Reinforcing structure for preventing water and soil loss

By using reinforcement installation mechanism and slope plane mechanism on the river slope, the existing reinforcement devices are solved for cumbersome operation and loose floor tiles when laying floor tiles, and the neat laying and sealing of protective bricks is achieved, ensuring the convenience of construction and the safety of personnel.

CN222594747UActive Publication Date: 2025-03-11SHANDONG AGRI & ENG UNIV +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421814214.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2025-03-11
Estimated Expiration
2034-07-30

AI Technical Summary

Technical Problem

When laying floor tiles on the surface of river slopes, the existing reinforcement devices are complicated to operate, and there are gaps between the floor tiles, which can easily cause the floor tiles to loosen.

Method used

The reinforced installation mechanism and slope plane mechanism are adopted to ensure the neat laying and sealing of protective bricks through sealing rubber strips and sealing connection grooves/blocks, sealing bevels and anti-slip bumps, reducing gaps, and ensuring personnel safety and preventing protective bricks from loosening through flat connecting plates and water leakage holes.

Benefits of technology

The neatly laid and sealed protective bricks on the river slopes are achieved, reducing gaps, avoiding the problem of loose floor tiles, and ensuring the convenience of construction and the safety of personnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222594747U_ABST
    Figure CN222594747U_ABST
Patent Text Reader

Abstract

The utility model provides a reinforcing structure for preventing water and soil loss, belongs to the technical field of river side slopes, and aims to solve the problem that in the prior art, a worker needs to tidily lay floor tiles when laying the floor tiles, and needs to use a ruler for measurement at any time, so that the operation is relatively tedious. Comprising a river side ground, a river side slope, protection bricks, sealing rubber strips, a reinforcing installation mechanism and a side slope plane mechanism. The river slope is arranged on the front end face of the river side ground. The multiple sets of protection bricks are fixedly connected to the upper end face of the river slope. The multiple sets of sealing rubber strips are arranged and located on the upper end face of the river slope. The multiple sets of reinforcing and mounting mechanisms are arranged on the outer sides of the multiple sets of sealing rubber strips correspondingly. The slope plane mechanism is arranged on the lower side of the front end face of the river slope. And by means of the reinforcing installation mechanism, laying construction of workers is facilitated, and by means of the slope plane mechanism, the safety of the workers is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of river slope, and more specifically, particularly relates to a reinforcement structure for preventing soil erosion. Background Art

[0002] When constructing a river channel in a water conservancy project, the river channel is paved into a slope in order to reduce the impact of water flow. Reinforcement devices are then laid on the slope to solidify the slope surface and reduce the possibility of soil erosion on the river channel slope, thereby ensuring the stability of the river channel.

[0003] According to CN202220620685.X, the present application discloses a river slope reinforcement structure, which relates to the technical field of water conservancy engineering, improves the problem of troublesome disassembly and assembly process of slope protection bricks, and includes a fixed beam and a plurality of brick bodies arranged at the upper end of the fixed beam, a fixing piece is arranged on the fixed beam, an operating rod slides on the brick body, an operating hole is provided on the brick body, a clamping block is arranged on the side wall of the operating rod, a clamping groove is provided on the brick body, a rotating groove is provided on the wall of the clamping groove, a rotating piece is arranged on the operating rod, an unlocking assembly is arranged on the brick body, a mounting hole is provided on the fixed beam for inserting the adjacent upper end operating rod along the slope direction, a movable groove is provided on the fixed beam for sliding the clamping block, a rotating groove is provided on the wall of the movable groove, and a plug-in groove is provided on the brick body. The present application can facilitate the disassembly and assembly of slope protection bricks.

[0004] Based on the above, the existing reinforcement device is generally laid on the surface of the river slope through multiple groups of floor tiles. When laying the floor tiles, the workers need to lay the floor tiles neatly and use a ruler to measure at all times. The operation is relatively cumbersome. After the floor tiles are laid, there are gaps between the floor tiles. When the river water flows into the gaps between the floor tiles, it is easy to cause the floor tiles to loosen over a long period of time. Utility Model Content

[0005] In order to solve the above technical problems, the utility model provides a reinforcement structure for preventing soil erosion, so as to solve the problem that the existing reinforcement device is generally laid on the surface of the river slope through multiple groups of floor tile structures. When laying the floor tiles, the workers need to lay the floor tiles neatly and need to use a ruler to measure at all times. The operation is relatively cumbersome. After the floor tiles are laid, there are gaps between the floor tiles. When river water flows into the gaps between the floor tiles, it is easy to cause the floor tiles to loosen over a long period of time.

