Heat tracing band drainage structure for preventing water seepage and frost heaving of tunnel lining
By setting up a tropical ties drainage structure in the tunnel, including symmetrical patched electrical ties and binding components, the problem of water seepage and freezing of tunnel lining is solved, and uniform heating and rapid assembly of drainage pipes are achieved, avoiding freezing and damage.
Patent Information
- Application Number
- CN202421474870.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2034-06-26
AI Technical Summary
Water seepage of tunnel lining can easily lead to icy, blockage and freezing damage in winter. It is difficult for the prior art to achieve uniform heating of drain pipes and rapid assembly of electrical heat trays.
A tropical harness drainage structure including a drain pipe, two electrical harnesses and multiple binding components is designed. Two electric heat ties are symmetrically applied to the drain pipe. The binding assembly quickly fixes the electric heat ties on the drain pipe through the load-bearing plate and elastic belt, and an insulation layer is provided on the outside.
By uniform heating of the drain pipes, the waterproof and freezing and blockage of water seepage and icing are quickly eliminated, and the waterproof and freezing effect of tunnel lining is achieved, while simplifying the assembly process of electric heat ties.
Smart Images

Figure CN222596130U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel engineering, in particular to a heating tape drainage structure for preventing tunnel lining from water seepage and frost heaving. Background Art
[0002] Tunnel lining seepage is a common disease that often occurs in tunnels but is not easy to deal with thoroughly. In order to treat this disease, grooves are usually dug in the seepage-prone areas inside the tunnel and drainage pipes are buried. The drainage pipes will guide the seepage water into the tunnel's drainage system.
[0003] However, in the routine maintenance of tunnels in winter, especially when water seepage occurs in the tunnel, the seepage water is easy to freeze and block in the drainage pipe, and even freeze and swell to damage the drainage pipe, causing the tunnel lining to be damaged. Although the prior art discloses that electric heating tape can be applied to the drainage structure of the tunnel to ensure the normal operation of the drainage pipe, how to achieve uniform heating of the drainage pipe and how to quickly assemble the electric heating tape are still problems to be solved in this field. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model discloses a heating tape drainage structure for preventing tunnel lining water seepage and frost heave, thereby solving or at least alleviating one or more of the above-mentioned problems and other problems in the prior art.
[0005] The utility model discloses a heating tape drainage structure for preventing tunnel lining from water seepage and frost heaving, comprising a drainage pipe buried in the inner wall of the tunnel, two electric heating tapes and a plurality of binding components;
[0006] The two electric heating cables are symmetrically attached to the drain pipe, and the length direction of the electric heating cables is consistent with the length direction of the drain pipe; a plurality of the binding assemblies are arranged on the drain pipe at intervals, and the binding assemblies are used to symmetrically attach the two electric heating cables to the drain pipe;
[0007] The binding assembly comprises a bearing plate and an elastic band, one end of the elastic band is connected to one end of the bearing plate, and the other end of the elastic band is connected to the other end of the bearing plate; both ends of the inner side of the bearing plate are provided with first limiting strips arranged in parallel, and the bearing plate and the two first limiting strips form a first limiting groove; two second limiting strips arranged in parallel are provided on the inner side of the elastic band, and the elastic band and the two second limiting strips form a second limiting groove; when the bearing plate and the elastic band are connected in a ring shape, the first limiting groove and the second limiting groove are arranged opposite to each other;
[0008] When the binding assembly is sleeved on the drainage pipe, the bearing plate abuts against one of the electric heating tapes, which is located in the first limiting groove, and the other electric heating tape is located in the second limiting groove.
[0009] Preferably, the heating tape drainage structure for preventing water seepage and frost heaving of the tunnel lining also includes water guide pipes and drainage ditches arranged on both sides of the tunnel bottom;
[0010] One end of the drainage pipe is communicated with the water guide pipe on the corresponding side through a connecting pipe, and the water guide pipe is communicated with the drainage ditch on the corresponding side through a connecting pipe.
[0011] Preferably, the other end of the drainage pipe is communicated with the water pipe on the other side through a connecting pipe, and the water pipe on the other side is communicated with the drainage ditch on the other side through a connecting pipe.
[0012] Preferably, an insulation layer is provided on the outer sides of the drainage pipe, the two electric heating cables and the plurality of binding components.
[0013] Preferably, the thermal insulation layer is made of rubber-plastic thermal insulation material.
