Water conservancy construction management monitoring station

By designing a detachable water conservancy construction management monitoring table base and mounting frame, the problem of high damage to the water level gauge device in the existing technology needs to be repaired by climbing and climbing, achieving a safe and convenient maintenance process, and extending the equipment through a protective mechanism Service life.

CN222528673UActive Publication Date: 2025-02-25LUSHAN COUNTY YONGCHANG ROAD & BRIDGE CONSTR ENG CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421424871.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2025-02-25
Estimated Expiration
2034-06-21

AI Technical Summary

Technical Problem

During use, the existing water conservancy construction management monitoring table is installed at a high place. Once damaged, it needs to be repaired, which affects the personal safety of the staff and is inconvenient to repair.

Method used

A water conservancy construction management monitoring table is designed, which includes a detachable base and mounting frame. The base and mounting frame are separated by the connection of bolts and nuts, which is convenient for maintenance personnel to carry out maintenance, and through the connection of cylinders and threaded blocks. The limit design avoids rotation at the splitting point.

Benefits of technology

The maintenance of water level gauge and other devices does not require climbing operations, which ensures the personal safety of maintenance personnel, and protects cables through protective mechanisms to avoid damage and extends the service life of the monitoring table.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222528673U_ABST
    Figure CN222528673U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of water conservancy construction management, in particular to a water conservancy construction management monitoring station, which comprises a main body, the main body comprises a mounting table, the surface of the mounting table is fixedly connected with a base, the surface of the base is provided with a mounting frame, and the surface of the mounting frame is provided with a water level gauge, a photovoltaic panel and a control box. The surface of the photovoltaic panel is fixedly connected with a cable, and the surface of the control box is provided with a through hole. And the rotating mechanism comprises a connecting cylinder. According to the utility model, the base and the mounting rack are split, so that the water level gauge, the photovoltaic panel and the control box which are mounted on the monitoring platform can be maintained more conveniently without climbing operation, the personal safety of maintenance personnel is further guaranteed, the first mounting plate and the second mounting plate can be connected through the connection of the bolts and the nuts, and the maintenance efficiency is improved. And through connection of a connecting cylinder and a threaded block, the effect of limiting the splitting position is achieved, and rotation is avoided when the device is not used.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy construction management, in particular to a water conservancy construction management monitoring station. Background Art

[0002] Water conservancy refers to the development of water resources and the prevention of floods. The construction of water conservancy projects is the work of building water conservancy projects in accordance with the requirements of the project structure, quantity, quality, progress and cost proposed in the design, and includes construction preparation, construction technology and construction management.

[0003] When carrying out water conservancy construction, it is necessary to use a management monitoring station to measure and monitor the water level of the construction water area. However, during the use of the existing monitoring station, the water level meter and other devices are installed at a high place. Once damaged, they must be repaired at a high place, which affects the personal safety of the staff and is inconvenient and difficult to carry out. Utility Model Content

[0004] The purpose of the utility model is to provide a water conservancy construction management monitoring station to solve the problem that during the use of the monitoring station proposed in the above background technology, the water level meter and other devices are installed at a high place. Once damaged, they need to be repaired at a high place, which affects the personal safety of the staff and is inconvenient and difficult to repair.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions, water conservancy construction management and monitoring platform, including:

[0006] The main body includes a mounting platform, a base is fixedly connected to the surface of the mounting platform, a mounting frame is installed on the surface of the base, a water level gauge, a photovoltaic panel and a control box are installed on the surface of the mounting frame, a cable is fixedly connected to the surface of the photovoltaic panel, and a through hole is opened on the surface of the control box;

[0007] The rotating mechanism includes a connecting tube, which is sleeved on the surface of the mounting frame, the surface of the base is fixedly connected to a bottom plate, the surface of the bottom plate is fixedly connected to a threaded block, the surface of the threaded block is fixedly connected to a first mounting plate, the surface of the mounting frame is fixedly connected to a second mounting plate, the surface of the first mounting plate is provided with a through hole, the surface of the second mounting plate is provided with a socket, the surface of the through hole is installed with a bolt, and the surface of the bolt is installed with a nut.

[0008] Preferably, the connecting tube is connected to the surface of the threaded block via threads, and the connecting tube is abutted against the surface of the bottom plate, and the diameter of the bottom plate is larger than the outer diameter of the connecting tube.

[0009] Preferably, two groups of the second mounting plates are provided, and the two groups of the second mounting plates are movably connected to both sides of the first mounting plate, the diameter of the through hole is the same as the diameter of the socket, and the bolts are plugged and connected on the surfaces of the through hole and the socket.

