Automatic feeding device for hydraulic shrinkage heads of pipes

By designing the automatic feeding device of hydraulic compression heads of pipes, the problems of low operating efficiency and poor product accuracy in the prior art are solved, automated supply and precise delivery are realized, and production efficiency and product quality are improved.

CN222642858UActive Publication Date: 2025-03-21DAWN ZHONGSHAN ALUMINUM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420893638.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2025-03-21
Estimated Expiration
2034-04-28

AI Technical Summary

Technical Problem

The existing metal pipe hydraulic compression heads have low operating efficiency and poor product accuracy, resulting in poor results in cold drawing and extraction.

Method used

An automatic feeding device for pipe hydraulic compression heads is designed, including a pre-loading platform, a plurality of first feeding mechanisms, a positioner and a clamping movement mechanism. The precise supply and conveying of pipe materials is achieved through automated mechanical control, and the accuracy of the shrinking head position is ensured.

Benefits of technology

Improve production efficiency, reduce labor intensity, ensure the accuracy of head shrinking position, and improve product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222642858U_ABST
    Figure CN222642858U_ABST
Patent Text Reader

Abstract

The utility model discloses an automatic feeding device for hydraulic shrinkage heads of pipes, which relates to the technical field of metal pipe processing and comprises a pre-placing platform, a plurality of first ejection mechanisms, a positioner and a clamping and moving mechanism. The positioner comprises a plurality of V-shaped rollers; the pre-placing platform is provided with a placing and conveying plane used for placing a plurality of pipes to be machined. At least one first material blocking bracket is fixedly arranged on one side of the placing and conveying plane; the first material jacking mechanism comprises a first jacking device and a first material jacking support, and the first material jacking support is fixedly arranged on a lifting output shaft of the first jacking device; the top of the first jacking bracket is provided with a first jacking guide inclined surface; a to-be-processed pipe positioned at the first material blocking bracket can be jacked up by the first material jacking bracket and rolls to each V-shaped roller wheel along the first material jacking guide inclined surface; and the clamping moving mechanism is provided with a clamping part capable of clamping the to-be-processed pipe positioned on each V-shaped roller and conveying the to-be-processed pipe to the necking part of the necking die. The head shrinking position precision is ensured, the product quality is improved, the production efficiency is improved, and the labor intensity is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of metal pipe processing, in particular to an automatic feeding device for a pipe type liquid compression head. Background Art

[0002] In the prior art, liquid compression heads for metal tubes are widely used in the field of cold drawing and finishing of metal tubes. The cold drawing and finishing process of metal tubes has relatively high precision requirements on the straightness of the shrinking head position and the length of the shrinking head.

[0003] Traditional hydraulic compression plugs usually need to be operated manually, which is inefficient and labor-intensive. In addition, the product precision of manually operated hydraulic compression plugs is poor, the port is easy to bend, and the shrinkage length is not uniform, which easily leads to defects in the post-process of cold drawing. Utility Model Content

[0004] The purpose of the utility model is to provide an automatic feeding device for a liquid compression head of a tube, so as to solve the problems existing in the above-mentioned prior art, ensure the position accuracy of the compression head, improve product quality, increase production efficiency and reduce labor intensity.

[0005] To achieve the above purpose, the utility model provides the following solutions:

[0006] The utility model provides an automatic feeding device for a liquid compression head of a tube, comprising a pre-placement platform, a plurality of first ejecting mechanisms, a positioner and a clamping and moving mechanism; the positioner comprises a plurality of V-shaped rollers, each of which is arranged in sequence along a first direction, and the first direction is parallel to the shrinking axis of the shrinking head mold; the pre-placement platform is fixedly arranged on one side of the positioner, and a placement and transmission plane is provided on the pre-placement platform, and a plurality of tubes to be processed are arranged in sequence along a second direction on the placement and transmission plane, and the second direction is perpendicular to the first direction; at least one first material blocking bracket is fixedly arranged on a side of the placement and transmission plane close to the positioner, and the placement and transmission plane can sequentially transmit each tube to be processed to the first material blocking bracket; each of the first ejecting mechanisms is arranged in sequence along the first direction; the first ejecting mechanism comprises a first ejector and a first ejecting bracket, and the first ejecting mechanism comprises a first ejector and a first ejecting bracket. The material support is fixed on the output shaft of the first lifter, and the output shaft of the first lifter can be lifted and lowered in the vertical direction; the top of the first lifter is provided with a first lifter guide slope; in the vertical direction, one end of the first lifter guide slope close to the pre-placement platform is higher than one end of the first lifter guide slope close to the positioner; the tube to be processed located at the first material blocking support can be lifted by the first lifter support and roll down to each of the V-shaped rollers along the first lifter guide slope based on the gravity of the tube to be processed; the axis of the tube to be processed located on each of the V-shaped rollers is coaxial with the shrinking axis of the shrinking die; the clamping moving mechanism has a clamping part that can move along the first direction, and the clamping axis of the clamping part is coaxial with the shrinking axis of the shrinking die; the clamping part can clamp the tube to be processed located on each of the V-shaped rollers and transport it to the shrinking part of the shrinking die.

