Hanging steel beam type formwork structure convenient to install

By designing a hanging steel beam-type formwork structure that is easy to install, the cooperation of the first steel frame, the second steel frame, the support beam, the wooden square and the steel bar support is solved, and the problem of labor and time-consuming installation of the traditional formwork support system is achieved. Efficient installation and reuse reduces the requirements for workers' skills.

CN222501065UActive Publication Date: 2025-02-18ZHONGQI JIAOJIAN GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421256895.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2025-02-18
Estimated Expiration
2034-06-04

AI Technical Summary

Technical Problem

The traditional steel pipe scaffolding formwork support system is very labor-intensive, labor-intensive, and labor-intensive, and is greatly affected by workers' operating skills, which often leads to situations that do not comply with national and local regulations.

Method used

A suspended steel beam type formwork structure is designed for easy installation. Through the cooperation of the first steel frame, the second steel frame, the first support beam, the second support beam, the wooden square and the steel bar support, the installation difficulty is reduced and the work is improved. efficiency.

Benefits of technology

This structure greatly reduces installation difficulty, improves work efficiency, facilitates disassembly and reuse, reduces material investment, and reduces the requirements for workers' operating skills.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222501065U_ABST
    Figure CN222501065U_ABST
Patent Text Reader

Abstract

The utility model discloses a hanging steel beam type formwork structure convenient to install, which comprises a first steel frame, two second steel frames are arranged on the outer side of the first steel frame, and a plurality of first supporting beams are installed on the sides, close to each other, of the two second steel frames through a plurality of steel bar supports. A second supporting beam fixedly connected with the outer wall of the second steel frame through a plurality of steel bar supports is arranged on one side of each first supporting beam. According to the suspended steel beam type formwork structure convenient to install, through cooperation of the first steel frame, the second steel frame, the first supporting beam, the second supporting beam, the batten and the reinforcing steel bar supports, the installation difficulty can be greatly reduced, installation is convenient, the overall working efficiency is high, and the suspended steel beam type formwork structure can be detached after being used and is convenient to use. And therefore, the input amount of materials can be greatly reduced, the requirement for the operation skill of workers is low, and the workers can use the device more conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a hanging steel beam type template structure which is easy to install. Background Art

[0002] Construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes foundation engineering construction, main structure construction, roof engineering construction, decoration engineering construction, etc.

[0003] The formwork support frame of construction projects generally adopts a full-floor formwork support system. Traditional steel pipe scaffolding formwork support systems include fastener type, bowl buckle type and disc pin type. Although they have good force performance and wide applicability, they also have many shortcomings. For example, when steel pipes are erected, the workload is large, and it is labor-intensive, time-consuming and material-intensive, which seriously restricts the speed of concrete construction. In addition, the force-bearing system of the entire formwork support frame is greatly affected by the workers' operating skills. For example, the spacing between steel pipes in the fastener-type steel pipe scaffolding, the erection of sweeping rods and the connection of fastener nodes are often not constructed according to the plan, resulting in non-compliance with national and local standards. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a suspended steel beam formwork structure which is easy to install, and solves the problem that the formwork support frame of construction projects generally adopts a full-floor formwork support system. Although the traditional steel pipe scaffolding formwork support systems include fastener type, bowl buckle type and disc pin type, they have good force performance and wide applicability, but also have many deficiencies. For example, when the steel pipes are erected, the workload is large, and it is labor-consuming, time-consuming and material-consuming, which seriously restricts the speed of concrete construction. In addition, the force system of the entire formwork support frame is greatly affected by the workers' operating skills. For example, the spacing between the steel pipes in the fastener type steel pipe scaffolding, the erection of the sweeping rod and the connection of the fastener nodes are often not constructed according to the plan, resulting in problems that do not meet national and local standards.

[0005] To achieve the above-mentioned purpose, the utility model is implemented through the following technical solutions: a suspended steel beam formwork structure that is easy to install, including a first steel frame, two second steel frames are arranged on the outer side of the first steel frame, and multiple first support beams are installed on the side where the two second steel frames are close to each other through multiple steel bar supports, and one side of the multiple first support beams is provided with a second support beam fixedly connected to the outer wall of the second steel frame through multiple steel bar supports, and multiple wooden squares are arranged on the top of the multiple first support beams and second support beams.