[0010] Preferably, one end of the bolt is abutted against the surface of the second mounting plate, and the other end of the bolt is threadedly connected to the surface of a nut, and the nut is abutted against the surface of the second mounting plate, and the size of the nut is larger than the size of the socket.

[0011] Preferably, a protective mechanism is provided on the surface of the control box, and the protective mechanism includes a mounting sleeve, the mounting sleeve is abutted and connected to the surface of the control box, a threaded barrel is fixedly connected to the surface of the control box, a mounting hole is opened on the surface of the mounting sleeve, a first sealing ring is installed on the surface of the mounting sleeve, and a second sealing ring is fixedly connected to the surface of the first sealing ring.

[0012] Preferably, the mounting sleeve is connected to the surface of the threaded barrel by threads, the inner diameter of the threaded barrel is the same as the diameter of the through hole, the diameter of the mounting hole is smaller than the diameter of the through hole, and two groups of the first sealing rings are provided, and the two groups of the first sealing rings are fixedly connected to both sides of the second sealing ring.

[0013] Preferably, the first sealing ring is abutted against the surface of the mounting sleeve, the inner diameter of the first sealing ring is the same as the inner diameter of the second sealing ring, the first sealing ring and the second sealing ring are sleeved on the surface of the control box, and the second sealing ring is installed on the surface of the mounting hole.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. By splitting the base and the mounting frame, the water level gauge, photovoltaic panel and control box installed on the monitoring platform can be more convenient to inspect and repair without the need for climbing operations, thereby ensuring the personal safety of maintenance personnel. The first mounting plate and the second mounting plate can be connected by the connection of bolts and nuts, thereby realizing the connection between the base and the mounting frame, and the connection of the connecting tube and the threaded block can be used to limit the split position to prevent rotation when not in use.

[0016] 2. By setting a protective mechanism at the connection between the cable and the control box, the cable can be prevented from being damaged by excessive bending at the through hole under the connection between the mounting sleeve and the threaded barrel, thereby achieving the effect of protecting the cable. A first sealing ring and a second sealing ring are set at the connection between the mounting sleeve and the cable, which can prevent rainwater from entering outdoors and also protect the connection from wear, thereby increasing the service life of the monitoring station. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1It is a right-side perspective schematic diagram of the structure of the utility model;

[0018] Figure 2 It is a left-side perspective schematic diagram of the structure of the utility model;

[0019] Figure 3 It is a partial three-dimensional cross-sectional schematic diagram of the structure of the connecting tube of the utility model;

[0020] Figure 4 It is a structural stereoscopic schematic diagram of the installation sleeve of the utility model;

[0021] Figure 5 For this utility model Figure 3 A schematic diagram of a partial three-dimensional cross-sectional view of the structure of the middle bolt;

[0022] Figure 6 For this utility model Figure 4 Schematic diagram of the structure of the first sealing ring.

[0023] In the figure: 1. mounting table; 11. base; 12. mounting frame; 13. water level gauge; 14. photovoltaic panel; 15. control box; 16. cable; 17. through hole; 2. connecting tube; 21. bottom plate; 22. threaded block; 23. first mounting plate; 24. second mounting plate; 25. through hole; 26. jack; 27. bolt; 28. nut; 3. mounting sleeve; 31. threaded tube; 32. mounting hole; 33. first sealing ring; 34. second sealing ring. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] See also Figure 1-6 , an embodiment provided by the utility model:

[0026] Water conservancy construction management monitoring station, including:

[0027] The main body includes a mounting platform 1, a base 11 is fixedly connected to the surface of the mounting platform 1, a mounting frame 12 is installed on the surface of the base 11, a water level meter 13, a photovoltaic panel 14 and a control box 15 are installed on the surface of the mounting frame 12, a cable 16 is fixedly connected to the surface of the photovoltaic panel 14, and a through hole 17 is opened on the surface of the control box 15. During the water conservancy construction, the water level needs to be detected by the water level meter 13, and the water level meter 13 is operated and controlled by the control box 15. The two ends of the cable 16 are respectively connected to the photovoltaic panel 14 and the control box 15, so that the photovoltaic panel 14 converts solar energy into electrical energy for use by the control box 15, and the data detected by the water level meter 13 is transmitted to the remote monitoring equipment, thereby realizing the monitoring of the water conservancy construction;

