Ship new energy filling device
By setting up liquid phase pipes, gas phase pipes and loading arms in the new energy filling device of the ship, and using mass flow meters and flow regulating valves, the problem of unclear flow during fuel filling in the prior art is solved, and accurate filling and real-time monitoring of the fuel silo is achieved.
Patent Information
- Application Number
- CN202421651818.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-07-12
AI Technical Summary
The existing marine LNG fuel gas supply system has unclear flow during the fuel filling process, so it is impossible to accurately fill the fuel silo.
A new marine energy filling device is designed, including a liquid phase pipe, a gas phase pipe and a loading arm. It is set in the liquid phase pipe and a gas phase pipe through a mass flowmeter and a flow regulating valve, and the flow rate is accurately controlled by a batch controller.
Accurate control and real-time monitoring of fuel filling flow in the ship's fuel silo is achieved to ensure efficient and accurate fuel filling process.
Smart Images

Figure CN222747096U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ship energy loading and unloading equipment, in particular to a ship new energy filling device. Background Art
[0002] Chemical new energy refers to fuels such as LNG and hydrogen. Fuels are usually stored and transported over long distances by ships. The fuel in the storage tank is transported to the ship's fuel bunker by controlling the opening and closing of the pipeline.
[0003] However, the prior art still has shortcomings. For example, the patent number is: CN201820240398.X, which is a marine LNG fuel supply system, including a fuel tank box and a gasification pressure regulating skid; the fuel tank box includes a tank body and a frame supporting the tank body; the gasification pressure regulating skid includes a skid seat, and a gasification device and a buffer tank installed on the skid seat; the gasification device is provided with a cooling channel for the circulation water of the main engine of the ship and a gasification channel for LNG to absorb the heat of the circulation water of the main engine and gasify; the gasification device is provided with a liquid inlet, an air outlet and a boosting air port, the liquid inlet of the gasification device is connected to the liquid outlet of the tank body, the boosting air port of the gasification device is connected to the return air port of the tank body, and the air outlet of the gasification device provides gas fuel to the main engine of the ship through the buffer tank. The process flow of the system is unclear during the fuel filling process, and the fuel tank cannot be accurately filled with fuel. Utility Model Content
[0004] The purpose of the utility model is to provide a new energy filling device for ships to solve the situation raised in the background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solution: a ship new energy filling device, comprising: a liquid phase pipe, a gas phase pipe and a loading arm, the loading arm and the tank truck are connected through a liquid phase pipe and a gas phase pipe, a batch controller is provided on the tank truck's mounting skid, the batch controller is electrically connected to a mass flow meter and a mass flow meter 2 through a wire, the batch controller is electrically connected to a flow regulating valve and a flow regulating valve 2 through a wire 2, the mass flow meter and the flow regulating valve are arranged in the liquid phase pipe, and the mass flow meter 2 and the flow regulating valve 2 are arranged in the gas phase pipe.
[0006] Preferably, a pneumatic shut-off valve is provided in the liquid phase pipe, a second pneumatic shut-off valve is provided in the gas phase pipe, and both the pneumatic shut-off valve and the second pneumatic shut-off valve are electrically connected to the batch controller via a third wire.
[0007] Preferably, a temperature transmitter is provided in the liquid phase tube, and a second temperature transmitter is provided in the gas phase tube, and both the first temperature transmitter and the second temperature transmitter are electrically connected to the batch controller via a fourth wire.
[0008] Preferably, a pressure transmitter is provided in the liquid phase tube, and a second pressure transmitter is provided in the gas phase tube, and both the first pressure transmitter and the second pressure transmitter are electrically connected to the batch controller via a wire five.
[0009] Preferably, one end of an electrostatic controller is provided in the tank truck, the end of the electrostatic controller extending outside the tank truck is connected to the end of a grounding device, and the other end of the grounding device is connected to the ground.
