Precision control device for rapid installation of pedestrian walkway plate of river ecosystem

By designing the accuracy control device for telescopic components, hoisting components and support components for pedestrian walkway boards in river ecosystems, the problems of low installation accuracy and poor straightness in the prior art are solved, and high precision and fast The installation effect and reduces construction costs.

CN222524096UActive Publication Date: 2025-02-25HEBEI CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421361201.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-14
Publication Date
2025-02-25
Estimated Expiration
2034-06-14

AI Technical Summary

Technical Problem

In the existing river ecosystem pedestrian walkway board installation process, crane control leads to low installation accuracy, poor straightness, high mechanical cost and complex operation.

Method used

An accuracy control device including telescopic components, jacking components and support components is designed to achieve dynamic height adjustment and fine adjustment through a hand-crank hydraulic jack and an adjustable support component to ensure installation height and straightness.

Benefits of technology

It improves the installation accuracy and speed of the walkway board, reduces construction costs, simplifies operations, and is suitable for various river slopes and installation heights.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222524096U_ABST
    Figure CN222524096U_ABST
Patent Text Reader

Abstract

The utility model discloses a precision control device for quick installation of a pedestrian walk plate of a river ecosystem, which comprises a telescopic assembly, a jacking assembly and three supporting assemblies, the top of the jacking assembly is connected with the telescopic assembly, the bottom of the jacking assembly is provided with the three supporting assemblies with adjustable lengths, and the telescopic assembly is connected with the jacking assembly. The three supporting assemblies are distributed below the jacking assembly in an annular array mode, the telescopic assembly comprises a sleeve and a telescopic pipe which are connected in a sleeved mode, the sleeve is fixedly connected with the jacking assembly, the telescopic pipe is connected with the output end of the jacking assembly, and the jacking assembly can drive the telescopic pipe to move up and down relative to the sleeve. The device can replace a crane to adjust the elevation according to the installation height of the pedestrian walkway plate of the river ecosystem, and has the advantages of high installation precision and high installation speed; meanwhile, later-stage disassembly is convenient, the whole device is simple in structure, convenient to construct and capable of being recycled, and the cost is effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction of pedestrian walkways in river ecosystems, in particular to a precision control device for rapid installation of pedestrian walkway panels in river ecosystems. Background Art

[0002] Existing river ecosystem pedestrian walkways are assembled using precast concrete slabs. The total width of the slabs is 2.5 meters, with each slab measuring 1 meter long. The bottom 1.5 meters are attached to the top of the riverbank retaining wall, and the remaining 1 meter is a cantilevered portion. During installation, these slabs are often hoisted using a crane. For the cantilevered portion, the crane adjusts the hoisting height up and down to adjust the elevation and straightness of the slab. However, this conventional construction process is costly for machinery, difficult to control elevation, and results in low installation accuracy. Furthermore, it cannot guarantee the overall straightness of the pedestrian walkway. Utility Model Content

[0003] The purpose of the utility model is to provide a precision control device for the rapid installation of pedestrian walkway boards in river ecosystems, so as to solve the above-mentioned problems existing in the prior art.

[0004] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0005] The utility model discloses a precision control device for the rapid installation of pedestrian walkway boards in river ecosystems, comprising a telescopic component, a jacking component and a support component. The top of the jacking component is connected to the telescopic component, and three support components with adjustable lengths are installed on the bottom. The three support components are distributed in a circular array below the jacking component. The telescopic component comprises a sleeve and a telescopic tube that are socketed with each other. The sleeve is fixedly connected to the jacking component, and the telescopic tube is connected to the output end of the jacking component. The jacking component can drive the telescopic tube to move up and down relative to the sleeve.

[0006] Furthermore, the jacking assembly includes a mounting frame and a jack, the jack is installed in the mounting frame, the bottom end of the sleeve is fixedly connected to the top plate of the mounting frame and is interconnected, and the bottom end of the telescopic tube extends downward into the mounting frame and is connected to the output end of the jack.

[0007] Furthermore, the jack is a hand-cranked hydraulic jack.

[0008] Furthermore, the installation frame is formed by enclosing steel plates.

[0009] Furthermore, the support assembly includes an upper support tube, a lower support tube and a fastener, and the relative position between the upper support tube and the lower support tube is fixed and adjusted by the fastener.

[0010] Furthermore, a bottom plate is fixedly connected to the bottom of the lower support tube.

[0011] Furthermore, a steel plate is fixedly connected to the top of the telescopic tube, and a rubber pad is provided on the top of the steel plate.