[0007] Preferably, a material holding platform is further provided on a side of the positioner away from the pre-placement platform, and at least one second material lifting mechanism is further provided on a side of the material holding platform close to the positioner; the material holding platform has a material holding surface, and in the vertical direction, an end of the material holding surface close to the positioner is higher than an end of the material holding surface away from the positioner, and a second material blocking bracket is fixedly provided on the end of the material holding surface away from the positioner; each of the second material lifting mechanisms is arranged in sequence along the first direction; the second material lifting mechanism includes a second lifter and a second material lifting bracket, the second material lifting bracket is fixedly provided on the output shaft of the second lifter, and the output shaft of the second lifter can be lifted and lowered in the vertical direction; the top of the second material lifting bracket is provided with a second material lifting guide slope; in the vertical direction, an end of the second material lifting guide slope close to the positioner is higher than an end of the second material lifting guide slope close to the material holding platform; the pipe located on each of the V-shaped rollers can be lifted by the second material lifting bracket and roll down to the material holding surface along the second material lifting guide slope based on the pipe's own gravity.

[0008] Preferably, a plurality of roller brackets are fixedly provided on one side of the pre-placement platform close to the positioner; each of the V-shaped rollers is respectively connected to one of the roller brackets by rotating around a second axis, and the second axis is perpendicular to the first direction; the roller bracket comprises a first vertical plate, a horizontal plate, and a second vertical plate, the first vertical plate and the second vertical plate are arranged opposite to each other, the lower end of the first vertical plate is fixedly connected to one end of the horizontal plate, and the lower end of the second vertical plate is fixedly connected to the other end of the horizontal plate; the first vertical plate is located on a side of the second vertical plate away from the pre-placement platform, and the upper end of the first vertical plate is higher than the upper end of the second vertical plate.

[0009] Preferably, a first limiting protrusion is fixedly provided on one end of the first material ejection guide slope close to the pre-placement platform; in the second direction, one end of the first material ejection guide slope having the first limiting protrusion is located on the side of the first material stopping bracket away from the locator, and the distance between the first material stopping bracket and the first limiting protrusion can accommodate a tube to be processed.

[0010] Preferably, an extension plate is fixedly provided on the top of the first material blocking bracket, and the extension plate extends toward the side close to the locator; the top of the extension plate has a sliding material guide slope; in the vertical direction, the end of the sliding material guide slope close to the locator is lower than the end of the sliding material guide slope away from the locator; the end of the extension plate close to the locator is located on the side of the first vertical plate close to the second vertical plate, and the end of the extension plate close to the locator is lower than the upper end of the first vertical plate in the vertical direction; under the action of the gravity of the tube to be processed itself, the tube to be processed lifted by the first material lifting bracket can fall on the sliding material guide slope and roll along the sliding material guide slope to each of the V-shaped rollers.

[0011] Preferably, the pre-placement platform also includes at least one conveying mechanism; the placement conveying plane is a horizontal plane; each of the conveying mechanisms is arranged in sequence along the first direction, and the conveying mechanism includes a conveyor belt and a conveying drive mechanism, and the conveying drive mechanism is used to drive the conveyor belt to rotate; the conveyor belt is located below the placement conveying plane, and the upper plane of the conveyor belt is flush with the placement conveying plane; the conveying plane can convey each tube to be processed located on the placement conveying plane in sequence along the second direction to the first material blocking bracket.

[0012] Preferably, at least one third material blocking bracket is fixedly provided on a side of the conveying plane away from the positioner.

[0013] Preferably, a positioning swinging table is fixedly provided at one end of the placing and conveying plane along the first direction, and the positioning swinging table has a first limiting surface, and the first limiting surface is used to limit the position of each end of the tube to be processed on the placing and conveying plane in the first direction.

[0014] Preferably, it also includes a controller and at least one sensor; each of the sensors is used to sense the pipe to be processed close to the first material blocking bracket; the controller is communicatively connected with each of the sensors and each of the conveying mechanisms.

[0015] Preferably, a second limiting protrusion is fixedly provided at one end of the first material ejecting guide inclined surface away from the pre-placement platform.

[0016] Compared with the prior art, the utility model has achieved the following technical effects:

[0017] The utility model provides an automatic feeding device for liquid compression heads of pipes, which realizes automatic feeding of pipe materials by using a pre-placed platform to be processed pipes, and each first lifting mechanism cooperates with a first lifting guide inclined surface arranged on a first lifting bracket to automatically lift the pipe materials on the pre-placed platform and transfer them to each V-shaped roller, and realizes the coaxial position of the pipe axis and the shrinking axis of the shrinking head mold through the V-shaped grooves on each V-shaped roller; and clamps the pipe materials on the V-shaped rollers and conveys them to the shrinking head mold through a clamping and moving mechanism, and after the shrinking head processing is completed, the processed pipe materials are moved out of the shrinking head mold through the clamping and moving mechanism to complete the shrinking head processing of the pipe materials; the entire feeding process is controlled by automated machinery, and no manual operation is required, which can reduce labor intensity and improve production efficiency; and the coaxial level of the axis of the pipe material and the shrinking axis of the shrinking head mold is realized through each V-shaped roller, and the position of the pipe material is moved through the clamping and moving mechanism, so as to ensure high precision of the shrinking head position and good product quality.

[0018] Furthermore, the material holding platform is provided in combination with the second material ejecting mechanism to realize automatic material collection of the pipe material that has completed the head shrinking process, thereby improving work efficiency.

