Embedded fabricated building foundation

Through the pre-embedded prefabricated building foundation technology, the foundation is split, transported and complete assembly by using components such as positioning frames, positioning strips, chambers, and card blocks, which solves the problem of time-consuming and labor-intensive transportation of existing foundation structures and improves foundation installation Efficiency and stability.

CN222525391UActive Publication Date: 2025-02-25CHINA MINSHENG TAIHE GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421312721.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2025-02-25
Estimated Expiration
2034-06-11

AI Technical Summary

Technical Problem

The existing building foundation structure is time-consuming and labor-intensive during transportation, resulting in a large transportation burden for construction personnel and low foundation installation efficiency.

Method used

Adopting the embedded prefabricated building foundation technology, the first foundation, second foundation, positioning frame, positioning strip, chamber, card block, slot, guide column and spring are used to remove the first foundation and the second foundation. Separate transportation and complete assembly to improve installation efficiency.

Benefits of technology

It realizes efficient installation of the foundation, reduces the transportation burden of construction personnel, and improves the efficiency and stability of foundation installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model discloses an embedded assembly type building foundation which comprises a first foundation and a second foundation, a positioning strip is fixed on the outer wall of the first foundation, a positioning frame connected to the outer wall of the positioning strip in a sleeved mode is fixed at the top end of the second foundation, and the positioning frame and the positioning strip are connected through a limiting mechanism. The limiting mechanism comprises a cavity, a clamping block, a clamping groove and a spring, and the cavity is formed in the positioning strip. According to the pre-embedded fabricated building foundation, after positioning strips are inserted into positioning frames, clamping blocks are pressed to be shrunk into cavities, springs are driven to be compressed, after the positioning strips continue to move, the clamping blocks correspond to clamping grooves, the clamping blocks are inserted into the clamping grooves under the springback of the springs, and therefore the first foundation and the second foundation can be completely assembled; and in the transportation process, the first foundation and the second foundation can be transported separately, the good splitting effect is achieved, the use requirement of building construction is met, and the foundation installation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building foundations, in particular to a pre-buried assembled building foundation. Background Art

[0002] The foundation refers to the soil or rock mass that supports the foundation under the building. The soil layer used as the foundation of the building is divided into rock, crushed stone soil, sand, silt, clay and artificial fill. There are two types of foundations: natural foundation and artificial foundation (composite foundation). The natural foundation is a natural soil layer that does not require human reinforcement. The artificial foundation needs to be reinforced by humans, and common ones include stone chip cushion layer, sand cushion layer, mixed ash soil backfill and compaction. The building foundation is divided into natural foundation and artificial foundation. The foundation that can directly bear the load of the building without treatment is called a natural foundation. On the contrary, the foundation that needs to be treated by foundation treatment technology is called an artificial foundation. According to the structural form: strip foundation, independent foundation, full foundation and pile foundation. Strip foundation: When a building uses brick walls to bear the weight, the foundation under the wall is often set continuously to form a full-length strip foundation. Independent foundation: When the upper part of the building is a frame structure or a single column, an independent foundation is often used; if the column is prefabricated, a cup-shaped foundation is used. Full-floor foundation: When the load transmitted from the upper structure is large, the bearing capacity of the foundation is very low, and the independent foundation cannot meet the foundation requirements, the lower part of the building is often made into a whole reinforced concrete foundation, which is called a full-floor foundation.

[0003] For example, a Chinese authorized patent, a building foundation infrastructure with the announcement number CN211057833U, is designed to solve the problem that the contact area between the foundation and the ground is relatively small when people are building foundations, and the ground is easily sunken due to long-term gravity pressure. The following scheme is proposed, which includes a concrete bottom plate, a ring baffle is fixedly installed on the top of the concrete bottom plate, a concrete top plate is fixedly installed on the top of the ring baffle, a finished building is fixedly installed on the top of the concrete top plate, a support seat is fixedly installed on the bottom of the support seat, a support plate is fixedly installed on the bottom of the support plate, and a plurality of support columns are fixedly installed on the bottom of the support plate, and the bottom end of the support column is fixedly connected to the top of the concrete bottom plate. The utility model has a simple structure and is easy to use. It can disperse the load of the gravity of the entire building foundation, and at the same time make the concrete bottom plate evenly stressed, which is convenient for people to use.