[0012] Compared with the prior art, the beneficial technical effects of the present invention are:

[0013] The precision control device for rapid installation of pedestrian walkway slabs in river ecosystems of the present invention can dynamically adjust the height according to the height of the retaining wall below the pedestrian walkway by arranging a telescopic component, a jacking component and a supporting component. At the same time, the height can be fine-tuned by a hand-cranked hydraulic jack to ensure the installation height and installation straightness of the cantilevered part of the pedestrian walkway, solving the problem of low installation straightness of the pedestrian walkway caused by the up and down adjustment of the elevation of the cantilevered part of the pedestrian walkway controlled by a crane. Moreover, due to the adjustability of the lower supporting component and the adjustability of the height of the middle jacking component, dynamic adjustment can be made according to the cantilever height below the pedestrian walkway slab and the slope of the river channel to be suitable for the installation of pedestrian walkway slabs in various river ecosystems.

[0014] The precision control device for the rapid installation of pedestrian walkway boards in river ecosystems of the utility model can replace the crane for height adjustment according to the installation height of the pedestrian walkway boards in river ecosystems. Compared with conventional crane control, it has the advantages of high installation precision and fast installation speed. At the same time, it is easy to disassemble in the later stage, and the overall device has a simple structure, is easy to carry, convenient for construction, and can be recycled, which effectively reduces costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0016] Figure 1 This is a schematic structural diagram of a precision control device for rapid installation of pedestrian walkway panels in a river ecosystem according to the present invention.

[0017] Explanation of the accompanying drawings: 1. Support assembly; 2. Lifting assembly; 3. Telescopic assembly; 4. Upper support tube; 5. Fastener; 6. Base plate; 7. Mounting frame plate; 8. Rubber pad; 9. Lower support tube. DETAILED DESCRIPTION

[0018] The following describes embodiments of the present invention in detail. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended only to explain the present invention and are not to be construed as limiting the present invention.

[0019] In the description of this utility model, it should be understood that the terms "length," "width," "inner," and "outer," etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings and are intended solely to facilitate and simplify the description of this utility model. They do not indicate or imply that the devices or components referred to must have a specific orientation, be constructed, or operate in a specific orientation. Therefore, they should not be construed as limitations on this utility model. In the description of this utility model, "plurality" means two or more, unless otherwise expressly specified.

[0020] In the description of this utility model, it should be noted that, unless otherwise expressly specified or limited, the terms "mounted," "connected," and "connected" should be understood in a broad sense. For example, they may refer to fixed connections, detachable connections, or integral connections; they may refer to direct connections or indirect connections through an intermediate medium; they may refer to internal communication between two components or the interaction between two components. Those skilled in the art will understand the specific meanings of the above terms in this utility model based on specific circumstances.

[0021] The technical solutions provided by the embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0022] like Figure 1 As shown, the precision control device for rapid installation of pedestrian walkway boards in river ecosystems of this embodiment includes a telescopic component 3, a lifting component 2 and a support component 1. The top of the lifting component 2 is connected to the telescopic component 3, and three support components 1 with adjustable lengths are installed at the bottom. The three support components 1 are distributed in a circular array below the lifting component 2.

[0023] The telescopic assembly 3 comprises a sleeve and a telescopic tube that are interconnected. The sleeve is sleeved onto the outside of the telescopic tube and is fixedly connected to the lifting assembly 2. The telescopic tube is connected to the output end of the lifting assembly 2. The lifting assembly 2 can drive the telescopic tube to move up and down relative to the sleeve. A steel plate is fixed to the top of the telescopic tube for contact with the concrete promenade slab. To prevent damage to the concrete promenade slab during lifting, a rubber pad 8 is installed on top of the steel plate. Preferably, both the sleeve and the telescopic tube are steel pipes.

[0024] Furthermore, the jacking assembly 2 includes a mounting frame 7 and a jack. Specifically, the mounting frame 7 is enclosed by four steel plates, and the jack is installed within the mounting frame 7. At this point, the bottom end of the casing is fixedly connected to the top plate of the mounting frame 7 and communicates with each other. The bottom end of the telescopic tube extends downward into the mounting frame 7 and is connected to the output end of the jack. The jack can drive the telescopic tube to move up and down relative to the casing. Preferably, the jack is a hand-cranked hydraulic jack, which can be used to fine-tune the height of the concrete promenade slab.

