Assembly type building electromechanical pipeline mounting equipment
By designing clamping structures and baffles in prefabricated building electromechanical pipeline installation equipment, the loosening problem caused by the lack of limit structure at the pipeline connection head is solved, safety and applicability are improved, and the service life of the pipeline is extended.
Patent Information
- Application Number
- CN202420446960.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2025-02-21
- Estimated Expiration
- 2034-03-08
AI Technical Summary
The existing prefabricated building electromechanical pipeline installation equipment lacks the limit structure at the pipeline connection head, which makes the pipeline easy to loosen due to external pulling, and has low safety.
A prefabricated building electromechanical pipeline installation equipment is designed, using a combination of clamping structure and baffle plates to fix the pipeline through the clamping structure to prevent the connection port from loosening, and isolate and protect the connection port through the baffle plate to avoid dust and moisture. Erosion of gas, etc.
It effectively improves the safety and applicability of the device, prevents the pipeline connection port from loosening due to external pulling, and extends the service life of the pipeline, avoiding accidental contact of the connection port.
Smart Images

Figure CN222515140U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building electromechanical pipeline installation, in particular to assembled building electromechanical pipeline installation equipment. Background Art
[0002] Prefabricated buildings refer to buildings that transfer a large amount of on-site work in traditional construction methods to factories, where building components and accessories (such as floor slabs, wall panels, stairs, balconies, etc.) are processed and manufactured in factories, transported to construction sites, and assembled and installed on site through reliable connection methods. During the construction of prefabricated buildings, it is necessary to install and arrange mechanical and electrical pipelines, which are often operated with the help of pipeline installation equipment.
[0003] The existing prefabricated building electromechanical pipeline installation equipment lacks a limiting structure at the pipeline connector when installing and connecting the electromechanical pipelines. The pipelines are easily loosened by the external environment, and the safety is low. To solve the above problems, the present application proposes a prefabricated building electromechanical pipeline installation equipment. Summary of the invention
[0004] The utility model provides an assembled building electromechanical pipeline installation device to solve the technical problems existing in the background technology.
[0005] In order to solve the above problems, the utility model proposes an assembled building mechanical and electrical pipeline installation equipment, including a mounting plate, a connecting bin and a clamping structure, and is characterized in that two fixing blocks are symmetrically arranged at the upper and lower ends of the mounting plate, connecting bins are arranged on the left and right sides of the front end of the mounting plate, second clamping plates are arranged on the upper and lower sides of the front end inside the connecting bin, and a clamping structure is arranged inside the connecting bin and at the rear side of the second clamping plate.
[0006] Preferably, the clamping structure includes an auxiliary rod, forward and reverse screw rods, a turntable, a threaded sleeve, a first movable block, a linkage rod, a movable plate, a second movable block and a first clamping plate. The auxiliary rod and forward and reverse screw rods are arranged on the rear side of the connecting warehouse, and the forward and reverse screw rods are located on the front side of the auxiliary rod. The upper and lower sides of the forward and reverse screw rods are threadedly connected with threaded sleeves.
[0007] Preferably, a first movable block is provided at the front end of the threaded sleeve, the first movable block can be rotatably connected to a linkage rod, the other end of the linkage rod is rotatably connected to a second movable block, and a movable plate is provided at the front end of the second movable block, and first clamping plates are provided on both the upper and lower sides of the front end of the movable plate.
[0008] Preferably, second sliding grooves are provided at both upper and lower ends inside the connection bin, and second sliding blocks are provided at both upper and lower ends of the movable plate, and the second sliding blocks are slidably connected to the second sliding grooves.
[0009] Preferably, a first rubber block is disposed on a side of the first clamping plate close to the second clamping plate, and a second rubber block is disposed on a side of the second clamping plate close to the first clamping plate.
[0010] Preferably, a first sliding groove is provided at the front end of the mounting plate and located on the upper and lower sides of the connecting bin, and a first sliding block is slidably connected to the left and right sides of the first sliding groove, a baffle plate is provided at the front end of the first sliding block, and the baffle plate is placed on the outside of the connecting bin, and grooves are provided at the upper and lower ends of the rear side of the baffle plate, and the turntable is placed in the groove.
[0011] Preferably, turntables are provided on both upper and lower sides of the forward and reverse screw rods and pass through the connecting bin.
[0012] Preferably, two slots are provided at the left and right ends of the two connecting bins.
