Filling machine for preparing concrete sticky steel glue
By using the heating stirring structure and the heating plate in the hose in the filling machine, the adhesive viscosity and fluidity are reduced, and the filling accuracy and pipe blockage caused by the solidification of the adhesive is solved, thus achieving efficient and accurate filling Installation process.
Patent Information
- Application Number
- CN202421290246.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-07
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-06-07
AI Technical Summary
When used by existing filling machines, the adhesive easily solidifies on the inner wall of the filling pipe, resulting in reduced filling accuracy and blockage of the pipe. The cleaning components will scrape away some of the unsettled glue during cleaning, causing waste.
A filling machine for preparation of concrete clay steel glue is designed, using heating and stirring structure and heating plate in the hose. Through heating and stirring, the adhesive viscosity is reduced, the fluidity is increased, the probability of solidification is reduced, and multiple hose outlets are passed through. and weighing scales improve filling efficiency and accuracy.
It effectively reduces the probability of concrete clay steel glue solidification during filling process, improves filling accuracy and efficiency, and reduces pipe blockage and glue waste.
Smart Images

Figure CN222496734U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete steel adhesive preparation, in particular to a filling machine for concrete steel adhesive preparation. Background Art
[0002] Concrete steel adhesive is a two-component high-strength adhesive with high bonding strength, high elastic modulus and good durability. This adhesive can maintain stable performance for a long time under harsh environmental conditions, providing a long-lasting and reliable bond reinforcement guarantee for concrete structures. A filling machine is required for filling concrete steel adhesive during production and preparation.
[0003] After searching, some solutions about filling machines are disclosed in the prior art, such as an automatic filling machine for construction adhesives disclosed in the authorized patent with application number CN202320320206.7, which includes a conveying platform and a fixed plate fixedly connected to one side of the top of the conveying platform, a T-shaped plate fixedly connected to the top of the fixed plate, a groove is provided inside the fixed plate, and a sliding plate is slidably connected between the front and back sides of the inner wall of the groove, a cleaning assembly is provided on one side of the top of the sliding plate, and a driving assembly and other components are provided at the bottom of the T-shaped plate.
[0004] When the above scheme is in use, the cleaning component provided can scrape off the adhesive solidified in the filling tube to prevent the solidified adhesive from clogging the filling tube, but it still cannot reduce the probability of adhesive solidification. Part of the adhesive will still solidify on the inner wall of the filling tube, affecting the filling accuracy, and when the cleaning component is used for cleaning, some of the unsolidified glue is scraped away, causing waste; based on this, the present application proposes a filling machine for preparing concrete steel glue. Utility Model Content
[0005] The utility model provides a filling machine for preparing concrete steel adhesive, which solves the problem proposed in the above background technology that the probability of adhesive solidification cannot be reduced, part of the adhesive will still solidify on the inner wall of the filling tube, affecting the filling accuracy, and when cleaning with a cleaning component, part of the unsolidified adhesive will be scraped away, causing waste.
[0006] The utility model provides the following technical scheme: a filling machine for preparing concrete steel glue, comprising a workbench and a glue storage tank, a weighing scale is evenly arranged on the top of the workbench, a filling bottle is placed on the top of the weighing scale, a glue storage tank is fixed on the top of the workbench through a bracket, a hydraulic telescopic rod 1 is movably connected to the top of the bracket, a glue outlet pipe is evenly fixed to the bottom of the glue storage tank, a heating plate is arranged on the inner wall of the glue outlet pipe, a weighing scale is arranged below the glue outlet pipe, a sealing structure is arranged at the bottom of the glue outlet pipe, a pressing plate is movably connected in the inner cavity of the glue storage tank, the bottom of the hydraulic telescopic rod 1 is fixedly connected to the top of the pressing plate, a hydraulic telescopic rod 2 is evenly fixed on the pressing plate, a heating and stirring structure is fixed to the bottom of the hydraulic telescopic rod 2, and the heating and stirring structure is adapted to the glue outlet pipe;
[0007] The sealing structure includes a movable plate connected to one side of the bottom end of the rubber outlet pipe, a sealing plate movably connected to the bottom end of the movable plate, and a positioning lamp and a vibration motor fixed to the sealing plate; the heating and stirring structure includes a stirring motor fixed to the bottom of the second hydraulic telescopic rod, a stirring shaft fixed to the end of the output shaft of the stirring motor, a heating plate fixedly connected to the outer surface of the stirring shaft, and a stirring blade fixedly connected to the outer surface of the heating plate.
[0008] Preferably, the outer diameter of the end of the stirring blade away from the stirring shaft is the same as the inner diameter of the rubber outlet pipe.
