Mounting device capable of replacing handrail

By designing a replacement railing installation device and using the disassembly connection of the connecting plate and the fixture, the problem of concrete being removed and repourged during railing replacement in the existing technology is solved, and rapid replacement and efficient installation are achieved, and construction efficiency is improved. Fixation of railings.

CN222525729UActive Publication Date: 2025-02-25CHINA CONSTR SCI & IND CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421012719.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-10
Publication Date
2025-02-25
Estimated Expiration
2034-05-10

AI Technical Summary

Technical Problem

In the prior art, concrete needs to be removed and repourged when replacing old railings, resulting in poor aesthetics and low construction efficiency.

Method used

An installation device for alternative railings is provided, including a railing body, a connecting plate, a connecting member and a fixture, through the detached connection of these components, the railings can be replaced and installed without removing concrete.

Benefits of technology

It realizes rapid replacement and installation of railings, avoids repeated pouring of concrete, improves construction efficiency, and enhances the fixity of railings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222525729U_ABST
    Figure CN222525729U_ABST
Patent Text Reader

Abstract

The utility model provides an installation device capable of replacing a handrail, which belongs to the technical field of building construction and comprises a handrail body, a first end face and a second end face are arranged at the lower end of the handrail body, and the first end face is higher than the second end face. The connecting plate is used for being detachably installed on the upper end face of the concrete square flange; the connecting piece is arranged on the upper end face of the connecting plate and detachably connected with the first end face of the handrail body. The fixing piece is detachably connected with the side end face of the turned-over edge, and the second end face of the handrail body is connected with the upper end face of the fixing piece. According to the guardrail, the connecting plate and the fixing plate are arranged, the first end face of the guardrail body is installed at the upper end of the connecting plate, and the first end face of the guardrail body is installed at the upper end of the fixing piece, so that concrete does not need to be smashed and then poured again, and only the connecting plate needs to be installed on the upper end face of the turned-over edge; and then the fixing plate is installed on the side end face of the turned-over edge, so that the handrail body can be fixed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to an installation device for replaceable handrails. Background Art

[0002] Existing steel railings in buildings are generally severely corroded due to long-term exposure to the air, especially those that have not been fully treated with anti-corrosion. This corrosion not only affects the aesthetics of the railings, but more importantly, weakens their structural strength, greatly reducing the bearing capacity and stability of the railings. In areas with dense traffic, such as schools, hospitals, shopping malls, etc., continuing to use severely corroded railings will pose a great safety hazard. Once an accident occurs, the consequences will be disastrous.

[0003] Therefore, in order to ensure people's safety, it is necessary to remove the old railings. In the prior art, the railings are removed, the concrete is broken, and then the new railings are installed on the newly poured concrete flanges. However, during the removal process, some style differences between the newly poured concrete and the retained existing buildings make the overall aesthetics poor. Utility Model Content

[0004] Therefore, the technical problem to be solved by the utility model is to overcome the defect in the prior art that the old railings need to be re-cast with concrete before being replaced with new railings, thereby providing an installation device for replaceable railings.

[0005] In order to solve the above technical problems, the utility model provides a replacement railing installation device, comprising: a railing body, the lower end of which is provided with a first end surface and a second end surface, the first end surface being higher than the second end surface;

[0006] A connecting plate, the connecting plate is used to be detachably mounted on the upper end surface of the concrete flange;

[0007] A connecting member, the connecting member is arranged on the upper end surface of the connecting plate, and the connecting member is detachably connected to the first end surface of the railing body;

[0008] A fixing piece is detachably connected to the side end surface of the flange, and the second end surface of the railing body is connected to the upper end surface of the fixing piece.

[0009] Preferably, an extension plate is vertically extended downward from the lower end of the connecting plate on a side away from the railing body, and the connecting plate is connected to the flange through a fastener passing through the extension plate.

[0010] Preferably, the number of the extension plates is two and they are symmetrically arranged on the lower end surface of the connecting plate, and the two extension plates are clamped on both sides of the flange.

[0011] Preferably, the fastener is a screw rod, which passes through two extension plates and is fixed with a nut.

