Pile foundation reinforcement cage positioning tool
By designing a pile-based steel cage positioning tooling including positioning components, the problem of the steel cage being placed in a difficult position to be placed on the steel cage is solved, and the construction quality and efficiency are improved.
Patent Information
- Application Number
- CN202420777191.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2034-04-16
AI Technical Summary
The pile foundation steel cage is not easy to be centered when lowered into the casing, which affects the quality of the pile foundation, and the installation process consumes a lot of time and affects the construction efficiency.
A pile-based steel cage positioning tool is designed, which includes three sets of positioning components, each set of components including a positioning part, a connecting rod and a wall part. The casing slot on the positioning part is used for inserting the casing wall. The connecting rod is axially parallel to the casing to ensure that the steel cage is lowered along the outer wall of the connecting rod and achieves centering.
Through positioning tooling, the problem of not being easy to live in when the steel cage is lowered is effectively solved, the construction quality of drilling piles is improved, debugging work and rework is reduced, construction costs are saved, and construction efficiency is improved.
Smart Images

Figure CN222648746U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of pile foundation construction auxiliary tools, and in particular relates to a pile foundation reinforcement cage positioning tool. Background Art
[0002] Pile foundation is the main foundation form for bridges and house buildings, and pile foundation engineering is the controlling and difficult engineering of the project. Usually, when the pile foundation steel cage is installed, the casing should be 20 to 40 cm larger than the designed pile diameter according to the specification requirements. Therefore, the part of the pile foundation steel cage lowered into the casing is not easy to be centered, which greatly affects the quality of the pile foundation. In addition, the staff needs to constantly adjust the pile foundation steel cage during the process of extending the pile foundation steel cage into the casing, which is time-consuming and not conducive to improving the efficiency of pile foundation construction. Utility Model Content
[0003] The utility model aims to provide a pile foundation reinforcement cage positioning tool to solve the problem that the pile foundation reinforcement cage is not easy to be centered when it is lowered into a casing.
[0004] In order to achieve the above-mentioned purpose, the scheme of the utility model is: a pile foundation steel cage positioning tool, including at least three groups of positioning components, each group of positioning components includes a positioning part, a connecting rod and a wall-attached part, the positioning part includes a positioning plate, a casing slot is provided on the positioning plate, the wall-attached part includes a connecting plate and a wall-attached plate, one end of the connecting rod is fixedly connected to the positioning plate, and the other end of the connecting rod is fixedly connected to the connecting plate.
[0005] The working principle and beneficial effects of this solution are as follows: in this solution, more than three groups of positioning components are evenly distributed on the circumference of the casing, the casing grooves on the positioning pieces are for the casing wall to be inserted, and the wall-adhering pieces are in contact with the inner wall of the casing, so that the connecting rod is parallel to the casing axis so that the pile foundation steel cage can fit the outer wall of the connecting rod and be lowered, thereby realizing the centering of the pile foundation steel cage, thereby effectively improving the construction quality of bored piles, reducing the debugging work of the staff, and avoiding rework caused by the pile foundation steel cage not being centered, which not only saves construction costs, but also improves the efficiency of pile foundation construction, and this solution has a simple structure, easy operation, and high positioning accuracy.
[0006] Optionally, a half ring is fixedly connected to the top end of the positioning piece or the connecting rod.
[0007] In this solution, the half-ring design makes it easier for workers to take and place the positioning components.
[0008] Optionally, the positioning portion further comprises a guide piece which is tilted and the lower end of which is located at one end of the positioning piece close to the center of the casing or at one side of the top end of the connecting rod close to the center of the casing.
[0009] In this scheme, the guide plate is set at an angle, and the inner end of the guide plate (the end close to the center of the casing) is the bottom end, and the outer end of the guide plate (the end away from the center of the casing) is the high end. In this way, the guide plate guides the pile foundation steel cage, which helps to lower the pile foundation steel cage in the center.
[0010] Optionally, the positioning part also includes an adjusting screw, an adjusting cylinder and an axial translation rod. A smooth section and a threaded section are provided in the adjusting cylinder. The adjusting screw is threadedly connected to the threaded section. One end of the adjusting screw located in the adjusting cylinder is rotatably connected to the axial translation rod. The axial translation rod is axially slidingly connected to the smooth section. The end of the axial translation rod away from the adjusting screw is fixedly connected to the guide plate.
[0011] In this solution, the adjusting cylinder is fixedly connected to the positioning piece. By rotating the adjusting screw, the adjusting screw drives the axial translation rod to translate along the axial direction of the adjusting cylinder, thereby causing the guide piece to move radially along the casing. In this way, pile foundation reinforcement cages of different diameters can be guided and centered.