[0009] Preferably, a heat-insulating sleeve is fixed to the inner wall of the rubber outlet pipe, a heating plate is fixed to the inner wall of the heat-insulating sleeve, and an anti-sticking tube is fixed to the inner wall of the heating plate.
[0010] Preferably, a hydraulic telescopic rod three is fixed to the top of the movable plate, the other end of the hydraulic telescopic rod three is fixedly connected to the bottom end of the rubber outlet hose, the bottom end of the movable plate is movably connected to a rotating shaft, one end of the rotating shaft is fixedly connected to a sealing plate, the bottom end of the movable plate is fixedly connected to a rotating motor one, and the output shaft end of the rotating motor one is fixedly connected to the other end of the rotating shaft.
[0011] Preferably, the top of the bracket is fixedly connected to a support rod, one side of the top of the support rod is fixedly connected to a rotating motor 2, the outer ring of the top of the hydraulic telescopic rod 1 is fixedly connected to a fixing sleeve, the other end of the fixing sleeve is movably connected to the support rod, and the end of the output shaft of the rotating motor 2 is fixedly connected to the other end of the fixing sleeve.
[0012] Preferably, the outer surface of the sealing plate is coated with an anti-stick coating, and a heating plate is provided in the inner cavity of the sealing plate.
[0013] Preferably, the positioning light is located on a side of the sealing plate away from the rubber outlet pipe.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] 1. The filling machine for preparing concrete-steel glue has a heating and stirring structure and a glue outlet pipe. During the filling process, the heating and stirring structure can heat and stir the concrete-steel glue around the glue outlet pipe, which can reduce the viscosity of the concrete-steel glue during filling and increase the fluidity of the concrete-steel glue, making it easier to fill the concrete-steel glue. The heating plate in the glue outlet pipe can heat the concrete-steel glue, reducing the probability of the concrete-steel glue solidifying in the glue outlet pipe, thereby reducing the probability of the glue outlet pipe being blocked, making it easier to use the filling machine.
[0016] 2. The filling machine for preparing concrete-steel glue can perform multiple fillings at the same time through the arrangement of multiple glue outlet pipes, weighing scales and heating and stirring structures, thereby improving the filling efficiency. The filling machine weighs the concrete-steel glue dropped into the filling bottle in real time, and whether there is solidified concrete-steel glue on the inner wall of the glue outlet pipe will not affect the weighing result, thereby improving the filling accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a front view of the structure of the utility model;
[0018] Figure 2 The utility model structure Figure 1 Back diagram;
[0019] Figure 3 This is a schematic diagram of the interior of the glue storage tank of the utility model structure;
[0020] Figure 4 This is a top view schematic diagram of the stirring blade of the utility model structure;
[0021] Figure 5 This is a schematic diagram of the bottom of the rubber hose of the utility model structure;
[0022] Figure 6 The utility model structure Figure 5 Schematic cross section.
[0023] In the figure: 1. workbench; 2. weighing scale; 3. glue storage tank; 4. support rod; 5. fixed sleeve; 6. hydraulic telescopic rod 1; 7. rotating motor 2; 8. pressing plate; 9. hydraulic telescopic rod 2; 10. glue outlet hose; 11. stirring blade; 12. stirring shaft; 13. heating plate; 14. sealing plate; 15. rotating motor 1; 16. hydraulic telescopic rod 3; 17. moving plate; 18. vibration motor; 19. positioning lamp; 20. anti-sticking tube; 21. heating plate; 22. insulation sleeve; 23. bracket; 24. stirring motor. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0025] The utility model provides a filling machine for preparing concrete steel glue, comprising a workbench 1 and a glue storage tank 3. A weighing scale 2 is evenly arranged on the top of the workbench 1. When the filling machine is in use, a filling bottle for storing the concrete steel glue can be placed on the weighing scale 2. During the filling process, the weighing scale 2 can be used for weighing to ensure the filling accuracy.
[0026] A bracket 23 is fixedly connected to the top of the workbench 1, and a glue storage tank 3 is fixed to the top of the bracket 23. The glue storage tank 3 is used to store concrete-steel glue to be filled. A pressing plate 8 is movably connected to the inner cavity of the glue storage tank 3, and a glue outlet pipe 10 is evenly arranged at the bottom of the glue storage tank 3. A support rod 4 is fixedly connected to the top of the bracket 23, and a fixed sleeve 5 is movably connected to the top of the support rod 4. A rotating motor 2 7 is fixedly connected to one side of the top of the support rod 4. The end of the output shaft of the rotating motor 2 7 is fixedly connected to the fixed sleeve 5 through a reducer, and the other end of the fixed sleeve 5 is fixedly connected to a hydraulic telescopic rod 6, and the bottom of the hydraulic telescopic rod 6 is fixedly connected to the top of the pressing plate 8.