[0019] Furthermore, the rotating setting of the V-shaped roller can reduce the rolling friction of the pipe material in contact with it, and the upper end of the first vertical plate is set to be higher than the upper end of the second vertical plate, which can perform a unilateral limiting effect on the pipe material when it rolls onto each V-shaped roller, ensuring that the pipe material can accurately fall onto each V-shaped roller.

[0020] Furthermore, the first limiting protrusion on the first material lifting guide slope and the first material blocking bracket work together to lift up the tubes to be processed placed on the conveying plane one by one, thereby ensuring the feeding action of a single tube to be processed.

[0021] Furthermore, an extension plate is provided on the top of the first material blocking bracket, and a sliding guide slope is provided on the top of the extension plate. When the first lifting mechanism lifts the tube to be processed, the tube to be processed can fall on the sliding guide slope. That is, the setting of the sliding guide slope can prevent the tube to be processed from being stably fed to each V-shaped roller due to the fact that the lifted tube to be processed fails to roll toward the V-shaped roller in time after the first lifting mechanism descends because the tube itself is not completely straight. The tube to be processed can fall on the sliding guide slope and roll along the sliding guide slope to each V-shaped roller, thereby improving the stable feeding effect of the tube to be processed.

[0022] Furthermore, a conveying mechanism is arranged at the pre-placement platform, and through the contact friction between the conveyor belt and the tube to be processed, the conveyor belt drives the tube to be processed to move forward together when it is conveyed forward, so as to achieve the effect of stably conveying the tube to be processed forward and ensure the continuous feeding effect of the first pushing mechanism.

[0023] Furthermore, the third material blocking bracket can ensure that the tube to be processed located on the placement and conveying plane can be stably placed, thereby preventing the tube to be processed from falling from the side due to rolling.

[0024] Furthermore, the setting of the positioning swing table can achieve the effect of aligning one end of each tube to be processed placed on the conveying plane, thereby improving the stable lifting of the tube to be processed and more precise position clamping of the clamped moving mechanism.

[0025] Furthermore, the setting of the sensor can sense whether there is a pipe to be processed at the first material blocking bracket, and control the conveying mechanism through the controller to convey the pipe to be processed forward in time, thereby ensuring a continuous and stable feeding effect of the pipe to be processed.

[0026] Furthermore, the second limiting protrusion arranged on the first material lifting guide slope can limit the rolling speed of the lifted tube to be processed at the end of the first material lifting guide slope due to gravity, reduce its fluctuation when rolling onto each V-shaped roller, make it stabilize on each V-shaped roller as soon as possible, and improve work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0028] Figure 1 This is a schematic diagram of the overall structure of the automatic feeding device for the pipe hydraulic compression head provided by the utility model;

[0029] Figure 2A schematic diagram of the working state of the automatic feeding device for the pipe hydraulic compression head provided by the utility model in combination with the shrinking head equipment;

[0030] Figure 3 It is a structural schematic diagram of the head shrinking equipment;

[0031] Figure 4 A structural schematic diagram of the automatic feeding device for the pipe-type hydraulic compression head provided by the utility model from another perspective;

[0032] Figure 5 A top view of the automatic feeding device for the pipe hydraulic compression head provided by the utility model;

[0033] Figure 6 for Figure 2 A top view of

[0034] Figure 7 This is a schematic diagram of the structure of the first feeding mechanism in the automatic feeding device for the pipe hydraulic compression head provided by the utility model;

[0035] Figure 8 This is a schematic diagram of the structure of the first material blocking bracket in the automatic feeding device for the pipe hydraulic compression head provided by the utility model;

[0036] Fig. 9 This is a schematic diagram of the structure of the clamping and moving mechanism in the automatic feeding device for the pipe hydraulic compression head provided by the utility model;

[0037] Fig.10 The utility model provides a schematic structural diagram of a V-shaped roller and a roller bracket in an automatic feeding device for a pipe hydraulic compression head.

[0038] In the figure:

[0039] 1-pre-placement platform; 11-first material blocking bracket; 111-extension plate; 112-sliding material guide slope; 12-third material blocking bracket; 13-positioning swinging platform; 131-first limit surface;

[0040] 2-first ejecting mechanism; 21-first ejector; 22-first ejecting bracket; 221-first ejecting guide inclined plane; 222-first limiting protrusion; 223-second limiting protrusion;

[0041] 3-V-shaped roller; 31-roller bracket; 311-first vertical plate; 312-horizontal plate; 313-second vertical plate;

[0042] 4-clamping and moving mechanism; 41-base; 42-slider; 43-guide rail; 44-driver; 45-pneumatic clamp;

[0043] 5- the second ejecting mechanism;

[0044] 6-material holding platform; 61-second material blocking bracket;

[0045] 7-transmission mechanism; 71-conveyor belt; 72-transmission drive mechanism; 73-sensor;

[0046] 8-head shrinking equipment; 81-control box; 811-start switch; 812-stop switch; 813-emergency stop button; 82-head shrinking mold; 83-template; 84-hydraulic cylinder;

[0047] 9- Tube to be processed. DETAILED DESCRIPTION

[0048] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0049] The utility model aims to provide an automatic feeding device for a liquid compression head of a tube to solve the problems existing in the prior art, ensure the position accuracy of the compression head, improve product quality, increase production efficiency and reduce labor intensity.