[0025] In order to facilitate the installation of the hand-crank hydraulic jack, Figure 1 As shown, the mounting frame plate 7 is in a U-shape as a whole.

[0026] In this embodiment, the support assembly 1 includes an upper support tube 4, a lower support tube 9 and a fastener 5. The upper support tube 4 and the lower support tube 9 are fixed and adjusted in relative position by the fastener 5. The fastener 5 can be a fastening screw. The upper support tube 4 can be movably inserted into the lower support tube 9 by the fastening screw. At this time, the height can be dynamically adjusted according to the height of the retaining wall below the concrete promenade slab. In addition, a base plate 6 is fixedly connected to the bottom of the lower support tube 9 to increase the contact area between the lower support tube 9 and the ground and improve the stability of the overall structure. Preferably, the upper support tube 4 and the lower support tube 9 are both steel tubes, and the base plate 6 is a steel plate. The lower support tube 9 and the base plate 6 are connected by welding.

[0027] The precision control device for the rapid installation of pedestrian walkway panels in river ecosystems of the present invention can dynamically adjust the height according to the height of the retaining wall below the pedestrian walkway by setting a telescopic component 3, a lifting component 2 and a supporting component 1. At the same time, the height can be fine-tuned by a hand-cranked hydraulic jack to ensure the installation height and installation straightness of the cantilevered part of the pedestrian walkway, solving the problem of low installation straightness of the pedestrian walkway caused by the up and down adjustment of the elevation of the cantilevered part of the pedestrian walkway controlled by a crane; and, due to the adjustability of the lower supporting component 1 and the adjustability of the height of the middle lifting component 2, dynamic adjustment can be made according to the cantilever height below the pedestrian walkway panel and the river slope to be suitable for the installation of pedestrian walkway panels in various river ecosystems.

[0028] The precision control device for the rapid installation of pedestrian walkway boards in river ecosystems of the utility model can replace the crane for height adjustment according to the installation height of the pedestrian walkway boards in river ecosystems. Compared with conventional crane control, it has the advantages of high installation precision and fast installation speed. At the same time, it is easy to disassemble in the later stage, and the overall device has a simple structure, is easy to carry, convenient for construction, and can be recycled, which effectively reduces costs.

[0029] The embodiments described above are merely preferred embodiments of the present invention and are not intended to limit the scope of the present invention. Without departing from the spirit of the present invention, various modifications and improvements to the technical solutions of the present invention made by ordinary technicians in this field should fall within the scope of protection determined by the claims of the present invention.

Claims

1. A precision control device for rapid installation of pedestrian walkway panels in river ecosystems, characterized in that: It includes a telescopic component, a lifting component and a supporting component. The top of the lifting component is connected to the telescopic component, and three supporting components with adjustable lengths are installed on the bottom. The three supporting components are distributed in a ring array below the lifting component. The telescopic component includes a sleeve and a telescopic tube that are mutually socketed. The sleeve is fixedly connected to the lifting component, and the telescopic tube is connected to the output end of the lifting component. The lifting component can drive the telescopic tube to move up and down relative to the sleeve.

2. The precision control device for rapid installation of pedestrian walkway panels in river ecosystems according to claim 1 is characterized in that: The lifting assembly includes a mounting frame and a jack, wherein the jack is mounted in the mounting frame, the bottom end of the sleeve is fixedly connected to the top plate of the mounting frame and are interconnected, and the bottom end of the telescopic tube extends downward into the mounting frame and is connected to the output end of the jack.

3. The precision control device for rapid installation of pedestrian walkway panels in river ecosystems according to claim 2 is characterized in that: The jack is a hand-cranked hydraulic jack.

4. The precision control device for rapid installation of pedestrian walkway panels in river ecosystems according to claim 2 is characterized in that: The installation frame is enclosed by steel plates.

5. The precision control device for rapid installation of pedestrian walkway panels in river ecosystems according to claim 1 is characterized in that: The support assembly includes an upper support tube, a lower support tube and a fastener, and the fastener is used to fix and adjust the relative position between the upper support tube and the lower support tube.

6. The precision control device for rapid installation of pedestrian walkway panels in river ecosystems according to claim 5 is characterized in that: The bottom of the lower supporting tube is fixedly connected with a bottom plate.

7. The precision control device for rapid installation of pedestrian walkway panels in river ecosystems according to any one of claims 1 to 6, characterized in that: A steel plate is fixedly connected to the top of the telescopic tube, and a rubber pad is arranged on the top of the steel plate.