Gusset plate hoisting and assembling tool
By designing a nodal plate lifting set for marine engineering projects and using reverse chain connection lifting, the dilemma of welding temporary lifting points during the node plate lifting process is solved, and a more efficient and safe node plate replacement process is achieved.
Patent Information
- Application Number
- CN202421487337.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2034-06-27
AI Technical Summary
In marine engineering projects, temporary lifting points are needed to be welded during the lifting process of the node plate, which causes huge expenses in the later cutting, grinding and painting work, and damages the surrounding structural parts, and the lifting is unstable, affecting the stable positioning of the node plate.
Design a nodal plate lifting set tooling, including a combination beam and a card slot, a reverse chain buckle is connected to the card slot, and a temporary lifting point is installed on the node board. The reversing chain is connected to the lifting, so as to achieve stable lifting of the node board and group butt welding.
It avoids the additional construction costs caused by temporary welding lifting points, simplifies installation operations, ensures the balance of the node plate stress, and improves the efficiency and safety and reliability of on-site node plate replacement.
Smart Images

Figure CN222714881U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of offshore oil engineering, and in particular relates to a node plate hoisting assembly tool. Background Art
[0002] During the general assembly and construction phase of offshore engineering project modules, additional reinforcing ribs are required to increase the strength at the nodes, which results in the flange plates at the joints of local composite beams needing to be replaced with thickened and widened plates. This operation is called "lifting the lid" on site. Currently in conventional module projects, the replacement of flange plates of node composite beams requires the use of tools such as fall chains, and finding nearby rigid structural parts (such as main columns or other upper steel sections) to weld temporary lifting points as the suspension force points. A hand winch is hung at one end, and the node plate to be replaced is hoisted at the other end, and personnel are adjusted to assemble them in place.
[0003] During this construction process, due to the involvement of welding temporary lifting points, the subsequent cutting, grinding and repainting of the lifting points were extremely time-consuming and caused certain damage to the surrounding structural parts. In addition, the lifting of a single lifting point was not stable, and the web of the composite beam was located in the center, which was not conducive to the stable positioning of the node plate.
[0004] Therefore, it is urgent to design a node plate hoisting and assembly tooling to solve the node plate hoisting and assembly problems mentioned above. Utility Model Content
[0005] In order to solve the technical problems of the temporary welding hanging points mentioned in the background technology, the later cutting, grinding and repainting of the hanging points are extremely time-consuming and cause certain damage to the surrounding structural parts. In addition, the lifting of a single hanging point is not stable, and the web of the composite beam is located in the center, which is not conducive to the stable positioning of the node plate. A node plate lifting and assembly tool is provided to solve the problem of node plate lifting and assembly.
[0006] In order to achieve the above purpose, the specific technical scheme of the node plate hoisting group of the utility model is as follows:
[0007] A node plate hoisting and assembly tool comprises a composite beam and a slot, wherein the slot is clamped on the composite beam, and two ends of the slot are respectively connected to a first fall chain hook and a second fall chain hook, and a first temporary lifting point and a second temporary lifting point are connected to the node plate, and the first temporary lifting point and the second temporary lifting point are both connected to a fall chain, and the end of the fall chain away from the first temporary lifting point passes through the first fall chain hook, and the end of the fall chain away from the second temporary lifting point passes through the second fall chain hook, and the fall chain is pulled to assemble the node plate and the composite beam.
[0008] Furthermore, the composite beam comprises an upper flange plate, a lower flange plate and a web plate, the web plate is vertically connected between the upper flange plate and the lower flange plate, and a slot is clamped on the web plate.
[0009] Furthermore, through holes are provided at both ends of the slot, and the first fall chain hook and the second fall chain hook are respectively connected in the through holes.
[0010] Furthermore, the fall chain includes a first fall chain and a second fall chain, the first fall chain is wound around the first fall chain hook, and the second fall chain is wound around the second fall chain hook.
[0011] Furthermore, a first temporary hanging point and a second temporary hanging point are vertically welded at both ends of the node plate, the first temporary hanging point is connected to a first fall chain, and the second temporary hanging point is connected to a second fall chain.
