Scaffold steel pipe conveying device

By designing a scaffolding steel pipe transportation device including fixed iron piers, steel pipe guide rails and mobile loading platforms, the safety hazards and inefficiency caused by manpower handling in the prior art are solved, and a more efficient and safe transportation process is achieved.

CN222646919UActive Publication Date: 2025-03-21SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420522333.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2025-03-21
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

In the prior art, the transportation of scaffolding steel pipes mostly relies on manpower transportation, which poses safety hazards, may lead to work-related accidents and inefficient efficiency.

Method used

A scaffolding steel pipe transportation device is designed, including a relatively fixed iron pier and a side-by-side steel pipe guide rail. The loading platform can move along the steel pipe guide rail. A pulley is installed on the lower side. It has a simple structure, convenient operation and improves working efficiency.

Benefits of technology

Through this device, human labor is reduced, operating procedures are simplified, construction efficiency is improved, labor intensity and safety risks are reduced, and safety hazards are significantly reduced during handling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222646919U_ABST
    Figure CN222646919U_ABST
Patent Text Reader

Abstract

The utility model discloses a scaffold steel pipe conveying device which comprises a first fixing iron pier and a second fixing iron pier which are oppositely arranged, and a plurality of steel pipe guide rails are arranged between the first fixing iron pier and the second fixing iron pier side by side. The loading platform is arranged on the upper side of the steel pipe guide rail, the loading platform can move in the length direction of the steel pipe guide rail, a plurality of pulleys are arranged on the lower side of the loading platform, and the pulleys are attached to the upper surface of the steel pipe guide rail and roll. The utility model can solve the problems of potential safety hazards, possible industrial accidents and low efficiency due to the fact that the existing scaffold steel pipes are transported by manpower.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building material transportation, in particular to a scaffolding steel pipe transportation device. Background Art

[0002] In the traditional construction process, after dismantling the scaffolding steel pipes, the transportation method mostly relies on manual handling or simple mechanical lifting to a distant unloading platform. In this process, workers not only need to consume a lot of physical strength when carrying by hand, but also need to ensure the stability and safety of the steel pipes, especially when the unloading platform is far away from the work point. This task becomes particularly arduous. In addition, since the steel pipes are heavy and large in size, there are safety hazards during manual handling, which may lead to work-related accidents. To address this problem, there is an urgent need for a special transportation device that can reduce manual labor and simplify the operation process. Utility Model Content

[0003] The utility model provides a scaffold steel pipe transportation device, which can solve the problems that the existing scaffold steel pipe transportation mostly adopts manual handling, has potential safety hazards, may cause work-related accidents and has low efficiency.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a scaffolding steel pipe transportation device, comprising a first fixed iron pier and a second fixed iron pier arranged relatively to each other, a plurality of steel pipe guide rails are arranged side by side between the first fixed iron pier and the second fixed iron pier; a loading platform is arranged on the upper side of the steel pipe guide rail, the loading platform can be moved along the length direction of the steel pipe guide rail, a plurality of pulleys are arranged on the lower side of the loading platform, the pulleys are abutted against the upper surface of the steel pipe guide rail and roll, the structure is simple, the operation is convenient, and the work efficiency is improved.

[0005] Preferably, the loading platform is in a "concave" shape, and the space between the side walls at both ends is used to place the removed scaffolding steel pipes. A handrail is provided on the side of the loading platform close to the first fixed iron pier, and the handrail is convenient for operation during movement.

[0006] Preferably, a fixing hook is provided on the upper side of the first fixed iron pier, and the fixing hook is used to hook the handrail to form an effective fixation, which is simple to operate and convenient to fix and open.

[0007] Preferably, a sponge pad is provided on the inner side of the second fixed iron pier to reduce the impact force generated when the loading platform reaches the end, thereby playing a protective role.

[0008] Preferably, the number of the steel pipe guide rails is three, and the movement is smooth.

[0009] Compared with the prior art, the beneficial effects of the utility model are:

[0010] The structure is simple and easy to operate, which improves the flexibility of use, reduces the difficulty of operation and labor costs, can effectively improve construction efficiency, reduce labor intensity, and significantly reduce safety risks during transportation. It can solve the problem that the existing scaffolding steel pipe transportation mostly uses manual transportation, which has safety hazards, may cause work-related accidents and is inefficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a three-dimensional structural diagram of the utility model;

[0012] Figure 2 This is a structural schematic diagram of the utility model when the loading platform is fixed;

[0013] Figure 3 It is a structural schematic diagram of the utility model when the loading platform carries the scaffolding steel pipe.