[0012] Preferably, a sealing member for water isolation is provided between the extension plate and the flange.

[0013] Preferably, the sealing member is fixed to the side end surface of the flange by a fastener.

[0014] Preferably, the upper end surface of the connecting piece is provided with a groove for inserting the first end surface of the railing body.

[0015] Preferably, the connecting member is a column extending vertically upward.

[0016] Preferably, the fixing member comprises: a first fixing plate and a second fixing plate which are perpendicularly arranged to each other, the second end surface of the railing body abuts against the upper end surface of the first fixing plate, and the fastener passes through the second fixing plate and is connected to the flange.

[0017] The technical solution of the utility model has the following advantages:

[0018] 1. The installation device of the replaceable handrail provided by the utility model, by providing a connecting plate and a fixing plate, installs the first end face of the handrail body to the upper end of the connecting plate, and installs the first end face of the handrail body to the upper end of the fixing piece, so that there is no need to break up the concrete and then re-pour it. It is only necessary to install the connecting plate to the upper end face of the flange, and then install the fixing plate to the side end face of the flange to fix the handrail body.

[0019] 2. The utility model provides an installation device for replaceable handrails, in which fasteners pass through the extension plate and are fixedly connected to the flange of the concrete. At this time, when the handrail body is subjected to force, the force can be transmitted to the fasteners through the connecting plate, and the fasteners pass through the extension plate in the horizontal direction and are connected to the flange. At this time, the fasteners have an upward pulling force, and the fasteners have better fixation to the handrail body.

[0020] 3. The utility model provides a mounting device for replaceable handrails, wherein two extension plates are clamped on both sides of the flange, and the fasteners are respectively passed through the two extension plates and connected to the flange, thereby increasing the connection strength between the connection plate and the flange. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 A front view of a mounting device for a replaceable railing provided in one embodiment of the utility model;

[0023] Figure 2 for Figure 1 Magnified view of the connecting plate in .

[0024] Description of reference numerals:

[0025] 1. Railing body; 2. First end face; 3. Second end face; 4. Flanging; 5. Connector; 6. Fixing member; 7. Extension plate; 8. Sealing member; 9. Groove; 10. First rod body; 11. Second rod body; 12. Connecting plate. DETAILED DESCRIPTION

[0026] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0029] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0030] The installation device of the replaceable handrail provided in this embodiment is used to install and fix the new handrail after the handrail is replaced.

[0031] like Figure 1 As shown, a specific implementation of the installation device of the replaceable handrail provided in this embodiment includes a handrail body 1, a connecting plate 12 and a fixing plate. The handrail body 1 includes a first rod body 10 and a second rod body 11, the first rod body 10 and the second rod body 11 are fixedly connected, the lower end face of the first rod body 10 is provided with a first end face 2, and the lower end face of the second rod body 11 is provided with a second end face 3, wherein the first end face 2 is higher than the second end face 3; the connecting plate 12 is used for detachably mounting to the upper end face of the concrete square flange 4, wherein the flange 4 is arranged on the upper end face of the concrete square and extends upward; the connecting member 5 is arranged on the upper end face of the connecting plate 12, and the connecting member 5 is detachably connected to the first end face 2 of the handrail body 1; the fixing member 6 is detachably connected to the side end face of the flange 4, and the second end face 3 of the handrail body 1 is connected to the upper end face of the fixing member 6. By providing the connection plate 12 and the fixing plate, the first end face 2 of the handrail body 1 is mounted to the upper end of the connection plate 12, and the first end face 2 of the handrail body 1 is mounted to the upper end of the fixing member 6, and the concrete does not need to be broken and re-cast. It is only necessary to mount the connection plate 12 to the upper end face of the flange 4, and then mount the fixing plate to the side end face of the flange 4 to fix the handrail body 1. When disassembling, the handrail body 1 can also be easily disassembled and replaced.