[0012] Furthermore, the first temporary hanging point and the second temporary hanging point are symmetrically welded on the side wall of the node plate, and the first fall chain and the second fall chain are pulled to move the node plate horizontally upward.
[0013] Furthermore, the slot is provided with a U-shaped opening, and the U-shaped opening of the slot is clamped on the outer wall of the web.
[0014] Furthermore, the card slot is arranged in a trapezoidal shape, and a U-shaped opening is provided on the bottom surface of the card slot.
[0015] Furthermore, the through hole comprises a first through hole and a second through hole, the first through hole and the second through hole are symmetrically arranged at two ends of the slot, and the first through hole and the second through hole are located at one side of the lower bottom surface of the slot.
[0016] Furthermore, the first through hole and the second through hole are both arranged in a circular shape, the first through hole is rotatably connected to the first fall chain hook, and the second through hole is rotatably connected to the second fall chain hook.
[0017] The node plate hoisting assembly of the utility model has the following advantages:
[0018] By clamping the slot on the composite beam, connecting the first fall chain hook and the second fall chain hook on the slot, and connecting the fall chain passing through the first fall chain hook to the first temporary hanging point of the node plate, and connecting the fall chain passing through the second fall chain hook to the second temporary hanging point of the node plate, the worker pulls the fall chain to lift the node plate to the node, and removes the slot on the composite beam after welding is completed. This application solves the dilemma of replacing the flange plate of the node composite beam with the help of the fall chain to find the temporary hanging point for welding the rigid structural parts nearby, avoids the extra construction cost caused by the temporary hanging point of the welding, facilitates the installation operation, ensures the balanced force of the node plate, improves the efficiency of on-site node plate replacement, and is safe and reliable. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of node plate hoisting assembly of the node plate hoisting assembly tool of the utility model;
[0020] Figure 2 It is a three-dimensional diagram of the tooling slot of the node plate lifting assembly of the utility model.
[0021] Description of the markings in the figure:
[0022] 1. Composite beam; 2. Slot; 3. Second through hole; 4. Second fall chain hook; 5. Node plate; 6. First temporary hanging point; 7. Second temporary hanging point; 8. First fall chain; 9. Second fall chain; 10. First through hole. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the utility model.
[0024] Those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims, any one of the claimed embodiments may be used in any combination.
[0025] Please refer to the attached Figure 1 To Attachment Figure 2 The utility model describes a node plate hoisting assembly tool.
[0026] like Figure 1 As shown, the node plate lifting assembly tooling in the utility model includes a combined beam 1 and a slot 2, the slot 2 is connected to the combined beam 1, and the two ends of the slot 2 are respectively connected to the first fall chain hook and the second fall chain hook 4, the node plate 5 is connected to the first temporary lifting point 6 and the second temporary lifting point 7, the first temporary lifting point 6 and the second temporary lifting point 7 are both connected to a fall chain, the end of the fall chain away from the first temporary lifting point 6 passes through the first fall chain hook, and the end of the fall chain away from the second temporary lifting point 7 passes through the second fall chain hook 4, and the fall chain is pulled to assemble the node plate 5 with the combined beam 1.
[0027] The node plate hoisting assembly tool of the utility model is connected to the slot 2 on the composite beam 1, the slot 2 is connected to the first fall chain hook and the second fall chain hook 4, and the fall chain passing through the first fall chain hook is connected to the first temporary hanging point 6 of the node plate 5, and the fall chain passing through the second fall chain hook 4 is connected to the second temporary hanging point 7 of the node plate 5. The worker pulls the fall chain to lift the node plate 5 to the node, and removes the slot 2 on the composite beam after welding. The application solves the dilemma of replacing the flange plate of the node composite beam 1 by using the fall chain to find a temporary hanging point for welding of rigid structural parts nearby, avoids the extra construction cost caused by assembling and welding temporary hanging points, facilitates installation operations, ensures balanced force on the node plate, improves the efficiency of on-site node plate replacement, and is safe and reliable.