[0010] Preferably, the loading arm comprises: a rod body, a worm gear and a mounting plate, the rod body is rotatably mounted in a driving shell, a motor is mounted on the side wall of the driving shell, an end of a worm is connected to an output end of the motor, the worm is rotatably connected to the driving shell, the worm is meshingly connected to the worm gear, the worm gear is arranged in the driving shell, two mounting plates are rotatably connected to the side wall of the rod body, the top end of a torsion spring is connected to the bottom surface of the mounting plate, the bottom end of the torsion spring is connected to a mounting ring, the mounting ring is coaxially mounted on the rod body, and the mounting ring is arranged above the top surface of the driving shell.
[0011] Preferably, the loading arm also includes: a liquid phase loading arm and a gas phase loading arm, the top surface of one mounting plate is rotatably connected to the side wall of the liquid phase loading arm, the top surface of the other mounting plate is rotatably connected to the side wall of the gas phase loading arm, the end of the liquid phase loading arm is connected to the liquid phase pipe, and the end of the gas phase loading arm is connected to the gas phase pipe.
[0012] Preferably, the rod body is provided with a second motor, the output end of the second motor is connected to the second rod body, and the second rod body is rotatably connected to the two mounting plates respectively.
[0013] Preferably, two spiral tubes are mounted on the second rod body, the spiral tubes are threadedly connected to the threaded ring, the top of the spring is mounted on the bottom end of the threaded ring, the bottom end of the spring is connected to the second mounting ring, the second mounting ring is fixed in the circular hole of the outer shell, the circular hole is coaxially arranged with the second rod body, a slider is mounted on the inner wall of the circular hole, the slider is slidably connected to the longitudinal slide groove, and the longitudinal slide groove is slidably opened on the side wall of the threaded ring.
[0014] Preferably, each side wall of the shell is equipped with a guide rod, which is slidably connected to the mounting plate, and the other side wall of each shell is equipped with a connecting rod, the bottom end of the connecting rod is rotatably connected to the second end of the connecting rod, and the other end of the second connecting rod is connected to the side wall of the liquid phase loading arm or the gas phase loading arm.
[0015] The beneficial effects of the utility model are as follows:
[0016] A mass flow meter and a flow regulating valve are arranged on the liquid phase pipe, and a mass flow meter 2 and a flow regulating valve 2 are arranged on the gas phase pipe. The batch controller controls the mass flow meter 2 and the flow regulating valve 2 through the wire, and can accurately control the filling flow of fuel in the ship's fuel tank and monitor the filling process in real time. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the main structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the installation position of the worm gear of the utility model;
[0019] Figure 3 It is a schematic diagram of the connection relationship between the rod body and the mounting plate of the utility model;
[0020] Figure 4 This is a schematic diagram of the installation position of the spiral tube of the utility model;
[0021] Figure 5 It is a schematic diagram of the installation position of the threaded ring of the utility model.
[0022] In the figure: liquid phase pipe 1, gas phase pipe 2, loading arm 3, rod body 4, worm gear 5, mounting plate 6, liquid phase loading arm 7, gas phase loading arm 8, torsion spring 9, rod body 2 10, screw tube 11, threaded ring 12, connecting rod 13. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model, not all the embodiments. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0025] Example 1: Reference Figure 1-Figure 5A new energy filling device for ships comprises: a liquid phase pipe 1, a gas phase pipe 2 and a loading arm 3, wherein the loading arm 3 is connected to a tank truck via a liquid phase pipe 1 and a gas phase pipe 2, a batch controller is provided on the mounting skid of the tank truck, the batch controller is electrically connected to a mass flow meter and a mass flow meter 2 via a wire, the batch controller is electrically connected to a flow control valve and a flow control valve 2 via a wire 2, the mass flow meter and the flow control valve are arranged in the liquid phase pipe 1, and the mass flow meter 2 and the flow control valve 2 are arranged in the gas phase pipe 2.