[0032] like Figure 1 As shown, in this embodiment, the lower end of the connecting plate 12 is provided with an extension plate 7 extending vertically downward on a side away from the railing body 1, and the connecting plate 12 is connected to the flange 4 through a fastener passing through the extension plate 7. Specifically, the fastener passes through the extension plate 7 and is fixedly connected to the concrete flange 4. At this time, when the railing body 1 is subjected to force, the force can be transmitted to the fastener through the connecting plate 12, and the fastener passes through the extension plate 7 in the horizontal direction and is connected to the flange 4. At this time, the fastener has an upward pulling force, and the fastener has better fixation to the railing body 1. In addition, as an alternative embodiment, the fastener can pass through the connecting plate 12 from the upper end surface of the connecting plate 12 and then be connected to the flange 4.

[0033] like Figure 1 As shown, in this embodiment, two extension plates 7 are symmetrically arranged on the lower end surface of the connecting plate 12, and the two extension plates 7 are clamped on both sides of the flange 4. At this time, the fasteners pass through the two extension plates 7 and are connected to the flange 4, thereby increasing the connection strength between the connecting plate 12 and the flange 4. In addition, as an alternative embodiment, only one extension plate 7 can be provided, which can also realize the installation between the connecting plate 12 and the flange 4.

[0034] like Figure 1As shown, in this embodiment, the fastener is a screw rod, which is fixed with a nut after passing through the two extension plates 7. After the screw rod passes through the two extension plates 7, both ends of the screw rod extend out of a part of the extension plate 7. The nuts are screwed on both ends of the screw rod respectively, so that the two nuts clamp the extension plate 7, making the connection more secure. In addition, as an alternative embodiment, the fastener can be set as a bolt.

[0035] like Figure 1 As shown, in this embodiment, a sealing member 8 for water isolation is provided between the extension plate 7 and the flange 4, and the sealing member 8 is provided between the extension plate 7 and the flange 4 on the side away from the railing body 1. The sealing member 8 is a waterproof roll in the prior art, and the waterproof roll is provided between the extension plate 7 and the flange 4 to prevent liquid from entering the connecting plate 12 and corroding the connecting plate 12 and the screw. In addition, as an alternative embodiment, two sealing members 8 can be provided, respectively located between two extension plates 7 and the flange 4.

[0036] like Figure 1 As shown, in this embodiment, the sealing member 8 is fixed to the side end surface of the flange 4 by fasteners, and specifically, the waterproofing membrane is fixed to the side end surface of the flange 4 by nails. In addition, as an alternative embodiment, the waterproofing membrane can also be fixed by bolts, or clamped and fixed by the extension plate 7 and the flange 4.

[0037] like Figure 2 As shown, in this embodiment, the upper end surface of the connecting member 5 is provided with a groove 9 for plugging with the first end surface 2 of the railing body 1. Specifically, the first rod 10 on the railing body 1 is inserted into the groove 9 of the connecting member 5. At this time, the installation and disassembly of the railing body 1 are more convenient. When disassembling, it is only necessary to move the railing body 1 upward and disengage it from the groove 9 of the connecting member 5. When the railing body 1 is inserted into the groove 9 of the connecting member 5, the horizontal and vertical downward forces of the railing body 1 will be limited by the connecting plate 12, thereby ensuring the stability of the railing body 1. In addition, as an alternative embodiment, the connecting member 5 can be detachably connected to the railing body 1 by bolts.

[0038] like Figure 2 As shown, in this embodiment, the connecting member 5 is a columnar body extending vertically upward, specifically a cylindrical body. The bottom of the connecting member 5 is fixedly connected to the upper end surface of the connecting plate 12 by welding. The groove 9 is provided on the upper end surface of the connecting member 5, and the railing body 1 is inserted into the groove 9 of the connecting member 5 during insertion. In addition, as an alternative embodiment, the connecting member 5 is block-shaped, such as a rectangular parallelepiped or a cube.

