Eatrium river blocking embedded part and atrium river blocking system
By designing integrated atrium river barrier embedded parts, the problems of low construction efficiency and difficult to ensure the construction accuracy of traditional atrium river barrier are solved, and an efficient and safe installation and construction method is achieved.
Patent Information
- Application Number
- CN202421251984.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-04
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2034-06-04
AI Technical Summary
The column embedded plates and glass embedded plates in traditional atrium blocking are split, resulting in low construction efficiency and high construction accuracy requirements when installing column embedded parts, but welding construction is often aerial work, so the construction quality is difficult to guarantee.
An atrium river barrier embedded member is designed, including an embedded member base, a carrier plate, a glass positioner and a column. Through the combination of vertical assembly part, curved groove line part and horizontal assembly part, the integrated installation of the column and the glass railing is achieved to avoid high altitude construction.
The installation and construction methods have been optimized, the operation risks have been reduced, the welding construction accuracy has been improved, the construction efficiency has been improved and the construction quality has been ensured.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building assembly parts, in particular to an atrium weir embedded part and an atrium weir system. Background Art
[0002] With the progress of society, the design of buildings is becoming more and more humanized and closer to nature. Atriums are designed in the middle part of buildings or curtain wall areas. In order to pursue a better visual effect, the glass balustrades and columns of the atrium weir system need to be arranged along the outer contour of the atrium and maintained neatly and uniformly.
[0003] The column embedded plate and glass embedded plate of the traditional atrium weir are split and need to be installed separately, which has low construction efficiency. In addition, the installation of column embedded parts requires high construction accuracy, but the welding construction between the column and the embedded parts is often done at high altitude, and the construction quality is difficult to guarantee. Therefore, we proposed an atrium weir embedded part and atrium weir system. Utility Model Content
[0004] The present application provides an atrium dam embedded parts and an atrium dam system, so as to at least solve the problem that the column embedded plates and glass embedded plates of the traditional atrium dam in the prior art are split and need to be installed separately, resulting in low construction efficiency, and high construction precision is required when installing the column embedded parts, but the welding construction between the columns and the embedded parts is often carried out at high altitude, and the construction quality is difficult to guarantee.
[0005] In a first aspect, the present application provides an atrium dam embedded component, comprising:
[0006] The embedded base plate has a vertical assembly part, a curved groove part and a horizontal assembly part distributed in sequence from bottom to top, wherein the vertical assembly part is fixed to the vertical wall surface of the building wall, and the curved groove part includes a plurality of grooves opened in the horizontal direction;
[0007] A bearing plate, which is horizontally fixed on the vertical assembly part;
[0008] A glass positioning member, the top of which has a U-shaped notch opening upwardly for mounting a glass balustrade, and the bottom of which is fixedly mounted on the top wall of the carrying plate, and the side wall of which is fixed to the vertical mounting portion;
[0009] Wherein, the horizontal assembly portion can be bent along one of the groove lines and then fixed to the horizontal floor surface of the building wall, so that a plurality of the glass balustrades are located at the same installation baseline height.
[0010] Optionally, at least one assembly hole is formed on each of the horizontal assembly portion and the vertical assembly portion, and expansion bolts are installed in the assembly holes to fix the embedded component substrate.
[0011] Optionally, at least one rib plate is further included, the top end of which is fixed to the bottom wall of the bearing plate, and the side wall of which is fixed to the vertical assembly portion.
[0012] Optionally, a flexible rubber strip for protecting the glass railing assembly is provided in the U-shaped notch of the glass positioning piece.
[0013] Optionally, the glass positioning member is fixed to the carrying plate and the vertical assembly portion via an adhesive layer.
[0014] Optionally, a plurality of the groove lines are horizontally equidistantly opened on the curved groove line portion.
[0015] In a second aspect, the present application further provides an atrium weir system, comprising the atrium weir embedded parts described in the first aspect above, and:
[0016] The bottom end of the column is vertically fixed on the horizontal assembly part, and the upper part of the glass railing is connected to the upper end of the column through a fastener.
[0017] Optionally, a floor layer for burying the horizontal assembly portion and the lower part of the column is further provided on the horizontal floor surface.
[0018] Optionally, it also includes several L-shaped steel frames, the transverse section of which is connected to the end of the bearing plate away from the vertical assembly part, and the outer side of the steel frame is equipped with a decorative aluminum plate covering the embedded parts and the glass positioning parts.