[0050] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0051] Embodiment 1

[0052] The utility model provides an automatic feeding device for a pipe type hydraulic compression head, which is mainly used for automatic feeding of a hydraulic compression head of a metal pipe type, such as Figures 1 to 10As shown, it includes a pre-placement platform 1, multiple first ejection mechanisms 2, a positioner and a clamping and moving mechanism 4; the positioner includes multiple V-shaped rollers 3, each of which is arranged in sequence along a first direction, and the first direction is parallel to the shrinking axis of the shrinking head mold 82; the pre-placement platform 1 is fixed on one side of the positioner, and the pre-placement platform 1 has a placement and transmission plane, and multiple tubes to be processed 9 are arranged in sequence on the placement and transmission plane along a second direction, and the second direction is perpendicular to the first direction; at least one first material blocking bracket 11 is fixed on the side of the placement and transmission plane close to the positioner, and the placement and transmission plane can sequentially transmit each tube to be processed 9 to the first material blocking bracket 11; each first ejection mechanism 2 is arranged in sequence along the first direction; the first ejection mechanism 2 includes a first ejector 21 and a first ejection bracket 22, and the first ejection bracket 22 is fixed on the output shaft of the first ejector 21 On the top, the output shaft of the first lifter 21 can be lifted and lowered in the vertical direction; the top of the first lift bracket 22 is provided with a first lift guide slope 221; in the vertical direction, the end of the first lift guide slope 221 close to the pre-placement platform 1 is higher than the end of the first lift guide slope 221 close to the locator; the tube 9 to be processed located at the first material blocking bracket 11 can be lifted by the first lift bracket 22 and based on the gravity of the tube 9 to be processed, it rolls down to each V-shaped roller 3 along the first lift guide slope 221; the axis of the tube 9 to be processed located on each V-shaped roller 3 is coaxial with the shrinking axis of the shrinking mold 82; the clamping moving mechanism 4 has a clamping part that can move in the first direction, and the clamping axis of the clamping part is coaxial with the shrinking axis of the shrinking mold 82; the clamping part can clamp the tube 9 to be processed located on each V-shaped roller 3 and transport it to the shrinking part of the shrinking mold 82.

[0053] The pre-placement platform 1 is used to automatically supply the processing tube 9, and each first material pushing mechanism 2 is matched with the first material pushing guide inclined surface 221 set on the first material pushing bracket 22, so that the tube material on the pre-placement platform 1 is automatically lifted and transferred to each V-shaped roller 3, and the V-shaped groove on each V-shaped roller 3 is used to realize the coaxial position of the tube axis and the shrinking axis of the shrinking head mold 82; and the tube material on the V-shaped roller 3 is clamped by the clamping and moving mechanism 4 and transported to the shrinking head mold 82, and after the shrinking head processing is completed, the processed tube material is moved out of the shrinking head mold 82 by the clamping and moving mechanism 4 to complete the shrinking head processing of the tube material; the entire feeding process is controlled by automated machinery, without manual operation, which can reduce labor intensity and improve production efficiency; and the axis of the tube material is coaxial and horizontal with the shrinking axis of the shrinking head mold 82 by each V-shaped roller 3, and the tube material is moved by the clamping and moving mechanism 4, so as to ensure high precision of the shrinking position and good product quality.

[0054] Among them, in order to facilitate the removal of the pipe material after the shrinking process, it is also provided with:

[0055] Among the optional solutions of this embodiment, it is more preferred that Figure 1-2 and Figures 4 to 6 As shown, a material holding platform 6 is also provided on the side of the positioner away from the pre-placement platform 1, and at least one second material lifting mechanism 5 is also provided on the side of the material holding platform 6 close to the positioner; the material holding platform 6 has a material holding surface, in the vertical direction, the end of the material holding surface close to the positioner is higher than the end of the material holding surface away from the positioner, and a second material blocking bracket 61 is fixedly provided on the end of the material holding surface away from the positioner; each second material lifting mechanism 5 is arranged in sequence along the first direction; the second material lifting mechanism 5 includes a second lifter and a second material lifting bracket, the second material lifting bracket is fixed on the output shaft of the second lifter, and the output shaft of the second lifter can be lifted and lowered in the vertical direction; the top of the second material lifting bracket is provided with a second material lifting guide slope; in the vertical direction, the end of the second material lifting guide slope close to the positioner is higher than the end of the second material lifting guide slope close to the material holding platform 6; the pipe located on each V-shaped roller 3 can be lifted by the second material lifting bracket and roll down to the material holding surface along the second material lifting guide slope based on the pipe's own gravity. The material holding platform 6 is provided in combination with the second material ejecting mechanism 5 to realize automatic material collection of the pipe material that has completed the shrinking process, thereby improving work efficiency.