[0012] Optionally, the axial translation rod is provided with scale lines.
[0013] In this solution, the scale lines on the axial translation rod are helpful for the staff to quickly adjust the position of the guide piece.
[0014] Optionally, the connecting rod is a steel pipe, and the positioning plate and the connecting plate are both fixedly connected to the outer wall of the steel pipe.
[0015] In this solution, when the connecting rod is a steel pipe, the outer diameter of the steel pipe is relatively large, and the pile foundation reinforcement cage can be lowered along the outer wall of the steel pipe.
[0016] Optionally, the connecting rod is a solid rod, and an extension piece is provided at one end of the positioning piece close to the center of the casing, the extension piece is perpendicular to the positioning piece, and a side wall of the extension piece away from the positioning piece is flush with the outer wall of the connecting rod.
[0017] In this solution, when the connecting rod is a solid rod, the outer diameter of the solid rod is smaller, and the pile foundation reinforcement cage is first lowered along the extension piece and then lowered along the outer wall of the solid rod.
[0018] Optionally, there are two wall-adhering portions, one wall-adhering portion is distributed at the middle of the connecting rod, and the other wall-adhering portion is distributed at the bottom of the connecting rod.
[0019] In this solution, the two wall-adhering parts support the middle and bottom of the connecting rod respectively. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the structure of the pile foundation reinforcement cage positioning tooling in the first embodiment of the utility model;
[0021] Figure 2This is a structural schematic diagram of the pile foundation reinforcement cage positioning tool installed on the casing in the first embodiment of the utility model;
[0022] Figure 3 This is a schematic diagram of the structure of the pile foundation reinforcement cage positioning tooling in the second embodiment of the utility model;
[0023] Figure 4 This is a schematic diagram of the structure of the pile foundation reinforcement cage positioning tooling in the third embodiment of the utility model;
[0024] Figure 5 It is a structural schematic diagram of the pile foundation reinforcement cage positioning tooling in the fourth embodiment of the utility model. DETAILED DESCRIPTION
[0025] The following is further described in detail through specific implementation methods:
[0026] The marks in the drawings of the specification include: positioning part 100, positioning plate 101, casing slot 1011, extension plate 102, guide plate 103, adjusting screw 104, adjusting cylinder 105, axial slide groove 1051, axial translation rod 106, slide plate 1061, connecting rod 200, wall-attached part 300, connecting plate 301, wall-attached plate 302, half ring 400, casing 500.
[0027] Embodiment 1
[0028] This embodiment is basically Figure 1 and Figure 2 As shown: the pile foundation steel cage positioning tooling includes at least three groups of positioning components, each group of positioning components includes a positioning part 100, a connecting rod 200 and a wall-attaching part 300, the positioning part 100 includes a positioning piece 101, and a casing clamping groove 1011 is opened on the positioning piece 101, and the groove size of the casing clamping groove 1011 is equal to the wall thickness of the casing 500 or greater than 1-3mm of the wall thickness of the casing 500; the wall-attaching part 300 includes a connecting piece 301 and a wall-attaching piece 302, and the connecting piece 301 and the wall-attaching piece 302 are integrally formed, and one end of the connecting rod 200 is connected to the positioning The connecting rod 200 is fixedly connected with the connecting piece 301, and the other end of the connecting rod 200 is fixedly connected with the connecting piece 301; in this embodiment, the connecting rod 200 is a solid rod, and the end of the positioning piece 101 close to the center of the casing 500 is integrally formed with an extension piece 102, the extension piece 102 is perpendicular to the positioning piece 101, and the side wall of the extension piece 102 away from the positioning piece 101 is flush with the outer wall of the connecting rod 200, and the side wall of the connecting piece 301 away from the wall-attached piece 302 is flush with the outer wall of the connecting rod 200; a semi-ring 400 is welded on the extension piece 102 to facilitate the staff to take and place the positioning tooling. In addition, in this embodiment, the number of positioning components is four groups. When in use, the four groups of positioning components are evenly distributed on the circumference of the casing 500, so that there are four positioning points in the circumferential direction of the pile foundation steel cage.