[0019] Optionally, the upper end surface of the decorative aluminum plate is flush with or higher than the upper end surface height of the glass positioning piece.
[0020] Compared with the related art, the atrium weir embedded parts and atrium weir system provided by this application have at least the following technical effects:
[0021] The column embedded plate and the glass embedded plate are integrated into one. During installation, it is only necessary to ensure the verticality of the vertical assembly part on the vertical wall. The elevation of the control bearing plate is determined according to the installation elevation of the glass railing on site. The horizontal assembly part is bent along the groove line and fixed to the horizontal floor surface. Then, the glass positioning piece is fixed on the inner side of the bearing plate, and the glass railing is inserted and assembled in the U-shaped groove on the glass positioning piece. At this time, multiple glass railings are located on the same installation baseline. At the same time, the installation construction of the column can be carried out on the horizontal floor surface of the building wall, which optimizes the installation and construction method, eliminates the need for high-altitude construction, reduces the operation risk, and the welding construction accuracy is controllable.
[0022] Details of one or more embodiments of the present application are set forth in the following drawings and description to make other features, objects, and advantages of the present application more readily apparent. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 It is a schematic diagram of the assembly structure of atrium weir embedded parts according to an exemplary embodiment.
[0025] Figure 2 The figure is a front view of an atrium weir embedded component according to an exemplary embodiment.
[0026] Figure 3 It is a schematic diagram of the structure of atrium weir embedded parts according to an exemplary embodiment.
[0027] Figure 4 It is a schematic diagram of the assembly structure of atrium weir embedded parts according to another exemplary embodiment.
[0028] Description of reference numerals: building wall 10, floor layer 101;
[0029] Embedded parts 20, embedded parts base plate, vertical assembly part 201, horizontal assembly part 202, curved groove line part 203, bearing plate 204, rib plate 205, assembly hole 206, expansion bolt 207;
[0030] Column 30; glass positioning piece 40; glass railing 50; steel frame 60; decorative aluminum plate 70. DETAILED DESCRIPTION
[0031] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0032] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present invention.
[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] In the relevant technology, the column embedded plate and glass embedded plate of the traditional atrium dam are split and need to be installed separately, which has low construction efficiency. In addition, high construction precision is required when installing the column embedded parts. However, the welding construction between the column and the embedded parts is often carried out at high altitude, and the construction quality is difficult to guarantee.
[0035] Based on the above situation, an embodiment of the utility model provides an atrium weir embedded part and an atrium weir system, which are described in detail below in conjunction with specific embodiments and drawings.
[0036] Example 1
[0037] The embodiment of the utility model provides an atrium river dam embedded component. Figure 1 It is a schematic diagram of the assembly structure of atrium weir embedded parts according to an exemplary embodiment. Figure 2 The figure is a front view of an atrium weir embedded component according to an exemplary embodiment. Figure 3 FIG. 1 is a schematic diagram of a structure of an atrium weir embedded component according to an exemplary embodiment. Figure 1-3 As shown, the atrium dam embedded parts include:
[0038] The embedded base plate has a vertical assembly part 201, a curved groove part 203 and a horizontal assembly part 202 distributed in sequence from bottom to top on its width surface. The vertical assembly part 201 is fixed to the vertical wall surface of the building wall 10. The curved groove part 203 includes a plurality of grooves opened horizontally. In this embodiment, the plurality of grooves are opened horizontally at equal intervals on the curved groove part 203.
[0039] The carrying plate 204 is horizontally fixed on the vertical assembly portion 201;
[0040] The glass positioning member 40 has a U-shaped notch at its top which opens upwards to assemble the glass balustrade 50, and a flexible rubber strip for assembling and protecting the glass balustrade 50 is provided in the U-shaped notch, and its bottom end is fixedly assembled on the top wall of the carrier plate 204, and its side wall is fixed to the vertical assembly part 201. In this embodiment, the glass positioning member 40 is fixed to the carrier plate 204 and the vertical assembly part 201 by an adhesive layer;
[0041] The horizontal assembly portion 202 can be bent along one of the groove lines and then fixed to the horizontal floor surface of the building wall 10, so that a plurality of glass railings 50 are located at the same installation baseline height.
