By designing the screen chute-distribution device, the movable baffle is used to adjust the size of the discharge port and control the material flow, the problem of unbalanced efficiency of crushing equipment in the sand and gravel processing system is solved and the continuous production is improved.

CN222518786UActive Publication Date: 2025-02-25CHINA GEZHOUBA GROUP NO 5 ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420891489.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-26
Publication Date
2025-02-25
Estimated Expiration
2034-04-26

AI Technical Summary

Technical Problem

In the sand and gravel processing system, after screening, the amount of material screened out by one layer of screen increases, and the amount of material screened out of the other layer of screen decreases, resulting in an imbalance in the crushing efficiency of crushing equipment and affecting production continuity.

Method used

A screening machine chute-distribution device is designed, including a chute, a aggregate box, a first chute and a second chute, and the size of the discharge port is adjusted through the movable baffle, the material separation flow is controlled, and the crushing equipment is ensured to balance the operation.

Benefits of technology

By controlling the material separation flow, the crushing efficiency of crushing equipment is balanced and the production continuity of the sand and gravel processing system is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222518786U_ABST
    Figure CN222518786U_ABST
Patent Text Reader

Abstract

A chute distributing device of a screening machine comprises a chute, a material collecting box, a first chute, a second chute and a movable baffle, the material collecting box is installed at the lower end of the chute, two discharging openings are formed in the material collecting box, the first chute and the second chute are installed at the positions, located at the two discharging openings, of the material collecting box, and the movable baffle is installed on the first chute and the second chute. The first chute extends to the position above the first sealing-tape machine, the second chute extends to the position above the second sealing-tape machine, the height of a discharging port above the second chute is larger than that of a discharging port above the first chute, a movable baffle is installed at the discharging port above the first chute, and the movable baffle is used for adjusting the size of the discharging port. According to the material distributing device, under the condition that the requirement for normal operation of the downstream crushing equipment of the first sealing-tape machine is met, redundant materials enter the downstream crushing equipment of the second sealing-tape machine from the second chute to be crushed, the crushing efficiency of the crushing equipment is balanced, and the production continuity of the gravel processing system is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sandstone processing, in particular to a chute material dividing device for a screening machine. Background Art

[0002] When the sand and gravel processing system adopts the post-screening crushing process, the screened materials of each layer of screen are usually sent to different belt conveyors and then to the crushing equipment for crushing. In the design stage, the number of crushing equipment will be calculated according to the flow rate to meet the crushing needs. However, in the actual crushing and screening process, due to changes in the physical and chemical properties of the raw materials or other reasons, the amount of material screened out of a certain layer of screen after screening will increase, while the amount of material screened out of another layer of screen will decrease, resulting in an unbalanced crushing efficiency of the crushing equipment in the design, causing one crushing equipment to be full of aggregate in the crushing chamber, while the other crushing equipment has less aggregate in the crushing chamber, affecting the continuity of the sand and gravel processing system production. Utility Model Content

[0003] The technical problem to be solved by the utility model is: to solve the problems existing in the above-mentioned background technology, and to provide a chute material dividing device for a screening machine, which solves the production continuity problem of the crushing equipment by controlling the material dividing flow rate.

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a screening machine chute dividing device, including a chute, a collection box, a first chute, a second chute and a movable baffle, the collection box is installed at the lower end of the chute, and two discharge ports are arranged on the collection box. The first chute and the second chute are installed on the collection box at the positions of the two discharge ports respectively, the first chute extends to the top of the first belt conveyor, and the second chute extends to the top of the second belt conveyor. The height of the discharge port above the second chute is higher than the height of the discharge port above the first chute, and the discharge port located above the first chute is installed with a movable baffle, and the movable baffle is used to adjust the size of the discharge port.

[0005] The movable baffle is longitudinally provided with a sliding hole, the collecting box is provided with a limiting screw above the discharge port, the sliding hole of the movable baffle passes through the limiting screw, and a nut is screwed on the limiting screw.

[0006] The first chute is provided with limit plates on both sides of the corresponding discharge port, and the movable baffle is movably inserted and installed between the outer wall of the collecting box and the limit plates.

[0007] The first chute is respectively installed with limit plates on both sides of the corresponding discharge port, the movable baffle is movably inserted between the outer wall of the collection box and the limit plate, the movable baffle is installed with a first pull plate, and the collection box is installed with a second pull plate above the discharge port, the bolt movably passes through the first pull plate and is screwed with the second pull plate thread, or the bolt movably passes through the second pull plate and is screwed with the first pull plate thread.