[0056] Among them, regarding the connection of the V-shaped roller 3:

[0057] Among the optional solutions of this embodiment, it is more preferred that Figure 1 , Figure 4 and Figure 6 and Fig.10 As shown, a plurality of roller brackets 31 are fixedly provided on one side of the pre-placement platform 1 close to the positioner; each V-shaped roller 3 is respectively connected to a roller bracket 31 by rotating around a second axis, and the second axis is perpendicular to the first direction; the roller bracket 31 comprises a first vertical plate 311, a horizontal plate 312 and a second vertical plate 313, the first vertical plate 311 and the second vertical plate 313 are arranged opposite to each other, the lower end of the first vertical plate 311 is fixedly connected to one end of the horizontal plate 312, and the lower end of the second vertical plate 313 is fixedly connected to the other end of the horizontal plate 312; the first vertical plate 311 is located on a side of the second vertical plate 313 away from the pre-placement platform 1, and the upper end of the first vertical plate 311 is higher than the upper end of the second vertical plate 313. The rotating setting of the V-shaped roller 3 can reduce the rolling friction of the pipe material in contact with it, and the upper end of the first vertical plate 311 is set to be higher than the upper end of the second vertical plate 313, which can perform a unilateral limiting effect on the pipe material when it rolls onto each V-shaped roller 3, ensuring that the pipe material can accurately fall onto each V-shaped roller 3.

[0058] Specifically, the roller bracket 31 is fixedly connected to the pre-placement platform 1 through a pipe fitting.

[0059] Among them, regarding the structures of the first ejection mechanism 2 and the second ejection mechanism 5:

[0060] Specifically, the first ejection mechanism 2 and the second ejection mechanism 5 have the same structure.

[0061] Among the optional solutions of this embodiment, it is more preferred that Figure 1-2 and Figures 4 to 7 As shown, a first limiting protrusion 222 is fixedly arranged at one end of the first material ejection guide inclined surface 221 close to the pre-placement platform 1; in the second direction, one end of the first material ejection guide inclined surface 221 having the first limiting protrusion 222 is located at the side of the first material blocking bracket 11 away from the positioner, and the spacing between the first material blocking bracket 11 and the first limiting protrusion 222 can accommodate a tube to be processed 9. The first limiting protrusion 222 on the first material ejection guide inclined surface 221 and the first material blocking bracket 11 are used together to realize the lifting of the tubes to be processed 9 placed on the conveying plane one by one, ensuring the feeding action of a single tube to be processed 9 at a time.

[0062] Among the optional solutions of this embodiment, it is more preferred that Figure 1-2 and Figures 4 to 7 As shown, a second limiting protrusion 223 is fixedly arranged at one end of the first material-lifting guide inclined surface 221 away from the pre-placement platform 1. The second limiting protrusion 223 arranged on the first material-lifting guide inclined surface 221 can limit the rolling speed of the lifted tube 9 to be processed at the end of the first material-lifting guide inclined surface 221 due to the gravity, reduce the fluctuation when it rolls onto each V-shaped roller 3, make it stabilize on each V-shaped roller 3 as soon as possible, and improve the working efficiency.

[0063] Among them, regarding the structure of the first material blocking bracket 11:

[0064] Among the optional solutions of this embodiment, it is more preferred that Figure 1-2 and Figures 4 to 6 and Figure 8As shown, an extension plate 111 is fixedly provided on the top of the first material blocking bracket 11, and the extension plate 111 extends toward the side close to the positioner; a sliding material guide slope 112 is provided on the top of the extension plate 111; in the vertical direction, the end of the sliding material guide slope 112 close to the positioner is lower than the end of the sliding material guide slope 112 away from the positioner; the end of the extension plate 111 close to the positioner is located on the side of the first vertical plate 311 close to the second vertical plate 313, and the end of the extension plate 111 close to the positioner is lower than the upper end of the first vertical plate 311 in the vertical direction; under the action of the gravity of the tube 9 to be processed itself, the tube 9 to be processed lifted by the first material lifting bracket 22 can fall on the sliding material guide slope 112 and roll along the sliding material guide slope 112 to each V-shaped roller 3. An extension plate 111 is arranged on the top of the first material blocking bracket 11, and a sliding guide slope 112 is arranged on the top of the extension plate 111. When the first material lifting mechanism 2 lifts the tube 9 to be processed, the tube 9 to be processed can fall on the sliding guide slope 112. That is, the setting of the sliding guide slope 112 can prevent the tube 9 to be processed from failing to roll toward the V-shaped roller 3 in time due to the fact that the lifted tube 9 is not completely straight after the first material lifting mechanism 2 descends, resulting in the tube 9 to be processed not being stably fed to each V-shaped roller 3. The tube 9 to be processed can fall on the sliding guide slope 112 and roll down to each V-shaped roller 3 along the sliding guide slope 112, thereby improving the stable feeding effect of the tube 9 to be processed.

[0065] Among them, about the structure of pre-release platform 1:

[0066] Among the optional solutions of this embodiment, it is more preferred that Figure 1-2 and Figures 4 to 6 As shown, at least one third material stop bracket 12 is fixedly arranged on the side of the placement and conveying plane away from the positioner. The third material stop bracket 12 can ensure that the tube 9 to be processed on the placement and conveying plane can be stably placed to prevent the tube 9 to be processed from falling from the side due to rolling.

[0067] Among the optional solutions of this embodiment, it is more preferred that Figure 1-2 and Figures 4 to 6 As shown, a positioning swinging platform 13 is fixedly provided at one end of the placement and conveying plane along the first direction, and the positioning swinging platform 13 has a first limiting surface 131, and the first limiting surface 131 is used to limit the position of the end of each tube 9 to be processed on the placement and conveying plane in the first direction. The setting of the positioning swinging platform 13 can achieve the effect of aligning one end of each tube 9 to be processed on the placement and conveying plane, thereby improving the stable lifting of the tube 9 to be processed and more accurate position clamping by the clamping moving mechanism 4.

