Automatic guide rail painting equipment

By introducing a drying structure into the automatic paint coating equipment of the guide rail, the heat of the heating lamp tube is used to quickly dry the paint on the guide rail, solving the problem of long drying time of paint in existing equipment, improving production efficiency and ensuring the normal use of the equipment.

CN222625078UActive Publication Date: 2025-03-18ZHEJIANG BONLY ELEVATOR GUIDE RAIL MFG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421043417.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2025-03-18
Estimated Expiration
2034-05-14

AI Technical Summary

Technical Problem

The existing paint equipment lacks the structure of quickly drying paint, which causes the guide rails to wait for the paint to solidify and dry after being painted, resulting in a long processing time and low efficiency.

Method used

An automatic guide rail paint device is designed, which includes a drying structure, including a guide rod, a lifting plate, a cylinder and a heating lamp tube. The guide rail is slowly passed under the drying structure through the conveyor belt, and the paint is quickly dried using the heat generated by the heating lamp tube.

Benefits of technology

It realizes rapid drying of guide rail paint, shortens processing time, improves production efficiency, and prevents paint splashing through barrier structures, ensuring the normal use of heating lamp tubes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222625078U_ABST
    Figure CN222625078U_ABST
Patent Text Reader

Abstract

The utility model discloses automatic guide rail painting equipment, which belongs to the field of painting equipment and comprises a conveying seat, a conveying belt is arranged on the conveying seat, a support is mounted at the end of the conveying seat, a transverse rod is arranged on the support, and a sliding seat and a nozzle are connected below the transverse rod. Through the arranged drying structure, after painting work on the guide rail is completed, the conveying belt slowly drives the guide rail to pass through the lower portion of the drying structure, paint on the guide rail can be dried through the drying structure, and therefore the purpose of rapid drying is achieved, and the drying structure is internally provided with a guide rod, a lifting plate, an air cylinder and other structures; the height can be adjusted according to actual conditions, the use flexibility is high, the blocking structure is arranged on the sliding base, the spray head and the drying structure are separated, when the spray head moves along with the sliding base and sprays paint, sprayed paint cannot be splashed and attached to a heating lamp tube in the drying structure due to the effect of the blocking structure, and the paint spraying effect is good. Therefore, the normal use of the heating lamp tube is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of painting equipment, in particular to automatic painting equipment for guide rails. Background Art

[0002] Elevator guide rails are the guide rails used when the elevator car is raised or lowered. They are generally T-shaped guide rails. In the process of elevator guide rail production, in order to ensure the use effect of the guide rails, the guide rails need to go through processes such as painting, oiling and film pasting. For the painting work, the guide rails can be painted using painting equipment. The painting equipment is also called spray painting equipment. When in use, the conveying structure moves the guide rails to the bottom of the spray painting structure, and the spray painting structure sprays the guide rails. At the same time, the spray painting structure moves along the guide rails, thereby realizing the automatic painting of the entire guide rail.

[0003] In the existing painting equipment, since there is no structure for quickly drying the paint in the painting equipment, the paint cannot be dried quickly after the guide rail is painted. After the guide rail is transported to the subsequent workstation, it is necessary to wait for the paint on the guide rail to solidify and dry before the next processing can be carried out. This process requires waiting for a certain amount of time, resulting in a long time-consuming processing of the guide rail. The processing of the guide rail takes a long time and has a low efficiency. Utility Model Content

[0004] The main purpose of the utility model is to provide an automatic rail painting device, which can effectively solve the problems in the background technology.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] A guide rail automatic painting device includes a conveying seat, a conveying belt is provided on the conveying seat, and a bracket is installed at the end of the conveying seat, a cross bar is provided on the bracket, and a sliding seat and a nozzle are connected below the cross bar, a drying structure is provided on the bracket, and the drying structure includes a guide rod, a lifting plate, a mounting seat and a heating lamp tube, the guide rod is connected to the lifting plate, and the guide rod is connected to the bracket, the mounting seat is installed on the lower surface of the lifting plate, the heating lamp tube is arranged on the mounting seat, and a blocking structure is provided on the sliding seat.

[0007] Preferably, a conveying roller is provided on the conveying seat, the conveying belt is sleeved on the conveying roller, and a base frame is installed at the lower end of the conveying seat.

[0008] Preferably, a container box is fixed on the cross bar, a paint spraying tube is provided at the lower end of the sliding seat, and a threaded hole is provided on the sliding seat, and the spray head is installed at the lower end of the paint spraying tube.

[0009] Preferably, the drying structure further comprises a cylinder and a telescopic rod, wherein the cylinder is fixedly mounted on the upper end of the bracket, the telescopic rod is connected to the cylinder, and the lower end of the telescopic rod is connected to the lifting plate, and the heating lamp is fixedly mounted on the mounting base.

