High-speed rail pantograph electro-pneumatic training system
By designing a high-speed rail pantograph and aerospace training system, the protective shell and conductive turntable are used to simulate the contact between the pantograph and the wire, solving the problems of safety hazards and unreal contact in the existing technology, and achieving more efficient teaching results.
Patent Information
- Application Number
- CN202420439007.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-07
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-03-07
AI Technical Summary
The existing high-speed rail pantograph training device will generate current during simulation, which poses safety risks, and cannot truly simulate the contact between the pantograph and the wire, affecting the real effect of the training.
A high-speed rail pantograph enlargement training system was designed, including a protective shell, control panel, observation window, pantograph main body, pneumatic lifting structure and conductive turntable. By simulation in the protective shell, insulating material and transparent glass avoid current generation, and pneumatic lifting structure and conductive turntable simulate the contact between the pantograph and the wire.
It effectively avoids the current safety hazard during simulation, and truly simulates the contact between the pantograph and the wire, improving the authenticity of the practical training and teaching effect.
Smart Images

Figure CN222580638U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of a high-speed railway pantograph electric-pneumatic training system, in particular to a high-speed railway pantograph electric-pneumatic training system. Background Art
[0002] With the continuous development of my country's transportation field, my country's influence on the international rail transit field is also growing, and its important position is increasingly reflected. In recent years, it has achieved brilliant achievements that have attracted worldwide attention. At the same time, the country's demand for talents in urban rail and high-speed rail transportation industries is also huge. More and more secondary and high-level vocational colleges and institutions of higher learning have begun to pay attention to the training of such special talents and set up relevant majors. Therefore, the need for teaching and training devices that can cooperate with relevant teaching content is becoming more and more urgent. For example, the teaching and training device for how to access the electric energy of high-speed standard EMUs is one of them. In the practical training of high-speed rail pantographs, mastering the structural characteristics, application inspection and management and maintenance of pantographs is a very important content in ensuring the safe operation of rail transit equipment.
[0003] After searching, the publication (announcement) number is: CN114627712A, which discloses a subway pantograph simulation training device, specifically related to the technical field of training devices, including a connecting shaft, the outer end of the connecting shaft is fixedly provided with a detection line and two first baffles, one end of the detection line is fixedly provided with an outer sleeve, the inner part of the outer sleeve is provided with a second fixed shaft, and the outer end of the second fixed shaft is provided with an inner sleeve. The present invention drives the detection line to move and contact the pantograph slide plate through a motor, and in this process, the friction between the detection line and the pantograph slide plate is monitored, and the contact pressure between the pantograph slide plate and the detection line is adjusted, so as to combine the friction force in the simulation process, and reasonably control the contact pressure between the pantograph slide plate and the detection line, so as to achieve the purpose of simulation training for subway operators, so as to maintain normal contact pressure while reducing the friction between the detection line as much as possible.
[0004] The technical solution in the application document still has shortcomings: the pantograph training device will generate electric current during simulation, and there are safety hazards in the training process due to the lack of protective structure. At the same time, the detection line moves in a straight line, and it is impossible to truly simulate the contact between the pantograph and the wires on the moving high-speed rail, which affects the actual effect of the training and makes the teaching effect not outstanding. Summary of the invention
[0005] The purpose of the utility model is to provide a high-speed railway pantograph electric-pneumatic training system to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a high-speed railway pantograph electric-pneumatic training system, comprising a training equipment base, a protective shell, a control panel, an observation window, a pantograph body, a pneumatic lifting structure, a mounting plate and a conductive turntable, wherein a protective shell is installed on the training equipment base, and observation windows are provided on the four sides of the protective shell, a pantograph body is installed on the training equipment base, a motor A is installed in the top inner wall of the protective shell, a missing gear is installed at the power shaft end of the motor A, the missing gear is meshed with a toothed plate installed on the protective shell, a spring column is installed between one end of the toothed plate and the protective shell, the toothed plate is connected to the mounting plate, and a conductive turntable is installed on the mounting plate.
[0007] By adopting the above technical solution, a protective shell is installed on the base of the training equipment, so that the pantograph training equipment is simulated in the protective shell. Trainees observe through the observation windows opened on the four sides of the protective shell. The protective shell is made of insulating material and transparent glass installed on the observation window, which can avoid the problem of safety hazards caused by the current generated during the simulation. The power switch is started through the control panel. After the conductive turntable is powered on, the motor B drives the conductive turntable to rotate. At the same time, the motor A starts to drive the missing gear to rotate. When the teeth on the missing gear are engaged with the tooth plate, the tooth plate drives the conductive turntable to move to one side. When the missing gear rotates to the side without teeth, the tooth plate will reset due to the rebound of the spring column, thereby driving the conductive turntable to reset, and making the conductive turntable shake back and forth. At this time, the pneumatic lifting structure is started through the control panel to lift the pantograph body to make it contact with the conductive turntable, thereby simulating the contact between the pantograph and the wire on the real moving high-speed railway, improving the real effect of the training, and making the teaching effect more prominent.