[0013] The above technical solution of the utility model has the following beneficial technical effects:
[0014] 1. The device achieves the fixation of the pipeline by setting a clamping structure. The two pipelines to be connected are passed through the slots of the two connecting bins respectively, so that the pipelines pass between the first clamping plate and the second clamping plate. Then, the two turntables are rotated to drive the positive and negative screws to rotate, thereby driving the two threaded sleeves and the first movable block to approach each other. With the help of the mutual cooperation of the first movable block, the linkage rod and the second movable block, the movable plate and the first clamping plate are driven to move toward the second clamping plate to complete the clamping and fixation of the pipeline, preventing the connection port of the pipeline from loosening due to the pulling of the external environment, effectively improving the safety of the device, and adjusting the position of the first clamping plate to adapt the device to pipelines of different specifications and sizes, effectively improving the applicability of the device;
[0015] 2. This device realizes the isolation and protection of the pipeline connection port by setting two baffle plates. After the pipeline is connected, the first sliders of the two baffle plates are installed on the first slide grooves of the mounting plate, and then the baffle plates are slid to move the two baffle plates to the connection port of the pipeline to prevent the pipeline connection port from being exposed to the air and corroded by dust, moisture, chemicals, etc. By setting the baffle plates, the connection port can be effectively isolated and protected, the service life of the pipeline can be extended, and at the same time, it can prevent people from operating incorrectly or accidentally touching the pipeline connection port. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a stereoscopic diagram of an assembled building electromechanical pipeline installation device proposed by the utility model.
[0017] Figure 2 This is a front view of an assembled building electromechanical pipeline installation device proposed by the utility model.
[0018] Figure 3This is a side sectional view of an assembled building electromechanical pipeline installation device proposed by the utility model.
[0019] Figure 4 It is an enlarged view of A in the assembled building electromechanical pipeline installation equipment proposed by the utility model.
[0020] Figure numerals: 1. mounting plate; 2. fixing block; 3. first slide groove; 4. first slider; 5. baffle plate; 6. groove; 7. connecting compartment; 8. auxiliary rod; 9. forward and reverse screw rods; 10. turntable; 11. threaded sleeve; 12. first movable block; 13. linkage rod; 14. movable plate; 15. second slider; 16. second slide groove; 17. second movable block; 18. first clamping plate; 19. first rubber block; 20. second clamping plate; 21. second rubber block; 22. slot. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below in combination with specific implementation methods and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the utility model. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the utility model.
[0022] like Figure 1-4 As shown, the utility model proposes an assembled building mechanical and electrical pipeline installation equipment, including a mounting plate 1, a connecting compartment 7 and a clamping structure, and is characterized in that two fixing blocks 2 are symmetrically arranged at both upper and lower ends of the mounting plate 1, connecting compartments 7 are arranged on both left and right sides of the front end of the mounting plate 1, second clamping plates 20 are arranged on both upper and lower sides of the front end inside the connecting compartment 7, and a clamping structure is arranged inside the connecting compartment 7 and at the rear side of the second clamping plate 20.
[0023] In an optional embodiment, the clamping structure includes an auxiliary rod 8, a forward and reverse screw rod 9, a turntable 10, a threaded sleeve 11, a first movable block 12, a linkage rod 13, a movable plate 14, a second movable block 17 and a first clamping plate 18. The auxiliary rod 8 and the forward and reverse screw rods 9 are arranged on the rear side of the interior of the connecting bin 7. The forward and reverse screw rods 9 are penetrated by the connecting bin 7 and are provided with turntables 10 on both the upper and lower sides, and the forward and reverse screw rods 9 are located on the front side of the auxiliary rod 8. The forward and reverse screw rods 9 are threadedly connected with the threaded sleeve 11 on both the upper and lower sides. The front end of the threaded sleeve 11 is provided with a first movable block 12. The first movable block 12 can be rotatably connected to the linkage rod 13. The other end of the linkage rod 13 is rotatably connected to the second movable block 17, and the front end of the second movable block 17 is provided with a movable plate 14. The first clamping plate 18 is arranged on both the upper and lower sides of the front end of the movable plate 14. Two slots 22 are provided at the left and right ends of the two connecting bins 7.
[0024] In an optional embodiment, second slide grooves 16 are provided at both upper and lower ends of the connecting bin 7, and second sliders 15 are provided at both upper and lower ends of the movable plate 14, and the second sliders 15 are slidably connected to the second slide grooves 16, and a first rubber block 19 is provided on the side of the first clamping plate 18 close to the second clamping plate 20, and a second rubber block 21 is provided on the side of the second clamping plate 20 close to the first clamping plate 18. The two turntables 10 are rotated to drive the forward and reverse screw rods 9 to rotate, thereby driving the two threaded sleeves 11 and the first movable block 12 to approach each other, and with the help of the mutual cooperation of the first movable block 12, the linkage rod 13 and the second movable block 17, the movable plate 14 and the first clamping plate 18 are driven to move toward the second clamping plate 20 to complete the clamping and fixation of the pipeline, thereby preventing the connection port of the pipeline from loosening due to the pulling of the external environment.
[0025] In an optional embodiment, a first slide groove 3 is provided at the front end of the mounting plate 1 and on both the upper and lower sides of the connecting bin 7, and a first slider 4 is slidably connected to the left and right sides of the first slide groove 3, a baffle plate 5 is provided at the front end of the first slider 4, and the baffle plate 5 is placed on the outside of the connecting bin 7, and grooves 6 are provided at both the upper and lower ends of the rear side of the baffle plate 5, and a turntable 10 is placed in the groove 6, the first sliders 4 of the two baffle plates 5 are installed on the first slide groove 3 of the mounting plate 1, and then the baffle plates 5 are slid to move the two baffle plates 5 to the connection port of the pipeline to prevent the pipeline connection port from being exposed to the air and corroded by dust, moisture, chemicals, etc. By setting the baffle plate 5, the connection port can be effectively isolated and protected, the service life of the pipeline can be extended, and at the same time, it can prevent people from operating incorrectly or accidentally touching the pipeline connection port.