[0068] Specifically, the placement and conveying plane of the pre-placement platform 1 can sequentially convey each tube 9 to be processed to the first material blocking bracket 11 in any of the existing ways; in addition to setting the placement and conveying plane as a horizontal plane and coordinating multiple conveying mechanisms 7 to achieve it; the placement and conveying plane can also be set as an inclined plane, and the tubes 9 to be processed are arranged one by one and automatically fall on the first material blocking bracket 11 based on their own weight.

[0069] Among the optional solutions of this embodiment, it is more preferred that Figure 1-2 and Figures 4 to 6 and Fig. 9 As shown, the pre-placement platform 1 also includes at least one conveying mechanism 7; the placement conveying plane is a horizontal plane; each conveying mechanism 7 is arranged in sequence along the first direction, and the conveying mechanism 7 includes a conveyor belt 71 and a conveying drive mechanism 72, and the conveying drive mechanism 72 is used to drive the conveyor belt 71 to rotate; the conveyor belt 71 is located below the placement conveying plane, and the upper plane of the conveyor belt 71 is flush with the placement conveying plane; the conveying plane can sequentially convey each tube to be processed 9 located on the placement conveying plane along the second direction to the first material blocking bracket 11. The conveying mechanism 7 is set at the pre-placement platform 1, and through the contact friction between the conveyor belt 71 and the tube to be processed 9, the conveyor belt 71 drives the tube to be processed 9 to move forward together when it is conveyed forward, so as to achieve the effect of stably conveying the tube to be processed 9 forward, and ensure the continuous feeding effect of the first material lifting mechanism 2.

[0070] In order to ensure that the first lifting mechanism 2 can stably lift the tube 9 to be processed, the following settings can also be made:

[0071] Among the optional solutions of this embodiment, it is more preferred that Figure 6 As shown, the apparatus further includes a controller and at least one sensor 73; each sensor 73 is used to sense the tube 9 to be processed close to the first material-blocking bracket 11; the controller is in communication with each sensor 73 and each conveying mechanism 7. The setting of the sensor 73 can sense whether there is a tube 9 to be processed at the first material-blocking bracket 11, and control the conveying mechanism 7 through the controller to timely convey the tube 9 to be processed, thereby ensuring a continuous and stable feeding effect of the tube 9 to be processed.

[0072] Specifically, the sensor 73 is a photoelectric switch.

[0073] Among them, about the structure of the clamping moving mechanism 4:

[0074] Specifically, the clamping and moving mechanism 4 includes a base 41, a slider 42, a guide rail 43, a driver 44 and a pneumatic clamping clamp 45; the clamping and moving mechanism 4 is arranged at a position close to the shrinking device 8; the base 41 is fixed in position by a bracket, a guide rail 43 is arranged on the base 41 along a first direction, the slider 42 is slidably arranged on the guide rail 43 along the first direction, the driver 44 has a telescopic rod that is telescopic along the first direction, and the end of the telescopic rod is fixedly connected to the slider 42; the pneumatic clamping clamp 45 is arranged on the slider 42, the pneumatic clamping clamp 45 has an opening and closing clamping mouth, the pneumatic clamping clamp 45 is connected to the driving gas, and the release or supply of the driving gas realizes the opening and closing of the clamping mouth.

[0075] To increase the automation control, you can also set as follows:

[0076] Specifically, the automatic feeding device for the hydraulic compression head of pipes is installed on one side of the shrinking equipment 8; the shrinking equipment 8 includes a control box 81, in which a hydraulic press, a shrinking mold 82, a template 83 and a hydraulic cylinder 84 are arranged, the hydraulic cylinder 84 links the shrinking mold 82 to realize the shrinking processing, and the hydraulic press provides hydraulic power for the hydraulic cylinder 84; the template 83 has a conical horn hole, and the shrinking mold 82 expands and contracts in the conical horn hole to realize the shrinking or opening action of the shrinking mold 82, that is, the hydraulic cylinder 84 pushes the shrinking mold 82 to move in the conical horn hole, and the shrinking mold 82 gradually shrinks along the inner wall of the conical horn hole, clamping the end of the pipe to be processed until it is shrunk to a set size; after the shrinking is completed, the hydraulic cylinder 84 pushes the shrinking mold 82 to move in the conical horn hole, and the shrinking mold 82 gradually expands along the inside of the conical horn hole, loosening the clamping of the pipe end, and the operation is completed.

[0077] Specifically, the control box 81 may also be provided with a start switch 811 , a stop switch 812 , an emergency stop button 813 , etc. according to actual needs.