[0039] like Figure 1As shown, in this embodiment, the fixing member 6 includes: a first fixing plate and a second fixing plate which are arranged perpendicularly to each other, the second end face 3 of the railing body 1 abuts against the upper end face of the first fixing plate, and the railing body 1 is fixedly connected to the upper end face of the first fixing plate by welding. The fastener is a bolt, and the fastener is connected to the flange 4 after passing through the second fixing plate. At this time, the gravity of the railing body 1 is borne by the fastener and the first fixing plate. The first fixing plate and the second fixing plate are arranged perpendicularly to each other, and the structure is relatively simple and the installation is relatively convenient. In addition, as a replaceable embodiment, a reinforcing rib is arranged between the first fixing plate and the second fixing plate. In addition, as a replaceable embodiment, the fixing member 6 can be set as a rectangular block, and the fastener is connected to the flange 4 after passing through the fixing member 6 from the side end face of the fixing member 6.

[0040] Installation method of the installation device of the replaceable handrail: the upper end surface of the concrete flange 4 is provided with a connecting plate 12, and the lower end surface of the connecting plate 12 extends downward to two extension plates 7, and a sealing member 8 is provided between the extension plate 7 and the flange 4. The extension plates 7 are clamped on both sides of the flange 4 respectively, and after the screw passes through the extension plate 7, nuts are arranged at both ends of the screw for fixing. The second end surface 3 of the handrail body 1 is fixedly connected with the first fixing plate of the fixing member 6, and the second fixing plate of the fixing member 6 is attached to the outer end surface of the flange 4, and is connected to the flange 4 after passing through the second fixing plate with a bolt. During installation, the first fixing plate of the fixing member 6 is welded to the handrail body 1, and then the connecting plate 12 is installed to the upper end surface of the flange 4 through the screw, and the first end surface 2 of the handrail body 1 is aligned with the groove 9 on the connecting member 5 and inserted, and the bolt is passed through the second fastener to fix the handrail body 1 to the concrete flange 4 for fixing. It is convenient to install and disassemble, and the installation of the handrail body 1 will not damage the concrete flange 4, which greatly improves the construction efficiency.

[0041] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from these are still within the scope of protection of the present utility model.

Claims

1. A mounting device for a replaceable railing, characterized in that: include: A railing body (1), wherein the lower end of the railing body (1) is provided with a first end surface (2) and a second end surface (3), and the first end surface (2) is higher than the second end surface (3); A connecting plate (12), the connecting plate (12) being used for being detachably mounted on the upper end surface of the concrete flange (4); A connecting member (5), the connecting member (5) being arranged on the upper end surface of the connecting plate (12), the connecting member (5) being detachably connected to the first end surface (2) of the railing body (1); The fixing member (6) is detachably connected to the side end surface of the flange (4), and the second end surface (3) of the railing body (1) is connected to the upper end surface of the fixing member (6).

2. The installation device of replaceable railing according to claim 1, characterized in that: An extension plate (7) extends vertically downward from the lower end of the connecting plate (12) on a side away from the railing body (1), and the connecting plate (12) is connected to the flange (4) through a fastener passing through the extension plate (7).

3. The installation device of replaceable railing according to claim 2, characterized in that: The extension plates (7) are two symmetrically arranged on the lower end surface of the connecting plate (12), and the two extension plates (7) are clamped on both sides of the flange (4).

4. The installation device of replaceable railing according to claim 3, characterized in that: The fastener is a screw rod, which passes through two extension plates (7) and is fixed with a nut.

5. The installation device of replaceable railing according to claim 2, characterized in that: A sealing member (8) for water isolation is provided between the extension plate (7) and the flange (4).

6. The installation device of replaceable railing according to claim 5, characterized in that: The sealing member (8) is fixed to the side end surface of the flange (4) by means of a fastener.

7. The installation device of replaceable railing according to any one of claims 1 to 6, characterized in that: The upper end surface of the connecting piece (5) is provided with a groove (9) for inserting the first end surface (2) of the railing body (1).

8. The mounting device of replaceable railing according to claim 7, characterized in that: The connecting member (5) is a columnar body extending vertically upwards.

9. The installation device of replaceable railing according to any one of claims 1 to 6, characterized in that: The fixing member (6) comprises a first fixing plate and a second fixing plate which are arranged perpendicular to each other, the second end surface (3) of the railing body (1) abuts against the upper end surface of the first fixing plate, and the fastener passes through the second fixing plate and is connected to the flange (4).