Installation structure for assisting in hidden installation of pipe clamp and light partition wall
By using auxiliary hidden installation pipe card in ALC lightweight partition wall installation, combined with the design of connecting plates, anchor pipes, slots and anchors, the problem of difficulty in installing conventional pipe card in special positions is solved, and the stability and aesthetics of the structure are improved.
Patent Information
- Application Number
- CN202421429485.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2034-06-21
AI Technical Summary
During the installation of ALC lightweight partition walls, especially when the upper part of the wall is a beam or a lower part has a reverse ridge, it is difficult to install conventional pipe cards in special positions, resulting in the structural stability and aesthetics being affected.
An auxiliary hidden installation pipe card is adopted, including connecting plates, anchor pipes, slots and anchors. It is connected to the lightweight partition wall through the anchor pipe, and the slots and anchors cooperate to achieve fixation with the building main body, avoiding leakage of conventional pipe cards.
It solves the problem of difficulty in installing ALC lightweight partition walls in special locations, ensures the stability and aesthetics of the structure, and avoids the leakage of iron parts and the quality risks of post-decoration caused by U-shaped cards.
Smart Images

Figure CN222649145U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of lightweight partition wall installation and construction, and specifically relates to an auxiliary hidden installation pipe clamp and a lightweight partition wall installation structure, which is suitable for ALC board on-site construction. Auxiliary hidden pipe clamps are used for installation during the wall installation process of special parts to ensure the aesthetics of the building and the stability of the overall structure. Background Art
[0002] At present, the construction industry is using ALC lightweight partition walls more and more widely. With its multiple advantages such as light weight, high strength, thermal insulation, and wide applicability to various construction scenarios, ALC lightweight partition walls have become a new type of wall material that has attracted much attention in the current construction industry. With the in-depth promotion of green buildings and sustainable development concepts, ALC lightweight partition walls have been more widely used and developed.
[0003] However, during the installation of ALC lightweight partition walls, there are a series of problems with the connection method to the main structure: the installation process of ALC lightweight partition walls should be that before installing each board, conventional pipe clamp connectors should be nailed into the 80 mm position on each side of the upper and lower ends of the board (each board should have no less than 4 pipe clamps) to connect to the main structure. Conventional pipe clamps will be exposed outside the wall to be fixedly connected to the structure. They can be fixed in any direction, but are only applicable to areas where the wall is a structural board or the width of the beam above the wall is greater than the wall thickness.
[0004] When the upper part of the ALC lightweight partition wall is a beam or the lower part has an anti-cut, and the wall thickness is the same as the width of the beam / anti-cut, the pipe clamps of the first board can be installed normally during the installation process. However, the second board, the third board, etc., meet the bottom of the beam at the upper part / the anti-cut at the lower part, and it is extremely difficult to install them with pipe clamps. It is impossible to use all pipe clamps for the installation of ALC wall panels. U-shaped clamps must be used for open installation to compensate for the problem that the upper end of the pipe clamp at the joint of the two boards cannot be fixed.
[0005] Adding U-shaped clamps to match pipe clamps can solve the problem of structural stability, but if U-shaped clamps are used, there will be exposed iron parts, and the later decoration of this position is prone to cracking and other problems, which directly affects the beauty of the building. The installation process of ALC lightweight partition walls in special parts on site is prone to insufficient number of pipe clamps, which is extremely unfavorable to structural stability and has many quality defects. Utility Model Content
[0006] The purpose of this application is to provide an auxiliary hidden installation structure for pipe clamps and lightweight partition walls, solving the problem of difficult installation or quality defects in special locations of lightweight partition walls. This application is improved in combination with existing pipe clamp connectors, involving a new type of hidden installation pipe clamp for special locations, ensuring the construction quality of ALC lightweight partition boards.
[0007] The purpose of this application is achieved through the following technical solutions:
[0008] An auxiliary hidden installation pipe clamp comprises a connecting plate, an anchor pipe at one end of which stands on the plate surface, and an insertion slot is opened at the other end of the connecting plate, the insertion slot passes through the two plate surfaces, and the slot of the insertion slot faces the end.
[0009] Furthermore, a hole is provided in the insertion slit.
[0010] Furthermore, the connecting plate is a galvanized steel plate.
[0011] Furthermore, the anchor pipe is a galvanized steel pipe, and the connecting plate is connected to the anchor pipe by welding.
[0012] Furthermore, the anchoring pipe is vertically erected on the connecting plate.
[0013] Furthermore, an arc-shaped transition structure extending outward is provided at the notch of the insertion slot.
[0014] Furthermore, the insertion slots are arranged along the length direction of the connecting plate, and both ends of the connecting plate are ends in the length direction.
[0015] Furthermore, holes are provided at the bottom and the middle of the insertion slot.
