Prefabricated hectometer stake convenient to install
By designing prefabricated 100-meter piles that are easy to install, the problems of installation difficulties, easy dumping and environmental pollution in the existing 100-meter pile construction process are solved, and rapid installation, replacement and efficient construction are achieved, improving work efficiency and safety.
Patent Information
- Application Number
- CN202420682821.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-04-03
AI Technical Summary
The existing 100-meter pile construction process has problems such as installation difficulties, easy dumping, long construction period, environmental pollution and large self-weight, and it is difficult to replace quickly.
A prefabricated 100-meter pile that is conveniently installed is designed, including grounding base, 100-meter pile and spare pile. The 100-meter pile and spare pile can be replaced according to needs. The insert plate can be inserted into the 100-meter pile for display. The magnetic connection display block in the outer frame of the spare pile is used for distance display.
The rapid installation and replacement of 100-meter piles has been achieved, construction efficiency has been improved, environmental pollution and safety hazards have been avoided, and the contents of the display can be replaced according to needs.
Smart Images

Figure CN222594660U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of road construction equipment, and specifically relates to a prefabricated 100-meter pile which is convenient to install. Background Art
[0002] Highway 100-meter piles refer to the group of stone tablets set in the middle of milestones at equal intervals of every 100 meters from the starting point to the end point on the highway route. It is used to calculate the length of a route or section and mark the position along a certain place on the highway. It is a scientific and effective means of highway positioning, which is of great significance for drivers to accurately and quickly locate their positions on the road. The conventional 100-meter pile construction process is: line positioning → slotting (making the foundation) → installation → spraying text. Due to the large number of 100-meter piles, the construction is characterized by high fluidity and fragmentation; it is necessary to slot and install on the completed curbstone or ditch, which is not conducive to the protection of the finished product, and the construction period is long. The dust generated by the slotting is easy to cause environmental pollution; the conventional 100-meter piles are made of concrete, which has a large dead weight and is easy to damage.
[0003] Patent No. CN201911015346.8 discloses a high-gloss aluminum-backed 100-meter pile and its construction method. A water collecting trough is provided on the top of the pile body, and a plurality of positioning through holes are extended downward from the top. The bottom is conical, and a positioning rod is inserted into each of the positioning through holes. The side wall of the water collecting trough has a plurality of horizontally arranged annular patterns. The length of the pile body is 0.3m-0.4m, and an aluminum-backed reflective film is attached to the surrounding wall. It solves the problem that the 100-meter piles in highway engineering construction are difficult to fix and are easy to tip over under long-term erosion of rainwater. It does not describe how to replace the 100-meter piles more conveniently and quickly. Utility Model Content
[0004] In order to overcome the problems existing in the background technology, the utility model discloses a prefabricated 100-meter pile which is easy to install, wherein the 100-meter pile and spare pile of the prefabricated 100-meter pile which is easy to install are installed on a grounded base, the 100-meter pile and spare pile are replaced according to the use requirements, a plug-in plate can be inserted into the 100-meter pile frame of the 100-meter pile for display, and a display block is magnetically connected to the spare pile outer frame of the spare pile for distance display, which is convenient for installation and replacement, and the display content can also be replaced according to the requirements, which is convenient and practical. Compared with the conventional 100-meter pile construction process: line laying and positioning → grooving (making foundation) → installation → spraying text, the prefabricated 100-meter pile recorded in the utility model is more convenient and quick to install, and the work efficiency is higher.
[0005] To achieve the above purpose, the utility model is implemented through the following technical solutions:
[0006] The prefabricated 100-meter pile that is easy to install includes a ground base, a 100-meter pile, a spare pile, a display board, and an inner pile of the 100-meter pile;
[0007] The 100-meter pile is arranged on the top surface of the ground base, the spare pile is arranged on the top surface of the ground base, and the display board is arranged inside the 100-meter pile.
[0008] Preferably, it comprises: a grounding base bolt hole; the grounding base bolt hole is arranged on the grounding base.
[0009] As a preferred embodiment: it comprises: a 100-meter pile base, a 100-meter pile bolt hole, a 100-meter pile outer frame, and a 100-meter pile display port; the 100-meter pile bolt hole is arranged on the 100-meter pile base, the 100-meter pile outer frame is arranged on the outside of the 100-meter pile inner pile, and the 100-meter pile display port is arranged on the front of the 100-meter pile outer frame.
