Emergency leaking stoppage device for pipeline

By designing a pipeline emergency leak plugging device, and using a fastening mechanism and a top pressure mechanism to make the leak plugging body close to the pipeline, the problem of insufficient sealing and safety in the prior art is solved, rapid and effective leakage sealing is achieved, and the risk of safe operation of the equipment is reduced.

CN222634109UActive Publication Date: 2025-03-18CHINA YANGTZE POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420696702.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2025-03-18
Estimated Expiration
2034-04-07

AI Technical Summary

Technical Problem

The prior art has insufficient sealing and safety when dealing with pipe leakage, and is inconvenient to operate, and there is a risk of expanding leakage points.

Method used

A pipeline emergency leak plugging device is designed, and the lift plugging body is installed on the outside of the pipeline through a fastening mechanism, and the leak plugging body is tightly attached to the pipeline by using the top pressure mechanism to achieve the leak plugging function.

Benefits of technology

It provides better sealing, safety and convenient operation, can quickly and effectively block leakage points and reduce the risk of safe operation of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222634109U_ABST
    Figure CN222634109U_ABST
Patent Text Reader

Abstract

The utility model provides an emergency leaking stoppage device for a pipeline. The emergency leaking stoppage device comprises a fastening mechanism, a mounting bracket, a jacking mechanism and a leaking stoppage body, during use, the mounting bracket is mounted on the outer side of the pipeline through the fastening mechanism, and the leaking stoppage body is mounted between the pipeline and the mounting bracket; the positions of the mounting support and the leaking stoppage body are adjusted, so that the leaking stoppage body directly faces a leaking point on the pipeline, the jacking mechanism is operated to apply jacking force to the leaking stoppage body, the bottom of the leaking stoppage body is tightly attached to the pipeline, and therefore the leaking stoppage function is achieved, and sufficient sealing performance, safety and operation convenience are provided compared with the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline maintenance, in particular to an emergency pipeline leak plugging device. Background Art

[0002] Pipeline is a medium conveying channel widely used in industry and construction. Its main features are hard texture, strong corrosion resistance, tight interface, etc. Pipeline is widely used in factories of various industries, and the pipe network is complex. Flanges, joints, welds, etc. will inevitably produce leakage defects. When defects occur, emergency treatment is required. At present, it can only be temporarily handled by tightening flange bolts, live joints or wrapping welds with rubber skin, but these measures are less effective. Leakage defects can only be tracked and observed or equipment shutdown is requested for treatment. There is a risk of further expansion of leakage points, thus affecting the safe operation of equipment.

[0003] The current methods for dealing with pipeline leaks have the following defects: 1. Tightening flange bolts and live joints is suitable for small leaks or seepage, but may not provide sufficient sealing and safety for serious leaks or high-pressure pipelines; there may also be a small risk of leakage due to factors such as incomplete alignment, looseness or wear; and installation and maintenance require intervention in the pipeline, which may cause certain interruptions to production and operations; 2. Wrapping with rubber skin is suitable for small leaks or seepage, and is usually used to temporarily repair cracks or holes in the pipeline. For larger or serious leaks, rubber skin wrapping may not provide sufficient sealing; and the effect of the wrapping depends on the quality and adaptability of its materials. If the selected rubber skin material is not suitable for the required working environment or medium, it may not be able to effectively stop the leak; its sealing ability is limited, and it may not provide sufficient pressure resistance for high-pressure pipelines. Under high pressure conditions, stronger sealing and repair methods may be required. Utility Model Content

[0004] The purpose of the utility model is to provide an emergency leak plugging device for pipelines, which uses a fastening mechanism to install the mounting bracket on the outside of the pipeline, and a pressing mechanism to apply a tightening force to the leak plugging body, so that the bottom of the leak plugging body is close to the pipeline to achieve the leak plugging function, which provides better sealing, safety and convenience in operation compared to the prior art. In order to achieve the above technical features, the purpose of the utility model is achieved as follows:

[0005] A pipeline emergency plugging device comprises a mounting bracket installed on the outside of the pipeline through a fastening mechanism, a pressing mechanism is installed on the mounting bracket, and a plugging body is provided between the mounting bracket and the pipeline; the pressing mechanism applies a tightening force to the plugging body so that the bottom of the plugging body is tightly attached to the pipeline.

[0006] The fastening mechanism comprises a chain, a first end of the chain is detachably connected to a first side of the mounting bracket, and a second end of the chain is connected to a second side of the mounting bracket via a tightening mechanism.

[0007] The mounting bracket comprises a clamping block, and fenders symmetrically distributed on both sides of the clamping block are connected by connecting columns arranged on both sides of the clamping block, and the connecting columns are provided with mounting holes.

[0008] The tightening mechanism includes a second screw rod which is sleeved in the mounting hole 34 on the second side connecting column of the clamp block, one end of the second screw rod is connected to the second end of the chain, the other end of the second screw rod is threadedly connected to the tightening handle, and the first end of the chain is detachably connected to a fastener installed in the mounting hole on the first side connecting column of the clamp block.