[0029] When in use, the staff engages the positioning piece 101 on the tube mouth of the casing 500, that is, the tube mouth of the casing 500 is engaged in the casing groove 1011 on the positioning piece 101; at the same time, the wall-adhering piece 302 contacts the inner wall of the casing 500, thereby supporting the bottom end of the solid rod (connecting rod 200), so that the solid rod (connecting rod 200) is parallel to the axial direction of the casing 500, such as Figure 2 After the four sets of positioning components are installed, the pile foundation steel cage is lowered. During the lowering process, the pile foundation steel cage is first lowered along the extension piece 102, and then lowered along the outer wall of the solid rod (connecting rod 200), so as to ensure that the pile foundation steel cage is lowered in the center, which effectively solves the problem that the pile foundation steel cage is not easy to be centered when it is lowered into the casing 500, and prevents the pile foundation steel cage from being offset, thereby improving the construction quality of the bored pile, reducing the debugging work of the staff, and avoiding rework caused by the pile foundation steel cage not being centered, which not only saves construction costs, but also improves the efficiency of pile foundation construction. In addition, the positioning tooling in this embodiment has a simple structure, is easy to operate, and has a high positioning accuracy.
[0030] After the pile foundation concrete is poured, the positioning tool is disassembled from the casing 500 and stored, so that the positioning tool is reused.
[0031] Embodiment 2
[0032] This embodiment is basically Figure 3 As shown: the pile foundation steel cage positioning tooling includes at least three groups of positioning components, each group of positioning components includes a positioning part 100, a connecting rod 200 and a wall-attached part 300, the positioning part 100 includes a positioning piece 101, and a casing groove 1011 is opened on the positioning piece 101, and the groove size of the casing groove 1011 is equal to the wall thickness of the casing 500 or greater than 1-3mm of the wall thickness of the casing 500; the wall-attached part 300 includes a connecting piece 301 and a wall-attached piece 302, and the connecting piece 301 and the wall-attached piece 302 are integrally formed, one end of the connecting rod 200 is fixedly connected to the positioning piece 101, and the other end of the connecting rod 200 is fixedly connected to the connecting piece 301; in this embodiment, the connecting rod 200 is a steel pipe, and the positioning piece 101 and the connecting piece 301 are both fixedly connected to the outer wall of the steel pipe (connecting rod 200); a semi-ring 400 is welded at the top of the steel pipe (connecting rod 200) to facilitate the staff to take and place the positioning tooling. In addition, in this embodiment, the number of positioning components is four groups. When in use, the four groups of positioning components are evenly distributed on the circumference of the casing 500. In this way, there are four positioning points in the circumferential direction of the pile foundation reinforcement cage.
[0033] When in use, the staff will clamp the positioning piece 101 on the tube mouth of the casing 500, that is, the tube mouth of the casing 500 is clamped into the casing clamping groove 1011 on the positioning piece 101; at the same time, the wall-adhering piece 302 contacts the inner wall of the casing 500, thereby supporting the bottom end of the steel pipe (connecting rod 200), so that the steel pipe (connecting rod 200) is parallel to the axis of the casing 500. After the four sets of positioning components are installed, the pile foundation steel cage is lowered. During the lowering process, the pile foundation steel cage is lowered along the outer wall of the steel pipe (connecting rod 200), thereby ensuring that the pile foundation steel cage is lowered in the center, effectively solving the problem that the pile foundation steel cage is not easy to be centered when it is lowered into the casing 500, preventing the pile foundation steel cage from being offset, thereby improving the construction quality of the bored pile, reducing the debugging work of the staff, avoiding rework caused by the pile foundation steel cage not being centered, saving construction costs, and improving the efficiency of pile foundation construction. In addition, the positioning tooling in this embodiment has a simple structure, easy operation, and high positioning accuracy.
[0034] After the pile foundation concrete is poured, the positioning tool is disassembled from the casing 500 and stored, so that the positioning tool is reused.
[0035] Embodiment 3
[0036] The difference between this embodiment and the second embodiment is that: Figure 4 As shown, in this embodiment, the top of the steel pipe is not welded with a half ring 400; the positioning part 100 also includes a guide piece 103, an adjusting screw 104, an adjusting cylinder 105 and an axial translation rod 106, the guide piece 103 is tilted, and the lower end of the guide piece 103 is located on the side of the top of the steel pipe (connecting rod 200) close to the center of the casing 500, that is, the guide piece 103 is low inside and high outside; the adjusting cylinder 105 is welded to the positioning piece 101 through a steel sheet, and the axial direction of the adjusting cylinder 105 is aligned with the positioning piece 101. The length direction of the position piece 101 is parallel, a smooth section and a threaded section are provided in the adjusting cylinder 105, the adjusting screw 104 is threadedly connected with the threaded section, one end of the adjusting screw 104 located in the adjusting cylinder 105 is rotatably connected with the axial translation rod 106 through a bearing, and the axial translation rod 106 is axially slidably connected to the smooth section, specifically, the smooth section is provided with an axial slide groove 1051, and the axial translation rod 106 is integrally formed with a slide piece 1061 that slides with the axial slide groove 1051. In addition, a scale line is provided on the axial translation rod 106, so that the staff can quickly adjust the position of the guide piece 103 and make the distance between the four guide pieces 103 and the inner wall of the casing 500 the same.
