Multi-stage spraying tail gas absorption equipment

By designing a multi-stage spray exhaust gas absorption equipment, the multi-stage spraying and rotating swinging nozzles are used to extend the gas-liquid contact time, and through multiple purification treatments, the problems of incomplete exhaust gas treatment and poor adaptability of single-stage spraying are solved, achieving a more efficient exhaust gas treatment effect.

CN222534477UActive Publication Date: 2025-02-28WUXI HILINGER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421275826.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2025-02-28
Estimated Expiration
2034-06-05

AI Technical Summary

Technical Problem

When existing exhaust gas absorption equipment treats industrial exhaust gas, the exhaust gas rise rate is too fast and cannot fully react with alkaline liquid, resulting in incomplete exhaust gas treatment and poor adaptability of single-stage spraying devices, which cannot meet the exhaust gas treatment needs of high pollution loads or complex components.

Method used

A multi-stage spray exhaust gas absorption device is designed. Through the multi-stage spray structure and rotating swing nozzle in the spray tower, the gas-liquid contact time is extended, and multiple purification treatments are carried out through the interlayer between the lower baffle and the asbestos adsorption plate to improve absorption efficiency.

Benefits of technology

Through multi-stage spraying and multiple purification treatments, the treatment efficiency of exhaust gas is significantly improved, and it can react with alkaline liquid more fully, reach higher environmental standards, and meet different types of exhaust gas treatment needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The utility model discloses multi-stage spraying tail gas absorption equipment, which belongs to the technical field of tail gas absorption equipment and comprises a spraying tower, a mounting block fixedly mounted in the spraying tower, a large motor fixedly mounted in the mounting block, two connecting blocks rotatably mounted in the mounting block, an output end of the large motor fixedly connected with one connecting block, and an output end of the large motor fixedly connected with the other connecting block. The bottom ends of the two connecting blocks are fixedly provided with the same fixing frame, a connecting rod is rotationally installed on the fixing frame, two connecting plates and a worm wheel are fixedly installed on the connecting rod, the two connecting plates are fixedly provided with the same spray head, two fixing blocks are fixedly installed in the installation block, and a worm is rotationally installed between the two fixing blocks. And a small motor is fixedly mounted on one worm. According to the utility model, waste gas flows from bottom to top, so that the gas-liquid contact time is greatly prolonged, the use efficiency of an absorbent is improved, the spraying range and the types of absorption liquid can be adjusted according to actual conditions, and different tail gas treatment requirements are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tail gas absorption equipment, in particular to a multi-stage spray tail gas absorption equipment. Background Art

[0002] Multi-stage spray tail gas absorption equipment; In the treatment of tail gas generated in the catalyst production process, a new tail gas multi-stage absorption technology has been developed through a thorough study of physical absorption and chemical absorption. The core of this technology is to extend the contact time between tail gas and spray liquid, thereby improving the absorption effect. Some technologies use a two-stage series multi-stage spray form of water washing plus alkaline washing to recover and purify gases such as sulfur dioxide. This method ensures the demisting effect and solves the problem of difficult maintenance of screen film by setting a cyclone plate demisting layer and an external wire mesh demisting device. The existing tail gas absorption tower has some shortcomings in treating industrial tail gas, such as the tail gas rising rate is too fast, and it cannot fully react with the alkaline liquid, resulting in incomplete tail gas treatment. In order to solve this problem, a multi-stage exhaust absorption tower was developed to improve the exhaust gas treatment efficiency and environmental protection effect. The spray cyclone plate exhaust gas purification tower is a technologically advanced wet dust removal equipment, especially in boiler dust removal and desulfurization and spray paint mist removal. It has good purification effect and low gas humidity content. In response to the needs of high-concentration exhaust gas treatment, an integrated multi-stage spray device was developed. The device has application value in the fields of mechanical engineering, chemical engineering, fluid mechanics and environmental engineering technology.