[0014] Reference numerals:

[0015] 1. Handrail, 2. Loading platform, 3. Steel pipe guide rail, 4. Sponge pad, 5. Fixed hook, 6. Pulley, 71. First fixed iron pier, 72. Second fixed iron pier, 8. Scaffolding steel pipe. DETAILED DESCRIPTION

[0016] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0017] like Figure 1-3 As shown, the utility model provides the following technical solutions to solve the problems that the existing scaffolding steel pipe transportation mostly adopts manual handling, which has potential safety hazards, may cause work-related accidents and is inefficient: a scaffolding steel pipe transportation device, comprising a first fixed iron pier 71 and a second fixed iron pier 72 arranged relatively to each other, a plurality of steel pipe guide rails 3 are arranged side by side between the first fixed iron pier 71 and the second fixed iron pier 72; a loading platform 2, which is arranged on the upper side of the steel pipe guide rail 3, and the loading platform 2 can be moved along the length direction of the steel pipe guide rail 3, and a plurality of pulleys 6 are arranged on the lower side of the loading platform 2, and the pulley 6 is close to the upper surface of the steel pipe guide rail 3 and rolls, with a simple structure, convenient operation and improved work efficiency.

[0018] In this embodiment, if Figure 3 As shown, the loading platform 2 is in a "concave" shape, and the space between the side walls at both ends is used to place the removed scaffolding steel pipes 8. A handrail 1 is provided on the side of the loading platform 2 close to the first fixed iron pier 71, and the handrail 1 is convenient for operation during movement.

[0019] In this embodiment, if Figure 2As shown, a fixing hook 5 is provided on the upper side of the first fixing iron pier 71, and the fixing hook 5 is used to hook the handrail 1 to form an effective fixation, which is simple to operate and convenient to fix and open.

[0020] In this embodiment, if Figure 1 As shown, a sponge pad 4 is provided on the inner side of the second fixed iron pier 72 to reduce the impact force generated when the loading platform 2 reaches the end, thus playing a protective role.

[0021] In this embodiment, if Figure 1 As shown, there are three steel pipe guide rails 3, which move smoothly.

[0022] In this embodiment, if Figure 1 As shown, the first fixed iron pier 71 and the second fixed iron pier 72 of the device are arranged at the connection between the unloading platform and the floor, the loading platform 2 is placed on the upper side of the steel pipe guide rail 3, the fixing hook 5 is hooked on the handrail 1, and then the disassembled scaffolding steel pipe is placed on the inner side of the loading platform 2. After the scaffolding steel pipe is tied, the fixing hook 5 is opened. Because the steel pipe guide rail 3 has a slope, the loading platform 2 will move forward. A worker holds the handrail 1 and moves to the second fixed iron pier 72 at the end point with the loading platform 2, stops under the action of the sponge pad 4, and waits for the tower crane to lift the scaffolding steel pipe off the platform. At the same time, another worker puts another loading platform 2 on the steel pipe guide rail 3, and continues to repeat the above operations to cooperate with each other to evacuate the scaffolding steel pipe from the floor. In this way, the labor consumed by workers during transportation is greatly reduced, and the device can also be reused, eliminating safety hazards.

[0023] It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0024] In addition, in the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0025] In the present invention, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0026] In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

Claims

1. A scaffolding steel pipe transportation device, characterized in that: include: A first fixed iron pier (71) and a second fixed iron pier (72) are arranged opposite to each other, and a plurality of steel pipe guide rails (3) are arranged side by side between the first fixed iron pier (71) and the second fixed iron pier (72); A loading platform (2) is arranged on the upper side of the steel pipe guide rail (3), and the loading platform (2) can move along the length direction of the steel pipe guide rail (3). A plurality of pulleys (6) are arranged on the lower side of the loading platform (2), and the pulleys (6) are attached to the upper surface of the steel pipe guide rail (3) and roll.

2. The scaffolding steel pipe transportation device according to claim 1 is characterized in that: The loading platform (2) is in a "concave" shape, and the space between the side walls at both ends is used to place the removed scaffolding steel pipe (8). A handrail (1) is provided on the side of the loading platform (2) close to the first fixed iron pier (71).

3. The scaffolding steel pipe transportation device according to claim 2 is characterized in that: A fixing hook (5) is provided on the upper side of the first fixing iron pier (71), and the fixing hook (5) is used to hook the handrail (1) to form an effective fixation.

4. The scaffolding steel pipe transportation device according to claim 1 is characterized in that: A sponge pad (4) is arranged on the inner side of the second fixed iron pier (72).

5. The scaffolding steel pipe transportation device according to claim 1 is characterized in that: The number of the steel pipe guide rails (3) is three.

Citation Information

Cited By

  • Fabricated directional sliding rail material transportation structure in narrow frame body and construction method

    CN120774128A

  • Fabricated directional slide rail material transportation structure in narrow frame body

    CN224563472U