[0028] Further, if Figure 1 As shown, the composite beam 1 includes an upper flange plate, a lower flange plate and a web plate, the web plate is vertically connected between the upper flange plate and the lower flange plate, and a slot 2 is clamped on the web plate; through holes are provided at both ends of the slot 2, and the first fall chain buckle and the second fall chain buckle 4 are respectively connected in the through holes; the fall chain includes a first fall chain 8 and a second fall chain 9, the first fall chain 8 is wound around the first fall chain buckle, and the second fall chain 9 is wound around the second fall chain buckle 4.
[0029] In this embodiment, the upper flange plate and the lower flange plate are arranged in parallel, and a web plate is vertically welded on the lower flange plate. The end of the web plate away from the lower flange plate is vertically welded to the upper flange plate, so that the composite beam 1 is in an I-shape; preferably, a slot 2 is clamped on the web plate, and the first fall chain hook and the second fall chain hook 4 are respectively rotatably connected to the through holes of the slot 2.
[0030] The first fall chain 8 is wound around the first fall chain hook, and the second fall chain 9 is connected to the second fall chain hook 4. The first fall chain 8 and the second fall chain 9 are pulled to move the node plate 5 upward in the vertical direction.
[0031] Further, if Figure 1 As shown, the first temporary hanging point 6 and the second temporary hanging point 7 are vertically welded at both ends of the node plate 5, the first temporary hanging point 6 is connected to the first fall chain 8, and the second temporary hanging point 7 is connected to the second fall chain 9; the first temporary hanging point 6 and the second temporary hanging point 7 are symmetrically welded on the side wall of the node plate 5, and the first fall chain 8 and the second fall chain 9 are pulled to move the node plate 5 horizontally upward; the slot 2 is provided with a U-shaped opening, and the U-shaped opening of the slot 2 is clamped on the outer wall of the web.
[0032] In this embodiment, preferably, the first temporary hanging point 6 and the second temporary hanging point 7 are both vertically welded to the side wall of the node plate 5, the first fall chain 8 is connected to the first temporary hanging point 6, and the second fall chain 9 is connected to the second temporary hanging point 7, and the first fall chain 8 and the second fall chain 9 are pulled at the same time to realize the upward movement of the node plate 5 in a horizontal state.
[0033] Preferably, the card slot 2 is provided with a U-shaped opening, and the U-shaped opening is consistent with the width of the web, so that the U-shaped opening of the card slot 2 is snapped onto the web, thereby achieving a stable connection of the card slot 2.
[0034] Further, if Figure 1 and Figure 2 As shown, the card slot 2 is arranged in a trapezoidal shape, and a U-shaped opening is provided on the lower bottom surface of the card slot 2; the through hole includes a first through hole 10 and a second through hole 3, and the first through hole 10 and the second through hole 3 are symmetrically arranged at both ends of the card slot 2, and the first through hole 10 and the second through hole 3 are located on one side of the lower bottom surface of the card slot 2; the first through hole 10 and the second through hole 3 are both arranged in a circular shape, and a first fall chain hook is rotatably connected to the first through hole 10, and a second fall chain hook 4 is rotatably connected to the second through hole 3.
[0035] In the present embodiment, preferably, the slot 2 is trapezoidal, and a U-shaped opening is provided on the lower bottom surface of the slot 2, the first through hole 10 and the second through hole 3 are symmetrically provided on the slot 2, the first through hole 10 and the second through hole 3 are both circular openings, and the first through hole 10 and the second through hole 3 are provided on the side of the slot 2 close to the lower bottom surface, so that the first fall chain hook and the second fall chain hook 4 are plugged into the first through hole 10 and the second through hole 11 to perform the lifting and lowering assembly and welding of the node plate 5.
[0036] The working principle of the node plate hoisting assembly tooling in the utility model is as follows:
[0037] First, the slot 2 is clamped on the web, and the first and second through holes 10 and 3 of the slot 2 are connected with the first and second fall chain hooks 4;
[0038] Next, the first temporary hanging point 6 and the second temporary hanging point 7 are vertically and symmetrically welded on the node plate 5, the first fall chain 8 passing through the first fall chain hook is connected to the first temporary hanging point 6, and the second fall chain 9 passing through the second fall chain hook 4 is connected to the second temporary hanging point 7;
[0039] Next, the first fall chain 8 and the second fall chain 9 are pulled simultaneously to lift the node plate 5 to the node, so as to perform assembly welding on the node plate 5;
[0040] Finally, remove the clamping slot 2 on the web, disconnect the first fall chain 8 and the second fall chain 9 connected to the first temporary hanging point 6 and the second temporary hanging point 7, and cut off the first temporary hanging point 6 and the second temporary hanging point 7, and the welding work of the node plate 5 group is completed.