[0026] The principle of the above scheme is:
[0027] Fuel is stored in the tank truck. The loading arm 3 is connected to the fuel tank of the ship. First, nitrogen is used to replace the air in the loading arm 3. The liquid phase pipe 1 and the gas phase pipe 2 are opened. The "loading precooling" button is pressed on the batch controller. The batch controller slowly opens the flow regulating valve and the flow regulating valve 2 to 5% of their opening to precool the loading arm 3. The mass flow meter and the mass flow meter 2 respectively measure the mass of the fuel liquid and the fuel gas output to the loading arm 3. When the mass of the fuel liquid and the mass of the fuel gas input into the loading arm 3 by the liquid phase pipe 1 and the gas phase pipe 2 reach the preset value, the loading arm 3 is completely frosted under the action of the low-temperature fuel liquid and the fuel gas. The "fast loading" button is pressed on the batch controller. The batch controller slowly opens the flow regulating valve and the flow regulating valve 2 to the set normal loading flow. When the loading volume reaches 95% of the set loading volume, that is, the fuel When the loading volume reaches 95% of the bunker loading volume, the batch controller slowly closes the flow regulating valve and the flow regulating valve 2 to the set small flow, continues to replenish the fuel to the fuel bunker until the fuel in the fuel bunker is full and the loading is ended, and at the same time closes the liquid phase pipe 1 and the gas phase pipe 2, and then disconnects the loading arm 3 from the fuel bunker; when the loading volume reaches the loading advance amount, the batch controller closes the flow regulating valve and the flow regulating valve 2, and at the same time closes the liquid phase pipe 1 and the gas phase pipe 2, and then disconnects the loading arm 3 from the fuel bunker; after disconnecting the loading arm 3 from the fuel bunker, the operator purges the arm 3 with nitrogen respectively; the specific model of the batch controller is: DZHB-08; the mass flowmeter and the mass flowmeter 2 are the same device, and the specific model of the mass flowmeter is: F300; the flow regulating valve and the flow regulating valve 2 are the same device, and the specific model of the flow regulating valve is: ZDLP.
[0028] The beneficial effects of the above scheme are:
[0029] A mass flow meter and a flow regulating valve are arranged on the liquid phase pipe 1, and a mass flow meter 2 and a flow regulating valve 2 are arranged on the gas phase pipe 2. The batch controller controls the mass flow meter and the flow regulating valve through a wire. The batch controller controls the mass flow meter 2 and the flow regulating valve 2 through a wire 2, and can accurately control the filling flow of the fuel in the ship's fuel tank and monitor the filling process in real time.
[0030] Fuel is simultaneously input to the loading arm 3 through the liquid phase pipe 1 and the gas phase pipe 2, and the loading arm 3 fills the fuel into the fuel bin, thereby increasing the speed of fuel filling.
[0031] Example 2: Reference Figure 1-Figure 5 A pneumatic shut-off valve is provided in the liquid phase pipe 1, and a pneumatic shut-off valve 2 is provided in the gas phase pipe 2. The pneumatic shut-off valve and the pneumatic shut-off valve 2 are both electrically connected to the batch controller through a wire 3.
[0032] The principle of the above scheme is:
[0033] After completing the nitrogen replacement of the air in the loading arm 3, the pneumatic shut-off valve and the pneumatic shut-off valve 2 are opened through the batch controller, and the fuel in the tank truck is input into the loading arm 3. After completing the loading, the pneumatic shut-off valve and the pneumatic shut-off valve 2 are closed through the batch controller.
[0034] The beneficial effects of the above scheme are:
[0035] A pneumatic shut-off valve is arranged in the liquid phase pipe 1, and a pneumatic shut-off valve 2 is arranged in the gas phase pipe 2, so that the fuel in the tank truck can be sealed before and after loading to prevent leakage.
[0036] Example 3: Reference Figure 1-Figure 5 The liquid phase tube 1 is provided with a temperature transmitter, and the gas phase tube 2 is provided with a second temperature transmitter. Both the first temperature transmitter and the second temperature transmitter are electrically connected to the batch controller through a fourth wire.
[0037] The principle of the above scheme is:
[0038] The specific model of the temperature transmitter is: RS485. The temperature transmitter and the temperature transmitter 2 are the same device. When the loading arm 3 is completely frosted under the action of the low-temperature fuel liquid and the fuel gas, the temperature transmitter feeds back an electrical signal to the batch controller to prompt that the pre-cooling of the loading arm 3 is completed.
[0039] The beneficial effects of the above scheme are:
[0040] A temperature transmitter is set to monitor the temperature of the loading arm 3 and feed back to the batch controller to prompt the operator to use the batch controller to perform the next operation. This can avoid the operator from observing the degree of frost near the loading arm 3, further improving the safety of the operator when working on the device.