[0027] By setting the rotary motor 27, the rotation of the rotary motor 27 can drive the fixed sleeve 5 connected thereto to rotate, and when the fixed sleeve 5 rotates, the pressing plate 8 can be driven to rotate through the hydraulic telescopic rod 16, so as to facilitate the cleaning of the filling machine. By setting the hydraulic telescopic rod 16, the extension and retraction of the hydraulic telescopic rod 16 can change the position of the pressing plate 8, and the pressing plate 8 can press the concrete steel glue in the glue storage tank 3. Under the extrusion force of the pressing plate 8, the glue in the glue storage tank 3 can fall into the filling bottle below it through the glue outlet pipe 10 to achieve filling.
[0028] The pressing plate 8 is evenly and fixedly connected with hydraulic telescopic rods 2 9, and the number of the hydraulic telescopic rods 2 9, the weighing scale 2 and the rubber outlet pipe 10 is the same. The bottom of the hydraulic telescopic rod 2 9 is fixed with a heating and stirring structure, which is adapted to the rubber outlet pipe 10. Through the setting of the hydraulic telescopic rod 2 9, the extension and contraction of the hydraulic telescopic rod 2 9 can change the position of the heating and stirring structure fixedly connected thereto, and the heating and stirring structure can be moved into the inner cavity of the rubber outlet pipe 10.
[0029] The heating and stirring structure includes a stirring motor 24 fixed to the bottom of the hydraulic telescopic rod 29, a stirring shaft 12 fixed to the end of the output shaft of the stirring motor 24, a heating plate 13 fixedly connected to the outer surface of the stirring shaft 12, and a stirring blade 11 fixedly connected to the outer surface of the heating plate 13. Through the setting of the stirring motor 24, the rotation of the stirring motor 24 can drive the stirring shaft 12 fixedly connected thereto to rotate, and the stirring shaft 12 drives the stirring blade 11 to rotate, and the stirring blade 11 can stir the glue liquid around it to improve the fluidity of the glue liquid, and the heat dissipated by the heating plate 13 when it is powered on can heat the glue liquid, improve the fluidity of the glue liquid, facilitate the falling of the glue liquid, and reduce the probability of the glue liquid solidifying during the filling process.
[0030] It can be seen from the above description that during use of the filling machine, the heating and stirring structure can stir and heat the glue liquid around the glue outlet pipe 10, thereby improving the fluidity of the glue liquid and facilitating the filling of the concrete-steel glue.
[0031] The outer diameter of the end of the stirring blade 11 away from the stirring shaft 12 is the same as the inner diameter of the glue outlet pipe 10. With this arrangement, when the stirring blade 11 is located in the inner cavity of the glue outlet pipe 10, the stirring blade 11 can scrape off the excess glue adhering to the inner wall of the glue outlet pipe 10, thereby reducing the probability of the glue solidifying.
[0032] An insulation sleeve 22 is fixed to the inner wall of the rubber outlet pipe 10, a heating plate 21 is fixed to the inner wall of the insulation sleeve 22, and an anti-sticking tube 20 is fixed to the inner wall of the heating plate 21. Through the setting of the anti-sticking tube 20 and the anti-sticking coating applied on the inner wall of the anti-sticking tube 20, the probability of the sticky steel glue adhering to the rubber outlet pipe 10 is reduced, which facilitates the falling of the sticky steel glue. Through the setting of the heating plate 21, the heat emitted when the heating plate 21 is powered on can heat the sticky steel glue in the rubber outlet pipe 10, thereby reducing the probability of the sticky steel glue solidifying.
[0033] The bottom of the rubber outlet pipe 10 is provided with a sealing structure, which includes a moving plate 17, a sealing plate 14, a positioning lamp 19 and a vibration motor 18. A hydraulic telescopic rod 3 16 is fixed to the top of the moving plate 17, and the other end of the hydraulic telescopic rod 3 16 is fixedly connected to the bottom end of the rubber outlet pipe 10. Under the action of the hydraulic telescopic rod 3 16, the distance between the moving plate 17 and the rubber outlet pipe 10 can be changed. The bottom end of the moving plate 17 is movably connected with a rotating shaft, one end of which is fixedly connected to the sealing plate 14, and the bottom end of the moving plate 17 is fixedly connected with a rotating motor 15, and the output shaft end of the rotating motor 15 is fixedly connected to the other end of the rotating shaft. Through the setting of the rotating motor 15, the rotation of the rotating motor 15 can drive the rotating shaft fixedly connected thereto to rotate, and the rotating shaft drives the sealing plate 14 fixedly connected thereto to rotate. When the sealing plate 14 is in a horizontal state, the sealing plate 14 can contact the bottom of the rubber outlet pipe 10, and the rubber outlet pipe 10 can be sealed by the sealing plate 14, which is convenient for the replacement of the filling bottle.