[0008] The material collecting box is installed on the bracket.

[0009] The bracket is supported on the ground, or on the first adhesive tape machine.

[0010] The utility model has the following beneficial effects:

[0011] After being screened by the screening equipment, the materials are fed to the aggregate box through the chute. The aggregate box is provided with two discharge ports, which are respectively connected to the first chute and the second chute. Since the height of the discharge port above the second chute is higher than that of the discharge port above the first chute, the materials will be discharged from the first chute first. After the production of the crushing equipment downstream of the first belt conveyor is saturated, the size of the discharge port is adjusted by the movable baffle to control the flow of materials entering the first belt conveyor, so that the crushing equipment downstream of the first belt conveyor can produce normally, and the excess materials will gradually accumulate in the aggregate box, and then enter the second belt conveyor from the second chute, and be sent to the crushing equipment downstream of the second belt conveyor for crushing. When the material dividing device satisfies the normal operation of the crushing equipment downstream of the first belt conveyor, the excess materials enter the crushing equipment downstream of the second belt conveyor from the second chute for crushing, so as to balance the crushing efficiency of the crushing equipment and improve the continuity of the production of the sand and gravel processing system. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0014] Figure 2 This is a schematic diagram of the main structure of the aggregate box of the utility model.

[0015] Figure 3 It is a schematic diagram of the side structure of the aggregate box of the utility model.

[0016] Figure 4 This is another schematic diagram of the adjustment structure of the movable baffle of the utility model.

[0017] In the figure: screening equipment 1, chute 2, collecting box 3, first chute 4, second chute 5, movable baffle 6, limit plate 7, limit screw 8, bracket 9, first belt conveyor 10, second belt conveyor 11, discharge port 12, slide hole 13, nut 14, handle 15, first pull plate 16, second pull plate 17, bolt 18. DETAILED DESCRIPTION

[0018] See also Figure 1-4 A screening machine chute material dividing device comprises a chute 2, a collection box 3, a first chute 4, a second chute 5 and a movable baffle 6, wherein the collection box 3 is installed at the lower end of the chute 2, and two discharge ports 12 are arranged on the collection box 3. The first chute 4 and the second chute 5 are installed on the collection box 3 at the positions of the two discharge ports 12 respectively. The first chute 4 extends to the top of the first belt conveyor 10, and the second chute 5 extends to the top of the second belt conveyor 11. The height of the discharge port 12 above the second chute 5 is higher than the height of the discharge port 12 above the first chute 4. The discharge port 12 located above the first chute 4 is installed with a movable baffle 6, and the movable baffle 6 is used to adjust the size of the discharge port 12.

[0019] After the material is screened by the screening equipment 1, it is fed to the aggregate box 3 through the chute 2. The aggregate box 3 is provided with two discharge ports 12, and the two discharge ports 12 are respectively connected to the first chute 4 and the second chute 5. Since the height of the discharge port 12 above the second chute 5 is higher than the height of the discharge port 12 above the first chute 4, the material will be discharged from the first chute 4 first. After the production of the crushing equipment downstream of the first belt conveyor 10 is saturated, the size of the discharge port 12 is adjusted by the movable baffle 6, and then the material flow entering the first belt conveyor 10 is controlled, so that the crushing equipment downstream of the first belt conveyor 10 can produce normally, and the excess material will gradually accumulate in the aggregate box 3, and then enter the second belt conveyor 11 from the second chute 5, and be sent to the crushing equipment downstream of the second belt conveyor 11 for crushing.

[0020] In one embodiment, see Figure 2 , 3 The movable baffle 6 is longitudinally provided with a sliding hole 13, and the collecting box 3 is provided with a limiting screw 8 above the discharge port 12. The sliding hole 13 of the movable baffle 6 passes through the limiting screw 8, and a nut 14 is screwed on the limiting screw 8. When the movable baffle 6 needs to be adjusted, the nut 14 is loosened, and the movable baffle 6 is moved up and down to adjust the size of the discharge port 12. After adjustment, the nut 14 is tightened.