[0008] Preferably, a pneumatic lifting structure is installed on the pantograph body, and the solenoid valve in the pneumatic lifting structure controls the inflation and deflation of the pneumatic component.
[0009] By adopting the above technical solution, the control unit in the control panel controls the solenoid valve in the pneumatic lifting structure, so that the air source in the pneumatic component inflates and deflates the airbag in the pneumatic lifting structure, thereby lifting the pantograph body.
[0010] Preferably, a motor B is mounted on the mounting plate, a power shaft end of the motor B is connected to a conductive turntable, and the conductive turntable is connected to a power supply system.
[0011] By adopting the above technical solution, after the motor B is started, it drives the conductive turntable to rotate, and at the same time the conductive turntable conducts electricity, simulating the friction between the wire and the pantograph.
[0012] Preferably, a control panel is installed on the base of the training equipment, and a control unit in the control panel controls a power supply system, a solenoid valve and electrical appliances in the training equipment.
[0013] By adopting the above technical solution, the main power supply and the raising and lowering of the pantograph are controlled through the control panel.
[0014] Preferably, a hydraulic rod is installed on the base of the training equipment, and a universal wheel is installed on a lifting plate installed at one end of the hydraulic rod.
[0015] By adopting the above technical solution, the universal wheel is driven to rise and fall by starting the hydraulic rod, thereby facilitating the movement of the training equipment.
[0016] Preferably, the protective shell is an insulating shell, and transparent glass is installed on the observation window.
[0017] By adopting the above technical solution, the protective shell is made of insulating material and transparent glass installed on the observation window, which can avoid the problem of safety hazards caused by the current generated during simulation.
[0018] Preferably, the motor A and the motor B are connected to a power supply system.
[0019] Compared with the prior art, the beneficial effects of the utility model are: through the installed protective device, the problem of safety hazards caused by the current generated during simulation can be avoided, the contact between the pantograph and the wires on the real moving high-speed railway is simulated, the real effect of the training is improved, and the teaching effect is more prominent. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a three-dimensional structural schematic diagram of the utility model.
[0021] Figure 2 It is a schematic diagram of the cross-sectional structure of the utility model.
[0022] Figure 3 It is an enlarged schematic diagram of the reciprocating structure of the utility model.
[0023] Figure 4 It is an enlarged schematic diagram of the side of the reciprocating structure of the utility model.
[0024] Figure 5 This is a schematic diagram of the system structure of the utility model.
[0025] In the figure: 1. Training equipment base; 2. Hydraulic rod; 3. Universal wheel; 4. Protective shell; 5. Control panel; 6. Observation window; 7. Pantograph body; 8. Pneumatic lifting structure; 9. Motor A; 10. Missing gear; 11. Mounting plate; 12. Motor B; 13. Conductive turntable; 14. Tooth plate; 15. Spring column. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Reference Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , including a training device base 1, a protective shell 4, a control panel 5, an observation window 6, a pantograph body 7, a pneumatic lifting structure 8, a mounting plate 11 and a conductive turntable 13. The training device base 1 is provided with a protective shell 4, and the four sides of the protective shell 4 are provided with observation windows 6. The training device base 1 is provided with a pantograph body 7. A motor A9 is provided in the top inner wall of the protective shell 4. A missing gear 10 is provided at the power shaft end of the motor A9. The missing gear 10 is meshed with a tooth plate 14 provided on the protective shell 4. A spring column 15 is provided between one end of the tooth plate 14 and the protective shell 4. The tooth plate 14 is connected to the mounting plate 11. A conductive turntable 13 is provided on the mounting plate 11. By installing the protective shell 4 on the training device base 1, the pantograph training device is simulated in the protective shell 4, and the trainees observe through the observation windows 6 provided on the four sides of the protective shell 4. The protective shell 4 is made of insulating material and the transparent glass installed on the observation window 6 can avoid the problem of safety hazards caused by the current generated during simulation. The power switch is started through the control panel 5. After the conductive turntable 13 is energized, the motor B12 drives the conductive turntable 13 to rotate. At the same time, the motor A9 starts to drive the missing gear 10 to rotate. When the teeth on the missing gear 10 are engaged with the tooth plate 14, the tooth plate 14 drives the conductive turntable 13 to move to one side. When the missing gear 10 rotates to the side without teeth, the tooth plate 14 will reset due to the rebound of the spring column 15, thereby driving the conductive turntable 13 to reset, and making the conductive turntable shake back and forth left and right. At this time, the pneumatic lifting structure 8 is started through the control panel 5 to lift the pantograph body 7 to make it contact with the conductive turntable 13, thereby simulating the contact between the pantograph and the wire on the real moving high-speed railway, improving the real effect of the training, and making the teaching effect more prominent. The circuit modules, electrical equipment and training systems involved in this application are all existing mature technologies, and there are many products on the market. The protection content of this application does not involve improvements to electrical software and systems, so the process of the training system is not described in detail here.