[0028] The rotating mechanism includes a connecting tube 2, which is sleeved on the surface of the mounting frame 12. The surface of the base 11 is fixedly connected to a bottom plate 21, the surface of the bottom plate 21 is fixedly connected to a threaded block 22, the surface of the threaded block 22 is fixedly connected to a first mounting plate 23, the surface of the mounting frame 12 is fixedly connected to a second mounting plate 24, the surface of the first mounting plate 23 is provided with a through hole 25, the surface of the second mounting plate 24 is provided with a plug hole 26, the surface of the through hole 25 is installed with a bolt 27, and the surface of the bolt 27 is installed with a nut 28. One end of the connecting tube 2 is installed on the surface of the mounting frame 12 and the other end is installed on the surface of the threaded block 22, so as to limit the connection between the base 11 and the mounting frame 12 to prevent the split portion from rotating when not in use.

[0029] Furthermore, the connecting tube 2 is connected to the surface of the threaded block 22 through threads, and the connecting tube 2 is abutted against the surface of the base plate 21. The diameter of the base plate 21 is larger than the outer diameter of the connecting tube 2. Under the action of the base plate 21, the threaded block 22 is installed and the support and limitation of the connecting tube 2 are achieved.

[0030] Furthermore, two groups of second mounting plates 24 are provided, and the two groups of second mounting plates 24 are movably connected to both sides of the first mounting plate 23. The diameter of the through hole 25 is the same as the diameter of the plug hole 26. The bolt 27 is plugged and connected on the surface of the through hole 25 and the plug hole 26. Under the connection between the first mounting plate 23 and the second mounting plate 24, the split base 11 and the mounting frame 12 can be connected. The bolt 27 passes through the through hole 25 and the plug hole 26 and penetrates the first mounting plate 23 and the surface of the two groups of second mounting plates 24.

[0031] Furthermore, one end of the bolt 27 is abutted and connected to the surface of the second mounting plate 24, and the other end of the bolt 27 is connected to the surface of the nut 28 through a thread. The nut 28 is abutted and connected to the surface of the second mounting plate 24. The size of the nut 28 is larger than the size of the socket 26. The connection of the nut 28 can achieve limited fixation of the bolt 27, thereby making the connection between the first mounting plate 23 and the second mounting plate 24 more secure, and when in use, the second mounting plate 24 will rotate around the bolt 27.

[0032] Furthermore, a protective mechanism is provided on the surface of the control box 15, and the protective mechanism includes a mounting sleeve 3, which is abutted and connected to the surface of the control box 15, a threaded tube 31 is fixedly connected to the surface of the control box 15, a mounting hole 32 is provided on the surface of the mounting sleeve 3, a first sealing ring 33 is installed on the surface of the mounting sleeve 3, a second sealing ring 34 is fixedly connected to the surface of the first sealing ring 33, and an anti-slip strip is provided on the surface of the mounting sleeve 3, so that the mounting sleeve 3 and the threaded tube 31 are more labor-saving when being connected.

[0033] Furthermore, the mounting sleeve 3 is connected to the surface of the threaded barrel 31 by means of threads, the inner diameter of the threaded barrel 31 is the same as the diameter of the through hole 17, the diameter of the mounting hole 32 is smaller than the diameter of the through hole 17, and two groups of first sealing rings 33 are provided, and the two groups of first sealing rings 33 are fixedly connected to both sides of the second sealing ring 34. Under the connection between the mounting sleeve 3 and the threaded barrel 31, the cable 16 can be protected to prevent the cable 16 from being damaged by bending at the through hole 17, and the first sealing ring 33 and the second sealing ring 34 can be installed through the mounting hole 32.

[0034] Furthermore, the first sealing ring 33 is abutted and connected to the surface of the mounting sleeve 3, the inner diameter of the first sealing ring 33 is the same as the inner diameter of the second sealing ring 34, the first sealing ring 33 and the second sealing ring 34 are sleeved on the surface of the control box 15, and the second sealing ring 34 is installed on the surface of the mounting hole 32. The first sealing ring 33 and the second sealing ring 34 are both made of rubber material, and the first sealing ring 33 and the second sealing ring 34 are tightly sleeved on the cable 16, which can prevent wear on the connection between the cable 16 and the mounting sleeve 3 while achieving waterproofing.

