Electric power settlement management system

By designing a power settlement management system, using remote communication links to collect and upload user information, the calculation and automatic deduction of electricity bills are realized, and the problem of delayed electricity bills is solved and the efficiency of capital turnover and financial management of power enterprises is improved.

CN222484375UActive Publication Date: 2025-02-14林峰
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420323869.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2025-02-14
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

At this stage, the electricity bill recovery of electricity bills in the power system, especially corporate users, has been severely delayed, making it difficult for power companies to recover electricity bills in a timely manner, affecting capital turnover and financial status.

Method used

Design a power settlement management system, including server, communication module, meter box, power meter and information collection module, collect user side information through remote communication links, upload data to the Internet, the server calculates and deducts electricity bills, and the account amount is Power off when insufficient.

Benefits of technology

It effectively resolves the chaos of delaying electricity bills, ensures that power companies recover electricity bills in a timely manner, improves capital turnover and financial status, and at the same time realizes automatic calculation and deduction of electricity bills, improving the efficiency and accuracy of power management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222484375U_ABST
    Figure CN222484375U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of electric power management, in particular to an electric power settlement management system, which comprises a server, a first communication module, a second communication module, a meter box, an electric energy meter and an information collection module, and the electric energy meter and the information collection module are arranged in the meter box. The utility model has the advantages that the information collection module collects the power, address and account number of a user side, the first communication module uploads data, the second communication module communicates with the Internet and downloads related data, the server processes and integrates the data and stores the data in the storage module, and the data are stored in the storage module by taking a natural month as a cycle. And the server compares the previous electricity charge information, calculates the amount of electric energy and deducts the amount of electric energy from the account of the electric energy meter, and when the amount of electric energy in the account of the electric energy meter is insufficient, the information collection module controls the electric energy meter to carry out power-off operation so as to manage and control the electricity charge delay disorder, so that the problems in the prior art are effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of power management, in particular to a power settlement management system. Background Art

[0002] The whole of the power system, which consists of substations and transmission and distribution lines of various voltages, is called the power grid. It includes three units: substation, transmission, and distribution. The task of the power grid is to transmit and distribute electric energy and change the voltage. In the power system, the metering device at the user end is the electric energy meter. The recovery of electricity charges is not only the completion of the transaction, but also the main source of profit for the power company's economy. It also improves the capital turnover of the power company and improves the financial situation. In turn, the power company has enough funds to serve the power users. At present, most areas are still in the idea that users use electricity first and then pay the fee. In particular, some corporate users have high electricity consumption, and the delay in electricity fee recovery is very serious, which is not conducive to management and control. Based on this, an electricity settlement management system is proposed to solve the above problems. Utility Model Content

[0003] The purpose of the utility model is to overcome the shortcomings of the prior art and provide an electricity settlement management system, which effectively solves the deficiencies of the prior art.

[0004] In order to achieve the above-mentioned purpose, an embodiment of one aspect of the utility model provides an electricity settlement management system, including a server, a first communication module, a second communication module, a meter box, an electric energy meter and an information collection module, wherein the electric energy meter and the information collection module are arranged inside the meter box, and the outer wall of the information collection module is provided with two connecting sockets, and connecting wires are arranged inside both, one end of the two connecting wires are respectively electrically connected to the electric energy meter, the server is electrically connected to the second communication module, and the first communication module is electrically connected to the information collection module.

[0005] Preferably, any of the above schemes is that the information collection module exchanges information with the electric energy meter in both directions through a connecting line and collects relevant information on the user side. By using this scheme, a PCB board is conveniently provided inside the information collection module, and two connecting plugs are installed on the PCB board through pins. A power conversion circuit, a signal processing circuit and an information sending circuit are provided on the PCB board. At the same time, the first communication module is integrated on the PCB board. The power conversion circuit is used to provide power support for the entire information collection and information sending. An ARM processor is also integrated on the PCB board for simple packaging of the collected information and transmitting it to the first communication module, and then sending it to the external Internet through the first communication module, so as to facilitate reception by the second communication module.

[0006] Preferably, any of the above schemes is that both the first communication module and the second communication module perform two-way communication with the Internet. The first communication module and the second communication module in this scheme both adopt the G / G communication module commonly used in the prior art, which has mature technology, good compatibility and anti-interference performance, and a large transmission bandwidth, which is convenient for sending signals in a timely manner, and has the advantages of low energy consumption and fast startup. At the same time, when uploading information at the end of the month, in order to avoid the transmission of short-term big data, interval uploading can be adopted by region, time period, etc., which can avoid server jams due to excessive information on the one hand, and avoid information superposition and miscalculation on the other hand.

[0007] Preferably, a storage module is provided on one side of the server, a mouse and a keyboard are provided on the input end of the server, and a spliced ​​display screen is provided on the output end of the server. The storage module in this scheme includes multiple disk storage arrays, which is convenient for timely storage of processed information and for retrieval and calculation of relevant information at a later time. The output end of the server can adopt input devices suggested by a mouse and a keyboard light, which is convenient for maintenance personnel to regularly upgrade the system of the server. At the same time, the spliced ​​display screen is used to synchronously display relevant data, which is convenient for maintenance personnel to observe.