[0041] Example 4: Reference Figure 1-Figure 5 The liquid phase pipe 1 is provided with a pressure transmitter, and the gas phase pipe 2 is provided with a second pressure transmitter. The pressure transmitter and the second pressure transmitter are both electrically connected to the batch controller through a wire five.
[0042] The principle of the above scheme is:
[0043] The specific model of the pressure transmitter is: SCH-31. The pressure transmitter and the pressure transmitter 2 are the same device. The pressure transmitter is provided in the liquid phase pipe 1, and the pressure transmitter 2 is provided in the gas phase pipe 2. The pressure transmitter and the pressure transmitter 2 can monitor the pressure status in the liquid phase pipe 1 and the gas phase pipe 2 in real time, and feed back to the batch controller in real time.
[0044] The beneficial effects of the above scheme are:
[0045] The pressure transmitter and the second pressure transmitter can monitor the pressure in the liquid phase pipe 1 or the gas phase pipe 2 in real time and display it on the batch controller. When a leak occurs in the device, an early warning can be given to avoid the leakage from expanding, further improving the safety of the device during operation.
[0046] Example 5: Reference Figure 1-Figure 5 One end of the electrostatic controller is provided in the tank car, the end of the electrostatic controller extending outside the tank car is connected to the end of the grounding device, and the other end of the grounding device is connected to the ground.
[0047] The principle of the above scheme is:
[0048] The specific model of the electrostatic controller is: SCP-SA. One end of the electrostatic controller is set in the tank truck and in contact with the fuel in the tank truck. When static electricity is generated in the device, the static electricity can be uniformly collected by the electrostatic controller and neutralized by the grounding device.
[0049] The beneficial effects of the above scheme are:
[0050] The use of an electrostatic controller can neutralize the static electricity in the fuel in the tank truck, further improving the safety of the device during operation.
[0051] Example 6: Reference Figure 1-Figure 5The loading arm 3 includes: a rod body 4, a worm gear 5 and a mounting plate 6. The rod body 4 is rotatably mounted in the driving housing. A motor is mounted on the side wall of the driving housing. The end of the worm is connected to the output end of the motor. The worm is rotatably connected to the driving housing. The worm is meshed with the worm gear 5. The worm gear 5 is arranged in the driving housing. Two mounting plates 6 are rotatably connected to the side wall of the rod body 4. The top end of the torsion spring 9 is connected to the bottom surface of the mounting plate 6. The bottom end of the torsion spring 9 is connected to the mounting ring. The mounting ring is coaxially mounted on the rod body 4. The mounting ring is arranged above the top surface of the driving housing.
[0052] The loading arm 3 also includes: a liquid phase loading arm 7 and a gas phase loading arm 8. The top surface of one mounting plate 6 is rotatably connected to the side wall of the liquid phase loading arm 7, and the top surface of the other mounting plate 6 is rotatably connected to the side wall of the gas phase loading arm 8. The end of the liquid phase loading arm 7 is connected to the liquid phase pipe 1, and the end of the gas phase loading arm 8 is connected to the gas phase pipe 2.
[0053] The principle of the above scheme is:
[0054] Start the motor, the motor output end drives the worm to rotate clockwise, the worm drives the worm wheel 5 meshing with it to rotate counterclockwise, the rod body 4 rotates counterclockwise synchronously, the rod body 4 drives the mounting plate 6 to rotate counterclockwise through the torsion spring 9, one mounting plate 6 drives the liquid phase loading arm 7 to rotate, and the other mounting plate 6 drives the gas phase loading arm 8 to rotate. When the output ends of the liquid phase loading arm 7 and the gas phase loading arm 8 are in contact with the interface of the fuel bunker, the torsion spring 9 is twisted clockwise;
[0055] Start the motor again, the motor output end drives the worm to rotate counterclockwise, the worm drives the worm wheel 5 meshing with it to rotate clockwise, the rod body 4 rotates clockwise synchronously, the rod body 4 drives the mounting plate 6 to rotate clockwise through the torsion spring 9, one mounting plate 6 drives the liquid phase loading arm 7 to rotate, and the other mounting plate 6 drives the gas phase loading arm 8 to rotate. When the output ends of the liquid phase loading arm 7 and the gas phase loading arm 8 are out of contact with the interface of the fuel bin, the torsion spring 9 is reset.