[0003] Most of the existing spray devices are traditional single-stage spray devices. Today's industrial exhaust emission standards are becoming more and more stringent. Single-stage spray absorption equipment can no longer meet the needs of exhaust treatment with certain high pollution loads or complex components, and it needs to deal with a variety of different exhaust gases and has poor adaptability. Therefore, we propose a multi-stage spray exhaust absorption equipment to solve this problem. Utility Model Content

[0004] The purpose of the utility model is to provide a multi-stage spray tail gas absorption device to solve the problems raised in the above background technology.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A multi-stage spray tail gas absorption device comprises: a spray tower, a mounting block is fixedly installed in the spray tower, a large motor is fixedly installed in the mounting block, two connecting blocks are rotatably installed in the mounting block, the output end of the large motor is fixedly connected to one of the connecting blocks, a same fixing frame is fixedly installed at the bottom ends of the two connecting blocks, a connecting rod is rotatably installed on the fixing frame, two connecting plates and a worm gear are fixedly installed on the connecting rod, a same spray head is fixedly installed on both connecting plates, two fixing blocks are fixedly installed in the mounting block, a worm is rotatably installed between the two fixing blocks, a small motor is fixedly installed on one of the worms, the output end of the small motor is fixedly connected to the worm, and the worm is meshed with the worm gear.

[0007] Preferably, a second water pipe is fixedly installed on the top of the installation water pipe, a plurality of water spray holes are opened on the second water pipe, the second water pipe is fixedly installed in a spray tower, a lower baffle and an asbestos adsorption plate are fixedly installed in the spray tower, the asbestos adsorption plate is arranged above the lower baffle, a demisting layer is fixedly installed in the spray tower, and the demisting layer is arranged above the second water pipe.

[0008] Preferably, a water pump is fixedly installed on one side of the spray tower, a mounting water pipe is fixedly installed on the water pump, a first water pipe is fixedly installed on the mounting water pipe, a folding pipe is fixedly installed on the bottom end of the first water pipe, and the nozzle is fixedly installed on the bottom end of the folding pipe.

[0009] Preferably, a water storage tank is integrally formed on the spray tower, a water injection pipe is fixedly installed on the water storage tank, an observation hole is opened on the water storage tank, a glass plate is fixedly installed in the observation hole, and an exhaust gas inlet pipe is integrally formed on one side of the spray tower.

[0010] Preferably, a fixing groove matching the large motor is provided in the mounting block, a swing groove matching the fixing frame is provided at the bottom end of the mounting block, and a rotating hole matching the connecting rod is provided on the fixing frame.

[0011] Preferably, a clean air exhaust pipe is fixedly installed on the top of the spray tower, an exhaust hole is provided on one side of the clean air exhaust pipe, and a mounting groove matching the water injection pipe is provided on the water storage tank.

[0012] In the utility model, the multi-stage spray tail gas absorption equipment described above pumps water through a water pump fixedly installed on one side of the spray tower, thereby transporting water to the first water pipe and the second water pipe, and the nozzle arranged on the first water pipe performs the first spraying and degassing, wherein part of the exhaust gas passes through the interlayer formed between the lower baffle plate and the asbestos adsorption plate, and activated carbon adsorption cotton or other materials with adsorption properties are added to the interlayer to purify the gas again, and then passes through the second water pipe for the second spraying and degassing, and then passes through the demisting layer and is discharged from the clean gas exhaust pipe;

[0013] In the utility model, the multi-stage spray tail gas absorption device starts a large motor to drive the connecting block to rotate, thereby driving the fixed frame to swing, driving the worm gear, the connecting rod and the connecting plate to swing, and allowing the spray head to swing to both sides, or starts a small motor to drive the worm to rotate, drive the worm gear, the connecting rod and the connecting plate to move, and swing the spray head in other two directions, thereby expanding the spraying range and improving the use efficiency of the absorbent;

[0014] The utility model has a reasonable structural design and can achieve higher environmental protection standards through the cooperation of multiple structures, allowing the exhaust gas to flow upward through the bottom, greatly enhancing the gas-liquid contact time and improving the efficiency of the absorbent. The spray range and the type of absorption liquid can be adjusted according to actual conditions to meet different tail gas treatment needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a three-dimensional structural schematic diagram of a multi-stage spray tail gas absorption device proposed by the utility model;

[0016] Figure 2 This is a cross-sectional structural schematic diagram of a multi-stage spray tail gas absorption device proposed by the utility model;

[0017] Figure 3 This is a partial structural schematic diagram of a multi-stage spray tail gas absorption device proposed by the utility model;

[0018] Figure 4 This is a schematic cross-sectional view of the local structure of a multi-stage spray tail gas absorption device proposed by the utility model;

[0019] Figure 5 The utility model is a partial structural schematic diagram of a multi-stage spray tail gas absorption device.