[0009] The bottom of the leak-blocking body is an arc-shaped structure adapted to the outer circle of the pipeline.

[0010] A sealing member is provided between the bottom of the leak-blocking body and the pipeline.

[0011] The pressing mechanism comprises a first screw rod which is screwed into a threaded hole at the top of the clamping block, and the end of the first screw rod abuts against the leak-blocking body after passing through the clamping block.

[0012] The pressing mechanism is a jack installed on the top of the clamping block, and the telescopic end of the jack passes through the through hole on the top of the clamping block and then abuts against the leak-blocking body.

[0013] The utility model has the following beneficial effects:

[0014] 1. The mounting bracket is installed on the outside of the pipeline through the fastening mechanism, and the plugging body is subjected to a tightening force by the pressing mechanism, so that the bottom of the plugging body is close to the pipeline to achieve the plugging function, which provides sufficient sealing, safety and operational convenience compared with the existing technology.

[0015] 2. The utility model has a simple structure, reduces the use cost, is convenient for maintenance personnel to use flexibly, is easy to disassemble and assemble, and can achieve rapid blocking.

[0016] 3. According to the material of the pipeline and the medium passing through it, different materials of plugging bodies and seals can be selected to achieve better sealing effects.

[0017] 4. By adjusting the number of chain links, efficient and rapid leak plugging of pipes with various diameters can be achieved, and the operation is simple and fast. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The utility model is further described below in conjunction with the accompanying drawings and embodiments.

[0019] Figure 1A side view of an emergency leak plugging device for a pipeline provided by an embodiment of the utility model when in use;

[0020] Figure 2 A front view of a pipeline emergency leak plugging device provided by an embodiment of the utility model when in use;

[0021] Figure 3 A schematic diagram of the structure of the mounting bracket provided in the embodiment of the utility model;

[0022] Figure 4 A schematic diagram of the connection structure of the second screw rod, the tightening handle and the chain provided in an embodiment of the utility model;

[0023] Figure 5 A schematic diagram of the connection structure of a chain and a fastener provided in an embodiment of the utility model;

[0024] Figure 6 A front view of a mounting bracket provided in an embodiment of the utility model;

[0025] Figure 7 A schematic diagram of the structure of the leak-proof body provided in the embodiment of the utility model;

[0026] Figure 8 A front view of a leak-proof body provided in an embodiment of the utility model;

[0027] In the figure: a fastening mechanism 1, a chain 11, a pipe 2, a mounting bracket 3, a fender 32, a clamping block 31, a connecting column 33, a mounting hole 34, a fastener 35, a threaded hole 31a, a pressing mechanism 4, a first screw rod 41, a plugging body 5, a groove 51, a tightening mechanism 6, a second screw rod 61, and a tightening handle 62. DETAILED DESCRIPTION

[0028] The embodiments of the present utility model are further described below in conjunction with the accompanying drawings.

[0029] See attached Figure 1-2 In order to realize the above technical features, the purpose of the utility model is achieved as follows:

[0030] A pipeline emergency plugging device includes a mounting bracket 3 installed on the outside of a pipeline 2 through a fastening mechanism 1, a pressing mechanism 4 is installed on the mounting bracket 3, and a plugging body 5 is provided between the mounting bracket 3 and the pipeline 2; the pressing mechanism 4 applies a tightening force to the plugging body 5 so that the bottom of the plugging body 5 is tightly attached to the pipeline 2.

[0031] The utility model comprises a fastening mechanism 1, a mounting bracket 3, a pressing mechanism 4 and a leak-blocking body 5. When in use, the mounting bracket 3 is mounted on the outside of the pipeline 2 by the fastening mechanism 1, and the leak-blocking body 5 is mounted between the pipeline 2 and the mounting bracket 3. The positions of the mounting bracket 2 and the leak-blocking body 5 are adjusted so that the leak-blocking body 5 is directly opposite to the leakage point on the pipeline 2, and the pressing mechanism 4 is operated to apply a tightening force to the leak-blocking body 5 so that the bottom of the leak-blocking body 5 is tightly attached to the pipeline 2, thereby realizing the leak-blocking function, which provides sufficient sealing, safety and convenience in operation compared with the prior art.

[0032] For further information, see Figure 1-5 The fastening mechanism 1 includes a chain 11, a first end of the chain 11 is detachably connected to a first side of the mounting bracket 3, and a second end of the chain 11 is connected to a second side of the mounting bracket 3 via a tightening mechanism 6. The mounting bracket 3 can be fixed to the outside of the pipe 2 by adjusting the tightening mechanism 6. By adjusting the number of chain links, efficient and rapid plugging of pipes of various diameters can be achieved, and the operation is simple and quick.