[0042] In this embodiment, refer to the attached Figure 2 and 3 At least one assembly hole 206 is formed on each of the horizontal assembly portion 202 and the vertical assembly portion 201 , and an expansion bolt 207 is installed in the assembly hole 206 to fix the embedded base plate to the building wall 10 .
[0043] Furthermore, it also includes a column 30, the bottom end of which is vertically fixed on the horizontal assembly part 202, and the upper part of the glass railing 50 is connected to the upper end of the column 30 through a fastener.
[0044] In the technical solution of the above embodiment, refer to the attached Figure 1-3 The column embedded plate and glass embedded plate of the traditional atrium weir are split and need to be installed separately, which has low construction efficiency. In addition, the installation of column embedded parts requires high construction accuracy. However, the welding construction between the column and the embedded parts is often carried out at high altitude, and the construction quality is difficult to guarantee.
[0045] The atrium weir embedded parts proposed in the present application only need to ensure the verticality of the vertical assembly part 201 on the vertical wall surface of the building wall 10 during installation, and the elevation of the control bearing plate 204 is determined according to the installation elevation of the on-site glass railing 50, and then the vertical assembly part 201 is fixed to the building wall 10 by the expansion bolts 207, and the horizontal assembly part 202 can be bent along the groove line at the connection between the vertical wall surface of the building wall 10 and the horizontal floor surface, and then the horizontal assembly part 202 is fixed to the horizontal floor surface of the building wall 10 by the expansion bolts 207, and then the glass positioning piece 40 is fixed on the inner side of the bearing plate 204, and the glass railing 50 is inserted and assembled in the U-shaped groove on the glass positioning piece 40. At this time, multiple glass railings 50 are located on the same installation baseline, and the installation construction of the column 30 can be carried out on the horizontal floor surface of the building wall 10, which optimizes the installation construction method, does not require high-altitude construction, reduces the operation risk, and the welding construction accuracy is controllable.
[0046] In this embodiment, refer to the attached Figure 2 and 3 , and also includes at least one rib 205, whose top is fixed to the bottom wall of the bearing plate 204, and whose side wall is fixed to the vertical assembly part 201. The bearing plate 204 is supported by the rib 205 to prevent the bearing plate 204 from being deformed by long-term stress and causing structural instability.
[0047] In summary, the atrium weir embedded parts provided by the embodiment of the utility model only need to ensure the verticality of the vertical assembly part 201 on the vertical wall during installation, and the elevation of the control bearing plate 204 is determined according to the installation elevation of the on-site glass railing 50. The horizontal assembly part 202 is bent along the groove line and fixed to the horizontal floor surface, and then the glass positioning part 40 is fixed on the inner side of the bearing plate 204, and the glass railing 50 is inserted and assembled in the U-shaped groove on the glass positioning part 40. At this time, multiple glass railings 50 are located on the same installation baseline, and the installation construction of the column 30 can be carried out on the horizontal floor surface of the building wall 10, which optimizes the installation construction method, does not require high-altitude construction, reduces the operation risk, and the welding construction accuracy is controllable.
[0048] Example 2
[0049] The present application also provides a central river blocking system. Figure 1 FIG. 1 is a schematic diagram of an atrium weir embedded component assembly structure according to an exemplary embodiment. Figure 1 As shown, the atrium weir embedded component has the atrium weir embedded component of the above-mentioned embodiment 1, and,
[0050] The bottom end of the column 30 is vertically fixed on the horizontal assembly part 202, and the upper part of the glass railing 50 is connected to the upper end of the column 30 by fasteners; a floor layer 101 is also provided on the horizontal floor surface to bury the horizontal assembly part 202 and the lower part of the column 30; in this embodiment, the column 30 is welded to the horizontal assembly part 202, and the welding construction of the column 30 can be carried out on the horizontal floor surface of the building wall 10, which optimizes the installation construction method, does not require high-altitude construction, reduces the operation risk, and the welding construction accuracy is controllable. It can be understood that a fixing hole is preset on the upper part of the glass railing 50, and the fastener is a bolt that passes through the fixing hole and fixes the upper part of the glass railing 50 to the column 30.
[0051] In this embodiment, Figure 4 As shown, it also includes a plurality of steel frames 60 in an L shape, a transverse section of the steel frame 60 is connected to an end of the bearing plate 204 away from the vertical assembly portion 201, and a decorative aluminum plate 70 covering the embedded parts 20 and the glass positioning parts 40 is installed on the outer side of the steel frame 60; in this embodiment, the upper end surface of the decorative aluminum plate 70 is flush with or higher than the upper end surface height of the glass positioning part 40.