[0006] The purpose and effect of the reinforcement structure for preventing soil erosion of the utility model are achieved by the following specific technical means:

[0007] A reinforcement structure for preventing soil erosion, comprising riverside ground, river channel slope, protective bricks, sealing strips, a reinforcement installation mechanism and a slope plane mechanism; the river channel slope is opened on the front end face of the riverside ground, and the river channel slope is an inclined surface structure; a plurality of groups of protective bricks are provided, and the plurality of groups of protective bricks are evenly arranged and fixedly connected to the upper end face of the river channel slope; a plurality of groups of sealing strips are provided, and the plurality of groups of sealing strips are respectively located on the upper end face of the river channel slope, and the sealing strips are located on the inner end faces of two groups of protective bricks, and the plurality of groups of sealing strips are respectively silicone rectangular structures; a plurality of groups of reinforcement installation mechanisms are provided, and the plurality of groups of reinforcement installation mechanisms are respectively arranged on the outside of the plurality of groups of sealing strips; the slope plane mechanism is provided on the lower side of the front end face of the river channel slope.

[0008] Furthermore, the reinforced installation mechanism includes: a sealing connection groove and a sealing connection block; the sealing connection groove is opened in the middle position of the outer end surface of the protective brick; the sealing connection block is fixedly connected to the outer end surface of the sealing strip, the outer end surface of the sealing connection block is an arc-shaped structure, and the sealing connection groove and the sealing connection block are plug-in connected.

[0009] Furthermore, the reinforced installation mechanism also includes: a sealing bevel and an anti-slip protrusion; the sealing bevel is arranged on the outer end surface of the sealing strip, and the sealing bevel is a V-shaped structure; the anti-slip protrusions are arranged in a total of multiple groups, and the multiple groups of anti-slip protrusions are respectively fixedly connected to the upper end surface of the sealing strip, and the multiple groups of anti-slip protrusions are respectively silicone circular structures.

[0010] Furthermore, the slope plane mechanism includes: a plane slot and a plane connecting plate; the plane slot is opened on the lower side of the front end surface of the riverside ground, and the plane slot is located on the lower side of the river channel slope; the plane connecting plates are arranged in a plurality of groups, and the plurality of groups of plane connecting plates are respectively fixedly connected inside the plane slots.

[0011] Furthermore, the slope plane mechanism also includes: water leakage holes and blocking protrusions; the water leakage holes are provided in multiple groups, and the multiple groups of water leakage holes are respectively opened on multiple groups of plane connecting plates; the blocking protrusions are provided in multiple groups, and the multiple groups of blocking protrusions are respectively fixedly connected to the upper face sides of the multiple groups of plane connecting plates.

[0012] Furthermore, the slope plane mechanism also includes: an alignment slot and an alignment block; the alignment slot is opened in the middle position of the right end surface of a group of plane connecting plates on the left side; the alignment block is fixedly connected to the middle position of the left end surface of a group of plane connecting plates on the right side, and the alignment slot and the alignment block are plug-connected.

[0013] Compared with the prior art, the utility model has the following beneficial effects:

[0014] The utility model adopts a reinforced installation mechanism, so that when the protective bricks are laid on the river channel slope, a sealing strip is arranged between the two groups of protective bricks, and the sealing strip and the protective bricks are connected by a sealing connection groove and a sealing connection block, so that the protective bricks are laid neatly on the river channel slope, the gap between the two groups of protective bricks is reduced, and the problem that the staff need to use a measuring ruler to measure all the time when laying the protective bricks is avoided, which is convenient for the staff to lay the protective bricks, and at the same time the problem that the protective bricks become loose due to the continuous impact of river water on the gap between the two groups of protective bricks is avoided.

