Emergency drainage device for tunnel construction
By designing a sewage pump device carried by a remote control car, the existing tunnel construction drainage device is solved in the use of safety hazards and equipment damage, and the stability of the sewage pump during movement and the smoothness of the water pump pump is achieved.
Patent Information
- Application Number
- CN202421554756.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2025-03-25
- Estimated Expiration
- 2034-07-03
AI Technical Summary
Existing tunnel construction drainage devices have safety hazards and risks of equipment damage during use, especially when moving into accumulated water.
An emergency drainage device for tunnel construction was designed, using a remote-controlled car to carry a sewage pump, which extends out of the sewage pump into the accumulated water through the connecting rod, and ensures the stability and convenience of the sewage pump through an electric push rod and a tooth block system.
It effectively avoids the problem of water damage caused by remote control trolley during pumping, while ensuring the stability of the sewage pump during movement, and improves the smoothness of water extraction through double-layer filter cover and waterproof motor.
Smart Images

Figure CN222668318U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel construction drainage devices, in particular to an emergency drainage device for tunnel construction. Background Art
[0002] The tunnel construction emergency drainage device plays a vital role in tunnel engineering. It can quickly and effectively remove accumulated water in an emergency and ensure the safety and smooth progress of tunnel construction. The tunnel construction emergency drainage device is an emergency drainage equipment specially designed for tunnel construction. It can be quickly activated when water accumulates in the tunnel and drain the accumulated water to the outside of the tunnel or the designated drainage system.
[0003] Existing tunnel construction drainage devices, such as the one disclosed in publication number CN220621962U, have the advantage of improving the water collection cover to collect leaking or gushing water on the tunnel wall. However, this drainage device generally needs to be moved as a whole into the accumulated water during use, which not only poses a safety problem for the users during operation, but also easily causes water damage to the carrier vehicle. For this reason, we propose an emergency drainage device for tunnel construction. Utility Model Content
[0004] The utility model aims to solve one of the technical problems existing in the prior art or related technology.
[0005] To this end, the technical solution adopted in this utility model is:
[0006] A tunnel construction emergency drainage device comprises: a remote-controlled trolley, an adjustment component, and an anti-blocking component; the adjustment component comprises a sewage pump movably mounted at the center of the front end of the remote-controlled trolley, a movable wheel fixedly mounted at the front end of the sewage pump, a driving wheel fixedly mounted at the bottom of the remote-controlled trolley, a connecting rod fixedly mounted on both sides of the sewage pump, a slide groove provided on both sides of the remote-controlled trolley, a tooth groove provided on the upper part of the connecting rod, a tooth block movably mounted on the upper part of the tooth groove on one side of the slide groove, and an electric push rod fixedly mounted on the upper end of the tooth block; the anti-blocking component comprises an inner filter cover fixedly mounted at the bottom of the sewage pump, a brush fixedly mounted on both sides of the bottom of the sewage pump, an outer filter cover movably mounted at the outer end of the brush, a toothed disc fixedly mounted on the outer end of the upper part of the outer filter cover, and a gear meshingly mounted on one side of the toothed disc.
[0007] Preferably, the connecting rods are all movably restrained and installed in the sliding groove.
[0008] Preferably, the tooth blocks are meshed with the tooth grooves, and the electric push rods are fixed to the top of the slide grooves.
[0009] Preferably, a stopper is fixedly installed at the rear end of the connecting rod in the slide groove.
[0010] Preferably, the upper part of the gear is also fixedly connected to a connecting shaft, the top of the connecting shaft is also fixedly installed with a waterproof motor, and the waterproof motor is fixed to the outer end of the sewage pump, and the outer end of the sewage pump is also fixedly installed with a stabilizing sleeve that is movably mounted to the outside of the connecting shaft.
[0011] Preferably, annular grooves are formed through both sides of the toothed disc, and screws are movably mounted on both sides of the bottom of the sewage pump, and the screws are located in the annular grooves on both sides.
[0012] By adopting the above technical solution, the beneficial effects achieved by the utility model are as follows:
[0013] 1. In the utility model, the sewage pump installed in the remote control trolley can be extended through the connecting rods at both ends when in use, so as to be moved into the accumulated water in the tunnel, and the sewage pump can be gradually moved by moving the remote control trolley during the pumping of the accumulated water, so as to be moved into deeper accumulated water, thereby avoiding the problem of damage caused by wading during the pumping of the remote control trolley. At the same time, after the sewage pump is moved forward through the connecting rod, the connecting rods at both ends thereof are pressed after the teeth are meshed by the tooth blocks in the slide groove, thereby ensuring that the extended sewage pump has good stability during movement, and the sewage pump can also be retracted into the remote control trolley after use, so as to improve its convenience in transportation;
[0014] 2. In the utility model, the inner filter cover and the outer filter cover installed at the inner and outer ends of the bottom of the sewage pump can perform double-layer filtration in the sewage pumping process. At the same time, the reciprocating outer filter cover driven by the waterproof motor can also avoid clogging during use when the inner end brush is cleaned, thereby ensuring the smoothness of the drainage of accumulated water. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is the overall structure diagram of the utility model;
[0016] Figure 2 It is a side sectional view of the connecting rod of the utility model;
[0017] Figure 3 It is a top view of the sewage pump of the utility model;
[0018] Figure 4 It is a side sectional view of the sewage pump of the utility model.