[0014] Preferably, the length direction of the first limiting strip is perpendicular to the length direction of the elastic band, and the length direction of the second limiting strip is perpendicular to the length direction of the elastic band.
[0015] Preferably, hooks are provided on both sides of the other end of the carrying plate, and a connecting rod is provided at the other end of the elastic band, and the connecting rod is hooked on the two hooks of the carrying plate.
[0016] Preferably, the open end of the hook is arranged to face inwards.
[0017] Preferably, the carrying plate is made of plastic.
[0018] Preferably, the heating tape drainage structure for preventing tunnel lining water seepage and frost heaving further includes a controller and a temperature sensor;
[0019] The temperature sensor is placed in the drain pipe, and the temperature sensor is used to monitor the temperature in the drain pipe;
[0020] The temperature sensor and the two electric heating tapes are electrically connected to the controller. The controller receives temperature data uploaded by the temperature sensor and compares the temperature data received by the controller with a built-in temperature threshold. When the temperature data received by the controller is greater than the built-in temperature threshold, the controller energizes the two electric heating tapes.
[0021] In summary, the heating cable drainage structure for preventing tunnel lining water seepage and frost heave using the above scheme can evenly heat the drain pipe by arranging two electric heating cables symmetrically on the drain pipe when the electric heating cables are powered on, and can quickly eliminate the phenomenon of ice blockage caused by water seepage in the drain pipe even when the temperature drops in winter, thus avoiding the phenomenon of tunnel lining damage caused by frost heave damage to the drain pipe. At the same time, the design of the bearing plate, elastic band, first limiting groove and second limiting groove facilitates the rapid arrangement of the two electric heating cables symmetrically on the drain pipe, thus realizing the rapid assembly of the electric heating cables. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the specific embodiments of the present disclosure, the following briefly introduces the drawings required for use in the specific embodiments. In all the drawings, each element or part is not necessarily drawn according to the actual scale.
[0023] Figure 1 This is a schematic diagram of the structure of an embodiment of the utility model;
[0024] Figure 2 It is a three-dimensional diagram of the cooperation of the bearing plate, the elastic band and the drainage pipe in one embodiment of the utility model;
[0025] Figure 3 It is a three-dimensional diagram of the coordination between the elastic band and the drainage pipe in one embodiment of the utility model;
[0026] Figure 4 This is a schematic diagram of the structure of the cooperation between the drainage pipe and the binding assembly in one embodiment of the utility model;
[0027] Figure 5 It is a structural schematic diagram of a binding assembly in one embodiment of the utility model.
[0028] Reference numerals:
[0029] 1- Drain pipe;
[0030] 2-Electric heating cable;
[0031] 3- Binding components;
[0032] 301-carrying plate, 302-elastic belt, 303-first limiting strip, 304-first limiting groove, 305-second limiting strip, 306-second limiting groove, 307-hook, 308-connecting rod;
[0033] 4- Aqueduct;
[0034] 5- Drainage ditch. DETAILED DESCRIPTION
[0035] The following embodiments of the technical solution of the present disclosure are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present disclosure, and are therefore only used as examples, and cannot be used to limit the protection scope of the present disclosure.
[0036] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in this application should have the common meanings understood by technicians in the field to which the utility model belongs.
[0037] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0038] In addition, the terms "first", "second", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0039] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.
[0040] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0041] like Figure 1 and Figure 5 As shown, this embodiment provides a heating tape drainage structure for preventing water seepage and frost heave of tunnel lining, comprising a drainage pipe 1 buried in the inner wall of the tunnel, two electric heating tapes 2 and a plurality of binding assemblies 3; the two electric heating tapes 2 are symmetrically applied to the drainage pipe 1, and the length direction of the electric heating tapes 2 is consistent with the length direction of the drainage pipe 1; the plurality of binding assemblies 3 are arranged at intervals on the drainage pipe 1, and the binding assemblies 3 are used to symmetrically attach the two electric heating tapes 2 to the drainage pipe 1.