[0020] In the figure: 1. spray tower; 2. water storage tank; 3. exhaust gas inlet pipe; 4. clean air exhaust pipe; 5. glass plate; 6. water injection pipe; 7. water pump; 8. installation water pipe; 9. first water pipe; 10. installation block; 11. second water pipe; 12. demisting layer; 13. lower baffle; 14. asbestos adsorption plate; 15. nozzle; 16. folding pipe; 17. large motor; 18. fixing frame; 19. connecting block; 20. worm gear; 21. fixing block; 22. worm; 23. small motor; 24. connecting rod; 25. connecting plate. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0022] Reference Figure 1-5 A multi-stage spray tail gas absorption device comprises: a spray tower 1, a mounting block 10 is fixedly installed in the spray tower 1, a large motor 17 is fixedly installed in the mounting block 10, two connecting blocks 19 are rotatably installed in the mounting block 10, the output end of the large motor 17 is fixedly connected to one of the connecting blocks 19, the bottom ends of the two connecting blocks 19 are fixedly installed with the same fixed frame 18, a connecting rod 24 is rotatably installed on the fixed frame 18, two connecting plates 25 and a worm gear 20 are fixedly installed on the connecting rod 24, the two connecting plates 25 are both fixedly installed with the same spray head 15, two fixed blocks 21 are fixedly installed in the mounting block 10, a worm 22 is rotatably installed between the two fixed blocks 21, a small motor 23 is fixedly installed on one of the worm gears 22, the output end of the small motor 23 is fixedly connected to the worm gear 22, and the worm gear 22 is meshed with the worm gear 20.

[0023] In this embodiment, a second water pipe 11 is fixedly installed on the top of the water pipe 8, and a plurality of water spray holes are opened on the second water pipe 11. The second water pipe 11 is fixedly installed in the spray tower 1. A lower baffle 13 and an asbestos adsorption plate 14 are fixedly installed in the spray tower 1. The asbestos adsorption plate 14 is arranged above the lower baffle 13. A demisting layer 12 is fixedly installed in the spray tower 1. The demisting layer 12 is arranged above the second water pipe 11 to further treat the exhaust gas.

[0024] In this embodiment, a water pump 7 is fixedly installed on one side of the spray tower 1, a water pipe 8 is fixedly installed on the water pump 7, a first water pipe 9 is fixedly installed on the water pipe 8, a folding pipe 16 is fixedly installed on the bottom end of the first water pipe 9, and a nozzle 15 is fixedly installed on the bottom end of the folding pipe 16 for better swinging. A water storage tank 2 is integrally formed on the spray tower 1, a water injection pipe 6 is fixedly installed on the water storage tank 2, an observation hole is opened on the water storage tank 2, a glass plate 5 is fixedly installed in the observation hole, and an exhaust gas inlet pipe 3 is integrally formed on one side of the spray tower 1 for better transmission of exhaust gas.

[0025] In this embodiment, a fixing groove matching the large motor 17 is provided in the mounting block 10, a swinging groove matching the fixing frame 18 is provided at the bottom of the mounting block 10, and a rotating hole matching the connecting rod 24 is provided on the fixing frame 18 for better swinging, thereby adjusting the spraying angle.

[0026] In this embodiment, a clean air exhaust pipe 4 is fixedly installed on the top of the spray tower 1, an exhaust hole is opened on one side of the clean air exhaust pipe 4, and an installation groove matching the water injection pipe 6 is opened on the water storage tank 2, so as to better carry out installation and connection and facilitate water transportation.