[0034] A positioning light 19 is provided at one end of the sealing plate 14 away from the glue outlet pipe 10. When the sealing plate 14 contacts the bottom of the glue outlet pipe 10, the positioning light 19 is located at the bottom of the sealing plate 14. When the positioning light 19 is powered on, the light emitted by the positioning light 19 shines on the weighing scale 2 to form a light spot, which can position the filling bottle and facilitate the placement of the filling bottle.
[0035] A vibration motor 18 is provided on the sealing plate 14. When the vibration motor 18 is working, the sealing plate 14 can vibrate, which is convenient for the steel glue adhered to the sealing plate 14 to be separated from the sealing plate 14, thereby reducing the probability of the steel glue solidifying on the sealing plate 14. The separated glue can fall into the filling bottle to avoid the steel glue being wasted. A rubber pad can be used for shock absorption between the rotating shaft and the movable plate 17 to reduce the impact of the vibration of the vibration motor 18 on the movable plate 17.
[0036] The outer surface of the sealing plate 14 is coated with an anti-stick coating, and a heating plate is provided in the inner cavity of the sealing plate 14. When the heating plate is powered on, the heat emitted can heat the steel adhesive attached to the sealing plate 14 to reduce the probability of the steel adhesive solidifying.
[0037] The outer surface of the heating and stirring structure and the outer surface of the hydraulic telescopic rod 29 are coated with an anti-stick coating. In some embodiments of the present application, the anti-stick coating is a polytetrafluoroethylene coating, and the positioning lamp 19 can be a laser lamp.
[0038] The electrical components involved in this application are all prior art, and technicians in this field are familiar with their connection methods. Through these technicians, all the electrical components in this application are connected to their compatible power supplies through wires, and according to the actual situation, a suitable controller is selected to meet the control requirements. The specific connection and control sequence are described below. The electrical connection is completed in a sequential working order, and the detailed connection means are well known in the art. The following mainly introduces the working principle and process, and no further explanation of the electrical control is given.
[0039] In summary, when the filling machine for preparing concrete adhesive steel glue is used, the concrete adhesive steel glue to be filled is placed in the glue storage tank 3, and the filling bottle for filling the concrete adhesive steel glue is placed on the top of the weighing scale 2. During the placement of the filling bottle, the positioning light 19 is used to position the filling bottle. After the filling bottle is placed, the hydraulic telescopic rod three 16 is extended, and the hydraulic telescopic rod three 16 drives the sealing plate 14 to move through the moving plate 17, and the glue outlet pipe 10 can be in an open state. During the movement of the sealing plate 14, the hydraulic telescopic rod one 6 is extended, and the hydraulic telescopic rod one 6 drives the pressing plate 8 to squeeze the concrete adhesive steel glue. The concrete adhesive steel glue can be discharged through the glue outlet pipe 10 under the squeezing action of the pressing plate 8, and the discharged concrete adhesive steel glue falls into the filling bottle under the action of gravity. The weighing scale 2 performs real-time detection on the weight of the concrete adhesive steel glue in the filling bottle. After the filling is completed, the hydraulic telescopic rod three 16 is contracted, and the sealing plate 14 can reseal the glue outlet pipe 10 to facilitate the replacement of the filling bottle. During the filling process, the heating plate and the heating sheet are always in a working state, and when the distance between the pressing plate 8 and the glue outlet pipe 10 is greater than the height value of the heating and stirring structure, the hydraulic telescopic rod 29 contracts. The contraction of the hydraulic telescopic rod 29 allows the position of the heating and stirring structure to remain unchanged. The heating and stirring structure stirs and heats the glue around it, increases the fluidity of the concrete-steel glue, and facilitates the discharge of the concrete-steel glue through the glue outlet pipe 10 under the extrusion of the pressing plate 8. When the distance between the pressing plate 8 and the glue outlet pipe 10 is equal to the height value of the heating and stirring structure, the hydraulic telescopic rod 29 stops working, and the pressing plate 8 drives the heating and stirring structure to move. When the sealing plate 14 is completely separated from the glue outlet pipe 10, the sealing plate 14 rotates under the action of the rotating motor 15, so that the sealing plate 14 is in a tilted state, and the vibration motor 18 vibrates. The vibration of the vibration motor 18 allows the concrete steel glue adhered to the sealing plate 14 to be quickly separated from the sealing plate 14, and the separated glue can fall into the filling bottle. After the sealing plate 14 is cleaned, the rotating motor 15 rotates in the opposite direction so that the sealing plate 14 is in a horizontal state again.