[0004] The above-mentioned traditional foundation structure is generally an integrated design during use. However, when transporting the integrated foundation structure to the construction site, it is time-consuming and labor-intensive to carry, thereby increasing the transportation burden of the construction workers and reducing the foundation installation efficiency. Utility Model Content

[0005] 1. Technical issues to be solved

[0006] In view of the deficiencies in the prior art, the utility model provides a pre-buried assembled building foundation, which is provided by setting a first foundation, a second foundation, a positioning frame, a positioning strip, a chamber, a block, a slot, a guide column and a spring combination for use. After the positioning strip is inserted into the positioning frame, the block is compressed and shrinks into the chamber, and the spring is driven to compress. When the positioning strip continues to move, the block corresponds to the slot, and the block is inserted into the slot under the rebound of the spring. At this point, the first foundation and the second foundation can be completely assembled. During transportation, the first foundation and the second foundation can be transported separately, achieving a better splitting effect, meeting the use requirements of construction, and improving the foundation installation efficiency, etc., solving the problems raised by the background technology.

[0007] (II) Technical solution

[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pre-buried assembled building foundation, comprising a first foundation and a second foundation, wherein a positioning bar is fixed to the outer wall of the first foundation, and a positioning frame sleeved on the outer wall of the positioning bar is fixed to the top of the second foundation, wherein the positioning frame and the positioning bar are connected by a limiting mechanism;

[0009] The limiting mechanism includes a chamber, a block, a slot and a spring. The chamber is opened inside the positioning strip, the inner wall of the chamber is connected with the block through a spring, and the outer wall of the positioning frame is provided with a slot corresponding to the block.

[0010] Preferably, a guide hole is opened inside the card block, and a guide column corresponding to the guide hole is fixed to the inner wall of the chamber. The provision of the guide column and the guide hole can provide good stability and ensure that the card block is sufficiently stable in movement.

[0011] Preferably, a fixing strip is fixed to the inner wall of the chamber, and the fixing strip is inserted into the clamping block.

[0012] Preferably, the outer wall of the card block is provided with an inclined surface, which is distributed from front to back near the middle position of the second base. When the first base and the second base are installed, the inclined surface can interfere with the outer wall of the positioning frame, and drive the card block to automatically embed into the interior of the chamber, so that the spring is compressed to achieve the purpose of automatic locking.

[0013] Preferably, a bottom column is fixed to the bottom end of the first foundation, an embedded portion is fixed to the bottom of the bottom column, and the embedded portion is a cone. The cone-shaped embedded portion can facilitate the embedding of the first foundation, thereby facilitating the effect of pre-embedded installation.

[0014] Preferably, corresponding holes are opened inside the first foundation and the second foundation, and vertical steel bars are inserted into the holes.

[0015] Preferably, a pouring port and a pouring trough are provided at the top of the second foundation, the pouring port is located in the middle of the top of the second foundation, and the pouring trough is provided in several groups and is connected with the pouring port and the holes. After the vertical steel bars are inserted into the holes, the mixed concrete can be poured in through the pouring port, and the concrete flows into each hole through the pouring trough, so that the concrete casts the first foundation, the second foundation and the vertical steel bars into cast-in-place columns, thereby ensuring the stability of the foundation structure. After the pouring is completed, the concrete can seal the pouring port, the pouring trough and the holes, thereby ensuring that the foundation is sufficiently stable and not easily compressed to produce gaps.

[0016] Preferably, the outer wall of the vertical steel bars is sleeved with a connecting sleeve, and two adjacent groups of connecting sleeves are fixedly connected by a connecting plate. The connecting sleeves are arranged so that two adjacent vertical steel bars can be limitedly sleeved. During the installation process, it is ensured that the vertical steel bars are tilted and will not shift during the connection with the cement column to affect the construction progress.

[0017] (III) Beneficial effects

[0018] Compared with the prior art, the utility model has the following beneficial effects:

[0019] 1. A first foundation, a second foundation, a positioning frame, a positioning strip, a chamber, a block, a slot, a guide column and a spring are used in combination. After the positioning strip is inserted into the positioning frame, the block is compressed and retracted into the chamber, and the spring is driven to compress. When the positioning strip continues to move, the block corresponds to the slot, and the block is inserted into the slot under the rebound of the spring. At this point, the first foundation and the second foundation can be completely assembled. During transportation, the first foundation and the second foundation can be transported separately to achieve a better splitting effect, meet the use requirements of construction, and improve the foundation installation efficiency.