[0015] The utility model adopts a slope plane mechanism to realize that a plane connecting plate is installed on the lower side of the river channel slope through a plane slot, so that the lower side of the river channel slope has a plane structure, thereby avoiding the problem that workers fall into the river water when moving from the river channel slope to the riverside, thereby ensuring the safety of personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the front view of the reinforcement structure of the utility model.

[0017] Figure 2 It is a structural schematic diagram of the reinforcement structure part of the utility model.

[0018] Figure 3 It is a structural schematic diagram of the reinforcement installation mechanism of the utility model.

[0019] Figure 4 It is a structural schematic diagram of the slope plane mechanism of the utility model.

[0020] Figure 5 It is a structural schematic diagram of the plane connecting plate connection of the utility model.

[0021] Figure 6 This utility model Figure 5 Schematic diagram of the partially enlarged structure at point A in the middle.

[0022] In the figure, the corresponding relationship between the component names and the figure numbers is as follows:

[0023] 1. Riverside ground; 101. Plane slot; 2. Riverside slope; 3. Protective bricks; 301. Sealing connection groove; 4. Sealing strip; 401. Sealing connection block; 402. Sealing slope; 403. Anti-skid protrusion; 5. Plane connection plate; 501. Water leakage hole; 502. Blocking protrusion; 6. Alignment slot; 7. Alignment plug. DETAILED DESCRIPTION

[0024] The implementation of the utility model is further described in detail below in conjunction with the drawings and examples.

[0025] Embodiment 1:

[0026] As attached Figure 1 To Attachment Figure 3 As shown:

[0027] The utility model provides a reinforcement structure for preventing soil erosion, comprising a riverside ground 1, a river channel slope 2, protective bricks 3, sealing strips 4 and a reinforcement installation mechanism; the river channel slope 2 is opened on the front end surface of the riverside ground 1, and the river channel slope 2 is an inclined surface structure; a plurality of groups of protective bricks 3 are provided, and the plurality of groups of protective bricks 3 are respectively evenly arranged and fixedly connected to the upper end surface of the river channel slope 2; a plurality of groups of sealing strips 4 are provided, and the plurality of groups of sealing strips 4 are respectively located on the upper end surface of the river channel slope 2, and the sealing strips 4 are located on the inner end surfaces of two groups of protective bricks 3, and the plurality of groups of sealing strips 4 are respectively silicone rectangular structures; a plurality of groups of reinforcement installation mechanisms are provided, and the plurality of groups of reinforcement installation mechanisms are respectively arranged on the outer sides of the plurality of groups of sealing strips 4.

[0028] Among them, the reinforcement installation mechanism includes: a sealing connection groove 301 and a sealing connection block 401; the sealing connection groove 301 is opened in the middle position of the outer end face of the protective brick 3; the sealing connection block 401 is fixedly connected to the outer end face of the sealing strip 4, and the outer end face of the sealing connection block 401 is an arc-shaped structure. The sealing connection groove 301 and the sealing connection block 401 are plug-in connected. During use, when the protective bricks 3 are laid on the river slope 2, a group of protective bricks 3 are laid, and the sealing strip 4 is taken and placed on the outer end face of the protective brick 3. When the sealing strip 4 is placed on the outer end face of the protective brick 3, the sealing connection block 401 is inserted into the sealing connection groove 301 to seal the gaps between the protective bricks 3, and at the same time facilitate the alignment of the protective bricks 3 when laying.

[0029] Among them, the reinforcement installation mechanism also includes: a sealing bevel 402 and an anti-skid protrusion 403; the sealing bevel 402 is arranged on the outer end face of the sealing strip 4, and the sealing bevel 402 is a V-shaped structure; there are a total of multiple groups of anti-skid protrusions 403, and the multiple groups of anti-skid protrusions 403 are respectively fixedly connected to the upper end face of the sealing strip 4, and the multiple groups of anti-skid protrusions 403 are respectively silicone circular structures. During use, when multiple groups of sealing strips 4 are laid together and docked, the sealing bevel 402 facilitates the docking of four groups of sealing strips 4 together, and the anti-skid protrusions 403 are on the upper end face of the sealing strip 4. When personnel go from the river slope 2 to the riverside, the anti-skid protrusions 403 increase the friction at the bottom of the personnel, thereby ensuring the stability of the personnel on the river slope 2, thereby ensuring the safety of the personnel.