[0042] The binding assembly 3 includes a bearing plate 301 and an elastic band 302, one end of the elastic band 302 is connected to one end of the bearing plate 301, and the other end of the elastic band 302 is connected to the other end of the bearing plate 301. Both ends of the inner side of the bearing plate 301 are provided with first limiting strips 303 arranged in parallel, and the bearing plate 301 and the two first limiting strips 303 form a first limiting groove 304. Two second limiting strips 305 arranged in parallel are provided on the inner side of the elastic band 302, and the elastic band 302 and the two second limiting strips 305 form a second limiting groove 306; when the bearing plate 301 and the elastic band 302 are connected in a ring shape, the first limiting groove 304 and the second limiting groove 306 are arranged oppositely. In one embodiment, the bearing plate 301 is made of an elastically deformable plastic material, and after the bearing plate 301 is sleeved on the drain pipe 1, it can be conformed according to the shape of the drain pipe 1 and the electric heating belt 2.
[0043] When the binding assembly 3 is sleeved on the drainage pipe 1 , the bearing plate 301 abuts against one of the electric heating tapes 2 , which is located in the first limiting groove 304 , and the other electric heating tape is located in the second limiting groove 306 .
[0044] This technical solution arranges two electric heating cables 2 symmetrically on the drain pipe 1. When the electric heating cables 2 are powered on, the drain pipe 1 can be evenly heated. Even when the temperature drops in winter, the phenomenon of ice blockage caused by water seepage in the drain pipe 1 can be quickly eliminated, avoiding the phenomenon of tunnel lining damage caused by frost heave damage to the drain pipe. At the same time, the design of the bearing plate 301, the elastic band 302, the first limiting groove 304 and the second limiting groove 306 facilitates the rapid arrangement of the two electric heating cables 2 symmetrically on the drain pipe 1, thereby realizing the rapid assembly of the electric heating cables. In addition, the design of the elastic band 302 allows the binding assembly 3 to be applied to drain pipes of various specifications, thereby improving practicality.
[0045] Specifically, the length direction of the first limiting strip 303 is perpendicular to the length direction of the elastic band 302, so that the two first limiting strips 303 can limit one of the electric heating tapes 2; the length direction of the second limiting strip 306 is perpendicular to the length direction of the elastic band 302, so that the two second limiting strips 306 can limit the other electric heating tape 2.
[0046] Secondly, the heating tape drainage structure for preventing the tunnel lining from water seepage and frost heaving also includes a water pipe 4 and a drainage ditch 5 provided on both sides of the tunnel bottom; one end of the drainage pipe 1 is connected to the water pipe 4 on the corresponding side through a connecting pipe, and the water pipe 4 is connected to the drainage ditch 5 on the corresponding side through a connecting pipe. The other end of the drainage pipe 1 is connected to the water pipe on the other side through a connecting pipe, and the water pipe on the other side is connected to the drainage ditch on the other side through a connecting pipe. The seepage water in the drainage pipe 1 enters the drainage ditch 5 through the water pipe 4 and is discharged.
[0047] Furthermore, in order to improve the heat preservation effect of the drain pipe 1, a heat preservation layer is provided on the outside of the drain pipe 1, the two electric heating cables 2 and the plurality of binding components 3. The heat preservation layer is made of rubber-plastic heat preservation material, which is convenient for construction workers to wrap around the drain pipe 1.
[0048] In addition, hooks 307 are provided on both sides of the other end of the supporting plate 301, and a connecting rod 308 is provided on the other end of the elastic band 302, and the connecting rod 308 is hooked on the two hooks 307 of the supporting plate 301. The hooks 307 of the supporting plate 301 cooperate with the connecting rod 308 of the elastic band 302, so as to facilitate the quick connection of the binding assembly 3 on the drain pipe 1. Moreover, the open end of the hook 307 is arranged to face inward. After the binding assembly 3 is connected to the drain pipe 1, the open end of the hook 307 is close to the outer contour of the drain pipe 1, and the outer contour of the drain pipe 1 has an obstructive effect on the connection rod 308 from detaching from the hook 307. Secondly, the open end of the hook 307 is designed to be closed, which can also effectively prevent the connection rod 308 from detaching from the hook 307. In addition, when the binding assembly 3 needs to be stored, in order to prevent the connecting rod of one binding assembly from being hooked on the hook of another binding assembly, the elastic band can be wrapped around the supporting plate to make the connecting rod 308 hooked on the hook 307. Figure 5 shown.