[0008] The utility model has the following advantages:

[0009] The power settlement management system forms a remote communication link by setting up a server, a first communication module, a second communication module, a meter box, an electric energy meter and an information collection module. At the same time, the information collection module is convenient for collecting the power, address and account number on the user side, and uploading data through the first communication module. At the same time, the second communication module communicates with the Internet to download relevant data. The server processes and integrates the data and stores it in the storage module. With a natural month as a cycle, the server compares the past electricity fee information, calculates the amount of electricity, and deducts it from the electric energy meter account. When the amount in the electric energy meter account is insufficient, the electric energy meter is controlled to perform a power-off operation through the information collection module, which is used to control the chaos of electricity fee delays, thereby effectively solving the problems existing in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 This is a schematic diagram of the meter box structure of the utility model;

[0011] Figure 2 This is a schematic diagram of the information collection module structure of the utility model;

[0012] Figure 3 This is a system schematic diagram of the utility model.

[0013] In the figure: 1-meter box, 2-electricity meter, 3-information collection module, 4-connecting wire, 5-connection socket. DETAILED DESCRIPTION

[0014] The present invention is further described below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following description.

[0015] like Figures 1 to 3 As shown, an electricity settlement management system includes a server, a first communication module, a second communication module, a meter box 1, an electric energy meter 2 and an information collection module 3. The electric energy meter 2 and the information collection module 3 are arranged inside the meter box 1. The outer wall of the information collection module 3 is provided with two connecting sockets 5, and connecting wires 4 are arranged inside both. One end of the two connecting wires 4 is electrically connected to the electric energy meter 2 respectively, the server is electrically connected to the second communication module, and the first communication module is electrically connected to the information collection module 3.

[0016] The information collection module 3 communicates bidirectionally with the electric energy meter 2 through the connecting line 4, and collects relevant information on the user side. As an optional technical solution of the utility model, the information collection module 3 is conveniently provided with a PCB board inside, and two connecting plugs 5 are installed on the PCB board through pins. The power conversion circuit, signal processing circuit and information sending circuit are set on the PCB board. At the same time, the first communication module is integrated on the PCB board. The power conversion circuit is used to provide power support for the entire information collection and information sending. The PCB board also integrates an ARM processor for simple packaging processing of the collected information and transmitting it to the first communication module, and sending it to the external Internet through the first communication module, so that the second communication module can receive it.

[0017] Both the first communication module and the second communication module perform two-way communication with the Internet. As an optional technical solution of the utility model, the first communication module and the second communication module both adopt the 4G / 5G communication module commonly used in the prior art, which has mature technology, good compatibility and anti-interference performance, and large transmission bandwidth, which is convenient for sending signals in time, and has the advantages of low energy consumption and fast startup. At the same time, when uploading information at the end of the month, in order to avoid the transmission of short-term big data, interval uploading can be adopted by region, time period, etc., which can avoid server jams caused by excessive information on the one hand, and avoid the phenomenon of information superposition and incorrect calculation on the other hand.

[0018] A storage module is provided on one side of the server, a mouse and a keyboard are provided on the input end of the server, and a spliced ​​display screen is provided on the output end of the server. As an optional technical solution of the utility model, the storage module includes multiple disk storage arrays, which is convenient for timely storage of processed information and for retrieval and timely calculation of relevant information at a later time. The output end of the server can adopt input devices suggested by the mouse and keyboard light, which is convenient for maintenance personnel to regularly upgrade the system of the server. At the same time, the spliced ​​display screen is used to synchronously display relevant data, which is convenient for maintenance personnel to observe.

[0019] The electricity settlement management system requires the following steps when used:

[0020] 1) When in use, the information collection module 3 facilitates the collection of user-side power, address and account number;

[0021] 2) The information collection module 3 simply packages the information and uploads the data through the first communication module;

[0022] 3) The second communication module communicates with the Internet to download relevant data, and the server processes and integrates the data and stores it in the storage module as a basis for measurement;

[0023] 4) Taking a natural month as a cycle, the server compares the electricity fee information of the past periods, calculates the amount of electricity, and deducts it from the electricity meter account;

[0024] 5) When the amount in the electric energy meter account is insufficient, the electric energy meter is controlled to perform a power-off operation through the information collection module 3.

[0025] To sum up, when the user uses it, a remote communication link is formed by setting up a server, a first communication module, a second communication module, a meter box 1, an electric energy meter 2 and an information collection module 3. At the same time, the information collection module 3 is convenient for collecting the power, address and account number on the user side, and uploading the data through the first communication module. At the same time, the second communication module communicates with the Internet to download relevant data. The server processes and integrates the data and stores it in the storage module. Taking a natural month as a cycle, the server compares the past electricity bill information, calculates the amount of electricity, and deducts it from the electricity meter account. When the amount in the electricity meter account is insufficient, the information collection module 3 is used to control the electricity meter to perform a power-off operation, which is used to control the chaos of electricity bill delays, thereby effectively solving the problems existing in the prior art.

[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An electricity settlement management system, characterized in that: The invention comprises a server, a first communication module, a second communication module, a meter box (1), an electric energy meter (2) and an information collection module (3), wherein the electric energy meter (2) and the information collection module (3) are arranged inside the meter box (1), the outer wall of the information collection module (3) is provided with two connection sockets (5), and both are provided with connection wires (4), one end of the two connection wires (4) is electrically connected to the electric energy meter (2), the server is electrically connected to the second communication module, and the first communication module is electrically connected to the information collection module (3).

2. The power settlement management system according to claim 1, characterized in that: The information collection module (3) performs two-way information exchange with the electric energy meter (2) via a connecting line (4), and collects relevant information on the user side.

3. The power settlement management system according to claim 2, characterized in that: The first communication module and the second communication module both perform two-way communication with the Internet.

4. The power settlement management system according to claim 3, characterized in that: A storage module is arranged on one side of the server, a mouse and a keyboard are arranged on the input end of the server, and a spliced ​​display screen is arranged on the output end of the server.