[0026] The working principle of the utility model is as follows: when in use, the mounting plate 1 is first installed on the prefabricated building wall through the mutual cooperation of a plurality of bolts and the fixing block 2, and then the two pipelines to be connected are respectively passed through the slots 22 of the two connecting bins 7, so that the pipelines pass between the first clamping plate 18 and the second clamping plate 20, and then the two turntables 10 are rotated to drive the forward and reverse screw rods 9 to rotate, thereby driving the two threaded sleeves 11 and the first movable block 12 to approach each other, and with the mutual cooperation of the first movable block 12, the linkage rod 13 and the second movable block 17, the movable plate 14 and the first clamping plate 18 are driven to move toward the second clamping plate 20 to complete the clamping and fixing of the pipelines, thereby preventing The connection port of the pipeline becomes loose due to the pulling of the external environment, which effectively improves the safety of the device. By adjusting the position of the first clamping plate 18, the device can adapt to pipelines of different specifications and sizes, effectively improving the applicability of the device. After the two pipelines are connected, the first sliders 4 of the two baffle plates 5 are installed on the first slide groove 3 of the mounting plate 1, and then the baffle plates 5 are slid to move the two baffle plates 5 to the connection port of the pipeline to prevent the pipeline connection port from being exposed to the air and corroded by dust, moisture, chemicals, etc. By setting the baffle plates 5, the connection port can be effectively isolated and protected, the service life of the pipeline can be extended, and at the same time, it can prevent people from operating incorrectly or accidentally touching the pipeline connection port.
[0027] It should be understood that the above specific embodiments of the present invention are used to illustrate or explain the principles of the present invention, and do not constitute a limitation on the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the claims attached to the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the attached claims, or the equivalent forms of such scope and boundaries.
Claims
1. An assembled building electromechanical pipeline installation device, comprising a mounting plate (1), a connection compartment (7) and a clamping structure, characterized in that: Two fixing blocks (2) are symmetrically arranged at both upper and lower ends of the mounting plate (1); a connecting compartment (7) is arranged at both left and right sides of the front end of the mounting plate (1); a second clamping plate (20) is arranged at both upper and lower sides of the front end of the connecting compartment (7); and a clamping structure is arranged inside the connecting compartment (7) and at the rear side of the second clamping plate (20).
2. The assembled building electromechanical pipeline installation equipment according to claim 1, characterized in that: The clamping structure comprises an auxiliary rod (8), a forward and reverse screw rod (9), a rotating disk (10), a threaded sleeve (11), a first movable block (12), a linkage rod (13), a movable plate (14), a second movable block (17) and a first clamping plate (18); the auxiliary rod (8) and the forward and reverse screw rod (9) are arranged at the rear side of the connection chamber (7), the forward and reverse screw rod (9) is located at the front side of the auxiliary rod (8), and the threaded sleeve (11) is threadedly connected to the upper and lower sides of the forward and reverse screw rod (9).
3. The assembled building electromechanical pipeline installation equipment according to claim 2 is characterized in that: A first movable block (12) is arranged at the front end of the threaded sleeve (11), the first movable block (12) is rotatably connected to a linkage rod (13), the other end of the linkage rod (13) is rotatably connected to a second movable block (17), and a movable plate (14) is arranged at the front end of the second movable block (17), and first clamping plates (18) are arranged at both upper and lower sides of the front end of the movable plate (14).
4. The assembled building electromechanical pipeline installation equipment according to claim 1, characterized in that: The connection compartment (7) is provided with second sliding grooves (16) at both upper and lower ends, and the movable plate (14) is provided with second sliding blocks (15) at both upper and lower ends, and the second sliding blocks (15) are slidably connected to the second sliding grooves (16).
5. The assembled building electromechanical pipeline installation equipment according to claim 3 is characterized in that: A first rubber block (19) is provided on a side of the first clamping plate (18) close to the second clamping plate (20), and a second rubber block (21) is provided on a side of the second clamping plate (20) close to the first clamping plate (18).
6. The assembled building electromechanical pipeline installation equipment according to claim 1, characterized in that: The front end of the mounting plate (1) and located at the upper and lower sides of the connecting bin (7) are provided with first slide grooves (3), and the left and right sides of the first slide grooves (3) are slidably connected to first sliders (4), a baffle plate (5) is provided at the front end of the first slider (4), and the baffle plate (5) is placed outside the connecting bin (7), and grooves (6) are provided at the upper and lower ends of the rear side of the baffle plate (5), and the rotating disk (10) is placed in the groove (6).
7. The assembled building electromechanical pipeline installation equipment according to claim 2, characterized in that: The upper and lower sides of the forward and reverse screw rods (9) penetrate the connecting bin (7) and are provided with a rotating disk (10).
8. The assembled building electromechanical pipeline installation equipment according to claim 1, characterized in that: Two slots (22) are provided at the left and right ends of the two connecting chambers (7).