[0027] In this embodiment, when in use, medicine and water are injected into the water storage tank 2 through the water injection pipe 6, and the water level inside the water storage tank 2 is observed by the glass plate 5. A connecting pipe is installed on the exhaust gas inlet pipe 3 to allow the exhaust gas to enter the spray tower 1 through the exhaust gas inlet pipe 3. Then, water is pumped by a water pump 7 fixedly installed on one side of the spray tower 1, and the water is transported to the first water pipe 9 and the second water pipe 11 along the installed water pipe 8. The nozzle 15 provided on the first water pipe 9 performs the first spraying and degassing, and part of the exhaust gas passes through the interlayer formed between the lower baffle 13 and the asbestos adsorption plate 14. Activated carbon adsorption cotton or other materials with adsorption properties are added to the interlayer to purify the gas again, and then the second degassing is performed through the second water pipe 11. Spray to remove gas, then pass through the demisting layer 12 and be discharged from the clean air exhaust pipe 4. During the first spraying, the large motor 17 fixedly installed in the water pipe 8 can be started to drive the connecting block 19 to rotate, and the connecting block 19 drives the fixed frame 18 to swing, thereby driving the worm gear 20, the connecting rod 24 and the connecting plate 25 to swing, and drive the nozzle 15 to swing to both sides, or start the small motor 23, and let the small motor 23 drive the worm 22 to rotate, thereby driving the worm gear 20 to rotate, and the worm gear 20 drives the connecting rod 24 and the connecting plate 25 fixedly installed on the connecting rod 24 to move, and the nozzle 15 is swung in the other two directions, thereby expanding its spraying range and improving the use efficiency of the absorbent.

[0028] The above is a detailed introduction to a multi-stage spray tail gas absorption device provided by the utility model. This article uses specific embodiments to illustrate the principle and implementation method of the utility model. The description of the above embodiments is only used to help understand the method and core idea of ​​the utility model. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the utility model, the utility model can also be improved and modified, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.

Claims

1. A multi-stage spray tail gas absorption device, characterized in that: include: A spray tower (1), wherein a mounting block (10) is fixedly installed in the spray tower (1), a large motor (17) is fixedly installed in the mounting block (10), two connecting blocks (19) are rotatably installed in the mounting block (10), an output end of the large motor (17) is fixedly connected to one of the connecting blocks (19), a same fixing frame (18) is fixedly installed at the bottom ends of the two connecting blocks (19), a connecting rod (24) is rotatably installed on the fixing frame (18), and the connecting rod (24) Two connecting plates (25) and a worm wheel (20) are fixedly installed on the upper part, and the two connecting plates (25) are fixedly installed with the same nozzle (15). Two fixing blocks (21) are fixedly installed in the mounting block (10), and a worm (22) is rotatably installed between the two fixing blocks (21). A small motor (23) is fixedly installed on one of the worms (22), and the output end of the small motor (23) is fixedly connected to the worm (22), and the worm (22) is meshed with the worm wheel (20).

2. The multi-stage spray tail gas absorption equipment according to claim 1, characterized in that: A water pump (7) is fixedly mounted on one side of the spray tower (1); a mounting water pipe (8) is fixedly mounted on the water pump (7); a first water pipe (9) is fixedly mounted on the mounting water pipe (8); a folding pipe (16) is fixedly mounted on the bottom end of the first water pipe (9); and the spray head (15) is fixedly mounted on the bottom end of the folding pipe (16).

3. The multi-stage spray tail gas absorption equipment according to claim 2, characterized in that: A second water pipe (11) is fixedly installed at the top of the installation water pipe (8), and a plurality of water spray holes are opened on the second water pipe (11). The second water pipe (11) is fixedly installed in the spray tower (1), and a lower baffle (13) and an asbestos adsorption plate (14) are fixedly installed in the spray tower (1), and the asbestos adsorption plate (14) is arranged above the lower baffle (13). A demisting layer (12) is fixedly installed in the spray tower (1), and the demisting layer (12) is arranged above the second water pipe (11).

4. The multi-stage spray tail gas absorption equipment according to claim 1, characterized in that: The spray tower (1) is integrally formed with a water storage tank (2), a water injection pipe (6) is fixedly installed on the water storage tank (2), an observation hole is opened on the water storage tank (2), a glass plate (5) is fixedly installed in the observation hole, and an exhaust gas inlet pipe (3) is integrally formed on one side of the spray tower (1).

5. The multi-stage spray tail gas absorption equipment according to claim 1, characterized in that: A fixing groove matching the large motor (17) is provided in the mounting block (10), a swinging groove matching the fixing frame (18) is provided at the bottom end of the mounting block (10), and a rotating hole matching the connecting rod (24) is provided on the fixing frame (18).

6. The multi-stage spray tail gas absorption equipment according to claim 4, characterized in that: A clean air exhaust pipe (4) is fixedly installed on the top of the spray tower (1), an exhaust hole is provided on one side of the clean air exhaust pipe (4), and a mounting groove matching the water injection pipe (6) is provided on the water storage tank (2).