[0078] Specifically, in order to increase automation, the controller can also be connected to the hydraulic cylinder 84, the hydraulic press, each first material ejection mechanism 2, each second material ejection mechanism 5, the clamping and moving mechanism 4, the transmission mechanism 7 and other components for communication, and automatic control can be achieved through the controller; for example, if the controller senses the sensor 73, if there is no tube 9 to be processed at the first material stop bracket 11, the controller controls the transmission mechanism 7 to transmit forward according to the sensing signal of the sensor 73, so that there is a tube 9 to be processed at the first material stop bracket 11; the tubes on each V-shaped roller 3 are shrunken by the head shrinking die 8 After the shrinking process is performed under the set conditions, the controller controls the shrinking die 82 to open, and controls the clamping moving mechanism 4 to withdraw the processed tube to the initial position and release the clamping of the tube, and then the controller controls each second material pushing mechanism 5 to lift the processed tube and make it roll onto the material holding platform 6. At the same time, the controller controls each first material pushing mechanism 2 to lift the tube 9 to be processed and make it roll onto each V-shaped roller 3, and controls the clamping moving mechanism 4 to clamp the tube 9 to be processed and move it into the shrinking die 82, and the cycle is repeated in sequence.

[0079] Among them, some other structural designs:

[0080] Specifically, the pre-placement platform 1 and the material holding platform 6 are as follows: Figure 1-2 and Figures 4 to 6 As shown, they are all formed by multiple square tubes, which are arranged in parallel and fixed on a fixed frame. The main body of the pre-placement platform 1 is multiple horizontally arranged square tubes; the main body of the material holding platform 6 is multiple obliquely arranged square tubes.

[0081] Specifically, the positions on the pre-placement platform 1 and the material holding platform 6 that are used to contact the tube are provided with a protective layer, which may be a rubber layer to prevent the tube from being damaged by collision.

[0082] Specific instructions for use:

[0083] 1. Install and fix the shrinking head mold 82 and the template 83;

[0084] 2. Place the aluminum metal tube on the pre-placement platform 1, align the front end of the aluminum metal tube with the side plate of the positioning swing platform 13 (i.e., the first limiting surface 131), and arrange them in a single piece and lay them flat;

[0085] 3. Turn on the start switch 811;

[0086] 4. The hydraulic press starts working and all equipment is powered on;

[0087] 5. The conveyor drive mechanism 72 drives the conveyor belt 71 to rotate, and the metal tube rolls forward until the photoelectric switch senses the presence of the metal tube;

[0088] 6. The first lifter 21 rises upward to lift the metal pipe; (a first lift guide slope 221 is provided on the top of the first lift bracket 22)

[0089] 7. The photoelectric switch senses that there is no metal tube at the front end of the pre-placement platform 1, and feeds back to the controller, and the controller controls the conveying mechanism 7 to convey the metal tube forward until the photoelectric switch senses that there is a metal tube at the front end of the pre-placement platform 1;

[0090] 8. The lifted metal pipe slides downward to the rear section of the first lifting guide slope 221 due to gravity, and falls on the sliding guide slope 112 at the top of the first material blocking bracket 11 (above the V-shaped roller 3) as the first lifter 21 descends;

[0091] 9. The metal pipe falls onto the V-shaped roller 3;

[0092] 10. The pneumatic clamp 45 clamps the metal tube;

[0093] 11. The driver 44 extends forward, and the front end of the metal tube enters the shrinking die 82 (the length of entry is adjustable);

[0094] 12. The hydraulic cylinder 84 is opened to push the shrinking die 82 to shrink the end of the metal tube;

[0095] 13. The hydraulic cylinder 84 stops, pushing the shrinking die 82 to open;

[0096] 14. The driver 44 moves backward, and the metal tube moves out of the shrinking die 82;

[0097] 15. The pneumatic clamp 45 is released;

[0098] 16. The metal tube is on the V-shaped roller 3;

[0099] 17. The second lifting mechanism 5 rises to lift the metal pipe;

[0100] 18. The metal tube slides downwards under gravity to the top of the material holding platform 6 (the material holding platform 6 is an inclined surface);

[0101] 19. The metal tube slides down to the end of the material holding platform 6 due to gravity;

[0102] 20. Repeat steps 6-19 above;

[0103] 21. After the product is produced, press the stop switch 812;

[0104] 22. Turn off the power to the hydraulic press and all equipment. End.

[0105] The present invention uses specific examples to illustrate the principle and implementation of the present invention. The above examples are only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. An automatic feeding device for a tube hydraulic compression head, characterized in that: It includes a pre-placement platform, a plurality of first material ejection mechanisms, a positioner and a clamping and moving mechanism; The positioner comprises a plurality of V-shaped rollers, each of which is arranged in sequence along a first direction, and the first direction is parallel to the shrinking axis of the shrinking die; The pre-placement platform is fixedly arranged on one side of the positioner, and the pre-placement platform has a placement and conveying plane, on which a plurality of tubes to be processed are arranged in sequence along a second direction, and the second direction is perpendicular to the first direction; at least one first material blocking bracket is fixedly arranged on one side of the placement and conveying plane close to the positioner, and the placement and conveying plane can sequentially convey each tube to be processed to the first material blocking bracket; Each of the first material ejection mechanisms is arranged in sequence along the first direction; the first material ejection mechanism includes a first ejector and a first material ejection bracket, the first material ejection bracket is fixed on the output shaft of the first ejector, and the output shaft of the first ejector can be lifted and lowered in the vertical direction; the top of the first material ejection bracket is provided with a first material ejection guide slope; in the vertical direction, an end of the first material ejection guide slope close to the pre-placement platform is higher than an end of the first material ejection guide slope close to the positioner; the pipe to be processed located at the first material blocking bracket can be ejected by the first material ejection bracket and roll down to each of the V-shaped rollers along the first material ejection guide slope based on the weight of the pipe to be processed; The axis of the tube to be processed on each of the V-shaped rollers is coaxial with the shrinking axis of the shrinking die; The clamping and moving mechanism has a clamping part that can move along the first direction, and the clamping axis of the clamping part is coaxial with the shrinking axis of the shrinking mold; the clamping part can clamp the tube to be processed on each of the V-shaped rollers and transport it to the shrinking part of the shrinking mold.