[0021] For further information, see Figure 2 , 3The first chute 4 is respectively provided with limit plates 7 on both sides of the corresponding discharge port 12, and the movable baffle 6 is movably inserted and installed between the outer wall of the collecting box 3 and the limit plates 7. The movable baffle 6 is limited by the limit plates 7 to prevent the movable baffle 6 from deforming outwards under the impact of the material.

[0022] In this embodiment, in order to facilitate the operation of the movable baffle 6 when adjusting the movable baffle 6 , a handle 15 is provided on the movable baffle 6 .

[0023] In another implementation, see Figure 4 The first chute 4 is provided with limit plates 7 on both sides of the corresponding discharge port 12, and the movable baffle 6 is movably inserted and installed between the outer wall of the collecting box 3 and the limit plates 7. The movable baffle 6 is provided with a first pull plate 16, and the collecting box 3 is provided with a second pull plate 17 above the discharge port 12. The bolt 18 is movably passed through the first pull plate 16 and then threadedly engaged with the second pull plate 17, or the bolt 18 is movably passed through the second pull plate 17 and then threadedly engaged with the first pull plate 16. By rotating the bolt 18, the movable baffle 6 can be adjusted, and the adjustment is more convenient.

[0024] See also Figure 1 The material collecting box 3 is installed on a bracket 9. Preferably, the bracket 9 is supported on the ground, or supported on the first belt conveyor 10. The bracket 9 is welded with steel sections and is used to support the material collecting box 3.

[0025] See also Figure 3 The bottom wall of the material collecting box 3 is tilted downward toward the first chute 4 to facilitate the discharge of the material in the material collecting box 3.

[0026] The working principle or use process of the utility model:

[0027] In actual production, see Figure 1 Since less material enters the second belt conveyor 11 through the chute from the top screen of the screening device 1, less aggregate is contained in the crushing device downstream of the second belt conveyor 11, while more material enters the first belt conveyor 10 from the second screen of the screening device 1, which causes the aggregate to accumulate in the crushing chamber of the crushing device downstream of the first belt conveyor 10. Therefore, a collection box 3 is provided under the chute 2 of the second screen of the screening device 1 for diversion. Under the condition that the crushing device downstream of the first belt conveyor 10 can operate normally, the excess material enters the crushing device downstream of the second belt conveyor 11 from the second chute 5 for crushing, thereby balancing the crushing efficiency of the crushing equipment and improving the continuity of the production of the sand and gravel processing system.

Claims

1. A chute material dividing device for a screening machine, characterized in that: The invention comprises a chute (2), a material collecting box (3), a first chute (4), a second chute (5) and a movable baffle (6), wherein the material collecting box (3) is installed at the lower end of the chute (2), the material collecting box (3) is provided with two discharge ports (12), the first chute (4) and the second chute (5) are installed on the material collecting box (3) at positions respectively located at the two discharge ports (12), the first chute (4) extends to the top of the first belt conveyor (10), the second chute (5) extends to the top of the second belt conveyor (11), the height of the discharge port (12) above the second chute (5) is higher than the height of the discharge port (12) above the first chute (4), and the discharge port (12) located above the first chute (4) is installed with a movable baffle (6), and the movable baffle (6) is used to adjust the size of the discharge port (12).

2. A screening machine chute material dividing device according to claim 1, characterized in that: The movable baffle (6) is longitudinally provided with a sliding hole (13), the collecting box (3) is provided with a limiting screw (8) above the discharge port (12), the sliding hole (13) of the movable baffle (6) passes through the limiting screw (8), and a nut (14) is screwed onto the limiting screw (8).

3. A screening machine chute material dividing device according to claim 2, characterized in that: The first chute (4) is provided with limit plates (7) on both sides of the corresponding discharge opening (12), and the movable baffle (6) is movably inserted and installed between the outer wall of the collecting box (3) and the limit plates (7).

4. A screening machine chute material dividing device according to claim 1, characterized in that: The first chute (4) is respectively provided with limit plates (7) on both sides of the corresponding discharge port (12); the movable baffle (6) is movably inserted and installed between the outer wall of the collection box (3) and the limit plate (7); a first pull plate (16) is installed on the movable baffle (6); a second pull plate (17) is installed on the collection box (3) above the discharge port (12); a bolt (18) movably passes through the first pull plate (16) and is threadedly engaged with the second pull plate (17), or the bolt (18) movably passes through the second pull plate (17) and is threadedly engaged with the first pull plate (16).