The embodiment of the invention provides a method and device for determining a
frost heaving prevention result of a concrete
pipe pile. The method comprises the steps that the lowest environment temperature of an area where the concrete
pipe pile is located and the temperature of accumulated water in an accumulated water containing cavity are obtained; according to the temperature of the accumulated water, the allowed total
heat transfer amount of the accumulated water is determined; according to the lowest environment temperature, the
temperature difference between the accumulated water
freezing point temperature and the lowest environment temperature is determined; according to the
temperature difference and the thicknesses of the first plugging plate, the air interlayer and the second plugging plate, the
heat transfer speed of the concrete
pipe pile is determined; according to the accumulated water allowable total
heat transfer amount and the heat transfer speed, the time needed by freezing is determined; and comparing the time required for freezing with set time to obtain a
frost heaving prevention result. According to the embodiment of the invention, the first plugging plate, the second plugging plate and the air interlayer are arranged, an efficient heat
insulation layer is formed by utilizing the extremely low heat
conductivity coefficient of air, heat conduction of external low temperature to the accumulated water containing cavity is remarkably reduced, and accumulated water is prevented from being frozen.