[0041] Based on the node plate hoisting assembly tooling, the utility model clamps the slot 5 on the composite beam 1, connects the first fall chain hook and the second fall chain hook 4 to the slot 5, and connects the first fall chain 8 passing through the first fall chain hook to the first temporary hanging point 6 of the node plate 5, and the second fall chain 9 passing through the second fall chain hook 4 is connected to the second temporary hanging point 7 of the node plate 5. The worker pulls the first fall chain 8 and the second fall chain 9 at the same time to lift the node plate 5 to the node, and removes the slot 5 on the composite beam 1 after welding. The application solves the dilemma of finding a temporary hanging point for welding rigid structural parts nearby with the help of a fall chain when replacing the flange plate of the node composite beam 1, avoids the extra construction cost caused by assembling and welding temporary hanging points, facilitates installation operations, ensures balanced force on the node plate, improves the efficiency of on-site node plate replacement, and is safe and reliable.
[0042] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation methods of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all implementation methods here. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention shall be included in the protection scope of the claims of the present invention.
Claims
1. A node plate hoisting assembly tool, characterized in that: It includes a combined beam and a slot, the slot is connected to the combined beam, both ends of the slot are connected with a first fall chain hook and a second fall chain hook, the node plate is connected with a first temporary hanging point and a second temporary hanging point, the first temporary hanging point and the second temporary hanging point are both connected with a fall chain, the end of the fall chain away from the first temporary hanging point passes through the first fall chain hook, the end of the fall chain away from the second temporary hanging point passes through the second fall chain hook, the fall chain is pulled to mate the node plate with the combined beam.
2. The gusset plate hoisting assembly tool according to claim 1 is characterized in that: The composite beam comprises an upper flange plate, a lower flange plate and a web plate. The web plate is vertically connected between the upper flange plate and the lower flange plate, and a clamping groove is clamped on the web plate.
3. The gusset plate hoisting assembly tool according to claim 2, characterized in that: Through holes are provided at both ends of the clamping slot, and the first fall chain hook and the second fall chain hook are respectively connected in the through holes.
4. The gusset plate hoisting assembly tool according to claim 3 is characterized in that: The fall chain comprises a first fall chain and a second fall chain, the first fall chain is wound around the first fall chain hook, and the second fall chain is wound around the second fall chain hook.
5. The gusset plate hoisting assembly tool according to claim 4, characterized in that: A first temporary hanging point and a second temporary hanging point are vertically welded at both ends of the node plate, a first fall chain is connected to the first temporary hanging point, and a second fall chain is connected to the second temporary hanging point.
6. The gusset plate hoisting assembly tool according to claim 5, characterized in that: The first temporary hanging point and the second temporary hanging point are symmetrically welded on the side wall of the node plate, and the first fall chain and the second fall chain are pulled to move the node plate horizontally upward.
7. The gusset plate hoisting assembly tool according to claim 3, characterized in that: The clamping slot is provided with a U-shaped opening, and the U-shaped opening of the clamping slot is clamped on the outer wall of the web.
8. The gusset plate hoisting assembly tool according to claim 7, characterized in that: The card slot is arranged in a trapezoidal shape, and a U-shaped opening is arranged on the bottom surface of the card slot.
9. The gusset plate hoisting assembly tool according to claim 3, characterized in that: The through hole comprises a first through hole and a second through hole, the first through hole and the second through hole are symmetrically arranged at two ends of the slot, and the first through hole and the second through hole are located at one side of the lower bottom surface of the slot.
10. The gusset plate hoisting assembly tool according to claim 9, characterized in that: The first through hole and the second through hole are both arranged in a circular shape. The first through hole is rotatably connected to the first fall chain hook, and the second through hole is rotatably connected to the second fall chain hook.