[0035] Working principle: When repairing the device on the monitoring station, the maintenance personnel need to support the mounting frame 12 in advance, and remove the connecting tube 2 from the threaded block 22 through the thread, and the connecting tube 2 cancels the contact with the bottom plate 21. When the connecting tube 2 moves upward along the mounting frame 12 and the bolt 27 and the nut 28 are exposed, the nut 28 is loosened on the bolt 27 through the thread so that it no longer contacts the surface of the second mounting plate 24. At this time, the mounting frame 12 is moved to rotate around the bolt 27 until it rotates to the ground for maintenance.

[0036] When the cable 16 is installed in the control box 15, first install the first sealing ring 33 and the second sealing ring 34 at the installation hole 32 opened on the installation sleeve 3, and pass the cable 16 through the inner surfaces of the first sealing ring 33 and the second sealing ring 34 to achieve waterproof and anti-wear effects, and then insert it into the through hole 17 and connect it to the electrical components in the control box 15. At this time, rotate the installation sleeve 3 so that it is connected to the threaded barrel 31 through threads and rests against the surface of the control box 15.

[0037] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. Water conservancy construction management and monitoring station, characterized by: include: The main body comprises a mounting platform (1), a base (11) is fixedly connected to the surface of the mounting platform (1), a mounting frame (12) is installed on the surface of the base (11), a water level meter (13), a photovoltaic panel (14) and a control box (15) are installed on the surface of the mounting frame (12), a cable (16) is fixedly connected to the surface of the photovoltaic panel (14), and a through hole (17) is opened on the surface of the control box (15); The rotating mechanism comprises a connecting tube (2), wherein the connecting tube (2) is sleeved on the surface of a mounting frame (12), the surface of the base (11) is fixedly connected to a bottom plate (21), the surface of the bottom plate (21) is fixedly connected to a threaded block (22), the surface of the threaded block (22) is fixedly connected to a first mounting plate (23), the surface of the mounting frame (12) is fixedly connected to a second mounting plate (24), the surface of the first mounting plate (23) is provided with a through hole (25), the surface of the second mounting plate (24) is provided with an insertion hole (26), the surface of the through hole (25) is provided with a bolt (27), and the surface of the bolt (27) is provided with a nut (28).

2. The water conservancy construction management and monitoring station according to claim 1 is characterized by: The connecting tube (2) is connected to the surface of the threaded block (22) via threads, and the connecting tube (2) is abutted against the surface of the bottom plate (21), wherein the diameter of the bottom plate (21) is greater than the outer diameter of the connecting tube (2).

3. The water conservancy construction management and monitoring station according to claim 1 is characterized by: The second mounting plates (24) are provided in two groups, and the two groups of the second mounting plates (24) are movably connected to the two sides of the first mounting plate (23), the diameter of the through hole (25) is the same as the diameter of the insertion hole (26), and the bolt (27) is plugged and connected on the surface of the through hole (25) and the insertion hole (26).

4. The water conservancy construction management and monitoring station according to claim 1 is characterized by: One end of the bolt (27) is abutted against the surface of the second mounting plate (24), and the other end of the bolt (27) is threadedly connected to the surface of a nut (28), and the nut (28) is abutted against the surface of the second mounting plate (24), and the size of the nut (28) is larger than the size of the insertion hole (26).

5. The water conservancy construction management and monitoring station according to claim 1 is characterized by: The surface of the control box (15) is provided with a protective mechanism, the protective mechanism comprising a mounting sleeve (3), the mounting sleeve (3) is abutted against the surface of the control box (15), a threaded cylinder (31) is fixedly connected to the surface of the control box (15), a mounting hole (32) is provided on the surface of the mounting sleeve (3), a first sealing ring (33) is installed on the surface of the mounting sleeve (3), and a second sealing ring (34) is fixedly connected to the surface of the first sealing ring (33).

6. The water conservancy construction management and monitoring station according to claim 5 is characterized by: The mounting sleeve (3) is connected to the surface of the threaded barrel (31) by means of threads, the inner diameter of the threaded barrel (31) is the same as the diameter of the through hole (17), the diameter of the mounting hole (32) is smaller than the diameter of the through hole (17), and two groups of the first sealing rings (33) are provided, and the two groups of the first sealing rings (33) are installed on both sides of the second sealing ring (34).

7. The water conservancy construction management and monitoring station according to claim 6 is characterized by: The first sealing ring (33) is abutted against the surface of the mounting sleeve (3); the inner diameter of the first sealing ring (33) is the same as the inner diameter of the second sealing ring (34); the first sealing ring (33) and the second sealing ring (34) are sleeved on the surface of the control box (15); and the second sealing ring (34) is mounted on the surface of the mounting hole (32).