[0049] In order to facilitate the control of the electric heating tape 2 to heat the drainage pipe 1, the heating tape drainage structure for preventing the tunnel lining from water seepage and frost heaving also includes a controller and a temperature sensor; the temperature sensor is placed in the drainage pipe 1, and the temperature sensor is used to monitor the temperature in the drainage pipe 1. The temperature sensor and the two electric heating tapes 2 are electrically connected to the controller, and the controller receives the temperature data uploaded by the temperature sensor and compares the temperature data received by the controller with the built-in temperature threshold; when the temperature data received by the controller is greater than the built-in temperature threshold, the controller energizes the two electric heating tapes.
[0050] The above embodiments are only used to illustrate the technical solutions of the present disclosure, rather than to limit them. Although the present disclosure has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the embodiments of the present disclosure, and they should all be included in the scope of the claims and specification of the present disclosure.
Claims
1. A heating tape drainage structure for preventing tunnel lining water seepage and frost heave, characterized in that: It includes drainage pipes buried in the inner wall of the tunnel, two electric heating cables and multiple lashing components; The two electric heating cables are symmetrically attached to the drain pipe, and the length direction of the electric heating cables is consistent with the length direction of the drain pipe; a plurality of the binding assemblies are arranged on the drain pipe at intervals, and the binding assemblies are used to symmetrically attach the two electric heating cables to the drain pipe; The binding assembly comprises a bearing plate and an elastic band, one end of the elastic band is connected to one end of the bearing plate, and the other end of the elastic band is connected to the other end of the bearing plate; both ends of the inner side of the bearing plate are provided with first limiting strips arranged in parallel, and the bearing plate and the two first limiting strips form a first limiting groove; two second limiting strips arranged in parallel are provided on the inner side of the elastic band, and the elastic band and the two second limiting strips form a second limiting groove; when the bearing plate and the elastic band are connected in a ring shape, the first limiting groove and the second limiting groove are arranged opposite to each other; When the binding assembly is sleeved on the drainage pipe, the bearing plate abuts against one of the electric heating tapes, which is located in the first limiting groove, and the other electric heating tape is located in the second limiting groove.
2. The heating tape drainage structure for preventing tunnel lining water seepage and frost heave according to claim 1 is characterized in that: It also includes water pipes and drainage ditches set on both sides of the tunnel bottom; One end of the drainage pipe is communicated with the water guide pipe on the corresponding side through a connecting pipe, and the water guide pipe is communicated with the drainage ditch on the corresponding side through a connecting pipe.
3. The heating tape drainage structure for preventing tunnel lining water seepage and frost heave according to claim 2 is characterized in that: The other end of the drainage pipe is communicated with the water pipe on the other side through a connecting pipe, and the water pipe on the other side is communicated with the drainage ditch on the other side through a connecting pipe.
4. The heating tape drainage structure for preventing tunnel lining water seepage and frost heave according to claim 1 is characterized in that: The outer sides of the drainage pipe, two electric heating cables and multiple binding components are provided with a thermal insulation layer.
5. The heating tape drainage structure for preventing tunnel lining water seepage and frost heave according to claim 4 is characterized in that: The thermal insulation layer is made of rubber and plastic thermal insulation material.
6. The heating tape drainage structure for preventing tunnel lining water seepage and frost heave according to claim 1 is characterized in that: The length direction of the first limiting strip is perpendicular to the length direction of the elastic band, and the length direction of the second limiting strip is perpendicular to the length direction of the elastic band.
7. The heating tape drainage structure for preventing tunnel lining water seepage and frost heave according to claim 1 is characterized in that: Hooks are arranged on both sides of the other end of the bearing plate, and a connecting rod is arranged on the other end of the elastic band, and the connecting rod is hooked on the two hooks of the bearing plate.
8. The heating tape drainage structure for preventing tunnel lining water seepage and frost heave according to claim 7 is characterized in that: The open end surface of the hook is arranged toward the inside.
9. The heating tape drainage structure for preventing tunnel lining water seepage and frost heave according to claim 1, characterized in that: The carrying plate is made of plastic.
10. The heating tape drainage structure for preventing tunnel lining water seepage and frost heave according to claim 1, characterized in that: Also includes a controller and a temperature sensor; The temperature sensor is placed in the drain pipe, and the temperature sensor is used to monitor the temperature in the drain pipe; The temperature sensor and the two electric heating tapes are electrically connected to the controller. The controller receives temperature data uploaded by the temperature sensor and compares the temperature data received by the controller with a built-in temperature threshold. When the temperature data received by the controller is greater than the built-in temperature threshold, the controller energizes the two electric heating tapes.