[0010] Preferably, it comprises: a spare pile base, a spare pile bolt hole, a spare pile outer frame, a spare pile display port, and an exhibition board connecting port; the spare pile bolt hole is arranged on the spare pile base, the spare pile outer frame is arranged on the outer side of the inner pile of the 100-meter pile, the spare pile display port is arranged on the front side of the spare pile outer frame, and the exhibition board connecting port is arranged on the front side of the spare pile outer frame.
[0011] Preferably, the display board is included; the display board is magnetically connected to the display board connection port.
[0012] As a preferred embodiment: it comprises: a plug plate; the plug plate is arranged inside the outer frame of the 100-meter pile.
[0013] As a preference: a plate body, an upper support plate, a lower support plate, and a plate body connection port; the upper support plate is arranged on the top surface of the plate body, the lower support plate is arranged on the bottom surface of the plate body, the plate body connection port is arranged on the front surface of the plate body, and the plate body connection port is a magnetic connection.
[0014] The beneficial effects of the utility model: the 100-meter pile and spare pile of the easy-to-install prefabricated 100-meter pile are installed on a grounded base, the 100-meter pile and spare pile are replaced according to usage requirements, a plug-in plate can be inserted into the 100-meter pile frame of the 100-meter pile for display, and a display block is magnetically connected to the spare pile outer frame of the spare pile for distance display, which is convenient for installation and replacement, and the display content can also be replaced according to requirements, which is convenient and practical. Compared with the conventional 100-meter pile construction process: line laying and positioning → grooving (making the foundation) → installation → spraying text, the prefabricated 100-meter pile recorded in the utility model is more convenient and quick to install, and the work efficiency is higher. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the structure of the utility model;
[0016] Figure 2 It is a schematic diagram of the structure of the ground base;
[0017] Figure 3 It is a schematic diagram of the structure of the spare pile;
[0018] Figure 4 It is a structural schematic diagram of the plug board;
[0019] Figure 5 This is a schematic diagram of the structure of the exhibition board.
[0020] In the figure, 1-ground base, 2-100-meter pile base, 3-100-meter pile bolt hole, 4-100-meter pile, 5-100-meter pile inner pile, 6-100-meter pile outer frame, 7-100-meter pile display port, 8-ground base bolt hole, display board, 9-spare pile, 10-spare pile base, 11-spare pile bolt hole, 12-spare pile outer frame, 13-spare pile inner pile, 14-spare pile display port, 15-display board connection port, 16-plug board, 17-board body, 18-upper support plate, 19-lower support plate, 20-board body connection port, 21-display board. DETAILED DESCRIPTION
[0021] In order to make the above-mentioned objectives, technical solutions and beneficial effects clearer, the present invention is described in detail below with reference to the accompanying drawings.
[0022] like Figure 1-5 As shown, the prefabricated 100-meter pile 4 which is easy to install includes a grounding base 1, a 100-meter pile 4, a spare pile 9, a display board, a grounding base bolt hole 8, a 100-meter pile base 2, a 100-meter pile bolt hole 3, a 100-meter pile outer frame 6, a 100-meter pile display port 7, a 100-meter pile inner pile 5, a spare pile base 10, a spare pile bolt hole 11, a spare pile outer frame 12, a spare pile display port 14, an exhibition board connection port 15, an exhibition board 21, a plug board 16, a plate body 17, an upper support plate 18, a lower support plate 19, and a plate body connection port 20; the 100-meter pile 4 is arranged on the top surface of the grounding base 1, the spare pile 9 is arranged on the top surface of the grounding base 1, the display board is arranged inside the 100-meter pile 4, the grounding base bolt hole 8 is arranged on the grounding base 1, and the 100-meter pile bolt hole 3 is arranged on the 100-meter pile base 2, the 100-meter pile outer frame 6 is arranged on the outer side of the 100-meter pile inner pile 5, the 100-meter pile display port 7 is arranged on the front side of the 100-meter pile outer frame 6, the spare pile bolt hole 11 is arranged on the spare pile base 10, the spare pile outer frame 12 is arranged on the outer side of the 100-meter pile inner pile 5, the spare pile display port 14 is arranged on the front side of the spare pile outer frame 12, the exhibition board connecting port 15 is arranged on the front side of the spare pile outer frame 12, the exhibition board 21 is magnetically connected to the exhibition board connecting port 15, the plug plate 16 is arranged inside the 100-meter pile outer frame 6, the upper support plate 18 is arranged on the top surface of the plate body 17, the lower support plate 19 is arranged on the bottom surface of the plate body 17, the plate body connecting port 20 is arranged on the front side of the plate body 17, and the plate body connecting port 20 is magnetically connected.