[0019] Reference numerals:
[0020] 100. Remote control car;
[0021] 200, adjustment assembly; 201, sewage pump; 202, movable wheel; 203, driving wheel; 204, connecting rod; 205, slide groove; 206, tooth groove; 207, tooth block; 208, electric push rod; 209, stop block;
[0022] 300, anti-blocking assembly; 301, inner filter cover; 302, brush; 303, outer filter cover; 304, toothed disc; 305, gear; 306, connecting shaft; 307, waterproof motor; 308, stabilizing sleeve; 309, ring groove; 310, screw. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below in combination with specific implementation methods and with reference to the accompanying drawings. It should be noted that the embodiments of the utility model and the features in the embodiments can be combined with each other without conflict.
[0024] A tunnel construction emergency drainage device provided by some embodiments of the utility model will be described below in conjunction with the accompanying drawings.
[0025] Embodiment 1:
[0026] Combination Figure 1-2 As shown, the utility model provides an emergency drainage device for tunnel construction, comprising: a remote control trolley 100, an adjustment component 200, and an anti-blocking component 300; the adjustment component 200 comprises a sewage pump 201 movably installed at the center of the front end of the remote control trolley 100, a movable wheel 202 fixedly installed at the front end of the sewage pump 201, a driving wheel 203 fixedly installed at the bottom of the remote control trolley 100, a connecting rod 204 fixedly installed on both sides of the sewage pump 201, and a remote control trolley 100 with a plurality of connecting rods 204 fixedly installed on both sides. The slide groove 205, the tooth groove 206 formed in the upper part of the connecting rod 204, the tooth block 207 movably installed on the upper part of the tooth groove 206 on one side of the slide groove 205, and the electric push rod 208 fixedly installed on the upper end of the tooth block 207; the connecting rod 204 is movably restrained and installed in the slide groove 205, the tooth block 207 and the tooth groove 206 are meshingly connected, the electric push rod 208 is fixed at the top of the slide groove 205, and the rear end of the connecting rod 204 in the slide groove 205 is fixedly installed with a stopper 209.
[0027] Specifically, the tunnel construction emergency drainage device plays a vital role in tunnel engineering. It can quickly and effectively drain the accumulated water in an emergency situation to ensure the safety and smooth progress of tunnel construction. The sewage pump 201 installed in the remote control trolley 100 can be extended through the connecting rods 204 at both ends when in use to move to the accumulated water in the tunnel, and the sewage pump 201 can be gradually moved by moving the remote control trolley 100 during the drainage of the accumulated water to move it to deeper accumulated water, thereby avoiding the problem of damage caused by wading during the drainage of the remote control trolley 100. At the same time, the sewage pump 201 01 After the connecting rod 204 moves forward, the connecting rods 204 at both ends are tightened after the teeth are meshed by the tooth blocks 207 in the slide groove 205, so as to ensure that the extended sewage pump 201 has good stability during movement, and the sewage pump 201 can also be retracted into the remote control car 100 after use to improve its convenience in transportation. The electric push rod 208 installed in the slide groove 205 is mainly used for driving the tooth block 207, and the block 209 installed at the rear end of the connecting rod 204 in the slide groove 205 is mainly used for restraining the connecting rod 204 to avoid its detachment.
[0028] Embodiment 2:
[0029] Combination Figure 1-4 As shown, on the basis of Example 1, the anti-blocking component 300 includes an inner filter cover 301 fixedly installed at the bottom of the sewage pump 201, a brush 302 fixedly installed on both sides of the bottom of the sewage pump 201, an outer filter cover 303 movably installed at the outer end of the brush 302, a toothed disc 304 fixedly installed at the upper outer end of the outer filter cover 303, and a gear 305 meshingly installed on one side of the toothed disc 304, a connecting shaft 306 is also fixedly connected to the upper part of the gear 305, a waterproof motor 307 is also fixedly installed on the top of the connecting shaft 306, and the waterproof motor 307 is fixed to the outer end of the sewage pump 201, and a stabilizing sleeve 308 movably sleeved to the outside of the connecting shaft 306 is also fixedly installed on the outer end of the sewage pump 201, and an annular groove 309 is also opened on both sides of the toothed disc 304, and screws 310 are also movably installed on both sides of the bottom of the sewage pump 201, and the screws 310 are located in the annular grooves 309 on both sides.