[0020] 2. By setting up a base column and an embedded part in combination, the embedded part can be in the shape of a cone with a sharp bottom, which can facilitate piercing the soil and achieve the purpose of positioning construction, and can meet the stability of the foundation installation during the installation process.

[0021] 3. By setting holes, vertical steel bars, pouring ports, pouring troughs, connecting plates and connecting sleeves in combination, and inserting resin steel bars into the holes, the first foundation and the second foundation can be fastened and connected. Concrete enters the pouring troughs and the holes in turn through the pouring ports to achieve a comprehensive sealing effect, making the connection between the first foundation and the second foundation more stable. After pouring is completed, the staff will close the pouring ports to ensure that the foundation structure is not easily deformed after being compressed, thereby improving the safety of foundation construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0023] Figure 2 This is a schematic diagram of the second basic structure of the utility model;

[0024] Figure 3 This is a schematic diagram of the cross-sectional structure of the positioning strip of the utility model;

[0025] Figure 4 For this utility model Figure 3 The enlarged structural diagram at A in the middle;

[0026] Figure 5 This is a schematic diagram of the casting trough structure of the utility model;

[0027] Figure 6 This is a schematic diagram of the first basic structure of the utility model.

[0028] In the figure: 1, first foundation; 2, second foundation; 311, positioning frame; 312, positioning strip; 313, chamber; 314, block; 315, slot; 316, guide column; 317, spring; 318, guide hole; 319, fixing strip; 411, bottom column; 412, embedded part; 413, hole; 414, vertical steel bar; 415, pouring port; 416, pouring trough; 417, connecting plate; 418, connecting sleeve. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] Example

[0031] Reference Figure 1-6As shown, a pre-buried assembled building foundation includes a first foundation 1 and a second foundation 2. A positioning bar 312 is fixed to the outer wall of the first foundation 1, and a positioning frame 311 is fixed to the top of the second foundation 2 and is sleeved on the outer wall of the positioning bar 312. The positioning frame 311 and the positioning bar 312 are connected by a limiting mechanism. The limiting mechanism includes a chamber 313, a block 314, a slot 315 and a spring 317. The chamber 313 is opened inside the positioning bar 312. The inner wall of the chamber 313 is connected to the block 314 through the spring 317. The outer wall of the positioning frame 311 is provided with a slot 315 corresponding to the block 314. The block 314 is pressed to be embedded into the chamber 313, and the spring 317 is driven to be compressed. Then the positioning frame 311 is sleeved on the outer wall of the positioning bar 312. When the block 314 corresponds to the slot 315, the block 314 can be driven to be inserted into the slot 315 under the elasticity of the spring 317, so as to achieve the effect of assembly locking. A guide hole 318 is opened inside the block 314, and a guide column 316 corresponding to the guide hole 318 is fixed on the inner wall of the chamber 313. The guide column 316 and the guide hole 318 can provide good stability to ensure that the block 314 is sufficiently stable. A fixing strip 319 is fixed to the inner wall of the chamber 313, and the fixing strip 319 is inserted into the block 314. The fixing strip 319 can be used to limit the rotation of the block 314, thereby further achieving a stabilizing effect. An inclined surface is provided on the outer wall of the block 314, and the inclined surface is distributed from front to back near the middle position of the second base 2. When the first base 1 and the second base 2 are installed, the inclined surface can contact the outer wall of the positioning frame 311, thereby driving the block 314 to automatically embed into the chamber 313, so that the spring 317 is compressed, thereby achieving the purpose of automatic locking.

[0032] A bottom column 411 is fixed at the bottom end of the first foundation 1, and an embedding portion 412 is fixed at the bottom of the bottom column 411. The embedding portion 412 is a cone, and the cone-shaped embedding portion 412 can facilitate the embedding of the first foundation 1, which is convenient for pre-embedded installation. Corresponding holes 413 are opened inside the first foundation 1 and the second foundation 2, and vertical steel bars 414 are inserted into the holes 413. The first foundation 1 and the second foundation 2 can be inserted through the vertical steel bars 414 to improve the firmness of the foundation structure.