[0030] The specific usage and function of the first embodiment are as follows:

[0031] During use, when laying the protective bricks 3 on the river bank slope 2, lay a group of protective bricks 3, take the sealing strip 4 and place it on the outer end face of the protective brick 3, when the sealing strip 4 is placed on the outer end face of the protective brick 3, the sealing connection block 401 is inserted into the sealing connection groove 301 to seal the gaps between the protective bricks 3, and at the same time facilitate the alignment of the protective bricks 3 when laying, and when multiple groups of sealing strips 4 are laid together and docked, the sealing bevel 402 facilitates the docking of four groups of sealing strips 4 together, and the anti-slip protrusion 403 is on the upper end face of the sealing strip 4. When people go from the river bank slope 2 to the riverside, the anti-slip protrusion 403 increases the friction at the bottom of the people, ensures the stability of the people on the river bank slope 2, thereby ensuring the safety of the people and making it convenient for the staff to lay the protective bricks 3.

[0032] Embodiment 2:

[0033] Based on the first embodiment, as shown in the attached Figure 4 To Attachment Figure 6 As shown:

[0034] The utility model provides a reinforcement structure for preventing soil erosion, which also includes a slope plane mechanism, which is arranged on the lower side of the front end surface of a river channel slope 2, and the slope plane mechanism includes: a plane slot 101 and a plane connecting plate 5; the plane slot 101 is opened on the lower side of the front end surface of a riverside ground 1, and the plane slot 101 is located on the lower side of the river channel slope 2; a total of multiple groups of plane connecting plates 5 are arranged, and the multiple groups of plane connecting plates 5 are respectively fixedly connected inside the plane slots 101. During use, the plane connecting plates 5 are inserted into the plane slots 101, and then the plane connecting plates 5 and the plane slots 101 are fixed by using concrete, so that the plane connecting plates 5 are fixed on the lower side of the front end surface of the riverside ground 1. When personnel go from the river channel slope 2 to the river, the plane connecting plates 5 act as a buffer for the personnel to prevent them from falling into the river water.

[0035] Among them, the slope plane mechanism also includes: water leakage holes 501 and blocking protrusions 502; there are multiple groups of water leakage holes 501, and the multiple groups of water leakage holes 501 are respectively opened on multiple groups of plane connecting plates 5; there are multiple groups of blocking protrusions 502, and the multiple groups of blocking protrusions 502 are respectively fixedly connected to the front sides of the upper end faces of the multiple groups of plane connecting plates 5. During use, when river water is on the plane connecting plate 5, the river water falls from the plane connecting plate 5 through the water leakage holes 501, and the blocking protrusions 502 block the objects falling from the plane connecting plate 5 into the river water.

[0036] Among them, the slope plane mechanism also includes: an alignment slot 6 and an alignment plug 7; the alignment slot 6 is opened in the middle position of the right end surface of a group of plane connecting plates 5 on the left side; the alignment plug 7 is fixedly connected to the middle position of the left end surface of a group of plane connecting plates 5 on the right side, and the alignment slot 6 and the alignment plug 7 are plug-connected. During use, the plane connecting plate 5 is installed inside the plane slot 101, and the two groups of plane connecting plates 5 are aligned together through the alignment slot 6 and the alignment plug 7.

[0037] The specific usage and function of the second embodiment are as follows:

[0038] During use, the plane connecting plate 5 is inserted into the plane slot 101, and then the plane connecting plate 5 and the plane slot 101 are fixed with concrete, so that the plane connecting plate 5 is fixed to the lower side of the front end surface of the riverside ground 1. When people go from the river bank slope 2 to the river bank, the plane connecting plate 5 acts as a buffer to prevent people from falling into the river water. When the river water is on the plane connecting plate 5, the river water falls from the plane connecting plate 5 through the water leakage hole 501, and the blocking protrusion 502 blocks the objects falling from the plane connecting plate 5 into the river water. The plane connecting plate 5 is installed in the plane slot 101. When the two groups of plane connecting plates 5 are aligned together, they are plugged together through the alignment slot 6 and the alignment plug block 7, so that when people go from the river bank slope 2 to the river bank, the plane connecting plate 5 prevents people from falling into the river water.