[0052] In the above embodiments, referring to the attached Figure 4 The steel frame 60 can be directly installed on the end of the bearing plate 204 away from the vertical assembly part 201, thereby realizing simple and fast assembly without separate embedded parts. The decorative aluminum plate 70 covers the steel frame 60, thereby covering the embedded parts 20 and the glass positioning parts 40 to keep the atrium beautiful.
[0053] For other structures not described, refer to Example 1.
[0054] In summary, the atrium weir embedded parts and atrium weir system provided by the embodiment of the utility model only need to ensure the verticality of the vertical assembly part 201 on the vertical wall surface during installation, and the elevation of the control bearing plate 204 is determined according to the installation elevation of the on-site glass balustrade 50. The horizontal assembly part 202 is bent along the groove line and fixed to the horizontal floor surface, and then the upper glass positioning member 40 is fixed on the inner side of the bearing plate 204, and the upper glass balustrade 50 is inserted and assembled in the U-shaped groove on the glass positioning member 40. At this time, multiple glass balustrades 50 are located on the same installation baseline, and the installation construction of the column 30 can be carried out on the horizontal floor surface of the building wall 10, which optimizes the installation construction method, does not require high-altitude construction, reduces the operation risk, and the welding construction accuracy is controllable;
[0055] At the same time, the steel frame 60 can be directly installed on the end of the supporting plate 204 away from the vertical assembly part 201, thereby realizing simple and quick assembly without the need for separate embedded parts. The decorative aluminum plate 70 covers the steel frame 60, thereby covering the embedded parts 20 and the glass positioning parts 40 to maintain the beauty of the atrium.
[0056] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0057] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the utility model patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. An atrium weir embedded part, characterized in that: include: The embedded base plate includes a vertical assembly part, a curved groove line part and a horizontal assembly part, which are sequentially distributed from bottom to top. The vertical assembly part is fixed to the vertical wall surface of the building wall, and the curved groove line part includes a plurality of groove lines opened horizontally. A bearing plate, which is horizontally fixed on the vertical assembly part; A glass positioning member, the top of which has a U-shaped notch opening upwardly for mounting a glass balustrade, and the bottom of which is fixedly mounted on the top wall of the carrying plate, and the side wall of which is fixed to the vertical mounting portion; Wherein, the horizontal assembly portion can be bent along one of the groove lines and then fixed to the horizontal floor surface of the building wall, so that a plurality of the glass balustrades are located at the same installation baseline height.
2. The atrium weir embedded part according to claim 1, characterized in that: At least one assembly hole is formed on each of the horizontal assembly portion and the vertical assembly portion, and expansion bolts are installed in the assembly holes to fix the embedded component substrate.
3. The atrium weir embedded part according to claim 1, characterized in that: It also includes at least one rib plate, the top of which is fixed to the bottom wall of the bearing plate, and the side wall of which is fixed to the vertical assembly portion.
4. The atrium weir embedded part according to claim 1, characterized in that: A flexible rubber strip for protecting the glass railing assembly is arranged in the U-shaped notch of the glass positioning piece.
5. The atrium weir embedded part according to claim 1, characterized in that: The glass positioning member is fixed to the carrying plate and the vertical assembly portion via an adhesive layer.
6. The atrium weir embedded part according to claim 1, characterized in that: A plurality of the groove lines are horizontally and equidistantly arranged on the curved groove line portion.
7. An atrium weir system, characterized in that: A method of providing an atrium weir embedded part according to any one of claims 1 to 6, and The bottom end of the column is vertically fixed on the horizontal assembly part, and the upper part of the glass railing is connected to the upper end of the column through a fastener.
8. The atrium weir system according to claim 7, characterized in that: The horizontal floor surface is also provided with a floor layer for burying the horizontal assembly portion and the lower part of the column.
9. The atrium weir system according to claim 7, characterized in that: It also includes several L-shaped steel frames, the transverse section of which is connected to the end of the bearing plate away from the vertical assembly part, and the outer side of the steel frame is equipped with a decorative aluminum plate covering the embedded parts and the glass positioning parts.
10. The atrium weir system according to claim 9, characterized in that: The upper end surface of the decorative aluminum plate is flush with or higher than the upper end surface height of the glass positioning piece.