[0033] For further information, see Figure 1-3 The mounting bracket 3 includes a clamping block 31 , and fenders 32 symmetrically distributed on both sides of the clamping block 31 are connected by connecting columns 33 arranged on both sides of the clamping block 31 , and mounting holes 34 are provided on the connecting columns 33 .

[0034] For further information, see Figure 1-4 The tightening mechanism 6 includes a second screw rod 61 which is sleeved in the mounting hole 34 on the second side connecting column 33 of the clamping block 31, one end of the second screw rod 61 is connected to the second end of the chain 11, and the other end of the second screw rod 61 is threadedly connected to the tightening handle 62, and the first end of the chain 11 is detachably connected to the fastener 35 installed in the mounting hole 34 on the first side connecting column 33 of the clamping block 31, see Figure 5 One end of the fastener 35 is inserted into the gap on the chain link to complete the fixing and limiting. When in use, by rotating the tightening handle 62, a tightening force can be applied to the chain 11 to make the chain 11 tight and the bottom of the mounting bracket 3 abut against the surface of the pipe 2, thereby achieving installation and fixing.

[0035] See also Figure 1-3 , Figure 6 The lower end of the fender 32 is a triangular structure. When working, the triangular protrusion 32a at the bottom abuts against the outer wall of the pipe 2 to support the entire mounting bracket.

[0036] For further information, see Figure 7 The plugging body 5 has a conical shape, and a groove 51 is provided on its end surface so as to fit more closely with the outer wall of the pipeline.

[0037] For further information, see Figure 8The bottom of the plugging body 5 is an arc-shaped structure adapted to the outer circle of the pipe 2. Different sizes of plugging bodies can be selected according to different pipe diameters so as to fit the surface of the pipe and achieve a good plugging effect.

[0038] Furthermore, a seal is provided between the bottom of the plugging body 5 and the pipeline 2 to ensure a stable anti-leakage effect.

[0039] For further information, see Figure 1-3 The pressing mechanism 4 includes a first screw rod 41 screwed into a threaded hole 31a at the top of the clamp block 31. The end of the first screw rod 41 passes through the clamp block 31 and abuts against the leak-blocking body 5. By rotating the first screw rod 41, a tightening force can be provided for the leak-blocking body 5.

[0040] Furthermore, the pressing mechanism 4 is a jack installed on the top of the clamp block 31 , and the telescopic end of the jack passes through the through hole provided on the top of the clamp block 31 and abuts against the plugging body 5 , thereby providing a tightening force for the plugging body 5 .

Claims

1. A pipeline emergency leak plugging device, characterized in that: The invention comprises a mounting bracket (3) mounted on the outside of a pipeline (2) by means of a fastening mechanism (1); a pressing mechanism (4) is mounted on the mounting bracket (3); a leak-blocking body (5) is provided between the mounting bracket (3) and the pipeline (2); the pressing mechanism (4) applies a tightening force to the leak-blocking body (5), so that the bottom of the leak-blocking body (5) is closely attached to the pipeline (2).

2. A pipeline emergency leak plugging device according to claim 1, characterized in that: The fastening mechanism (1) comprises a chain (11), a first end of the chain (11) being detachably connected to a first side of the mounting bracket (3), and a second end of the chain (11) being connected to a second side of the mounting bracket (3) via a tightening mechanism (6).

3. A pipeline emergency leak plugging device according to claim 2, characterized in that: The mounting bracket (3) comprises a clamping block (31), and fenders (32) symmetrically distributed on both sides of the clamping block (31) are connected via connecting columns (33) arranged on both sides of the clamping block (31), and the connecting columns (33) are provided with mounting holes (34).

4. The pipeline emergency leak plugging device according to claim 3 is characterized by: The tightening mechanism (6) comprises a second screw rod (61) sleeved in a mounting hole (34) on a second side connecting column (33) of the clamping block (31); one end of the second screw rod (61) is connected to the second end of the chain (11); the other end of the second screw rod (61) is threadedly connected to a tightening handle (62); and the first end of the chain (11) is detachably connected to a fastener (35) mounted in a mounting hole (34) on a first side connecting column (33) of the clamping block (31).

5. The pipeline emergency leak plugging device according to claim 4 is characterized by: The bottom of the leak-blocking body (5) is an arc-shaped structure adapted to the outer circle of the pipeline (2).

6. The pipeline emergency leak plugging device according to claim 5, characterized in that: A sealing member is provided between the bottom of the leak-blocking body (5) and the pipeline (2).

7. The pipeline emergency leak plugging device according to claim 6, characterized in that: The pressing mechanism (4) comprises a first screw rod (41) screwed into a threaded hole (31a) at the top of the clamping block (31), and the end of the first screw rod (41) passes through the threaded hole (31a) and abuts against the leak-blocking body (5).

8. The pipeline emergency leak plugging device according to claim 6, characterized in that: The pressing mechanism (4) is a jack installed on the top of the clamping block (31); the telescopic end of the jack passes through the through hole at the top of the clamping block (31) and then abuts against the leak-blocking body (5).