[0010] Preferably, the blocking structure includes a mounting plate, a baffle and mounting screws, the mounting plate is fixedly connected to the baffle, and a circular hole is provided on the mounting plate, the mounting screw is arranged in the circular hole on the mounting plate, and the end of the mounting screw is connected to the threaded hole on the sliding seat, and the mounting plate is fixed to the sliding seat by the mounting screws.

[0011] Compared with the prior art, the utility model has the following beneficial effects: the guide rail automatic painting equipment, through the setting of the drying structure, after completing the painting work on the guide rail, the conveyor belt slowly carries the guide rail through the bottom of the drying structure, and the paint on the guide rail can be dried by the drying structure, thereby achieving the purpose of rapid drying, and the drying structure is provided with guide rods, lifting plates, cylinders and other structures, and the height can be adjusted according to actual conditions, and the use flexibility is high, and a blocking structure is provided on the sliding seat to separate the nozzle from the drying structure. When the nozzle moves with the sliding seat and sprays paint, the sprayed paint will not splash and adhere to the heating lamp in the drying structure due to the effect of the blocking structure, thereby ensuring the normal use of the heating lamp and guaranteeing the use effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0013] Figure 2 For this utility model Figure 1 The enlarged view of point A in the middle;

[0014] Figure 3 This is a structural schematic diagram of the drying structure of the utility model;

[0015] Figure 4 It is a structural schematic diagram of the blocking structure of the utility model.

[0016] In the figure: 1. conveying seat; 2. conveyor belt; 3. bracket; 4. drying structure; 401. guide rod; 402. lifting plate; 403. cylinder; 404. telescopic rod; 405. mounting seat; 406. heating lamp tube; 5. cross bar; 6. sliding seat; 7. nozzle; 8. blocking structure; 801. mounting plate; 802. baffle; 803. mounting screws; 9. base frame; 10. container. DETAILED DESCRIPTION

[0017] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0018] like Figure 1-Figure 4 As shown, a guide rail automatic painting equipment includes a conveying seat 1, a conveying belt 2 is provided on the conveying seat 1, and a bracket 3 is installed at the end of the conveying seat 1, a cross bar 5 is provided on the bracket 3, and a sliding seat 6 and a nozzle 7 are connected below the cross bar 5, a drying structure 4 is provided on the bracket 3, a blocking structure 8 is provided on the sliding seat 6, a conveying roller is provided on the conveying seat 1, the conveying belt 2 is sleeved on the conveying roller, a base frame 9 is installed at the lower end of the conveying seat 1, a containing box 10 is fixed on the cross bar 5, a paint spraying tube is provided at the lower end of the sliding seat 6, and a threaded hole is provided on the sliding seat 6, and the nozzle 7 is installed at the lower end of the paint spraying tube.

[0019] When painting the guide rails used in the elevator, the preceding equipment transports the guide rails to the conveyor belt 2 on the conveyor seat 1, and the conveyor roller moves the guide rails through the conveyor belt 2, so that the guide rails move to the middle part of the equipment, and then the sliding seat 6 moves the nozzle 7 to the end position of the cross bar 5, and the paint in the container 10 enters the paint spraying pipe through the pipeline, and is finally sprayed out from the nozzle 7. In this process, the sliding seat 6 moves along the guide rails with the paint spraying nozzle 7, so as to realize the work of painting the guide rails. During the painting process, when the sliding seat 6 is located near the drying structure 4, the blocking structure 8 plays a blocking role to prevent the paint from splashing and adhering to the drying structure 4, and will not affect the subsequent normal use of the drying structure 4. After the painting work on the guide rails is completed, the conveyor roller slowly passes the bottom of the drying structure 4 with the guide rails through the conveyor belt 2, and the heat generated by the operation of the drying structure 4 acts on the guide rails, so that the paint dries quickly. When the guide rails pass through the bottom of the drying structure 4 and move to the next station, the paint has been dried and can continue to the next step of processing.