[0006] Preferably, a connecting plate is installed at one end of each of the first supporting beams and the second supporting beams close to each other, and the connecting plates are fixedly connected by first bolts.

[0007] Preferably, a plurality of first U-shaped components are installed on the tops of the plurality of first support beams and the second support beams, and outer walls of the plurality of first U-shaped components are respectively fixedly connected to outer walls of the plurality of wooden squares.

[0008] Preferably, second U-shaped components are respectively installed at both ends of the two second steel frames, and the plurality of second U-shaped components are fixedly connected to the outer wall of the first steel frame through second bolts.

[0009] Preferably, two cross bars are inserted at ends of the plurality of wooden squares that are away from each other.

[0010] Beneficial Effects

[0011] The utility model provides a hanging steel beam formwork structure that is easy to install. It has the following beneficial effects: the hanging steel beam formwork structure that is easy to install can greatly reduce the difficulty of installation through the cooperation of the first steel frame, the second steel frame, the first support beam, the second support beam, the wood and the steel support, and is easy to install, so that the overall work efficiency is high, and after use, it can be disassembled for reuse, so that the input of materials can be greatly reduced, and the operating skills requirements for the staff are low, so that the staff can use it more conveniently. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the structure of the utility model;

[0013] Figure 2 for Figure 1 Structural schematic diagram of the first steel frame, the second steel frame and the steel bar support;

[0014] Figure 3 for Figure 1 Schematic diagram of the structure of the first support beam, the second support beam and the wooden beam.

[0015] In the figure: 1. first steel frame, 2. second steel frame, 3. first support beam, 4. second support beam, 5. wooden beam, 6. first U-shaped member, 7. connecting plate, 8. first bolt, 9. second U-shaped member, 10. second bolt, 11. steel support, 12. cross bar. DETAILED DESCRIPTION

[0016] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0017] By those skilled in the art, the components in this case are connected in sequence. The specific connection and operation sequence should refer to the following working principle. The detailed connection means are well-known technologies in the art. The following mainly introduces the working principle and process.

[0018] The formwork support frame of construction projects generally adopts a full-floor formwork support system. The traditional steel pipe scaffolding formwork support systems include fastener type, bowl buckle type and disc pin type. Although they have good force performance and wide applicability, they also have many shortcomings. For example, when setting up steel pipes, the workload is large, labor-consuming, time-consuming and material-consuming, which seriously restricts the speed of concrete construction. In addition, the entire formwork support frame force system is greatly affected by the workers' operating skills. For example, the spacing between steel pipes in the fastener type steel pipe scaffolding, the setting of sweeping rods and the connection of fastener nodes are often not constructed according to the plan, resulting in situations that do not meet national and local standards;

[0019] In view of this, the utility model provides a suspended steel beam formwork structure that is easy to install. Through the cooperation of the first steel frame, the second steel frame, the first support beam, the second support beam, the wooden planks and the steel support, the installation difficulty can be greatly reduced, and the installation is convenient, so that the overall work efficiency is high. After use, it can be disassembled for reuse, so the material input can be greatly reduced, and the operating skills requirements for the staff are low, so that the staff can use it more conveniently.

[0020] Embodiment 1: By Figure 1 , 2 As can be seen from Figure 3, a suspended steel beam formwork structure that is easy to install includes a first steel frame 1, two second steel frames 2 are arranged on the outer side of the first steel frame 1, a plurality of first support beams 3 are installed on the side of the two second steel frames 2 close to each other through a plurality of steel support seats 11, a second support beam 4 fixedly connected to the outer wall of the second steel frame 2 through a plurality of steel support seats 11 is arranged on one side of the plurality of first support beams 3, and a plurality of wooden squares 5 are arranged on the tops of the plurality of first support beams 3 and the second support beams 4;