[0037] When in use, the staff will clamp the positioning piece 101 on the tube mouth of the casing 500, and at the same time, the wall-adhering piece 302 contacts the inner wall of the casing 500, thereby supporting the bottom end of the connecting rod 200, so that the steel pipe (connecting rod 200) is parallel to the axis of the casing 500. After the four sets of positioning components are installed, the pile foundation steel cage is lowered. During the lowering process, the pile foundation steel cage gradually becomes concentric with the casing 500 under the guidance of the guide piece 103, and then the pile foundation steel cage is lowered along the outer wall of the steel pipe (connecting rod 200), thereby ensuring that the pile foundation steel cage is lowered in the center, avoiding the pile foundation steel cage from abutting against the positioning piece 101 during the lowering process, thereby ensuring that the pile foundation steel cage is lowered smoothly.
[0038] In addition, in the present embodiment, the staff can adjust the position of the guide piece 103 by rotating the adjusting screw 104. Specifically, the staff rotates the adjusting screw 104, and the adjusting screw 104 drives the axial translation rod 106 to move radially along the casing 500, thereby driving the guide piece 103 to move radially along the casing 500, thereby adjusting the position of the guide piece 103. During the adjustment process, the staff can grasp the moving distance of the guide piece 103 through the scale line on the axial translation rod 106, and ensure that the distance between the guide piece 103 and the inner wall of the casing 500 in each positioning component is equal, thereby ensuring the guiding and positioning function of the guide piece 103.
[0039] Embodiment 4
[0040] The difference between this embodiment and the third embodiment is that: Figure 5 As shown, in this embodiment, there are two wall-attaching portions 300, wherein one wall-attaching portion 300 is distributed in the middle of the connecting rod 200, and the other wall-attaching portion 300 is distributed in the bottom of the connecting rod 200. In this way, the two wall-attaching portions 300 support the middle and bottom of the connecting rod 200 respectively, thereby improving the supporting effect of the connecting rod 200.
[0041] The above is only an embodiment of the utility model, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the utility model, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the utility model. The specific implementation methods and other records in the specification can be used to explain the content of the claims.
Claims
1. Pile foundation reinforcement cage positioning tool, characterized by: It comprises at least three groups of positioning components, each group of positioning components comprises a positioning part, a connecting rod and a wall-attached part, the positioning part comprises a positioning plate, a casing slot is provided on the positioning plate, the wall-attached part comprises a connecting plate and a wall-attached plate, one end of the connecting rod is fixedly connected to the positioning plate, and the other end of the connecting rod is fixedly connected to the connecting plate.
2. The pile foundation reinforcement cage positioning tool according to claim 1 is characterized in that: The top end of the positioning piece or the connecting rod is fixedly connected with a half ring.
3. The pile foundation reinforcement cage positioning tool according to claim 1 is characterized in that: The positioning part also includes a guide piece, which is arranged obliquely, and the lower end of the guide piece is located at one end of the positioning piece close to the center of the casing or at one side of the top end of the connecting rod close to the center of the casing.
4. The pile foundation reinforcement cage positioning tool according to claim 3 is characterized in that: The positioning part also includes an adjusting screw, an adjusting cylinder and an axial translation rod. A smooth section and a threaded section are provided in the adjusting cylinder. The adjusting screw is threadedly connected to the threaded section. One end of the adjusting screw located in the adjusting cylinder is rotatably connected to the axial translation rod. The axial translation rod is axially slidingly connected to the smooth section. One end of the axial translation rod away from the adjusting screw is fixedly connected to the guide plate.
5. The pile foundation reinforcement cage positioning tool according to claim 4 is characterized in that: The axial translation rod is provided with scale lines.
6. The pile foundation reinforcement cage positioning tool according to claim 1 is characterized in that: The connecting rod is a steel pipe, and the positioning piece and the connecting piece are fixedly connected to the outer wall of the steel pipe.
7. The pile foundation reinforcement cage positioning tool according to claim 1 is characterized in that: The connecting rod is a solid rod, and an extension piece is provided at one end of the positioning piece close to the center of the casing. The extension piece is perpendicular to the positioning piece, and a side wall of the extension piece away from the positioning piece is flush with the outer wall of the connecting rod.
8. The pile foundation reinforcement cage positioning tool according to claim 1 is characterized in that: There are two wall-adhering parts, one wall-adhering part is distributed at the middle part of the connecting rod, and the other wall-adhering part is distributed at the bottom of the connecting rod.