2. The automatic feeding device for the tube hydraulic compression head according to claim 1, characterized in that: A material holding platform is also provided on a side of the positioner away from the pre-placement platform, and at least one second material lifting mechanism is also provided on a side of the material holding platform close to the positioner; The material holding platform has a material holding surface, in the vertical direction, an end of the material holding surface close to the positioner is higher than an end of the material holding surface away from the positioner, and a second material blocking bracket is fixedly arranged at the end of the material holding surface away from the positioner; The second material ejection mechanisms are arranged in sequence along the first direction; the second material ejection mechanisms include a second ejector and a second material ejection bracket, the second material ejection bracket is fixed on the output shaft of the second ejector, and the output shaft of the second ejector can be lifted and lowered in a vertical direction; the top of the second material ejection bracket is provided with a second material ejection guide slope; in the vertical direction, the end of the second material ejection guide slope close to the positioner is higher than the end of the second material ejection guide slope close to the material holding platform; the pipe located on each of the V-shaped rollers can be lifted by the second material ejection bracket and roll down to the material holding surface along the second material ejection guide slope based on the pipe's own gravity.

3. The automatic feeding device for the tube hydraulic compression head according to claim 1 is characterized in that: A plurality of roller brackets are fixedly arranged on one side of the pre-placement platform close to the positioner; Each of the V-shaped rollers is rotatably connected to one of the roller brackets around a second axis, and the second axis is perpendicular to the first direction; The roller bracket includes a first vertical plate, a horizontal plate and a second vertical plate, the first vertical plate and the second vertical plate are arranged opposite to each other, the lower end of the first vertical plate is fixedly connected to one end of the horizontal plate, and the lower end of the second vertical plate is fixedly connected to the other end of the horizontal plate; the first vertical plate is located on a side of the second vertical plate away from the pre-placement platform, and the upper end of the first vertical plate is higher than the upper end of the second vertical plate.

4. The automatic feeding device for the tube hydraulic compression head according to claim 1, characterized in that: A first limiting protrusion is fixedly disposed on one end of the first material ejecting guide inclined surface close to the pre-placement platform; In the second direction, one end of the first material ejection guide slope having the first limiting protrusion is located on a side of the first material stopping bracket away from the locator, and the distance between the first material stopping bracket and the first limiting protrusion is sufficient to accommodate a tube to be processed.

5. The automatic feeding device for the tube hydraulic compression head according to claim 3 is characterized in that: An extension plate is fixedly arranged on the top of the first material blocking bracket, and the extension plate extends toward a side close to the positioner; The top of the extension plate is provided with a sliding material guiding inclined surface; in the vertical direction, an end of the sliding material guiding inclined surface close to the positioner is lower than an end of the sliding material guiding inclined surface away from the positioner; One end of the extension plate close to the positioner is located on a side of the first vertical plate close to the second vertical plate, and one end of the extension plate close to the positioner is lower than the upper end of the first vertical plate in the vertical direction; Under the action of the weight of the tube to be processed itself, the tube to be processed lifted by the first material lifting bracket can fall on the sliding material guide inclined surface and roll down onto each of the V-shaped rollers along the sliding material guide inclined surface.

6. The automatic feeding device for the tube hydraulic compression head according to claim 1, characterized in that: The pre-placement platform also includes at least one transmission mechanism; The placement and transmission plane is a horizontal plane; Each of the conveying mechanisms is arranged in sequence along the first direction, and the conveying mechanism includes a conveyor belt and a conveying drive mechanism, and the conveying drive mechanism is used to drive the conveyor belt to rotate; the conveyor belt is located below the placement conveying plane, and the upper plane of the conveyor belt is flush with the placement conveying plane; the conveying plane can convey each tube to be processed located on the placement conveying plane in sequence along the second direction to the first material blocking bracket.

7. The automatic feeding device for the tube hydraulic compression head according to claim 1, characterized in that: At least one third material blocking bracket is fixedly provided on a side of the placement and conveying plane away from the positioner.

8. The automatic feeding device for the tube hydraulic compression head according to claim 1, characterized in that: A positioning swinging platform is fixedly provided at one end of the placing and conveying plane along the first direction. The positioning swinging platform has a first limiting surface, and the first limiting surface is used to limit the position of each end of the to-be-processed tube on the placing and conveying plane in the first direction.

9. The automatic feeding device for the tube hydraulic compression head according to claim 6, characterized in that: Also includes a controller and at least one sensor; Each of the sensors is used to sense the pipe to be processed close to the first material blocking bracket; The controller is in communication connection with each of the sensors and each of the transmission mechanisms.

10. The automatic feeding device for the tube hydraulic compression head according to claim 4, characterized in that: A second limiting protrusion is fixedly disposed on one end of the first material ejecting guide inclined surface away from the pre-placement platform.