[0021] In the specific implementation process, it is worth pointing out that this method is developed on the basis that the steel structure beam column has a large bearing capacity and can bear the deadweight of the components and the construction load. The staff can lay the wooden formwork on the top of the wooden square 5, and then carry out the pouring work. The first support beam 3 and the second support beam 4 can support the wooden square 5;

[0022] Furthermore, a connecting plate 7 is installed at each end of the first supporting beams 3 and the second supporting beams 4 close to each other, and the connecting plates 7 are fixedly connected by first bolts 8;

[0023] In the specific implementation process, it is worth pointing out that the cooperation between the connecting plate 7 and the first bolt 8 can connect and fix the first support beam 3 and the second support beam 4;

[0024] Furthermore, a plurality of first U-shaped components 6 are installed on the top of each of the plurality of first support beams 3 and the second support beams 4, and the outer walls of the plurality of first U-shaped components 6 are respectively fixedly connected to the outer walls of the plurality of wooden squares 5;

[0025] In the specific implementation process, it is worth pointing out that the first U-shaped member 6 can install the wood 5 above the first support beam 3 and the second support beam 4;

[0026] Furthermore, second U-shaped components 9 are respectively installed at both ends of the two second steel frames 2, and the plurality of second U-shaped components 9 are fixedly connected to the outer wall of the first steel frame 1 through second bolts 10;

[0027] In the specific implementation process, it is worth pointing out that the second U-shaped member 9 can install and fix the first steel frame 1 and the second steel frame 2;

[0028] Furthermore, two cross bars 12 are inserted into the ends of the multiple wooden squares 5 that are away from each other;

[0029] In the specific implementation process, it is worth pointing out that the crossbar 12 can connect multiple wood squares 5 to ensure the overall use strength of the wood squares 5;

[0030] Specifically, when using the easy-to-install suspended steel beam formwork structure, the first steel frame 1 and the second steel frame 2 are connected and installed, the first support beam 3 and the second support beam 4 are fixed on the steel support 11, and the wooden square 5 is fixed on the first U-shaped member on the upper surface of the first support beam 3 and the second support beam 4. Finally, the wooden formwork is laid on the wooden square 5, and the steel bars are tied thereon and concrete is poured. After the concrete strength reaches a certain strength, only the steel support 11 needs to be cut off to remove the formwork.

[0031] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions. The sentence "includes an element defined by ... does not exclude the existence of other identical elements in the process, method, article or device including the element".

[0032] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.

[0033] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A suspended steel beam formwork structure that is easy to install, comprising a first steel frame (1), characterized in that: Two second steel frames (2) are arranged outside the first steel frame (1); a plurality of first support beams (3) are installed on the side of the two second steel frames (2) close to each other via a plurality of steel support seats (11); a second support beam (4) fixedly connected to the outer wall of the second steel frame (2) via a plurality of steel support seats (11) is arranged on one side of the plurality of first support beams (3); and a plurality of wooden planks (5) are arranged on the tops of the plurality of first support beams (3) and the second support beams (4).

2. The easy-to-install suspended steel beam formwork structure according to claim 1 is characterized in that: A connecting plate (7) is installed at one end of each of the plurality of first supporting beams (3) and second supporting beams (4) close to each other, and the plurality of connecting plates (7) are fixedly connected by first bolts (8).

3. The easy-to-install suspended steel beam formwork structure according to claim 1 is characterized in that: A plurality of first U-shaped components (6) are installed on the tops of the plurality of first support beams (3) and the second support beams (4), and the outer walls of the plurality of first U-shaped components (6) are respectively fixedly connected to the outer walls of the plurality of wooden squares (5).

4. The easy-to-install suspended steel beam formwork structure according to claim 1 is characterized in that: Second U-shaped components (9) are respectively installed at both ends of the two second steel frames (2), and the plurality of second U-shaped components (9) are fixedly connected to the outer wall of the first steel frame (1) via second bolts (10).

5. The easy-to-install suspended steel beam formwork structure according to claim 1 is characterized in that: Two cross bars (12) are inserted into the ends of the plurality of wooden squares (5) that are away from each other.