[0023] The prefabricated 100-meter pile 4 which is easy to install is made of iron and is light in weight. Anti-corrosion paint is sprayed on the outer surface of each component. The 100-meter pile 4 and the spare pile 9 are installed on the ground base 1. The 100-meter pile 4 and the spare pile 9 are replaced according to the use requirements. The main difference between the 100-meter pile 4 and the spare pile 9 is the different shapes. The plug-in plate 16 can be inserted into the frame of the 100-meter pile 4 for display. The spare pile outer frame 12 of the spare pile 9 is magnetically connected with a display block for distance display, which is convenient for installation and replacement. At the same time, the display content can also be replaced according to the needs, which is convenient and practical. Compared with the conventional 100-meter pile 4 construction process: line positioning → slotting (making foundation) → installation → spraying text, the prefabricated 100-meter pile 4 recorded in the utility model is more convenient and quick to install, and the work efficiency is higher; when the prefabricated 100-meter pile 4 which is easy to install is installed, the installation position is marked with red paint or Taiwan ash, and the ground base 1 corresponds to the 100-meter pile base 2 at the installation position, and the bolt holes 8 of the ground base and the bolt holes 3 of the 100-meter pile are inserted into the overlapping openings for connection by expansion bolts, and the insertion method of the expansion bolts is the same as that of the conventional 100-meter pile 4. In the prior art, the expansion bolts are installed in the same manner as the concrete floor. According to the display requirements, the plug plate 16 is inserted from the top of the outer frame. The lower support plate 19 of the plug plate 16 contacts the ground of the outer frame 6 of the 100-meter pile. The plug plate 16 is erected in the outer frame 6 of the 100-meter pile. A display board 21 is magnetically connected at the board connection port 20. The display content can be set with fluorescent materials on the front of the display board 21. The display board 16 can be replaced by replacing the display board 21. The plug plates 16 can be set on all four sides of the outer frame 6 of the 100-meter pile. The installation method of the spare pile 9 is the same as that of the 100-meter pile. The installation method of the pile 4 is the same. The front of the display board 21 can be used to set the display content with fluorescent materials. The display board 21 is magnetically connected to the front of the spare pile outer frame 12. The easy-to-install prefabricated 100-meter pile 4 adopts a prefabricated 100-meter pile 4 device with efficient and convenient installation to replace the concrete 100-meter pile 4. The installation of the device does not require grooving on the completed structure, which can effectively improve construction efficiency, avoid environmental pollution, and save resources. When disassembling, it can be disassembled from the expansion bolt, and no large-area installation opening will be left at the installation position, avoiding safety hazards.
[0024] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the utility model.
Claims
1. A prefabricated 100-meter pile that is easy to install, characterized in that: include: Ground base, 100-meter pile, spare pile, display board, 100-meter pile base, 100-meter pile bolt hole, 100-meter pile outer frame, 100-meter pile display port, 100-meter pile inner pile, spare pile base, spare pile bolt hole, spare pile outer frame, spare pile display port, display board connection port, board body, upper support plate, lower support plate, board body connection port; The 100-meter pile is arranged on the top surface of the grounding base, the spare pile is arranged on the top surface of the grounding base, the display board is arranged inside the 100-meter pile, the 100-meter pile bolt hole is arranged on the 100-meter pile base, the 100-meter pile outer frame is arranged on the outside of the inner pile of the 100-meter pile, and the 100-meter pile display port is arranged on the front of the 100-meter pile outer frame, the spare pile bolt hole is arranged on the spare pile base, the spare pile outer frame is arranged on the outside of the inner pile of the 100-meter pile, the spare pile display port is arranged on the front of the spare pile outer frame, and the display board connecting port is arranged on the front of the spare pile outer frame, the upper support plate is arranged on the top surface of the plate body, the lower support plate is arranged on the bottom surface of the plate body, the plate body connecting port is arranged on the front of the plate body, and the plate body connecting port is a magnetic connecting port.
2. A prefabricated 100-meter pile that is easy to install according to claim 1, characterized in that: include: Ground base bolt holes; The grounding base bolt holes are arranged on the grounding base.
3. A prefabricated 100-meter pile that is easy to install according to claim 1, characterized in that: include: Exhibition boards; The display board is magnetically connected to the display board connecting port.
4. A prefabricated 100-meter pile that is easy to install according to claim 1, characterized in that: include: Plug board; The plug plate is arranged inside the outer frame of the 100-meter pile.