[0056] The beneficial effects of the above scheme are:
[0057] The rod body 4 is rotatably connected to a mounting plate 6, and the bottom surface of the mounting plate 6 is connected to a mounting ring on the side wall of the rod body 4 through a torsion spring 9. By setting the torsion spring 9, when the rotation speed of the rod body 4 is too fast, the output ends of the liquid-phase loading arm 7 and the gas-phase loading arm 8 can be prevented from colliding with the interface of the fuel bin.
[0058] Example 7: Reference Figure 1-Figure 5 The rod body 4 is provided with a second motor, the output end of the second motor is connected with a second rod body 10, and the second rod body 10 is rotatably connected with two mounting plates 6 respectively.
[0059] The rod body 10 is provided with two screw tubes 11, which are threadedly connected with the threaded ring 12. The top of the spring is installed at the bottom end of the threaded ring 12, and the bottom end of the spring is connected with the mounting ring 2. The mounting ring 2 is fixed in the circular hole of the shell. The circular hole is coaxially arranged with the rod body 10. A slider is installed on the inner wall of the circular hole. The slider is slidably connected with the longitudinal slide groove, and the longitudinal slide groove is slidably opened on the side wall of the threaded ring 12.
[0060] Each side wall of the shell is equipped with a guide rod, which is slidably connected to the mounting plate 6. The other side wall of each shell is equipped with a connecting rod 13. The bottom end of the connecting rod 13 is rotatably connected to the second end of the connecting rod, and the other end of the second connecting rod is connected to the side wall of the liquid phase loading arm 7 or the gas phase loading arm 8.
[0061] The principle of the above scheme is:
[0062] Before connecting the output ends of the liquid-phase loading arm 7 and the gas-phase loading arm 8 to the interface of the fuel bunker, the heights of the output ends of the liquid-phase loading arm 7 and the gas-phase loading arm 8 can be adjusted, the motor 2 is started, the output end of the motor 2 rotates clockwise, the rod body 2 10 rotates clockwise, the guide rod is slidably connected to the mounting plate 6, the solenoid 11 moves downward under the cooperation of the spring, the housing, the guide rod, the slider and the longitudinal slide groove, the housing moves downward to drive the connecting rod 13 to move downward, the connecting rod 2 hinged to the connecting rod 13 drives the end of the liquid-phase loading arm 7 to move downward around its middle, or the end of the gas-phase loading arm 8 to move downward around its middle;
[0063] Start the motor 2 again, the output end of the motor 2 rotates counterclockwise, the rod body 2 10 rotates counterclockwise, the guide rod is slidably connected with the mounting plate 6, the solenoid 11 moves upward under the cooperation of the spring, the housing, the guide rod, the slider and the longitudinal slide groove, the housing moves downward to drive the connecting rod 13 to move upward, and the connecting rod 2 hinged to the connecting rod 13 drives the end of the liquid-phase loading arm 7 to move upward around its middle, or the end of the gas-phase loading arm 8 to move upward around its middle;
[0064] The beneficial effects of the above scheme are:
[0065] A threaded ring 12, a spring and a shell are provided, the threaded ring 12 is threadedly connected to the spiral tube 11, the side wall of the shell is connected to the guide rod, and the guide rod is slidably connected to the mounting plate 6. Before adjusting the height of the shell, the height of the threaded ring 12 can be adjusted first, and then the height of the ends of the liquid-phase loading arm 7 and the gas-phase loading arm 8 can be adjusted. By providing a spring, the ends of the liquid-phase loading arm 7 and the gas-phase loading arm 8 can be buffered by the elasticity of the spring when the height is adjusted, thereby further preventing the height adjustment speed from being too fast, causing the liquid-phase tube 1 or the gas-phase tube 2 to be torn off.
[0066] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any figure mark in the claims should not be regarded as limiting the claims involved.