[0016] A lightweight partition wall installation structure comprises a building body and a lightweight partition wall, and also comprises the above-mentioned auxiliary hidden installation pipe clamp, wherein the anchor pipe is anchored on the lightweight partition wall, the anchor piece is anchored on the building body, and the anchor piece is located in the insertion gap.
[0017] Furthermore, the right side of the lightweight partition wall on the left is fixed to the main building through a conventional pipe clamp, and an anchor pipe is anchored on the left side of the lightweight partition wall on the right. The lightweight partition wall on the right is fixed to the main building through the anchor pipe, connecting plate and anchor.
[0018] Beneficial effects of this application:
[0019] 1. The production method of pipe clamp is simple, the materials are easy to obtain, and the structure is reliable.
[0020] 2. Solved the problem that when the upper part of the ALC lightweight partition wall is a beam or the lower part has an anti-bump, and the wall thickness is the same as the width of the beam / anti-bump, the first plate and pipe clamps can be installed normally during the installation process, but the second plate is connected to the first plate, the third plate of the same type is connected to the second plate, and so on. The corresponding positions cannot be installed using conventional pipe clamps.
[0021] 3. Avoid the use of U-shaped clips for installation, which may cause iron parts to leak, rust, and crack during later decoration, etc.
[0022] 4. It can ensure that the main body of the building is tightly and stably connected to the ALC board to ensure structural safety.
[0023] 5. Its hidden design ensures that the pipe clamp itself will not be exposed on the building surface after installation, thus maintaining the beauty of the building and the stability of the structure.
[0024] The aforementioned main scheme of the present application and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and claimed for protection in the present application; and in the present application, (non-conflicting options) can also be freely combined with each other and with other options. After understanding the present scheme, those skilled in the art can understand that there are many combinations based on the prior art and common knowledge, all of which are technical schemes to be protected by the present application, and they are not exhaustively listed here. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is the main view of the structure of the hidden installation pipe clamp in this application.
[0026] Figure 2 This is a top view of the structure of the hidden installation pipe clamp in this application.
[0027] Figure 3 This is the main view of the installation structure of the lightweight partition wall of this application.
[0028] Figure 4 It is a top view of the installation structure of the lightweight partition wall of the present application.
[0029] In the figure: 1-connecting plate, 2-anchor pipe, 3-insertion seam, 4-hole, 5-anchor, 6-building body, 7-conventional pipe clamp, 8-lightweight partition wall. DETAILED DESCRIPTION
[0030] The present application is further described below in conjunction with specific embodiments and drawings.
[0031] Example 1
[0032] refer to Figure 1 and Figure 2 As shown, an auxiliary hidden installation pipe clamp includes a connecting plate 1, an anchoring pipe 2, an insertion slot 3, a hole 4 and an anchor 5.
[0033] The connecting plate 1 is a straight plate with a rectangular structure, preferably a galvanized steel plate. The pipe clamp is processed using a 3mm thick Q235B galvanized steel plate. The connecting plate is 50mm to 60mm wide, 180mm long and 3mm thick. The connecting plate 1 serves as a transitional force-bearing component.
[0034] An anchor pipe 2 at one end is erected on the plate surface of the connecting plate 1. The anchor pipe 2 is a round galvanized steel pipe. The connecting plate 1 is welded to the anchor pipe 2 to keep the anchor pipe 2 vertically erected on the connecting plate 1. The anchor pipe 2 is anchored in the lightweight partition wall 8 as a part of the lightweight partition wall 8 to ensure the relative fixation between the connecting plate 1 and the lightweight partition wall 8.
[0035] The other end of the connecting plate 1 is provided with an insertion slot 3, which passes through the upper and lower plate surfaces, and the slot 3 faces the end. The insertion slot 3 is used for installing the next lightweight partition wall 8 after the anchor 5 has been fixed. When the lightweight partition wall 8 enters the installation position, the anchor 5 enters the insertion slot 3 to achieve the installation of the lightweight partition wall 8. At the same time, the anchor 5 is used to clamp the connecting plate 1 to achieve the fixing of the lightweight partition wall 8. There is no need to consider the installation of the pipe clamp affected by other structures in special positions.
[0036] The slot of the slot 3 is provided with an arc-shaped transition structure extending outward to facilitate the entry of the anchor 5. The slot 3 is arranged along the length direction of the connecting plate 1, and the two ends of the connecting plate 1 are the ends in the length direction, so the anchor 5 directly enters the slot 3 along the length direction, and the lightweight partition wall 8 is also arranged and entered along the length direction, which is convenient for construction.
[0037] A hole 4 is provided in the slot 3, and the diameter of the hole is slightly larger than the slot width, which is convenient for the anchor 5 to be positioned. The bottom and middle of the slot 3 are provided with holes 4, corresponding to two anchors 5, to ensure the stability of the positioning effect.