[0028] Reference Figure 2 , Figure 3 , Figure 5 A pneumatic lifting structure 8 is installed on the pantograph body 7. The solenoid valve in the pneumatic lifting structure 8 controls the inflation and deflation of the pneumatic component. The control unit in the control panel 5 controls the solenoid valve in the pneumatic lifting structure 8, so that the air source in the pneumatic component inflates and deflates the airbag in the pneumatic lifting structure 8, thereby lifting the pantograph body 7. A motor B12 is installed on the mounting plate 11. The power shaft end of the motor B12 is connected to the conductive turntable 13, and the conductive turntable 13 is connected to the power supply system. After the motor B12 is started, it drives the conductive turntable 13 to rotate, and at the same time, the conductive turntable 13 is conductive and charged, simulating the friction between the wire and the pantograph.
[0029] Reference Figure 1 , Figure 2 , Figure 5 A control panel 5 is installed on the base 1 of the training equipment. The control unit in the control panel 5 controls the power supply system, the solenoid valve and the electrical appliances in the training equipment. The main power supply and the lifting and lowering of the pantograph are controlled by the control panel 5. A hydraulic rod 2 is installed on the base 1 of the training equipment. A universal wheel 3 is installed on the lifting plate installed at one end of the hydraulic rod 2. The universal wheel 3 is driven to lift and lower by starting the hydraulic rod 2, so as to facilitate the movement of the training equipment. The protective shell 4 is an insulating shell, and the observation window 6 is installed with transparent glass. The protective shell 4 is made of insulating material and the transparent glass installed on the observation window 6, which can avoid the problem of safety hazards caused by the current generated during simulation. The motor A9 and the motor B12 are connected to the power supply system.
[0030] The implementation principle of a high-speed railway pantograph electric-pneumatic training system in the embodiment of the present application is as follows: by installing a protective shell 4 on the training equipment base 1, the pantograph training equipment is simulated in the protective shell 4, and the trainees observe through the observation windows 6 opened on the four sides of the protective shell 4. The protective shell 4 is made of insulating material and the transparent glass installed on the observation window 6 can avoid the problem of safety hazards caused by the current generated during the simulation. The power switch is started through the control panel 5. After the conductive turntable 13 is energized, the motor B12 drives the conductive turntable 13 to rotate. At the same time, the motor A9 starts to drive the missing gear 10 Rotate, when the teeth on the missing gear 10 mesh with the tooth plate 14, the tooth plate 14 drives the conductive turntable 13 to move to one side, and when the missing gear 10 rotates to the side without teeth, the tooth plate 14 will reset due to the rebound of the spring column 15, thereby driving the conductive turntable 13 to reset, and making the conductive turntable shake back and forth left and right. At this time, the pneumatic lifting structure 8 is started through the control panel 5 to lift the pantograph body 7 to make it contact with the conductive turntable 13, thereby simulating the contact between the pantograph and the wire on the high-speed railway in real movement, improving the real effect of the training, and making the teaching effect more prominent.
[0031] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A high-speed railway pantograph electro-pneumatic training system, comprising a training equipment base (1), a protective housing (4), a control panel (5), an observation window (6), a pantograph body (7), a pneumatic lifting structure (8), a mounting plate (11) and a conductive turntable (13), characterized in that: A protective shell (4) is installed on the training device base (1), and observation windows (6) are provided on four sides of the protective shell (4). A pantograph body (7) is installed on the training device base (1). A motor A (9) is installed in the top inner wall of the protective shell (4). A missing gear (10) is installed at the power shaft end of the motor A (9), and the missing gear (10) is meshed with a toothed plate (14) installed on the protective shell (4). A spring column (15) is installed between one end of the toothed plate (14) and the protective shell (4). The toothed plate (14) is connected to a mounting plate (11), and a conductive turntable (13) is installed on the mounting plate (11).
2. A high-speed railway pantograph electro-pneumatic training system according to claim 1, characterized in that: A pneumatic lifting structure (8) is installed on the pantograph body (7), and a solenoid valve in the pneumatic lifting structure (8) controls the inflation and deflation of the pneumatic component.
3. The high-speed railway pantograph electro-pneumatic training system according to claim 1 is characterized in that: A motor B (12) is mounted on the mounting plate (11); a power shaft end of the motor B (12) is connected to a conductive rotating disk (13); and the conductive rotating disk (13) is connected to a power supply system.
4. The high-speed railway pantograph electro-pneumatic training system according to claim 1 is characterized in that: A control panel (5) is installed on the training device base (1), and a control unit in the control panel (5) controls a power supply system and a solenoid valve as well as electrical appliances in the training device.
5. The high-speed railway pantograph electro-pneumatic training system according to claim 1 is characterized by: A hydraulic rod (2) is installed on the training equipment base (1), and a universal wheel (3) is installed on a lifting plate installed at one end of the hydraulic rod (2).
6. The high-speed railway pantograph electro-pneumatic training system according to claim 1, characterized in that: The protective housing (4) is an insulating housing, and transparent glass is installed on the observation window (6).
7. The high-speed railway pantograph electro-pneumatic training system according to claim 3 is characterized by: The motor A (9) and the motor B (12) are connected to a power supply system.
Citation Information
Patent Citations
Subway pantograph simulation training device
CN114627712A