Claims
1. A new energy filling device for ships, characterized in that: include: A loading arm (3), wherein the loading arm (3) is connected to the tank truck via a liquid phase pipe (1) and a gas phase pipe (2), a batch controller is provided on the tank truck mounting skid, the batch controller is electrically connected to a mass flow meter and a second mass flow meter via a wire, the batch controller is electrically connected to a flow control valve and a second flow control valve via a second wire, the mass flow meter and the flow control valve are arranged in the liquid phase pipe (1), and the second mass flow meter and the second flow control valve are arranged in the gas phase pipe (2).
2. A ship new energy filling device according to claim 1, characterized in that: The liquid phase pipe (1) is provided with a pneumatic shut-off valve, and the gas phase pipe (2) is provided with a second pneumatic shut-off valve. Both the pneumatic shut-off valve and the second pneumatic shut-off valve are electrically connected to the batch controller via a third wire.
3. A ship new energy filling device according to claim 2, characterized in that: The liquid phase tube (1) is provided with a temperature transmitter, and the gas phase tube (2) is provided with a second temperature transmitter. Both the first temperature transmitter and the second temperature transmitter are electrically connected to the batch controller via a fourth wire.
4. A ship new energy filling device according to claim 3, characterized in that: The liquid phase tube (1) is provided with a pressure transmitter, and the gas phase tube (2) is provided with a second pressure transmitter. Both the first pressure transmitter and the second pressure transmitter are electrically connected to the batch controller via a wire five.
5. A ship new energy filling device according to claim 1, characterized in that: One end of an electrostatic controller is arranged in the tank car, the end of the electrostatic controller extending out of the tank car is connected to the end of a grounding device, and the other end of the grounding device is connected to the ground.
6. A ship new energy filling device according to claim 1, characterized in that: The loading arm (3) comprises: a rod body (4), the rod body (4) is rotatably mounted in a driving shell, a motor is mounted on the side wall of the driving shell, the output end of the motor is connected to the end of a worm, the worm is rotatably connected to the driving shell, the worm is meshingly connected to a worm wheel (5), the worm wheel (5) is arranged in the driving shell, two mounting plates (6) are rotatably connected to the side wall of the rod body (4), the bottom surface of the mounting plate (6) is connected to the top end of a torsion spring (9), the bottom end of the torsion spring (9) is connected to a mounting ring, the mounting ring is coaxially mounted on the rod body (4), and the mounting ring is arranged above the top surface of the driving shell.
7. A ship new energy filling device according to claim 6, characterized in that: The loading arm (3) further comprises: a liquid phase loading arm (7), the top surface of one mounting plate (6) being rotatably connected to the side wall of the liquid phase loading arm (7), the top surface of another mounting plate (6) being rotatably connected to the side wall of the gas phase loading arm (8), the end of the liquid phase loading arm (7) being connected to the liquid phase pipe (1), and the end of the gas phase loading arm (8) being connected to the gas phase pipe (2).
8. A ship new energy filling device according to claim 7, characterized in that: The rod body (4) is provided with a second motor, the output end of the second motor is connected to a second rod body (10), and the second rod body (10) is rotatably connected to two mounting plates (6) respectively.
9. A ship new energy filling device according to claim 8, characterized in that: The rod body (10) is provided with two screw tubes (11), which are threadedly connected to the threaded ring (12), the top end of the spring is provided at the bottom end of the threaded ring (12), the bottom end of the spring is connected to the second mounting ring, the second mounting ring is fixed in the circular hole of the shell, the circular hole is coaxially arranged with the rod body (10), a sliding block is provided on the inner wall of the circular hole, the sliding block is slidably connected to the longitudinal sliding groove, and the longitudinal sliding groove is slidably opened on the side wall of the threaded ring (12).
10. A ship new energy filling device according to claim 9, characterized in that: Each of the side walls of the shell is provided with a guide rod, which is slidably connected to the mounting plate (6). Each of the other side walls of the shell is provided with a connecting rod (13), the bottom end of the connecting rod (13) is rotatably connected to the other end of the connecting rod, and the other end of the second connecting rod is connected to the side wall of the liquid phase loading arm (7) or the gas phase loading arm (8).
Citation Information
Patent Citations
Marine LNG fuel gas supply system
CN207865031U