[0020] Through the above implementation scheme, the drying structure 4 includes a guide rod 401, a lifting plate 402, a mounting seat 405 and a heating lamp 406, the guide rod 401 is connected to the lifting plate 402, and the guide rod 401 is connected to the bracket 3, the mounting seat 405 is installed on the lower surface of the lifting plate 402, and the heating lamp 406 is arranged on the mounting seat 405, the drying structure 4 also includes a cylinder 403 and a telescopic rod 404, the cylinder 403 is fixedly installed on the upper end of the bracket 3, the telescopic rod 404 is connected to the cylinder 403, and the lower end of the telescopic rod 404 is connected to the lifting plate 402, the heating lamp 406 is fixedly installed on the mounting seat 405, the blocking structure 8 includes a mounting plate 801, a baffle 802 and a mounting screw 803, the mounting plate 801 is fixedly connected to the baffle 802, and a circular hole is provided on the mounting plate 801, and the mounting screw 803 is arranged in the circular hole on the mounting plate 801, And the end of the mounting screw 803 is connected to the threaded hole on the sliding seat 6, and the mounting plate 801 is fixed to the sliding seat 6 by the mounting screw 803. Through the drying structure 4, after the painting work on the guide rail is completed, the conveyor belt 2 slowly carries the guide rail through the bottom of the drying structure 4, and the paint on the guide rail can be dried by the drying structure 4, so as to achieve the purpose of rapid drying. The drying structure 4 is provided with a guide rod 401, a lifting plate 402, a cylinder 403 and other structures, which can be adjusted in height according to actual conditions, and have high flexibility in use. A blocking structure 8 is provided on the sliding seat 6 to separate the nozzle 7 from the drying structure 4. When the nozzle 7 moves with the sliding seat 6 and sprays paint, the sprayed paint will not splash and adhere to the heating lamp 406 in the drying structure 4 due to the action of the blocking structure 8, thereby ensuring the normal use of the heating lamp 406 and ensuring the use effect.

[0021] During the painting process, when the sliding seat 6 is located near the drying structure 4, the baffle 802 below the mounting plate 801 installed by the mounting screws 803 separates the nozzle 7 from the drying structure 4, which can play a barrier role to prevent paint from splashing onto the heating lamp 406 in the drying structure 4, thereby ensuring the subsequent normal use of the heating lamp 406. When the painting work of the guide rail is completed, the guide rail passes under the drying structure 4. At this time, the heat generated by the heating lamp 406 on the mounting seat 405 acts on the guide rail, so that the paint on the guide rail can be Quick drying improves the drying rate. When necessary, the height of the heating lamp 406 can be adjusted. When adjusting, start the cylinder 403 on the bracket 3, and the cylinder 403 runs to extend and retract the telescopic rod 404, thereby driving the lifting plate 402, the mounting seat 405 and the heating lamp 406 to rise and fall, so that the heating lamp 406 moves to a suitable height, and then continues to be used. During the adjustment process, the lifting plate 402 moves relative to the bracket 3 through the guide rod 401, which can ensure the relative stability of the lifting. The structure is simple and the use effect is good.

[0022] The above content describes the use principle, features and beneficial effects of the utility model. Relevant personnel in the field can understand from the above content that the above content does not limit the utility model. The above embodiments and instructions describe the basic principles and features of the utility model. Under the premise of conforming to the concept of the utility model, the utility model can also be modified in various ways, and these modifications should fall within the scope of protection required by the utility model.

Claims

1. A guide rail automatic painting device, comprising a conveying seat (1), a conveying belt (2) being provided on the conveying seat (1), a bracket (3) being installed at the end of the conveying seat (1), a cross bar (5) being provided on the bracket (3), and a sliding seat (6) and a nozzle (7) being connected below the cross bar (5), characterized in that: The support (3) is provided with a drying structure (4), and the drying structure (4) comprises a guide rod (401), a lifting plate (402), a mounting seat (405) and a heating lamp (406); the guide rod (401) is connected to the lifting plate (402), and the guide rod (401) is connected to the support (3); the mounting seat (405) is installed on the lower surface of the lifting plate (402); the heating lamp (406) is arranged on the mounting seat (405); and a blocking structure (8) is provided on the sliding seat (6).

2. The guide rail automatic painting equipment according to claim 1, characterized in that: The conveying seat (1) is provided with a conveying roller, the conveying belt (2) is sleeved on the conveying roller, and a base frame (9) is installed at the lower end of the conveying seat (1).

3. The guide rail automatic painting equipment according to claim 2, characterized in that: A container box (10) is fixed on the cross bar (5), a paint spraying tube is provided at the lower end of the sliding seat (6), a threaded hole is provided on the sliding seat (6), and the spray head (7) is installed at the lower end of the paint spraying tube.

4. The guide rail automatic painting equipment according to claim 3, characterized in that: The drying structure (4) further comprises a cylinder (403) and a telescopic rod (404); the cylinder (403) is fixedly mounted on the upper end of the bracket (3); the telescopic rod (404) is connected to the cylinder (403); and the lower end of the telescopic rod (404) is connected to the lifting plate (402); and the heating lamp tube (406) is fixedly mounted on the mounting base (405).

5. The guide rail automatic painting equipment according to claim 4, characterized in that: The blocking structure (8) comprises a mounting plate (801), a baffle plate (802) and mounting screws (803); the mounting plate (801) is fixedly connected to the baffle plate (802); a circular hole is provided on the mounting plate (801); the mounting screws (803) are arranged in the circular hole on the mounting plate (801); and the ends of the mounting screws (803) are connected to the threaded holes on the sliding seat (6); the mounting plate (801) is fixed to the sliding seat (6) by means of the mounting screws (803).