[0030] Specifically, the inner filter cover 301 and the outer filter cover 303 installed at the inner and outer ends of the bottom of the sewage pump 201 can perform double-layer filtration on the sewage pump 201 during the extraction and drainage. The reciprocating outer filter cover 303 driven by the waterproof motor 307 can also avoid blockage during use when the inner end brush 302 is cleaned, thereby ensuring the smoothness of the drainage of accumulated water. The toothed disc 304 installed at the outer end of the outer filter cover 303 and the gear 305 meshingly installed at the outer end of the toothed disc 304 are mainly used for the rotational drive of the outer filter cover 303 by the waterproof motor 307. The stabilizing sleeve 308 sleeved on the outer end of the connecting shaft 306 is mainly used to ensure the stability of the gear 305 during rotation. The annular grooves 309 opened at both ends of the toothed disc 304 and the screws 310 installed in the annular grooves 309 are mainly used for the movable installation of the toothed disc 304 and the outer filter cover 303 as a whole at the bottom of the sewage pump 201.
[0031] The working principle and use process of this utility model:
[0032] When emergency drainage is required during tunnel construction, the sewage pump 201 at the front end of the remote control trolley 100 is first pulled, so that the sewage pump 201 pulls the connecting rods 204 on both sides forward through the movable wheel 202 at the front end. After the sewage pump 201 moves forward to a suitable distance, the electric push rod 208 in the slide groove 205 can be started. After the electric push rod 208 is started, the tooth block 207 at the bottom of the drive is moved downward to engage with the tooth groove 206 in the connecting rod 204, thereby ensuring the stability of the sewage pump 201 after adjustment. After the sewage pump 201 is stably fixed, the remote control trolley 100 can be used to control the sewage pump 201. The vehicle 100 moves the sewage pump 201 into the accumulated water. After the sewage pump 201 is moved into the accumulated water, the sewage pump 201 and the waterproof motor 307 at its upper end can be started. After the sewage pump 201 is started, the accumulated water will be pumped out. After the waterproof motor 307 is started, the connecting shaft 306 and the gear 305 are driven to drive the gear plate 304 and the outer filter cover 303 at the bottom of the sewage pump 201 to reciprocate, so that the brush 302 at the inner end can be used to clean the blockage in the outer filter cover 303 during rotation, thereby ensuring the pumping efficiency of the sewage pump 201.
[0033] Although the embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and purpose of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A tunnel construction emergency drainage device, characterized in that: include: A remote-controlled vehicle (100), an adjustment component (200), and an anti-blocking component (300); The adjustment component (200) comprises a sewage pump (201) movably mounted at the center of the front end of the remote-controlled vehicle (100), a movable wheel (202) fixedly mounted at the front end of the sewage pump (201), a driving wheel (203) fixedly mounted at the bottom of the remote-controlled vehicle (100), a connecting rod (204) fixedly mounted on both sides of the sewage pump (201), a slide groove (205) provided on both sides of the remote-controlled vehicle (100), a tooth groove (206) provided on the upper part of the connecting rod (204), a tooth block (207) movably mounted on the upper part of the tooth groove (206) on one side of the slide groove (205), and an electric push rod (208) fixedly mounted on the upper end of the tooth block (207); The anti-blocking assembly (300) comprises an inner filter cover (301) fixedly mounted on the bottom of the sewage pump (201), brushes (302) fixedly mounted on both sides of the bottom of the sewage pump (201), an outer filter cover (303) movably mounted on the outer end of the brush (302), a toothed disc (304) fixedly mounted on the upper outer end of the outer filter cover (303), and a gear (305) meshingly mounted on one side of the toothed disc (304).
2. The tunnel construction emergency drainage device according to claim 1, characterized in that: The connecting rods (204) are all movably restrained and installed in the sliding grooves (205).
3. The tunnel construction emergency drainage device according to claim 1, characterized in that: The tooth block (207) and the tooth groove (206) are meshedly connected, and the electric push rods (208) are fixed to the top of the slide groove (205).
4. The tunnel construction emergency drainage device according to claim 1, characterized in that: A stopper (209) is fixedly mounted at the rear end of the connecting rod (204) in the slide groove (205).
5. The tunnel construction emergency drainage device according to claim 1, characterized in that: The upper portion of the gear (305) is also fixedly connected to a connecting shaft (306), the top of the connecting shaft (306) is also fixedly mounted with a waterproof motor (307), and the waterproof motor (307) is fixed to the outer end of the sewage pump (201), and the outer end of the sewage pump (201) is also fixedly mounted with a stabilizing sleeve (308) that is movably sleeved to the outside of the connecting shaft (306).
6. The tunnel construction emergency drainage device according to claim 1, characterized in that: Annular grooves (309) are also provided through both sides of the toothed disc (304), and screws (310) are movably installed on both sides of the bottom of the sewage pump (201), and the screws (310) are located in the annular grooves (309) on both sides.
Citation Information
Patent Citations
Tunnel construction drainage device
CN220621962U