[0039] In this article, there are a few points to note:

[0040] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.

[0041] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.

[0042] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.

Claims

1. A reinforcement structure for preventing soil erosion, comprising a riverside ground (1), a river slope (2), protective bricks (3), a sealing strip (4), a reinforcement installation mechanism and a slope plane mechanism; the river slope (2) is provided on the front end surface of the riverside ground (1), and the river slope (2) is an inclined surface structure; the characteristics are: The protective bricks (3) are provided in a plurality of groups, and the plurality of groups of protective bricks (3) are evenly arranged and fixedly connected to the upper end surface of the river channel slope (2); the sealing strips (4) are provided in a plurality of groups, and the plurality of groups of sealing strips (4) are respectively located on the upper end surface of the river channel slope (2), and the sealing strips (4) are located on the inner end surfaces of the two groups of protective bricks (3), and the plurality of groups of sealing strips (4) are respectively silicone rectangular structures; the reinforcement installation mechanism is provided in a plurality of groups, and the plurality of groups of reinforcement installation mechanisms are respectively arranged on the outer sides of the plurality of groups of sealing strips (4); the slope plane mechanism is arranged on the lower side of the front end surface of the river channel slope (2).

2. A reinforcement structure for preventing soil erosion as claimed in claim 1, characterized in that: The reinforcement installation mechanism comprises: a sealing connection groove (301) and a sealing connection block (401); the sealing connection groove (301) is arranged in the middle of the outer end surface of the protective brick (3); the sealing connection block (401) is fixedly connected to the outer end surface of the sealing rubber strip (4); the outer end surface of the sealing connection block (401) is an arc-shaped structure; the sealing connection groove (301) and the sealing connection block (401) are plug-connected.

3. A reinforcement structure for preventing soil erosion as claimed in claim 1, characterized in that: The reinforcement installation mechanism also includes: a sealing bevel (402) and an anti-skid convex block (403); the sealing bevel (402) is provided on the outer end surface of the sealing strip (4), and the sealing bevel (402) is a V-shaped structure; a plurality of groups of anti-skid convex blocks (403) are provided, and the plurality of groups of anti-skid convex blocks (403) are respectively fixedly connected to the upper end surface of the sealing strip (4), and the plurality of groups of anti-skid convex blocks (403) are respectively silicone circular structures.

4. A reinforcement structure for preventing soil erosion as claimed in claim 1, characterized in that: The slope plane mechanism comprises: a plane slot (101) and a plane connecting plate (5); the plane slot (101) is opened on the lower side of the front end surface of the riverside ground (1), and the plane slot (101) is located on the lower side of the river channel slope (2); a plurality of groups of the plane connecting plates (5) are provided, and the plurality of groups of the plane connecting plates (5) are respectively fixedly connected inside the plane slot (101).

5. A reinforcement structure for preventing soil erosion as claimed in claim 4, characterized in that: The slope plane mechanism also includes: water leakage holes (501) and blocking protrusions (502); the water leakage holes (501) are provided in a plurality of groups, and the plurality of water leakage holes (501) are respectively opened on a plurality of groups of plane connecting plates (5); the blocking protrusions (502) are provided in a plurality of groups, and the plurality of groups of blocking protrusions (502) are respectively fixedly connected to the front sides of the upper end faces of the plurality of groups of plane connecting plates (5).

6. A reinforcement structure for preventing soil erosion as claimed in claim 4, characterized in that: The slope plane mechanism further comprises: an alignment slot (6) and an alignment plug block (7); the alignment slot (6) is arranged at the middle position of the right end surface of a group of plane connecting plates (5) on the left side; the alignment plug block (7) is fixedly connected to the middle position of the left end surface of a group of plane connecting plates (5) on the right side, and the alignment slot (6) and the alignment plug block (7) are plug-connected.

Citation Information

Patent Citations

  • River slope reinforcing structure