[0033] A pouring port 415 and a pouring trough 416 are provided at the top of the second foundation 2. The pouring port 415 is located in the middle of the top of the second foundation 2. The pouring trough 416 is provided with several groups and is connected with the pouring port 415 and the hole 413. After the vertical steel bar 414 is inserted into the hole 413, the mixed concrete can be poured through the pouring port 415. The concrete flows into each hole 413 through the pouring trough 416, so that the concrete casts the first foundation 1, the second foundation 2 and the vertical steel bar 414 into a cast-in-place column, ensuring the stability of the foundation structure, and facilitating the pre-embedded use of the construction. After the pouring is completed, the concrete can block the pouring port 415, the pouring trough 416 and the hole 413, ensuring that the foundation is stable enough and not easy to be compressed and produce a gap. The outer wall of the vertical steel bar 414 is sleeved with a connecting sleeve 418, and the two adjacent groups of connecting sleeves 418 are fixedly connected by a connecting plate 417. The connection sleeve 418 and the connection sleeve 418 can be used to limit the connection between two adjacent vertical steel bars 414 in the front and back. During the installation process, it is ensured that the vertical steel bars 414 are tilted and will not deviate during the connection with the cement column to affect the construction progress.

[0034] Working principle: When the first base 1 and the second base 2 need to be assembled, the card block 314 on the right side is pressed to insert the card block 314 into the chamber 313. At this time, the card block 314 can slide along the outer wall of the guide column 316 and the fixing bar 319, and drive the spring 317 to be squeezed and compressed. Then, the positioning frame 311 is sleeved on the outer wall of the positioning bar 312, and the second base 2 is pushed from left to right to make the positioning bar 312 slide on the inner wall of the positioning frame 311. The outer wall inclined surface of the card block 314 on the left side contacts the positioning frame 311, and drives the card block 314 to automatically shrink. When the slot 315 corresponds to the card block 314, the elasticity of the spring 317 can drive the card block 314 to rebound, and the card block 314 is inserted into the slot 315, thereby achieving the purpose of locking the first base 1 and the second base 2 and realizing the assembly effect.

[0035] When needed, the vertical steel bar 414 is inserted into the hole 413, and then the connecting sleeve 418 is put on the outer wall of the vertical steel bar 414 for reinforcement, and the stirred concrete is added through the pouring port 415. The concrete flows into each hole 413 through the pouring trough 416 to achieve the effect of cast-in-place use.

[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pre-buried assembled building foundation, comprising a first foundation (1) and a second foundation (2), characterized in that: A positioning strip (312) is fixed to the outer wall of the first foundation (1), a positioning frame (311) sleeved on the outer wall of the positioning strip (312) is fixed to the top of the second foundation (2), and the positioning frame (311) and the positioning strip (312) are connected via a limiting mechanism; The limiting mechanism comprises a chamber (313), a clamping block (314), a clamping slot (315) and a spring (317); the chamber (313) is arranged inside the positioning strip (312); the inner wall of the chamber (313) is connected to the clamping block (314) via the spring (317); and the outer wall of the positioning frame (311) is provided with a clamping slot (315) corresponding to the clamping block (314).

2. The pre-buried assembled building foundation according to claim 1, characterized in that: A guide hole (318) is provided inside the block (314), and a guide column (316) corresponding to the guide hole (318) is fixed to the inner wall of the chamber (313).

3. The pre-buried assembled building foundation according to claim 2, characterized in that: A fixing strip (319) is fixed to the inner wall of the chamber (313), and the fixing strip (319) is inserted into the interior of the clamping block (314).

4. The pre-buried assembled building foundation according to claim 3, characterized in that: The outer wall of the block (314) is provided with an inclined surface, which is distributed from front to back close to the middle position of the second foundation (2).

5. The pre-buried assembled building foundation according to claim 1, characterized in that: A bottom column (411) is fixed at the bottom end of the first foundation (1), an embedded portion (412) is fixed at the bottom of the bottom column (411), and the embedded portion (412) is a cone.

6. The pre-buried assembled building foundation according to claim 1, characterized in that: The first foundation (1) and the second foundation (2) are provided with corresponding holes (413) inside, and vertical steel bars (414) are inserted into the holes (413).

7. The pre-buried assembled building foundation according to claim 6, characterized in that: The top of the second foundation (2) is provided with a pouring port (415) and a pouring trough (416), wherein the pouring port (415) is located in the middle of the top of the second foundation (2), and the pouring trough (416) is provided in a plurality of groups and is connected with the pouring port (415) and the hole (413).

8. The pre-buried assembled building foundation according to claim 7, characterized in that: The outer wall of the vertical steel bar (414) is sleeved with a connecting sleeve (418), and two adjacent groups of connecting sleeves (418) are fixedly connected by a connecting plate (417).

Citation Information

Patent Citations

  • Building foundation structure

    CN211057833U