[0038] Specifically, the end of the connecting plate without the anchor pipe is slotted inward (the slot width is determined by the diameter of the anchor), with a length of 80 mm, and anchor point holes are respectively set at 50 mm and 80 mm inward from the end (the hole diameter is determined by the anchor). The anchor 5 is a structure driven into the main body of the building in advance, such as nails, expansion screws or steel bars.
[0039] Example 2
[0040] refer to Figure 3 and Figure 4 As shown, a lightweight partition wall installation structure includes a building body 6 and a lightweight partition wall 8, and also includes the auxiliary hidden installation pipe clamp of Example 1.
[0041] The anchor pipe 2 is anchored on the lightweight partition wall 8. The anchor pipe 2 can be directly buried when the lightweight partition wall 8 is prefabricated, or a hole can be reserved on site for pouring and anchoring. The anchor 5 is anchored on the building body 6 and can be driven into the building body 6 during on-site construction. The anchor 5 is located in the insertion gap 3, and the fixing between the lightweight partition wall 8 and the building body 6 is achieved by the clamping relationship between the anchor 5 and the connecting plate 1.
[0042] For two adjacent lightweight partition walls 8, the right side of the lightweight partition wall 8 on the left is fixed to the building main body 6 through a conventional pipe clamp 7, and the left side of the lightweight partition wall 8 on the right is anchored with an anchor pipe 2. The lightweight partition wall 8 on the right is fixed to the building main body 6 through the anchor pipe 2, the connecting plate 1 and the anchor 5.
[0043] After the previous lightweight partition wall 8 is fixed, the next lightweight partition wall 8 is placed in place, and the anchor 5 enters the insertion gap 3 at the same time. After the next lightweight partition wall 8 is in place, the connecting plate 1 and the anchor 5 also form a clamping arrangement, thereby achieving the fixing of the lightweight partition wall 8. There is no need to consider the installation of the pipe clamp affected by other structures in special positions.
[0044] The workflow of this application is: install the hidden installation pipe clamp at the end of the ALC lightweight partition board as required, then lay out and locate according to the position of the first installed ALC board, and drive the anchor into position so that the end of the anchor is exposed 10mm to 20mm. Insert the lightweight partition board with the installed pipe clamp into the pre-driven structural anchor through the gap of the tube board to form a connection.
[0045] The aforementioned basic examples and their further selected examples can be freely combined to form multiple embodiments, all of which are embodiments that can be adopted and claimed for protection in this application. In the scheme of this application, each selected example can be arbitrarily combined with any other basic examples and selected examples.
[0046] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. An auxiliary hidden installation pipe clamp, comprising a connecting plate (1), characterized in that: An anchor pipe (2) is provided on one end of the plate surface of the connection plate (1), and an insertion slit (3) is provided on the other end of the connection plate (1). The insertion slit (3) passes through the two plate surfaces, and the notch of the insertion slit (3) faces the end.
2. The auxiliary hidden installation pipe clamp according to claim 1, characterized in that: A hole (4) is provided in the insertion slit (3).
3. The auxiliary hidden installation pipe clamp according to claim 1, characterized in that: The connecting plate (1) is a galvanized steel plate.
4. The auxiliary hidden installation pipe clamp according to claim 1, characterized in that: The anchor pipe (2) is a galvanized steel pipe, and the connecting plate (1) is connected to the anchor pipe (2) by welding.
5. The auxiliary hidden installation pipe clamp according to claim 1 or 4, characterized in that: The anchoring pipe (2) is vertically erected on the connecting plate (1).
6. The auxiliary hidden installation pipe clamp according to claim 1, characterized in that: The slot of the insertion slot (3) is provided with an arc-shaped transition structure extending outward.
7. The auxiliary hidden installation pipe clamp according to claim 1 or 6, characterized in that: The insertion slit (3) is arranged along the length direction of the connecting plate (1), and the two ends of the connecting plate (1) are the ends in the length direction.
8. The auxiliary hidden installation pipe clamp according to claim 2, characterized in that: The bottom and middle of the insertion slot (3) are provided with holes (4).
9. A lightweight partition wall installation structure, comprising a building body (6) and a lightweight partition wall (8), characterized in that: It also comprises the auxiliary hidden installation pipe clamp as claimed in any one of claims 1 to 8, the anchor pipe (2) is anchored on the lightweight partition wall (8), the anchor (5) is anchored on the building body (6), and the anchor (5) is located in the insertion gap (3).
10. The installation structure of a lightweight partition wall according to claim 9, characterized in that: The right side of the left lightweight partition wall (8) is fixed to the building main body (6) via a conventional pipe clamp (7), the left side of the right lightweight partition wall (8) is anchored with an anchor pipe (2), and the right lightweight partition wall (8) is fixed to the building main body (6) via the anchor pipe (2), the connecting plate (1) and the anchor piece (5).