[0040] The standard parts used in the utility model can be purchased from the market, and the special-shaped parts can be customized according to the description in the specification and the drawings. The specific connection methods of each part adopt the conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt the conventional models in the prior art and will not be described in detail here. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field. Although the embodiments of the utility model have been shown and described, it can be understood by ordinary technicians in this field that various changes, modifications, substitutions and modifications can be made to these embodiments without departing from the principle and spirit of the utility model. The scope of the utility model is defined by the attached claims and their equivalents.
Claims
1. A filling machine for preparing concrete-steel adhesive, comprising a workbench (1) and an adhesive storage tank (3), characterized in that: A weighing scale (2) is evenly arranged on the top of the workbench (1), a filling bottle is placed on the top of the weighing scale (2), a glue storage tank (3) is fixed on the top of the workbench (1) through a bracket (23), a hydraulic telescopic rod 1 (6) is movably connected to the top of the bracket (23), a glue outlet pipe (10) is evenly fixed to the bottom of the glue storage tank (3), a heating plate (21) is provided on the inner wall of the glue outlet pipe (10), a weighing scale (2) is provided below the glue outlet pipe (10), a sealing structure is provided at the bottom of the glue outlet pipe (10), a pressing plate (8) is movably connected in the inner cavity of the glue storage tank (3), the bottom of the hydraulic telescopic rod 1 (6) is fixedly connected to the top of the pressing plate (8), a hydraulic telescopic rod 2 (9) is evenly fixed on the pressing plate (8), a heating and stirring structure is fixed to the bottom of the hydraulic telescopic rod 2 (9), and the heating and stirring structure is adapted to the glue outlet pipe (10); The sealing structure comprises a movable plate (17) connected to one side of the bottom end of the rubber outlet pipe (10), a sealing plate (14) movably connected to the bottom end of the movable plate (17), a positioning lamp (19) and a vibration motor (18) fixed to the sealing plate (14); the heating and stirring structure comprises a stirring motor (24) fixed to the bottom of the second hydraulic telescopic rod (9), a stirring shaft (12) fixed to the end of the output shaft of the stirring motor (24), a heating plate (13) fixedly connected to the outer surface of the stirring shaft (12), and a stirring blade (11) fixedly connected to the outer surface of the heating plate (13).
2. A filling machine for preparing concrete steel adhesive according to claim 1, characterized in that: The outer diameter of the end of the stirring blade (11) away from the stirring shaft (12) is the same as the inner diameter of the rubber outlet pipe (10).
3. A filling machine for preparing concrete steel adhesive according to claim 1, characterized in that: A heat-insulating sleeve (22) is fixed to the inner wall of the rubber outlet pipe (10), a heating plate (21) is fixed to the inner wall of the heat-insulating sleeve (22), and an anti-sticking pipe (20) is fixed to the inner wall of the heating plate (21).
4. A filling machine for preparing concrete steel adhesive according to claim 1, characterized in that: A hydraulic telescopic rod three (16) is fixed to the top of the movable plate (17), the other end of the hydraulic telescopic rod three (16) is fixedly connected to the bottom end of the rubber outlet hose (10), the bottom end of the movable plate (17) is movably connected to a rotating shaft, one end of the rotating shaft is fixedly connected to the sealing plate (14), the bottom end of the movable plate (17) is fixedly connected to a rotating motor one (15), the output shaft end of the rotating motor one (15) is fixedly connected to the other end of the rotating shaft.
5. A filling machine for preparing concrete steel adhesive according to claim 1, characterized in that: The top of the bracket (23) is fixedly connected to a support rod (4), one side of the top of the support rod (4) is fixedly connected to a second rotating motor (7), the outer ring of the top of the first hydraulic telescopic rod (6) is fixedly connected to a fixing sleeve (5), the other end of the fixing sleeve (5) is movably connected to the support rod (4), and the end of the output shaft of the second rotating motor (7) is fixedly connected to the other end of the fixing sleeve (5).
6. A filling machine for preparing concrete steel adhesive according to claim 1, characterized in that: The outer surface of the sealing plate (14) is coated with an anti-stick coating, and a heating plate is provided in the inner cavity of the sealing plate (14).
7. A filling machine for preparing concrete steel adhesive according to claim 1, characterized in that: The positioning light (19) is located on a side of the sealing plate (14) away from the rubber outlet pipe (10).