connected to the vehicle frame (11), and a groove for the cleaning brush (43) to rotate is provided at the bottom of the vehicle frame (11).
8. The device for laying waterproofing roll material for building roofing according to claim 1, characterized in that: The top of the vehicle frame (11) is connected to a positioning plate (33), one end of the positioning plate (33) is connected to a winding roller (34), the laying roller (55) is rotatably connected to the vehicle frame (11) through a bracket, an air box with a control valve is arranged on the top of the vehicle frame (11), and the spray gun (56) is connected to the air box on the vehicle frame (11).
Citation Information
Patent Citations
Waterproof coiled material laying device for building roof layer
CN220704955U